Laserfiche WebLink
14 <br />C <br />B <br />A <br />1 <br />NOTE: <br />SEE BASE BID AND ALTERNATE NOTES <br />REGARDING DOOR FINISH SCOPE FOR <br />PCU PHASE 1 B. <br />4 <br />SVT-01 <br />PCU #15 <br />RWB-01 <br />RWB-01 <br />PCU #14 <br />PCU #13 <br />SVT-01 <br />RWB-01 <br />RWB-01 <br />PCU #12 <br />SVT-Ot <br />in � � � � � � <br />2 <br />aiHIM1lill!l1011lli!Iil1 loom E OL III ill! <br />3 <br />4 <br />BASE BID AND ALTERNATE NOTES #03: <br />THE NOTES INCLUDED HEREIN ARE FOR PCU PHASE 2- SEE PLANS & <br />KEYNOTES. <br />BASE BID: <br />A. NOTED EXISTING DOOR LEAVES IN PCU PHASE 2 SHALL REMAIN <br />AS EXISTING WITHOUT REFINISHING OR RESTAINING. <br />B. NOTED EXISTING DOOR HARDWARE SHALL REMAIN. <br />C. NOTED EXISTING DOOR FRAMES IN PCU PHASE 2 SHALL RECEIVE <br />NEW PAINT FINISH. <br />a. PROVIDE ALL LABOR AND MATERIALS TO REPAIR NOTED <br />EXISTING DOOR FRAMES VIA "BONDO" OR OTHER METHOD. <br />b. PROVIDE ALL LABOR AND MATERIALS TO PREP AND PAINT <br />NOTED DOOR FRAMES IN PCU PHASE 2. SEE FINISH <br />SCHEDULE. <br />ALTERNATE #03: <br />A. NOTED EXISTING DOOR LEAVES AND FRAMES IN PCU PHASE 2 TO <br />BE REFINISHED. <br />a. PROVIDE LABOR AND MATERIALS AS A "PER UNIT COST" LINE <br />ITEM REPRESENTING THE COST FOR THE WORK PER DOOR. <br />• PROVIDE ALL LABOR AND MATERIALS TO REMOVE <br />EXISTING DOOR LEAF FINISH. <br />• PROVIDE ALL LABOR AND MATERIALS TO REFINISH DOOR <br />LEAVES AS REQUIRED ON SHEET A-501. <br />• PROVIDE ALL LABOR AND MATERIALS TO PREP AND PAINT <br />NOTED DOOR FRAMES IN PCU PHASE 2 BEYOND THAT <br />INCLUDED WITHIN BASE BID. SEE FINISH SCHEDULE. <br />• PROVIDE LABOR AND MATERIALS FOR INSTALLATION OF <br />KICK PLATE- SEE NOTES ON A-501 DOOR SCHEDULE <br />SHEET AND WALL PROTECTION FINISH SCHEDULE <br />BASE BID AND ALTERNATE NOTES #04: <br />THE NOTES INCLUDED HEREIN ARE FOR PCU PHASE 2- SEE PLANS & <br />KEYNOTES. <br />BASE BID: <br />A. EXISTING FLOORING AND WALL FINISH IN CONF RM 2272 & OFFICE <br />2273 SHALL REMAIN AND BE PROTECTED THRU CONSTRUCTION <br />ALTERNATE #04: <br />A. EXISTING FLOORING AND WALL FINISHES IN CONF RM 2272 & <br />OFFICE 2273 SHALL BE REMOVED AND NEW FINISHES APPLIED. <br />a. PROVIDE ALL LABOR AND MATERIALS TO REMOVE EXISTING <br />FLOOR FINISH WITHIN ROOMS AND PREPARE FLOOR SLAB TO <br />RECEIVE NEW FLOORING. <br />B. NEW FLOORING TO BE INSTALLED IN CONF RM 2272 AND OFFICE <br />2273. <br />a. PROVIDE ALL LABOR AND MATERIALS TO INSTALL NEW <br />FLOORING, INCLUDING WALL BASE, WITHIN CONR RM 2272 <br />AND OFFICE 2273. SEE FLOOR FINISH PLAN & SCHEDULE. <br />C. CONF RM 2272 & OFFICE 2273 TO RECEIVE NEW PAINT FINISH. <br />a. PROVIDE ALL LABOR AND MATERIALS TO PREP AND PAINT <br />ALL WALLS IN CONF 2272 & OFFICE 2273. SEE WALL FINISH <br />PLAN & SCHEDULE <br />BASE BID AND ALTERNATE NOTES #01: <br />THE NOTES INCLUDED HEREIN ARE FOR PCU PHASE 2- SEE PLANS & <br />KEYNOTES. <br />BASE BID: <br />A. EXISTING CASEWORK WITHIN NOTED SPACES/ AREAS OF PCU <br />PHASE 2 SHALL REMAIN AS EXISTING AND NOT BE DEMOLISHED. <br />a. SUB -NURSE STATIONS, COMMAND CENTERS, MEDS, AND <br />NOURISH ROOMS IN PCU PHASE 2. SEE DEMOLITION PLAN. <br />b. PROVIDE ALL LABOR AND MATERIALS TO PROTECT (IN <br />PLACE) EXISTING CASEWORK FROM DAMAGE DURING <br />CONSTRUCTION. <br />B. NEW FLOORING IS TO BE INSTALLED TO THE EDGE OF THE <br />EXISTING CASEWORK. <br />ALTERNATE #01: <br />A. EXISTING CASEWORK WITHIN NOTED SPACES/ AREAS SHALL BE <br />DEMOLISHED AND REMOVED. <br />a. SUB -NURSE STATIONS, COMMAND CENTERS, MEDS, AND <br />NOURISH ROOMS IN PCU PHASE 2. SEE DEMOLITION PLAN. <br />b. PROVIDE ALL LABOR AND MATERIALS TO DEMOLISH AND <br />REMOVE EXISTING CASEWORK AT AREAS LISTED ABOVE. SEE <br />DEMOLITION PLAN KEYED NOTES. <br />B. INSTALL NEW CASEWORK AND ASSOCIATED CEILING SOFFITS AS <br />SHOWN IN NEW EQUIPMENT PLAN, ELEVATIONS, AND DETAILS. <br />a. PROVIDE ALL LABOR AND MATERIALS FOR FABRICATION AND <br />INSTALLATION OF NEW CASEWORK FOR NOTED SPACES. <br />C. NEW FLOORING TO BE INSTALLED UNDER NEW CASEWORK, NOT <br />FINISHED TO IT. <br />a. PROVIDE ALL LABOR AND MATERIALS FOR INSTALLATION OF <br />NEW FLOORING UNDER NEW CASEWORK BEYOND THAT <br />INCLUDED WITHIN BASE BID. <br />BASE BID AND ALTERNATE NOTES #02: <br />THE NOTES INCLUDED HEREIN ARE FOR PCU PHASE 2- SEE PLANS & <br />KEYNOTES. <br />BASE BID: <br />A. EXISTING TILE FLOOR & WALL FINISHES WITHIN NOTED PCU <br />PHASE 2 TOILET ROOMS TO REMAIN. TLT ACCESSORIES FOR <br />NOTED TILT RMS TO REMAIN. <br />a. PCU PATIENT TLT RMS, SEMI -PRIVATE PATIENT ROOM TILT <br />RM, AND PUBLIC TLTS 2001, 2002 ,& 2276A. <br />b. PROVIDE ALL LABOR AND MATERIALS TO PREPARE EXISTING <br />GYPSUM -FACED WALLS WITHIN ABOVE NOTED SPACES TO <br />RECEIVE NEW EPDXY PAINT (SEE FINISH SCHEDULE). <br />c. PROVIDE ALL LABOR AND MATERIALS TO APPLY NEW EPXOY <br />PAINT TO GYPSUM WALLS IN ABOVE LISTED SPACES, SEE <br />FINISH PLAN AND KEYNOTES LEGEND. <br />d. PROVIDE ALL LABOR AND MATERIALS TO PREPARE & INSTALL <br />NEW OFOI TLT ACCESSORIES (DISPENSERS) WITHIN NOTED <br />TLT ROOMS. SEE EQUIPMENT PLAN. <br />ALTERNATE #02: <br />A. EXISTING TILE FLOOR AND WALL FINISH AT NOTED PCU PHASE 2 <br />TOILET ROOMS SHALL BE DEMOLISHED AND REMOVED. <br />a. PCU PATIENT TLT RMS, SEMI -PRIVATE PATIENT ROOM TLT <br />RM, AND PUBLIC TLTS 2001, 2002 ,& 2276A <br />b. PROVIDE ALL LABOR AND MATERIALS TO REMOVE EXISTING <br />FLOOR AND WALL TILE IN ROOMS LISTED ABOVE AND PREP <br />FOR NEW FINISHES. <br />B. INSTALL NEW FLOOR AND WALL (TILE & PAINT) FINISHES IN PCU <br />PHASE 2 TOILET ROOMS. SEE FLOOR AND WALL FINISH PLANS <br />FOR FINISHES TO BE INSTALLED. <br />a. PROVIDE ALL LABOR AND MATERIALS TO INSTALL NEW WALL <br />TILE TO BE INSTALLED ON WET WALLS. SEE FINISH PLAN & <br />FINISH SCHEDULE. <br />b. PROVIDE ALL LABOR AND MATERIALS (EPDXY PAINT) TO <br />PAINT ON NON -WET WALLS IN THE SPACES LISTED ABOVE. <br />SEE FINISH PLAN & FINISH SCHEDULE. <br />c. PROVIDE ALL LABOR AND MATERIALS TO INSTALL NEW <br />FLOOR TILE. SEE FINISH PLAN & FINISH SCHEDULE. <br />d. PROVIDE ALL LABOR AND MATERIALS TO INSTALL NEW CFCI, <br />OFCi, & OFCRI TLT ACCESSORIES (GRAB BARS, MIRROR, <br />ETC.) IN NOTED TOILET ROOMS. SEE EQUIP PLAN <br />e. PROVIDE SEPARATE LINE ITEMS FOR FLOOR AND WALL TILE. <br />6 <br />WALL RATINGS: <br />—-S—�S—�-S- <br />-S—♦4'-S--��-S- <br />-♦T—♦T <br />S—S- <br />PARTITIONS: <br />1 HOUR FIRE <br />1 HOUR FIRE/ SMOKE BARRIER <br />2 HOUR FIRE <br />2 HOUR FIRE/ SMOKE BARRIER <br />TEMPORARY 1 HOUR FIRE <br />SMOKE BARRIER <br />"GRAY" = EXISTING RATING <br />TO REMAIN <br />EXISTING/REMAINING <br />j—-1 NEW WORK <br />C — _ DEMOLISHED <br />INTERIOR FINISH <br />GENERAL NOTES: <br />1. REFER TO FINISH LEGEND AND SCHEDULE FOR <br />FINISH TYPE. <br />2. FLOORING FINISH MATERIAL TO BE LAID <br />UNDER CASEWORK, NOT FINISHED TO IT. <br />3. ALL FLOOR FINISH CHANGES / TRANSITIONS <br />SHALL OCCUR UNDER CENTERLINE OF DOOR <br />IN CLOSED POSITION OR AT CENTERLINE OF <br />OPENING WHERE A DOOR DOES NOT OCCUR, <br />U.N.O <br />4. GROUT LINES OF SAME SIZE FLOOR AND WALL <br />TILE ARE TO ALIGN, U.N.O <br />5. ALL EXTERIOR PAINT TO BE PNT-01 U.N.O. <br />6. NEW EQUIPMENT TO BE INSTALLED AFTER <br />CONCRETE PAD FINISH HAS CURED. SEE <br />MANUFACTURER'S SUGGESTED CURE TIME. <br />7. SKIMCOAT ALL NEW INTERIOR CEMENT BOARD <br />PARTITIONS PRIOR TO PAINTING. <br />8. SEE FINISH SCHEDULE ON SHEET 1-001 FOR <br />ADDITIONAL FINISH NOTES. <br />KEYED NOTES: FINISHES <br />O <br />ROOM NOT IN SCOPE. NO FINISH WORK IN THIS <br />AREA. <br />2O <br />PCU PHASE 2: SEE BASE BID AND ALTERNATE #01 <br />FOR CASEWORK SCOPE IN THIS ROOM/SPACE. <br />O <br />PCU PHASE 2: SEE BASE BID AND ALTERNATE #02 <br />FOR FINISH AND FIXTURE SCOPE IN THIS TLT RM. <br />4O <br />PCU PHASE 2: SEE BASE BID AND ALTERNATE #03 <br />FOR RE -FINISH SCOPE RELATED TO THIS EXISTING <br />DOOR. <br />5O <br />PCU PHASE 2: SEE BASE BID AND ALTERNATE #04 <br />FOR FINISH SCOPE WITHIN THIS ROOM/SPACE. <br />6O <br />SVT FLOORING TO BE HEAT WELDED AND <br />INSTALLED WITHOUT INTEGRAL BASE. INSTALL <br />RWB-01 <br />O7 <br />SVT FLOORING TO BE HEAT WELDED AND <br />INSTALLED WITH 6" INTEGRAL BASE. <br />THIS SHEET RE -ISSUED <br />IN ITS ENTIRETY <br />E <br />B <br />A <br />chapuis design group <br />arch itecture. pa <br />510 VONDERBURG DR. SUITE 216 <br />BRANDON, FL 33511 <br />Tel. 813-667-2340 <br />CGDPA - FL # AA-26003049 <br />PROJECT FOR <br />ADVENTHEALTH - <br />ZEPHYRHILLS <br />PCU REFRESH <br />7050 Gall Blvd. <br />Zephyrhills, FL 33541 <br />AdventHealth <br />AHCA CLIENT CODE / FILE NUMBER: WA <br />2 <br />NOV. 2, 2022 <br />Addendum 2 - Construction Coordination <br />1 <br />SEPT. 09, 2022 <br />ADDENDUM No.1 <br />MARK <br />DATE <br />DESCRIPTION <br />PROJECT NUMBER <br />042-22-236.01 <br />ORIGINAL ISSUE <br />AUGUST 26, 2022 - <br />PROJECT MANAGER <br />TEC <br />PROJECT DESIGNER <br />TEC <br />PROJECT ARCHITECT <br />THOMAS E. CHAPUIS - AR97109 <br />LANDSCAPE ARCHITECT <br />N/A <br />CIVIL ENGINEER <br />WA <br />STRUCTURAL ENGINEER <br />WA <br />MECHANICAL ENGINEER <br />TIMOTHY P. PENNOCK - PE54516 <br />ELECTRICAL ENGINEER <br />CHARLES T. ALEXANDER - PE76422 <br />INTERIOR DESIGNER <br />CDG <br />EQUIPMENT PLANNER <br />WA <br />DRAWN BY <br />SDL, JU <br />PLANS -INTERIOR <br />FLOOR FINISHES - <br />PCU WING <br />As indicated <br />2 <br />a <br />0 <br />N <br />N <br />CV <br />O <br />PLAN - LVL 2 - PCU AREA - FINISH FLOORS <br />1 /8" = V-0" <br />PROJECT <br />NORTH <br />1=101 <br />1 2 3 4 5 6 Project Status <br />