Laserfiche WebLink
a <br />F. <br />yl <br />w <br />w <br />w <br />E <br />111 <br />C <br />B <br />A <br />1 2 3 4 5 6 <br />DOOR AND FRAME SCHEDULE - SIDE HINGED DOORS - EXISTING DOORS <br />IDENTIFICATION <br />PANEL <br />FRAME <br />HARDWARE <br />NOTES <br />ROOM NO. <br />ROOM NAME <br />DOOR NO. <br />DIMENSIONS <br />TYPE <br />MATERIAL <br />FINISH <br />TYPE <br />MATERIAL <br />FINISH <br />GROUP <br />ELECTRICAL <br />W <br />H <br />STAIR L <br />STR-L-A <br />3'- 6" <br />7' - 0" <br />N <br />HM <br />PNTLO-1 <br />1 <br />HM <br />PNTLO-1 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2001 <br />WT <br />2001-A <br />3'- 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2002 <br />MT <br />2002-A <br />3'- 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2215 <br />PAT. RM. <br />2215-A <br />4'- 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2215A <br />TLT <br />2215A-A <br />3' - 0" <br />T- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2216 <br />PAT. RM. <br />2215-B <br />4'- 0" <br />T- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2250 <br />PCU CORRIDOR <br />2250-A <br />3'-8" <br />7' - 0" <br />N/N <br />HM <br />PNTLO-1 <br />2 <br />HM <br />PNTLO-1 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2250 <br />PCU CORRIDOR <br />2250-B <br />3'- 8" <br />7' - 0" <br />N/N <br />HM <br />PNTLO-1 <br />2 <br />HM <br />PNTLO-1 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2250A <br />PASSAGE <br />2250A-A <br />3'- 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2250C <br />TLT <br />2250C-A <br />3'- 0" <br />T- 0" <br />F <br />WD <br />STN-10 <br />i <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2250E <br />WORK RM <br />2250E-A <br />2'-8" <br />7'-0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2251 <br />PCU #16 <br />2251-A <br />4'- 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2251 B <br />TLT <br />2251 B-A <br />2'- 8" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2252 <br />PCU #15 <br />2252-A <br />4' - 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2252E <br />TLT <br />22526-A <br />2'-8" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2253 <br />PCU #14 <br />2253-A <br />4'- 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2253E <br />TLT <br />2253E-A <br />2'- 8" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2254 <br />PCU #13 <br />2254-A <br />4'-0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2254B <br />TLT <br />2254E-A <br />2'-8" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2255 <br />PCU #12 <br />2255-A <br />4' - 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2255E <br />TLT <br />2255B-A <br />2'- 8" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2256 <br />PCU #11 <br />2256-A <br />4' - 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2256B <br />TLT <br />2256E-A <br />2'-8" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2257 <br />ISO PCU #10 <br />2257-A <br />4'-0" <br />7'-0" <br />F <br />WD <br />STN-10 <br />i <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2257B <br />TLT <br />2257B-A <br />T- 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2258 <br />PCU #9 <br />2258-A <br />4'- 0" <br />7'-0' <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2258B <br />TLT <br />2258E-A <br />2'-8" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2259 <br />PCU #8 <br />2259-A <br />4'- 0" <br />T - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2259E <br />TLT <br />2259E-A <br />2' - 8" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH, SEE PLAN & NOTES <br />2260 <br />ISO PCU #7 <br />2260-A <br />4' - 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2260B <br />TLT <br />2260B-A <br />3'-0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2261 <br />PCU #6 <br />2261-A <br />4'-0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2261 <br />PCU #6 <br />2261-B <br />2'- 8" <br />T - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2261 B <br />TLT <br />2261 B-A <br />2'-8- <br />T- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2262 <br />PCU #5 <br />2262-A <br />4' - 0" <br />T- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH, SEE PLAN & NOTES <br />2262B <br />TILT <br />22626-A <br />2'- 8" <br />7'-0' <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2263 <br />PCU #4 <br />2263-A <br />4' - 0" <br />7'-0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2263E <br />TLT <br />2263B-A <br />2'- 8" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2264 <br />PCU #3 <br />2264-A <br />4' - 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2264B <br />TLT <br />2264E-A <br />2'- 8" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2265 <br />PCU #2 <br />2265-A <br />4'- 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2265B <br />TLT <br />2265B-A <br />2' - 8" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2266 <br />PCU #1 <br />2266-A <br />4' - 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2266B <br />TLT <br />22666-A <br />2'-8" <br />7'-0' <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2267 <br />STAFF LOUNGE <br />2267-A <br />3'- 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2268 <br />EQUIP. <br />2268-A <br />3' - 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2268A <br />EVS <br />2268A-A <br />3'- 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2269 <br />OFFICE <br />2269-A <br />3' - 0" <br />T - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2270 <br />BLOOD GAS <br />2270-A <br />3' - 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2271 <br />MECH. <br />2271-A <br />4'- 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2272 <br />CONF. <br />2272-A <br />3'- 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2273 <br />OFFICE <br />2273-A <br />3'- 0" <br />7'. 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2273 <br />OFFICE <br />2273-B <br />T - 0" <br />7'-0' <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES <br />2275 <br />MECH <br />2275-A <br />4'- 0" <br />7' - 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2275A <br />IT <br />2275A-A <br />3' - 0" <br />T- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2276 <br />MONITORS <br />2276-A <br />3'- 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2276A <br />TLT <br />2276A-A <br />2' - 8" <br />7'-0' <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2278 <br />NOURISH <br />2278-A <br />2' - 8" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />2279 <br />EQUIP <br />2279-A <br />3' - 0" <br />7'- 0" <br />F <br />WD <br />STN-10 <br />1 <br />HM <br />PNTLO-10 <br />EXISTING <br />EXISTING DOOR AND FRAME TO RECEIVE NEW FINISH. SEE PLAN & NOTES. INCLUDE IN ADD. ALT. #4 <br />NOTES: <br />1. ROOM NUMBERING SHOWN ABOVE IS FOR REFERENCE AND COORDINATION PURPOSES. SHOULD A ROOM SIGNAGE PLAN BE DEVELOPED, THE SIGNAGE VENDOR IS TO VERIFY ROOM NAMES AND NUMBERS PRIOR TO DEVELOPING THE MESSSAGE SCHEDULE <br />2. SLABS OF EXISTING DOORS NOTED SHALL RECEIVE NEW FINISH. EXISTING DOOR SLABS SHALL BE PREPPED TO RECEIVE NEW FINISH AS REQUIRED. <br />A. EXISTING SOLID CORE WOOD SLAB DOORS SHALL BE CAREFULLY REMOVED. SLABS SHALL BE STRIPED AND RE -STAINED WITH NEW FINISH STAIN STN-10. <br />a. EXISTING DOOR HARDWARE SHALL BE CAREFULLY REMOVED PRIOR TO STRIPING & STAINING AND STORED FOR REINSTALLATION. <br />b. STRIPING AND STAINING OF DOORS SLABS SHALL NOT BE DONE WITHIN INTERIOR OF BUILDING. DOOR SLABS MAY BE REINSTALLED WITHIN INTERIOR OF BUILDING AFTER STAIN HAS DRIED COMPLETELY AND HAS OFF-GASED COMPLETELY. <br />c. REINSTALL EXISTING DOOR HARDWARE, U.N.O. <br />B. EXISTING HM DOOR SLABS SHALL BE PREPARED AND RECEIVE NEW PAINT FINISH. <br />a. EXISTING DOOR HARDWARE, EXCLUDING HINGES, SHALL BE CAREFULLY REMOVED PRIOR TO PAINTING AND STORED FOR REINSTALLATION. <br />b. ALL SURFACES OF HM DOOR SLABS SHALL BE PAINTED COMPLETELY. UNPAINTED AREAS UNDERNEATH HARDWARE WILL NOT BE ACCEPTED. CONTRACTOR TO TAKE CARE TO AVOID MARKING EXISTING GLAZING WITH PAINT, WHERE APPLICABLE. <br />c. HM DOOR SLABS SHALL RECEIVE NEW PAINT COLOR AS SPECIFIED IN DOOR SCHEDULE. <br />d. REINSTALL EXISTING DOOR HARDWARE, U.N.O., AFTER NEW PAINT HAS DRIED COMPLETELY. <br />C. EXISTING HM DOOR FRAMES SHALL BE PREPARED AND RECEIVE NEW PAINT FINISH. <br />a. EXISTING DOOR FRAMES, WHERE DAMAGED OR DENTED, SHALL BE REPAIRED VIA BONDO TO CREATE SMOOTH, FLAT SURFACES. REMOVE EXISTING PAINT PRIOR TO REPAIRING W/ BONDO. <br />b. EXISTING HM FRAMES SHALL RECEIVE NEW PAINT COLOR AS SPECIFIED IN DOOR SCHEDULE. <br />D. EXISTING INTERIOR STOREFRONT DOORS (e.g. ICU WAITING 2222-B) SHALL RECEIVE NEW PAINT FINISH. <br />a. EXISTING STOREFRONT MULLIONS AND FRAME, WHERE DAMAGED OR DENTED, SHALL BE REPAIRED VIA BONDO TO CREATE SMOOTH, FLAT SURFACES. REMOVE EXISTING PAINT PRIOR TO REPAIRING W/ BONDO. <br />b. EXISTING MULLIONS AND FRAME SHALL RECEIVE NEW PAINT COLOR AS SPECIFIED IN DOOR SCHEDULE. <br />3. VARIOUS EXISTING DOORS TO RECEIVE NEW SHEET WALL PROTECTION FRAME GUARDS AND FACE GUARDS ON DOOR FRAMES AND SLABS. SEE DOOR SCHEDULE TO VERIFY DOOR LOCATION. SEE FINISH SCHEDULE FOR SWP SPECIFICATIONS. <br />A. EXISTING PATIENT ROOM DOORS FROM CORRIDOR SHALL RECEIVE NEW FRAME GUARDS AND 48"H SWP FACE GUARDS, U.N.O. <br />B. DOORS INTO SOILED UTILITY ROOMS/TOILET ROOMS FROM PATIENT ROOMS SHALL RECEIVE 12"H SWP KICK PLATES, U.N.O. <br />1/2" VARIES 1/2" <br />SEE PLAN <br />HEAD 1 <br />T <br />N <br />WALL - SEE PLAN <br />T <br />FOR TYPE <br />U) <br />w <br />rY <br />SEALANT - EA. SIDE <br />> <br />& ALL AROUND, <br />TYR <br />r <br />HOLLOW METAL <br />FRAME <br />JAMB 3 <br />3" = V-0" <br />ADJACENT WALL <br />WHERE OCCURS <br />SEALANT - EA SIDE & <br />ALL AROUND, TYP. <br />HOLLOW METAL <br />FRAME <br />WALL - SEE PLAN <br />FOR TYPE <br />1 2 3 <br />TYPICAL FRAME DUAL EGRESS CASED OPENING <br />WRAPPED FRAME TYPES ELEVATIONSI <br />1/4" = V-0" <br />c <br />ZVI <br />VERI <br />R <br />w <br />F N N4 G1 G V L <br />FLUSH NARROW VISION NARROW VISION HALF GLASS HALF GLASS VISION FLUSH <br />W/ LOWER LOUVER <br />SIDE -HINGED DOOR TYPES <br />1 /4" = V-0" <br />chapuis design group <br />architecture -pa <br />510 VONDERBURG DR. SUITE 216 <br />BRANDON, FL 33511 <br />Tel. 813-667-2340 <br />CGDPA - FL # AA-26003049 <br />'fa*S exp, <br />PROJECT FOR <br />° ADVENTHEALTH- <br />ZEPHYRHILLS <br />PCU REFRESH <br />7050 Gall Blvd. <br />Zephyrhills, FL 33541 <br />AdventHealth <br />AHCA CLIENT CODE / FILE NUMBER: N/A <br />1 <br />NOV. 2, 2022 <br />Addendum 2 - Construction Coordination <br />MARK <br />DATE <br />DESCRIPTION <br />PROJECT NUMBER <br />042.22-236.01 <br />ORIGINAL ISSUE <br />AUGUST 26, 2022 - <br />PROJECT MANAGER <br />TEC <br />PROJECT DESIGNER <br />TEC <br />PROJECT ARCHITECT <br />THOMAS E. CHAPUIS - AR97109 <br />B LANDSCAPE ARCHITECT <br />N/A <br />CIVIL ENGINEER <br />N/A <br />STRUCTURAL ENGINEER <br />N/A <br />MECHANICAL ENGINEER <br />TIMOTHY P. PENNOCK - PE54516 <br />ELECTRICAL ENGINEER <br />CHARLES T. ALEXANDER - PE76422 <br />INTERIOR DESIGNER <br />CDG <br />EQUIPMENT PLANNER <br />N/A <br />DRAWN BY <br />SDL <br />vv <br />PCU - DOOR <br />SCHEDULE, DOOR <br />ELEVATIONS, BUCK <br />A PROFILES <br />SCALE As indicated <br />A=501 <br />1 2 3 4 5 6 1-1 Ujt;L;L %DLCLLUb <br />