My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7441 Gall Blvd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
7441 Gall Blvd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 11:00:24 PM
Creation date
2/18/2025 3:39:30 PM
Metadata
Fields
Template:
Building Plans
Street #
7441
Location
Gall Blvd
Contractor
Wallace Associates
Building Plans - Permit #
14068
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />A5a <br />KEYED NOTES <br />EP-2 II <br />23 23 10 19 <br />1 <br />EXISTING BRICK VENEER SYSTEM - FINISH TO BE EP-32 <br />D <br />10 19 <br />rc <br />TOP OF <br />EX15TING3 ELECTRICAL SERVICE - PAINT TO MATCH ADJACENT <br />WALL COLOR <br />41 <br />EXISTING CONCRETE SIDEWALK/CURB - SEE SITE PLAN <br />O-_ <br />�� <br />EP-1 <br />O EXISTING GAS SERVICE - PAINT TO MATCH ADJACENT WALL <br />EP-1 ILE <br />EP-I <br />16 <br />O5EXISTING PIPE BOLLARD -FINISH TO BE EP-8 <br />9 <br />O <br />9 <br />_ <br />O EXISTING ROOF ACCESS LADDER PAINT TO MATCH STOREFRONT <br />8 <br />8 <br />a <br />CT1 8 <br />8 G <br />O <br />16 <br />- o <br />�- <br />— <br />COLOR <br />O STONE VENEER OVER EXISTING WALL SYSTEM - SW-1 <br />- <br />i <br />❑� O ❑ <br />1�15 <br />_ <br />16 22 <br />21 <br />8 STANDING SEAM METAL AWNING INSTALLED BY MANUFACTURER - <br />O <br />AWNING SUPPORTS AT 4'-0" O.G. AND AT EACH END - FINISH TO <br />BE G-1 <br />"011- <br />6 <br />14 <br />_._ <br />15 <br />/ /` <br />14 <br />O SMOOTH SAND STUCCO FINISH <br />10 EIFS TRIM - SEE WALL SECTIONS <br />15P <br />O9 <br />24 <br />3 <br />it SIGNAGE BY SIGN VENDOR <br />O <br />\ / <br />III <br />EP-3 <br />\ <br />ED <br />0'-0 F.FE. <br />12 DRIVE-THRU CANOPY AND RAILING SYSTEM - FINISH TO BE EP-5 - <br />/ <br />TOP OF SLAB <br />SEE WALL SECTIONS <br />13 APPROXIMATE GRADE / PAVEMENT <br />14 I x 4 EIFS ACCENT BAND - FINISH TO BE EP-2 <br />1 1 1 I Lo 1 1 <br />15 EXISTING STOREFRONT WINDOW / DOOR SYSTEM - SEE FLOOR <br />PLAN FOR MORE INFORMATION <br />16 COMPOSITE WOOD TRIM - FINISH TO BE EP-I - SEE DETAIL C/A4 <br />ONOT <br />USED <br />SCALE: X" = X'-X" <br />O <br />SOUTH ELEVATION <br />SCALE: 3/16" 1'-0" <br />it 1/2" VINYL SHUTTER - FINISH TO SE EP-4 - SEE DETAILS B AND C <br />ON THIS SHEET FOR SIZE <br />2'-4" <br />I <br />20'-4" A.FF.�/- <br />18 FRAMED MONOLITH WITH EXTERIOR STUCCO FINISH - SEE WALL <br />SECTIONS <br />I' -2" <br />EP-2 <br />19 10 <br />EP-2 10 <br />19 <br />Asa <br />TOP OF <br />PARAPET <br />19 CONT. METAL COPING / FLASHING WITH HEMED LEADING EDGE <br />2" _ 10" _ <br />1V-10 A.FF.+/- <br />SET IN ADHESIVE -SEE WALL SECTIONS <br />1 <br />TOP OF <br />PA <br />PARAPET <br />20 O EXISTING DRIVE-THRU WINDOW SYSTEM <br />P-4 <br />E <br />L <br />0EXI5TING TRIM - PATCH, REPAIR OR REPLACE AS REQUIRED. <br />= <br />23 <br />PROVIDE NEW TRIM TO MATCH AND ALIGN WITH EXISTING TRIM. <br />VINYLf. <br />I <br />CONTINUE TRI OUND WINDOW/DOOR SYSTEM AS REQUIRED. <br />FINISH TO BE EP-I <br />H <br />S H UTTER <br />23 <br />g EP-1 <br />6 <br />EP-1 <br />I N DEFLECTOR - IF DAMAGED PROVIDE NEW. - FINISH <br />22 EXISTING MATGH RAIN <br />9 <br />=� <br />23 LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS <br />24 EXISTING HOLLOW METAL DOOR SYSTEM - PAINT TO MATCH <br />O <br />ADJACENT WALL COLOR <br />14 <br />PROVIDE BLACKENING FILM AS REQUIRED AT EXISTING <br />0 <br />DRIVE-THRU WINDOW SIDELITES AND WINDOWS BELOW DRIVE-THRU <br />14 <br />14 <br />WINDOW. <br />\C� <br />O <br />12 <br />I O O <br />EE <br />EP-3 <br />3 <br />13 <br />O <br />TOP OF SLAB <br />EP-3 9 <br />I <br />1 <br />$ <br />SHUTTER DETAIL AT DRIVE-THRU <br />O <br />EAST6ELEVATION <br />EXTERIOR FINISH SCHEDULE <br />4 <br />5 <br />EP-1 PAINT - BENJAMIN MOORE - 02158-30 - DELIGHTFUL <br />1 <br />A5a <br />Asa <br />GOLDEN - 155 LOW LUSTRE <br />5a <br />EP-2 <br />10 19 <br />EP-2 <br />10 19 <br />EP-2 PAINTJA MIN MO RE - 02086-I0 - EXOTIC <br />EE3-\I0 <br />23 <br />1916TOP <br />20'-4" A.FF.•/- <br />OF <br />IS E <br />PARAPET <br />EP-3 PAINT - BENJAMIN MOORE - 02101-20 - MOGHA <br />BROWN - 185 LOW LUSTRE <br />EP-I <br />®55�II� <br />O <br />_ <br />11 <br />9 <br />11 <br />23 <br />ED <br />9 <br />23 <br />23 <br />EP-4 PAINT - BENJAMIN MOORE - 02040-10 - RAINFOREST <br />FOLIAGE - 110 SEMI GLOSS <br />4 _8 <br />FIELD VERIFY <br />16 <br />16 16 <br />EP-5 METAL POWDERCOAT - TIGER DRYLAC - COLOR: RAL 6009 <br />A <br />_ <br />H, <br />jjj <br />HUNTER GREEN -SMOOTH <br />2'-4" 2'-4"���� <br />" <br />I1 <br />O <br />_ <br />12 <br />EP-5 PAINT - BENJAMIN MOORE - 02040-10 - RAINFOREST <br />FOLIAGE - P-2e DTM SEMI GLOSS <br />in", In,, i° I'-I1 In,,1'-11 In., 1° 31/2 <br />I� <br />I <br />- <br />� \ <br />a <br />\\ <br />EP-6 ANODIZED ALUMINUM - YKK AP - RY55N - DARK BRONZE <br />i0 <br />9 ElEP-6 <br />- RM <br />BRONZETBONEAMP 29 DTM SEMI GLOSS <br />0 <br />g <br />EP-1 PAINT -BENJAMIN MOORE - 0210-1-20 - MOCHA <br />BROWN - 165 LOW LUSTRE <br />14 <br />14 25 <br />25 <br />15 15 I <br />15 14 <br />6 <br />15 <br />IS <br />EP-S PAINT - BENJAMIN MOORE - RM SAFETY YELLOW - P58-10 <br />5 <br />20 <br />1 <br />SW-1 SIMULATED STONE VENEER - CORONADO STONE - CASCADE <br />EP- I <br />3 EP-3 <br />P-3 <br />_ <br />=- EP-3 3 <br />MOUNTAIN LEDGE - COLOR: FOUR RIVERS <br />SG-1 VENEER STONE MORTAR - QUIKRITE -POLYMER MODIFIED - <br />EP-4 <br />00 <br />COLOR: MOCHA BROWN - 1131-85 <br />1/2" VINYL <br />0'-0" F.F.E. <br />G-1 METAL POWDERGOAT - AWNING SUPPLIER - COLOR: RAL 6009 <br />HUNTER GREEN - SMOOTH <br />TOP OF SLAB <br />SHUTTER <br />1 <br />I 5 <br />I 1 i <br />1 <br />I <br />C-I UNA-CLAD -COPPER SALES, INC. - UG-4 ALUMINUM - <br />COMPOSITE <br />WOOD TRIM <br />COLOR: REGAL RED - 12" O.G. <br />PAINT - BENJAMIN MOORE - ALIPHATIC ACRYLIC URETHANE - <br />O <br />NORTH ELEVATION <br />SCALE: 3/16" = 1'-0" <br />CLEAR GLOSS - M14-00 / M-15 (2 COATS) <br />\ C <br />3 <br />Q <br />N Q <br />EP-2 23 <br />A5a <br />_W <br />u <br />Fee <br />EP-2 <br />Lee <br />10 19 <br />EP-2 <br />20'-4" AFF.+/- <br />TOP OF <br />. <br />PARAPET <br />�` 11 <br />23 <br />N, 11 <br />1019 <br />��gi49II� <br />23 <br />Ell <br />GENERAL NOTES <br />23 f D p D <br />o o��� <br />12 bOo t��p <br />r <br />�B�GN��� EP-1 O <br />9 <br />11 <br />1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS BEFORE <br />COMMENCING ANY WORK NOTIFY ARCHITECT IMMEDIATELY IN WRITING <br />' 9 <br />O <br />WITH ANY ISSUES. <br />� <br />[7 1 g El <br />D \ <br />2. PATCH AND REPAIR ALL EXISTING EXTERIOR WALLS, PREPARE TO <br />RECEIVE NEW FINISHES. PROVIDE NEW STUCCO PARGE COAT IF <br />NEEDED <br />�r <br />3. ALL NEW PAINT WORK MUST INCLUDE A 2 YEAR FULL WARRANTY AND A <br />PRO -RATED LABOR AND MATERIALS WARRANTY <br />OYEAR <br />�I <br />14 <br />1 <br />/ <br />/i <br />15 <br />14 <br />4. ALL NEW AWNING SIZES TO BE FIELD VERIFIED BEFORE FABRICATION <br />5. ALL EXISTING EXTERIOR WALLS TO BE PRESSURE WASHED, PATCH AN <br />2 1/2" C <br />13 <br />IS <br />0 // <br />1 <br />REPAIR AS REQUIRED. <br />3 3 <br />EP- <br />EP-3 \ <br />3 <br />6. ALL EXTERIOR FINISHES AND PAINT COLOR SELECTIONS TO BE <br />VERIFIED WITH POPEYES CONSTRUCTION MANAGER BEFORE ORDERING. <br />_ <br />0'-0" F.F.E. <br />7. CONTACT JASON BRAGG WITH ENTERA BRANDING, 1200 ENTERA DR, <br />PANAMA CITY, FLORIDA 32401 (TEL: 850.3 K.0801) FOR ALL SHUTTERS, <br />6 <br />TOP OF SLAB <br />AWNINGS AND DRIVE THRU CANOPY. VERIFY SIZES WITH ENTERA <br />I <br />1 <br />BRANDING AND POPEYE'S CONSTRUCTION MANAGER BEFORE <br />Asa <br />ORDERING. <br />OSHUTTER <br />DETAIL <br />O <br />WEST ELEVATION <br />SCALE: 1/2" = 1'-0" <br />SCALE: <br />3/16" = 1'-0" <br />REVISIONS <br />BY <br />• rn c. <br />_ o <br />"T CN <br />CCN <br />a s ti u <br />x ti v <br />� C N <br />/ <br />O C • U <br />00 3 <br />3 <br />° N • <br />� c <br />c ti o <br />c� <br />1 <br />_ <br />r <br />. Ry <br />1. <br />.fx <br />0c� <br />'I <br />c+7 � 0 <br />&0 <br />o' 0 <br />Cq <br />a0 <br />N <br />• � 0 0 <br />Oo <br />� <br />� � y <br />O <br />s` <br />O <br />+ Z <br />N W <br />C <br />0 �[ v <br />o U � <br />O O <br />= <br />m <br />U <br />� v � <br />O ,C <br />•� LLB �. <br />X > 0- <br />W LL1 O <br />C N <br />o p <br />C <br />Date: 03. 28. 13 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: AZP <br />Job: 13-03 <br />Sheet <br />A4 <br />H:`Projects\Projects 2013\ 13003 - Popeyes Zephyrhills\04-CDt01-CD.A\04-Architectural,A4 - EXEL.dwg, 3'2&2013 2:52: l8 PM, Xerox 6030.pc3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.