Laserfiche WebLink
4 <br />-- -- _-- 1 1 1 II 1 1 I_ I I .1_ I I I- - I I I I e I e I I if <br />3 I 2 <br />UI <br />ml <br />¢I <br />EXTERIOR <br />69' 11" LEASE LINE V.I.F. <br />e <br />j ADJACENT TENANT <br />EXISTING CONDITIONS AND DEMOLITION PLAN <br />1 /4" = 1'-0" <br />1 E ED OTES <br />O <br />NOTES <br />1 <br />EXISTING STOREFRONT SYSTEM, GLAZING, AND DOOR(S) TO REMAIN. <br />2 <br />EXISTING DEMISING WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. <br />3 <br />EXISTING STRUCTURAL COLUMN TO REMAIN. REMOVE ALL EXISTING FINISHES AND PREPARE FOR NEW FINISH AS INDICATED IN THESE PLANS. <br />4 <br />EXISTING FLOOR FINISHES TO BE REMOVED DOWN TO SLAB. PREPARE EXISTING CONCRETE FLOOR SURFACE FOR INSTALLATION OF NEW FLOORING MATERIALS AS INDICATED <br />IN THESE PLANS. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. (TYPICAL THROUGHOUT LEASED SPACE) <br />5 <br />EXISTING SERVICE DOOR TO REMAIN. SEE DOOR SCHEDULE FOR NEW HARDWARE. <br />6 <br />EXISTING RETAIL DISPLAY FIXTURES, FURNITURE, SIGNAGE, AND ASSOCIATED EQUIPMENT TO BE REMOVED IN THEIR ENTIRETY UNLESS OTHERWISE NOTED. ANY T-MOBILE <br />EQUPMENT DESIGNATED TO BE RETAINED FOR FUTURE USE IS TO BE DECOMMISHIONED BY OWNERS VENDOR AND STORED IN BACK OF HOUSE. <br />LEASE LINE <br />$ <br />EXISTING ELECTRICAL PANEL(S) TO REMAIN. SEE ELECTRICAL DRAWINGS. <br />9 <br />EXISTING THRESHOLD TO REMAIN. REPLACE IF IT EXCEEDS 1/2" IN HEIGHT. <br />10 <br />EXISTING INTERIOR WALL PARTITION TO BE REMOVED IN ITS ENTIRETY. <br />11 <br />NOT USED <br />12 <br />EXISTING INTERIOR DOOR TO BE REMOVED IN ITS ENTIRETY. <br />13 <br />EXISTING TOILET ROOM TO BE REMOVED IN ITS ENTIRETY INCLUDING ALL WALLS, DOOR, CEILING AND PLUMBING FIXTURES. EXTEND SUPPLY AND WASTE LINES AS REQ'D TO <br />NEW PLUMBING FIXTURES AS INDICATED IN THESE PLANS. PREPARE FOR CONSTRUCTION OF NEW TOILET ROOM. SEE A111 AND A401 FOR ENLARGED TOILET ROOM PLAN. <br />EXISTING CEILING SYSTEM TO BE REMOVED IN ITS ENTIRETY. PREPARE FOR INSTALLATION OF NEW CEILING SYSTEM AS SHOWN ON SHEET A131. PAINT ANY EXISTING GYP <br />SOFFIT AS NOTED ON SHEET A131. EXISTING LIGHTING, EMERGENCY LIGHTING, AND EXIT SIGNS TO BE REMOVED IN THEIR ENTIRETY. PREPARE FOR INSTALLATION OF NEW <br />LIGHTING, EM LIGHTING, AND EXIT SIGNS AS SHOWN ON SHEET A131. EXISTING DIFUSERS TO BE REMOVED AND REPLACED WITH NEW BLACK DIFUSERS IN THE SALES AREA AND <br />14 <br />HALLWAY/VESTIBULE. EXISTING DIFUSERS TO REMAIN AND BE RELOCATED AS REQ'D DUE TO NEW CONSTRUCTION IN ALL BACK OF HOUSE AREAS. PERFORM PRE -DEMO AND <br />FINAL BALANCING TEST AND ADJUST ALL SYSTEM BALANCING DAMPERS AND/OR SUPPLY AIR FAN TO PROVIDE THE ORIGINAL AIR QUANTITIES AT EACH AIR DEVICE. SEE <br />MECHANICAL DRAWINGS FOR MORE INFORMATION. IF AUXILLARY EQUIPMENT (TYCO, FIRE ALARM, SPRINKLERS, SHOPPER TRAK, ETC.) NEED TO BE REMOVED OR RELOCATED, <br />COORDINATE WITH T-MOBILE'S VENDOR AND/OR APPROVED FIRE SPRINKLER SUB -CONTRACTOR. T-MOBILES VENDOR TO RELOCATE SECURITY CAMERAS AS NEEDED PER NEW <br />FIXTURE LAYOUT. (TYPICAL THROUGHOUT LEASED SPACE) <br />15 <br />1EXISTING FLOOR MOUNTED EQUIPMENT RACK TO REMAIN. <br />ADJACENT TENANT <br />PI <br />1. GENERAL CONTRACTOR AND/OR SUBCONTRACTORS <br />SHALL REVIEW THE EXISTING FACILITY TO DETERMINE <br />THE EXTENT OF DEMOLITION REQUIRED TO INSTALL THE <br />NEW WORK. A WRITTEN OUTLINE OF ALL REQUIRED <br />DEMOLITION SHALL BE SUBMITTED TO T-MOBILE <br />DESCRIBING THE FOLLOWING (BUT NOT LIMITED TO): <br />1.1 CONDITION OF EXISTING POWER PANELS AND <br />TRANSFORMERS; FEASIBILITY FOR RELOCATION AND <br />REFURBISHING, OR NEED FOR REPLACEMENT DUE TO <br />AGE OR EXISTING CONDITION. <br />1.2 CONDITION OF EXISTING GYPSUM BOARD ON EXISTING <br />DEMISING WALLS AND RECOMMENDATION OR WHETHER <br />TO REMOVE EXISTING OR REUSE TO BE DETERMINED IN <br />FIELD, <br />1.3 SUMMARIZE RECOMMENDATIONS FOR REUSE OF <br />EXISTING MATERIALS, EQUIPMENT, AND ACCESSORIES. <br />ONCE REFURBISHED TO A LIKE -NEW CONDITION, <br />ITEMIZE THE CREDIT TO THE CONTRACT. <br />1.4 TENANT G.C. SHALL NOTIFY THE ARCHITECT OF ANY UN - <br />NOTED EXISTING CONDITION WHICH CONFLICTS WITH <br />THE PROJECT REQUIREMENTS AND MAY REQUIRE <br />MODIFICATION, RELOCATION, OR REMOVAL TO COMPLETE <br />THE PROJECT WITHIN 24 HOURS SO THAT THE <br />NECESSARY DRAWING REVISIONS MAY BE <br />INCORPORATED INTO THE PROJECT REQUIREMENTS. <br />1.5 IN ADDITION TO THE ABOVE, REFER TO GENERAL <br />DEMOLITION NOTES INDICATED IN SPECIFICATION <br />DIVISION 2- EXISTING CONDITIONS. <br />1.6 CONDITION OF EXISTING MECHANICAL SYSTEM; <br />FEASIBILITY OF REUSING, RELOCATION, OR <br />REFURBISHING EXISTING EQUIPMENT AND <br />DUCTWORK; AND RECOMMENDATION OF <br />REPLACEMENT, IF NECESSARY, PRIOR TO BID. <br />SEE MECHANICAL DRAWINGS FOR SCOPE OF <br />MECHANICAL WORK. <br />u <br />t <br />n <br />R <br />0 <br />w <br />z <br />J <br />w <br />U) <br />a <br />w <br />(V <br />('7 <br />G ►ii <br />N <br />1. <br />CHECK MECHANICAL AND ELECTRICAL DRAWINGS PRIOR RO DEMOLITION <br />14. <br />FIRE SPRINKLER SYSTEM TO REMAIN - G.C. TO RE -WORK/ MODIFY SYSTEM AS <br />WITH REGARD TO UTILIZING ANY EXISTING WIRING, LINES, COMPONENTS, <br />REQUIRED FOR NEWCONSTRUCTION. VERIFY IN FIELD. <br />ETC. <br />15. <br />WHERE REQUIRED BY THE LOCAL JURISDICTION, G.C. SHALL PREPARE A <br />2. <br />PROVIDE TRASH CONTAINER AS REQUIRED AT LOCATION TO SUIT <br />"RECYCLING PLAN" TO DIVERT DEBRIS FOR RECYCLING. G.C. SHALL KEEP <br />LANDLORD. REMOVE DEBRIS DAILY AND HAUL FROM THE SITE AT TIME TO <br />RECORDS OF DIVERTED MATERIAL AS REQUIRED. G.0 TO VERIFY <br />SUIT LANDLORD. <br />REQUIREMENTS WITH JURISDICTION AND TO MALL OPERATIONS/ LANDLORD <br />3. <br />NOTIFY ARCHITECTS IMMEDIATELY OF ANY DISCPRENANCIES OR <br />WHERE APLLICABLE. <br />UNFORESEEN ITEMS NOT SHOWN ON DRAWINGS. <br />16. <br />REMOVE ALL EXISTING INTERIOR PARTITIONS, DOORS, AND DOOR FRAMES <br />4. <br />ALL REMOVED MATERIAL AND DEBRIS, NOT OTHERWISE DESIGNATED, <br />SCHEDULED FOR DEMOLITION. REMOVE ALL MILLWORK, EQUIPMENT, ETC. THAT <br />BECOMES THE PROPERTY OF THE CONTRACTOR, WHO SHALL REMOVE IT <br />IS ATTACHED TO PARTITIONS SCHEDULED FOR DEMOLITION. <br />FROM THE SITE. <br />17. <br />REMOVE EXISTING HVAC CEILING DIFFUSERS AND RETURN GRILLES AS <br />5. <br />G.C. SHALL NOT DEMOLISH AND LOAD BEARING WALLS OR CONSTRUCTION <br />SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION DEMOLITION <br />THAT WILL COMPROMISE THE STRUCTURAL INTEGRITY OF THE EXISTING <br />AND NEW CONSTRUCTION. MODIFY EXISTING DUCTWORK AS REQUIRED BY <br />SPACE. G.C. TO NOTIFY THE ARCHITECT IMMEDIATELY OF ANY STRUCTURAL <br />NEW CONSTRUCTION, OR IF NOT REQUIRED, TERMINATE AND CAP OFF SUPPLY <br />CONCERNS DURING CONSTRUCTION. <br />AND RETURN DUCTS AT NEAREST SOURCE ABOVE CEILNG. <br />6. <br />EXISTING EQUIPMENT NOT BEING USED MUST BE COMPLETELY <br />18. <br />REMOVE ALL EXISTING PLUMBING FIXTURES, FITTINGS, AND PIPING AS <br />REMOVED/DISPOSED OF PROPERLY. NOTHING CAN BE ABANDONED ABOVE <br />SCHEDULED FOR DEMOLITION AND AS REQUIRED BY PARTITION DEMOLITION <br />THE CEILING. <br />AND NEW CONSTRUCTION, OR IF NOT REQUIRED, TERMINATE AND CAP OFF AT <br />7. <br />REMOVE EXISTING ACCOUSTICAL CEILING GRID AND TILES, LIGHT FIXTURES, <br />WET STACK. <br />AND GYPSUM WALL BOARD SOFFITS AS SCHEDULED FOR DEMOLITION AND <br />19. <br />REMOVAL/ RELOCATION OF ALL CEILING EQUIPMENT (TYCO, FIRE ALARM, <br />AS REQUIRED BY PARTITION DEMOLTION AND NEW CONSTRUCTION WORK. <br />SPRINKLER, SHOPPER TRAK, ETC.) MUST BE PERFORMED BY THE REQUIRED <br />MAINTAIN EXISTING CEILING WIRE HANGERS FOR FUTURE USE. <br />VENDORS. T-MOBILE'S VENDOR TO RELOCATE SECURITY CAMERAS AS NEEDED <br />8. <br />REMOVE EXISTING ELECTRICAL DEVICES, OUTLETS, TELEPHONE AND DATA <br />PER NEW FIXTURE LAYOUT. <br />JACKS AND THERMOSTATS IN PARTITIONS SCHEDULED FOR DEMOLITION. <br />20. <br />G.C. TO CONFIRM FLOOR SLAB IS SMOOTH AND LEVEL AND NOTIFY <br />MODIFY EXISTING WIRING AS REQUIRED BY NEW CONSTRUCTION OR, IF NOT <br />CONSTRUCTION PM OF ANY DISCREPANCIES. <br />REQUIRED, TERMINATE AND CAP OFF AT NEAREST PANEL OR SOURCE <br />21. <br />MAINTAIN EXISTING EXITS, EMERGENCY LIGHTING, AND ILLUMINATION MEANS <br />ABOVE CEILING. <br />OF EGRESS DURING DEMOLITION AND CONSTRUCTION AS REQUIRED BY JHA <br />9. <br />REMOVE EXISTING FLOOR FINISHES SCHEDULED FOR REMOVAL AND AS <br />AND ALL GOVERNING CODES. <br />REQUIRED BY PARTITION DEMOLITION AND NEW CONSTRUCTION. PREPARE <br />22. <br />SAW -CUTTING SHOWN ON PLANS IS AN INDICATION OF THE INTENDED WORK <br />EXISTING FLOOR SURFACE PER MANUFACTURER FOR INSTALLATION OF <br />FOR BIDDING AND COORDINATION PUPOSES ONLY. IT IS NOT INTENDED FOR BE <br />NEW FLOORING MATERIAL INDICATED IN THESE PLANS. G.C. MAY NEED TO <br />AS SPECIFICATION OR METHOD. <br />PERFORM A MOISTURE TEST PRIOR TO ANY DEMOLITION OR NEW FLOORING <br />23. <br />WHEN EXISTING MECHANICAL SYSTEM IS TO REMAIN, G.C. TO CLEAN <br />INSTALLATION. NEWLY REPLACED OR LIKE -NEW FINISHES MAY REMAIN AT <br />DUCTWORK, DIFFUSERS, AND REPLACE HVAC AIR FILTERS AFTER <br />THE DISCRETION OF THE CONSTRUCTION PM. G.C, TO VERIFY PRIOR TO <br />CONSTRUCTION AND CLEANUP IS COMPLETE PRIOR TO TURNING PROJECT <br />REMOVAL. PROTECT ALL NEW FLOOR FINISHES UNTIL FINAL CLEANING. <br />OVER TO T-MOBILE. <br />10. <br />REMOVE ALL CONSTRUCTION DEBRIS FROM AREA. REPAIR ALL ADJACENT <br />24. <br />DURING CONSTRUCTION, THE G.C. IS TO PROVIDE A PORTABLE FIRE <br />DAMAGED SURFACES, AS NECESSARY. PREPARE ALL DAMAGED SURFACES <br />EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A WITHING A 75 FOOR <br />FOR FINISHES AS SCHEDULED OR REFINISH TO MATCH EXISTING. <br />TRAVEL DISTANCE TO ALL PORTIONS OF THE SPACE. <br />11. <br />PROVIDE A SMOOTH, NEAT, AND CONTIUOUS APPEARANCE WHERE <br />DEMOLITION WORK MEETS ADJACENT EXISTING WORK, REMOVED EXISTING <br />FINISHES AS REQUIRED TO PROVIDE NEAT, STRAIGHT SEAMS AND <br />TRANSITIONS BETWEEN EXISTING AND MATCHING NEW FINISHES. <br />12. <br />IN ACCORDANCE WITH LOCAL CODES, REPLACE ALL FIRE SUPPRESSION <br />AND FIRE ALARM EQUIPMENT DISTURBED BY DEMOLITION WORK. MAINTAIN <br />INTEGRITY OF FIRE SUPPRESSION AND FIRE ALARM SYSTEMS. VERIFY IN <br />FIELD. <br />13. <br />IN THE CASE THAT THE EXISTING CABLE LINE, PHONE LINE AND BLOCK, T-1 <br />LINE AND DATA CABLING PRESENT, G.C. SHALL SALVAGE AND REWORK TO <br />FACILITATE NEW INSTALLATION. <br />T Mobl*le@ <br />12920 SE 38th STREET <br />BELLEVUE, WA 98006 <br />www.T-Mobile.com <br />COPYRIGHT NOTICE <br />THESE DRAWINGS AND SPECIFICATIONS ARE COPYRIGHTED AND SUBJECT TO <br />COPYRIGHT PROTECTION AS AN "ARCHITECTURAL WORK" UNDER SEC. 102 OF <br />THE COPYRIGHT ACT, 17 U.S.C. AS AMENDED JANUARY 2003, THE PROTECTION <br />INCLUDES, WITHOUT LIMITATION, THE OVERALL FORM, ARRANGEMENT AND <br />COMPOSITION OF SPACES AND ELEMENTS OF THE DESIGN. UNDER SUCH <br />PROTECTION, UNAUTHORIZED USE OF THESE DRAWINGS AND SPECIFICATIONS <br />MAY RESULT IN CESSATION OF CONSTRUCTION, BUILDING SEIZURE, AND/OR <br />MONETARY LIABILITY. <br />ARCHITECT <br />rmUzioN <br />9096 EAST BAHIA DRIVE <br />SUITE 103 <br />SCOTTSDALE, AZ 85260 <br />DESIGN@FUZIONVE.COM <br />WWW.FUZIONVE.COM <br />VENDOR PROJECT NO: 21.11.212680 <br />o <br />'S' e <br />Q 4 <br />FRED ARG�I► <br />02/10/2022 <br />CONSULTING ENGINEER: <br />N <br />W <br />a <br />Apr <br />W > M <br />C� J J <br />e.e.l = L=- <br />a <br />C.)m J <br />� J <br />� J � <br />06 0 <br />own. <br />.JtN�.N <br />CO <br />J <br />_el <br />a <br />f jp0$q MPTIQIN <br />DATE: February 5, 2022 <br />SCALE: AS NOTED <br />DRAWN BY: LEO V. <br />SAP NUMBER: <br />4SIR <br />CORPORATE TENANT REBUILD <br />LDC <br />SHEET TITLE: <br />EXISTING CONDITIONS <br />AND DEMO PLAN <br />SHEET NUMBER: <br />A101 <br />4 I 3 I 2 <br />