810DINCx REQUIREMENTS
<br />BIDDING REQUIREMENTS: INSTRUCTIONS TO BIDDERS
<br />EXAMINATION OF SITE:
<br />ALL BIDDERS SUBMITTING PROPOSALS FOR THIS WORK SHALL FIRST
<br />EXAMINE THE SITE (PREMISES) AND`ALL SUCH CONDITIONS AS MAY
<br />AFFECT THE WORK UNDER THIS CONTRACT. FAILURE TO EXAMINE THE
<br />SITE WILL NOT RELIEVE THE SUCCESSFUL BIDDER FROM THE
<br />NECESSITY TO PROVIDE WORK THAT MAY BE REQUIRED TO COMPLETE
<br />THE WORK WITHOUT ADDITIONAL COST TO THE OWNER
<br />EXPLANATION TO BIDDERS:
<br />A. NO ORAL EXPLANATION IN REGARD TO THE MEANING OF THE
<br />DRAWINGS AND SPECIFICATIONS WILL BE MADE AND NO ORAL
<br />INSTRUCTIONS WILL BE GIVEN BEFORE THE AWARD OF THE CONTRACT.
<br />DISCREPANCIES, OMISSIONS, OR DOUBTS AS TO MEANING OF THE
<br />DRAWINGS AND SPECIFICATIONS SHALL BE COMMUNICATED IN WRITING
<br />TO THE OWNER FOR INTERPRETATION.
<br />IN THE EVENT OF UNRESOLVED DISCREPANCIES OR AMBIGUITY,
<br />INTERPLAN LLC ARCHITECTURE AND ENGINEERING DEPARTMENT WILL
<br />BE THE FINAL JUDGE ON PLAN INTERPRETATION. BIDDERS SHOULD
<br />ACT PROMPTLY AND ALLOW SUFFICIENT TIME FOR A REPLY TO REACH
<br />THEM BEFORE THE SUBMISSION OF THEIR BIDS. ANY REVISION MADE
<br />WILL BE IN THE FOR"( OF AN ADDENDUM TO THE SPECIFICATIONS
<br />BEARING THE APPROVAL OF THE OWNER AND WILL BE FORWARDED
<br />TO ALL BIDDERS AND ITS RECEIPT BY THE BIDDER SHOULD BE
<br />ACKNOWLEDGED BY THE BIDDER BY HIS SIGNATURE AFFIXED
<br />THERETO AT THE TIME OF RECEIPT AND VERIFIED BY HIS
<br />ACKNOWLEDGMENT ON THE BID FORM.
<br />B. EACH PROSPECTIVE BIDDER WILL BE FURNISHED BIDDING
<br />DOCUMENTS TO COMPLETE THEIR BID.
<br />PREPARATION t SUBMISSION OF BIDS:
<br />A. THE BIDDER IS REQUIRED TO BID ON ALL ALTERNATES AND/OR
<br />ALLOWANCES OR ON ALL ITEMS CALLED FOR IN THE BID FORM,
<br />EXCEPT WHEN ALTERNATES ARE CALLED FOR ON A TYPE OR METHOD
<br />OF CONSTRUCTION AS TO WHICH BIDDER DOES NOT DESIRE TO BID,
<br />HE MAY INSERT THE WORDS "NO BID" IN THE SPACE PROVIDED FOR
<br />PRICES ON SUCH ALTERNATE TYPE OR METHOD OF CONSTRUCTION.
<br />B. BIDS SHALL BE SUBMITTED ON THE FORMS FURNISHED AND SHALL BE
<br />SIGNED IN INK ERASURES OR OTHER CHANGES IN A BID
<br />MUST BE
<br />EXPLAINED OR NOTED OVER THE SIGNATURE OF THE BIDDER. BIDS
<br />CONTAINING ANY CONDITIONS, OMISSIONS, UNEXPLAINED ERASES OR
<br />ALTERNATES, OR ITEMS NOT CALLED FOR IN THE PROPOSAL, OR
<br />IRREGULARITIES OF ANY KIND, MAY BE REJECTED BY THE OWNER AS
<br />BEING INCOMPLETE.
<br />BID ANALYSIS:
<br />BIDS SHALL BE ACCOMPANIED BY ONE (1) SIGNED COPY OF
<br />POPEYEB STANDARD "BID ANALYSIS" FORM. AS INDICATED ON THE
<br />FORM, INDIVIDUAL LINE ITEMS ARE TO BE SHOWN AT THE GENERAL
<br />CONTRACTOR'S COST WITH NO MARKUP FOR OVERHEAD OR PROFIT
<br />BY THE GENERAL CONTRACTOR HOWEVER, EACH LINE ITEM SHALL
<br />INDICATE THE FULL VALUE OF SUBCONTRACTOR WORK INCLUDING
<br />SUBCONTRACTOR'S OVERHEAD AND PROFIT. SUPERVISION,
<br />OVERHEAD, AND PROFIT FOR THE GENERAL CONTRACTOR'S WORK
<br />SHALL BE SHOWN ON THE APPROPRIATE LINES.
<br />AWARD OF CONTRACT:
<br />THE OWNER RESERVES THE RIGHT TO DETERMINE WHAT ARE
<br />INFORMALITIES IN THE MAKING, RECEIVING, AND OPENING OF BIDS AND
<br />THE AWARDING OF CONTRACTS THEREON, AND THE FURTHER RIGHT TO
<br />WAIVE ANY SUCH INFORMALITY WHEN SUCH WAIVER IS, IN THE
<br />DISCRETION OF THE OWNER, TO THE BEST INTEREST, ALSO. TO
<br />ACCEPT ANY ITEM IN THE BID UNLESS OTHERWISE SPECIFIED.
<br />REJECTION OF BIDS:
<br />THE OWNER RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS.
<br />STANDARD FORMS:
<br />1. AIA DOCUMENT A305 - CONTRACTORS QUALIFICATIONS STATEMENT.
<br />2. AIA DOCUMENT G101 - CHANGE ORDER.
<br />3. AIA DOCUMENT G102 - APPLICATION AND CERTIFICATE OF PAYMENT.
<br />THIS DOCUMENT SUMMARIZES THE CONTRACT AMOUNT, WORK
<br />COMPLETED, STORED MATERIALS, RETAINAGE, PREVIOUS
<br />CERTIFICATES OF PAYMENT, AND THE CURRENT AMOUNT DUE.
<br />4. AIA DOCUMENT G103 - CONTINUATION SHEET (ONE (1) OR MORE
<br />SHEETS AS REQUIRED). THIS DOCUMENT DETAILS THE AMOUNTS
<br />SUMMARIZED ON DOCUMENTS G102. IT PROVIDES A PROJECT
<br />BREAKDOWN AND DISCLOSES THE NAME OF THE COMPANY
<br />PROVIDING LABOR AND MATERIALS. WHEN LABOR IS PAID BY THE
<br />CONTRACTOR DIRECTLY TO INDIVIDUAL WORKERS, IT SHOULD BE
<br />IDENTIFIED AS "G.C. LABOR". THIS DOES NOT INCLUDE ANY LABOR
<br />PAID TO A THIRD PARTY. MATERIALS TAKEN FROM THE
<br />CONTRACTOR'S INVENTORY SHOULD BE LISTED AS "G.C. MATERIALS"
<br />THIS MAY NOT INCLUDE MATERIALS DELIVERED DIRECTLY TO THE
<br />JOB SITE OR IDENTIFIED IN ANY WAY THE SUPPLIER WITH AFCE.
<br />CONTRACTOR'S OVERHEAD AND PROFIT SHALL BE SHOWN AS A
<br />SEPARATE LINE ITEM. IF SUBCONTRACTOR AMOUNTS CHANGE FROM
<br />AMOUNTS SHOWN ON THE ORIGINAL PROJECT BREAKDOWN, THE
<br />CHANGES SHALL BE SHOWN ON THE PAYMENT REQUEST WITH A
<br />CORRESPONDING CHANGE TO THE CONTRACTOR'S OVERHEAD AND
<br />PROFIT LINE. UNLESS A CHANGE ORDER IS INVOLVED, THE TOTAL
<br />CONTRACT AMOUNT SHALL REMAIN THE SAME.
<br />5. CERTIFICATE OF SUBSTANTIAL COMPLETION, AIA DOCUMENT A104.
<br />6. CERTIFICATE OF INSURANCE, AIA DOCUMENT G105.
<br />1. AIA DOCUMENT G106 - CONTRACTOR'S AFFIDAVIT OF PAYMENT OF
<br />DEBTS AND CLAIMS - IN THIS DOCUMENT, THE CONTRACTOR SWEARS
<br />THAT ALL SUBCONTRACTORS AND MATERIALMEN ARE DISCLOSED
<br />ON G103 AND THAT EACH HAS BEEN PAID.
<br />g, AIA DOCUMENT G106A - CONTRACTOR'S AFFIDAVIT OF RELEASE OF
<br />LIENS - IN THIS DOCUMENT, THE CONTRACTOR SWEARS THAT ALL
<br />SUBCONTRACTORS AND MATERIALMEN ARE LISTED ON G103 AND
<br />THAT WAIVERS OF LIENS, HIS OWN INCLUDED, ARE ATTACHED.
<br />S. AIA DOCUMENT G8O5 - LIST OF SUBCONTRACTORS
<br />10. AIA DOCUMENT G113 - CHANGE ORDER AUTHORIZATIONS.
<br />11. CONSENT OF SURETY (SURETY COMPANY'S FORM).
<br />12. PARTIAL WAIVER OF LIEN FORM - IN THIS FOR"(, THE CONTRACTOR,
<br />SUBCONTRACTORS AND MATERIALMEN WAIVE THEIR RIGHT TO FILE A
<br />LIEN FOR WORK PERFORMED TO DATE. THIS DOCUMENT IS
<br />ACCEPTABLE FOR INTERIM CERTIFICATES OF PAYMENT.
<br />13. FINAL WAIVER OF LIEN FORM - IN THIS FORM, THE CONTRACTOR,
<br />SUBCONTRACTORS AND MATERIALMEN WAIVE THEIR RIGHT TO FILE A
<br />LIEN FOREVER.
<br />14. CONTRACTOR'S AFFIDAVIT OF DISCLOSURE OF DEBTS AND CLAIMS. IN
<br />THIS DOCUMENT, THE CONTRACTOR SWEARS THAT ALL DEBTS AND
<br />CLAIMS ARE DISCLOSED. IT SUMMARIZES THE CURRENT AMOUNT DUE
<br />EACH FIRM (CONTRACTOR, SUBCONTRACTOR, OR MATERIALMEN)
<br />LISTED ON G103. IT ALSO PROVIDES THE ADDRESS, PHONE NUMBER,
<br />AND REPRESENTATIVE OF EACH FIRM.
<br />CONTRACT FORMS
<br />1. THE CONTRACT FOR CONSTRUCTION SHALL BE AFC ENTERPRISES
<br />"CONSTRUCTION CONTRACT AGREEMENT" FOR ALL CONSTRUCTION.
<br />GENERAL CONDITIONS
<br />GENERAL:
<br />A. THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION",
<br />STANDARD FORM OF THE AMERICAN INSTITUTE OF ARCHITECTS, FORM
<br />A-201, LATEST EDITION, ARE HEREBY, EXCEPT AS THE SAME MAY BE
<br />INCONSISTENT HEREWITH, MADE A PART OF THIS SPECIFICATION.
<br />COPIES ARE ON FILE IN THE OFFICE OF INTERPLAN LLC ARCHITECTURE
<br />AND ENGINEERING DEPARTMENT AND ARE INCORPORATED BY
<br />REFERENCE AND HEREBY MADE A PART OF THE CONTRACT.
<br />B. WHERE ANY ARTICLE OF THE AIA "GENERAL CONDITIONS" IS
<br />SUPPLEMENTED HEREBY THE AIA PROVISION OF SUCH ARTICLE SHALL
<br />REMAIN IN EFFECT. ALL THE SUPPLEMENTARY CONDITIONS SHALL BE
<br />CONSIDERED AS IF ADDED THERETO. WHERE ANY PORTION OF SUCH
<br />ARTICLE IS AMENDED, VOIDED OR SUPERSEDED THEREBY, THE
<br />PROVISIONS OF SUCH ARTICLE NOT SO SPECIFICALLY AMENDED,
<br />VOIDED, OR SUPERSEDED SHALL REMAIN IN EFFECT.
<br />C. THE GENERAL CONDITION SUPPLEMENTARY CONDITIONS AND
<br />APPLICABLE PORTIONS OF DIVISION I OF THE SPECIFICATIONS
<br />APPLY TO ANY AND ALL SUBSEQUENT SECTIONS OF THESE
<br />SPECIFICATIONS.
<br />D. WHERE ANY ARTICLE OR PORTION OF AN ARTICLE CONFLICTS WITH THE
<br />LAWS OF THE STATE OF THE LOCATION OF THE PROJECT, SUCH
<br />ARTICLE, OR PORTION OF THE ARTICLE IS HEREBY STRICKEN.
<br />E. "CONTRACTOR SHALL BE REQUIRED TO COMPLY WITH THE 1SSO
<br />AMERICANS WITH DISABILITIES ACT (29CFR PART 1630). TITLE III AND
<br />THE REGULATIONS PROMULGATED IN ACCORDANCE THEREIN.
<br />CONTRACTOR SHALL INDEMNIFY AND HOLD OWNER AND ARCHITECT
<br />HARMLESS FROM ANY AND ALL LOSSES, SUITS, CLAIMS, COSTS,
<br />EXPENSES AND OTHER DAMAGES WHICH MAY BE INCURRED BY
<br />OWNER/ARCHITECT AS A RESULT OF CONTRACTOR'S FAILURE TO
<br />COMPLY WITH SAID ACT".
<br />13100 INCx REQUIREMENTS (CONT.)
<br />ARTICLE 3 - CONTRACTOR:
<br />A. ARTICLE 3.4 LABOR AND MATERIALS OF SAID "GENERAL CONDITION"
<br />PARAGRAPH 4A3 IS HEREBY ADDED AS FOLLOWS:
<br />"ALL CONTRACTORS AND SUBCONTRACTORS EMPLOYED UPON THE
<br />WORK SHALL BE REQUIRED TO CONFORM TO THE FEDERAL, STATE,
<br />AND LOCAL LABOR LAWS AND VARIOUS ACTS AMENDATORY AND
<br />SUPPLEMENTARY THERETO, AND TO ALL OTHER LAWS, ORDINANCES,
<br />AND LEGAL REQUIREMENTS APPLICABLE THERETO."
<br />B. ARTICLE 316 TAXES OF SAID "GENERAL CONDITIONS" PARAGRAPH
<br />3b.1 IS HEREBY AMENDED AND SUPPLEMENTED AS FOLLOWS:
<br />THE CONTRACTOR SHALL PAY FOR ALL TAXES NECESSARY FOR THE
<br />PROPER EXECUTION AND COMPLETION OF THE WORK, BOTH
<br />TEMPORARY AND PERMANENT."
<br />C. ARTICLE 3.1 PERMITS, FEES AND NOTICES OF SAID "GENERAL
<br />CONDITIONS" PARAGRAPH 4.13 DELETE IN ITS ENTIRETY AND
<br />SUBSTITUTE IN LIEU THEREOF AS FOLLOWS:
<br />"THE CONTRACTOR SHALL BRING TO THE ATTENTION OF THE OWNER
<br />ANY CONFLICTS, OMISSIONS, DELETIONS, OR ERRORS IN THE
<br />DRAWINGS AND/OR SPECIFICATIONS WHICH DO NOT CONFORM TO
<br />APPLICABLE ZONING, CODE AND OTHER USE REGULATIONS AND/OR
<br />TO THE'AMERICANS WITH DISABILITIES ACT AND REGULATIONS
<br />PROMULGATED THEREUNDER THE CONTRACTOR SHALL NOT BE
<br />LIABLE TO THE OWNER OR THE ARCHITECT FOR ANY DAMAGES
<br />RESULTING FROM ANY SUCH ERRORS EXCEPT THAT CONTRACT SHALL
<br />BE FULLY AND EXCLUSIVELY LIABLE UPON FAILURE TO PUT
<br />ARCHITECT ON NOTICE OF SAID CONFLICTS, OMISSIONS, DELETIONS,
<br />OR ERRORS."
<br />D. ARTICLE 3.15 CLEANING UP OF SAID "GENERAL CONDITIONS"
<br />PARAGRAPH 3.15.1 HEREBY AMENDED AND ADDED AS FOLLOWS:
<br />HE SHALL REMOVE FROM THE JOB SITE ALL CRATES, PACKING,
<br />DEBRIS, ETC. FROM KITCHEN EQUIPMENT. HE SHALL BROOM CLEAN
<br />THE BUILDING INTERIOR DAILY. AT THE COMPLETION OF THE
<br />PROJECT, THE CONTRACTOR SHALL LEAVE THE BUILDING CLEANED
<br />DUST FREE, CLEAN ALL GLASS, REPLACE ANY BROKEN GLASS,
<br />REMOVE STAINS, SPOTS, MARKS AND DIRT FROM DECORATED WORK,
<br />CLEAN HARDWARE, REMOVE PAINT SPOTS FROM ALL SURFACES,
<br />CLEAN FIXTURES, AND WASH ALL TILE FLOORS."
<br />ARTICLE Il - INSURANCE:
<br />A. ARTICLE 11.1 CONTRACTOR'S LIABILITY INSURANCE OF SAID "GENERAL
<br />CONDITIONS" IS HEREBY MODIFIED AS FOLLOWS:
<br />INSURANCE: COMPREHENSIVE, AUTOMOBILE, UMBRELLA LIABILITY
<br />CERTIFICATES OF INSURANCE FROM CARRIERS APPROVED BY THE
<br />OWNER SHALL BE FILED IN NOT LESS THAN THE FOLLOWING AMOUNTS
<br />OR GREATER AMOUNTS AS REQUIRED BY LAW PRIOR TO
<br />COMMENCEMENT OF THE WORK:
<br />I. WORKMEN'S COMPENSATION:
<br />AS REQUIRED BY LAW IN APPLICABLE STATE
<br />2. COMPREHENSIVE GENERAL LIABILITY:
<br />(A) $1,000000 PER OCCURRENCE COMBINED- SINGLE LIMIT
<br />(B) $2,000000 AGGREGATE
<br />3. OWNED AND NON -OWNED AUTOMOBILE LIABILITY:
<br />$500 00 PER OCCURRENCE
<br />ENCE
<br />4. EXCESS (UMBRELLA) LIABILITY:
<br />1 N 2 00 00 PER OCCURRENCE ALL INSURANCE POLICIES AND
<br />CERTIFICATES FOR WORK PERFORMED FOR AFCE SHALL SHOW THE
<br />OWNER'AS AN ADDITIONAL NAMED INSURED PARTY. THEY MUST ALSO
<br />STATE THAT THE COVERAGE AFFORDED UNDER THE POLICIES SHALL
<br />NOT BE CANCELED WITHOUT THIRTY (30) DAYS' PRIOR NOTICE TO THE
<br />OWNER AS EVIDENCED BY THE RETURN RECEIPT OF A REGISTERED
<br />LETTER AND BE IN FULL FORCE FOR 3 YEARS FOLLOWING
<br />COMPLETION EXPIRATION OR TERMINATION OF THIS CONTRACT.
<br />B. ARTICLE 11.3 PROPERTY INSURANCE OF SAID "GENERAL CONDITIONS"
<br />IS HEREBY AMENDED AND MODIFIED AS FOLLOWS:
<br />INSURANCE: FOR PROJECTS WHERE AFC ENTERPRISES IS THE OWNER,
<br />THE CONTRACTOR SHALL PROVIDE THE BUILDER'S RISK INSURANCE.
<br />THE INSURANCE SHALL BE IN AN AMOUNT EQUAL TO THE TOTAL
<br />AMOUNT OF THE CONTRACT, LESS THE AMOUNT OF THE SITE WORK
<br />INSURANCE WILL BE ON ALL RISK BASIS WITH $5000.00 DEDUCTIBLE.
<br />THE t5,000 DEDUCTIBLE WILL BE PAID BY THE CONTRACTOR THE
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE TOTAL AMOUNT OF
<br />LOSSES OF ALL BUILDING MATERIAL, TOOLS AND EQUIPMENT IN HIS
<br />POSSESSION AND NOT PERMANENTLY AFFIXED TO THE BUILDING OR
<br />SITE.
<br />BUILDERS' RISK INSURANCE CERTIFICATES WILL BE FURNISHED UPON
<br />REQUEST BY AFCE. ONE COPY WILL BE SENT DIRECTLY TO AFCE'S
<br />CONSTRUCTION COORDINATOR
<br />CLAIMS FOR DAMAGES MUST BE REPORTED TO AFCE'S INSURANCE
<br />DEPARTMENT. IMMEDIATELY BY TELEPHONE (404) 391-TI500.
<br />TELEPHONE REPORTS MUST BE FOLLOWED UP WITHIN TWENTY FOUR
<br />(24) HOURS BY A WRITTEN REPORT. SEND THE FIRST COPY TO AFCE'S
<br />INSURANCE DEPARTMENT, 5555 GLENRIDGE CONNECTOR, NE, SUITE
<br />300, ATLANTA, GA 30342, AND SEND THE COPY TO AFCE'S
<br />CONSTRUCTION DEPARTMENT (SAME ADDRESS). THE CONTRACTOR
<br />SHALL RETAIN THE THIRD COPY FOR HIS FILES. BLANK FORMS ARE
<br />AVAILABLE FROM AFCE'S INSURANCE DEPT.
<br />ARTICLE 1 - CHANGES IN THE WORK:
<br />A. ARTICLE 1.2 CHANGE ORDERS OF SAID "GENERAL CONDITIONS"
<br />SUBPARAGRAPH 12.1 IS HEREBY EXTENDED AS FOLLOWS:
<br />4. IN CONSIDERING PROPOSALS FOR CHANGES INVOLVING ADDED
<br />WORK, OMITTED WORK, OR ANY COMBINATION OF THE TWO, CHECKING
<br />OF ESTIMATES WILL BE MADE BY THE OWNER, UTILIZING UNIT PRICES
<br />WHERE SPECIFIED OR AGREED UPON, WITH THE VIEW OF ARRIVING AT
<br />EQUITABLE ADJUSTMENTS".
<br />5. WITH EACH PROPOSAL FOR A CHANGE INVOLVING INCREASE OR
<br />DECREASE IN THE AMOUNT OF THE CONTRACT, THE CONTRACTOR
<br />SHALL SUBMIT SEPARATELY AN ITEMIZED BREAKDOWN THAT WILL
<br />INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:
<br />(A)MATERIAL QUANTITIES AND UNIT PRICES (SEPARATED INTO TRADES).
<br />PROVIDE BONA FIDE MANUFACTURER'S OR SUPPLIERS' PROPOSALS
<br />FOR MANUFACTURED OR PRE ASSEMBLED ITEMS.
<br />(B) LABOR COST
<br />(C) CONSTRUCTION EQUIPMENT
<br />(D) WORKMEN'S COMPENSATION AND PUBLIC LIABILITY
<br />(E) OVERHEAD
<br />(F) PROFIT
<br />(G) SOCIAL SECURITY TAX
<br />SUPPLEMENTARY CONDITIONS
<br />I. PAYMENT TO CONTRACTOR:
<br />A. MONTHLY CONTRACT PAYMENT
<br />MONTHLY PROGRESS PAYMENTS SHALL BE PAID BY THE OWNER FOR
<br />1109. OF THE WORK COMPLETED AND MATERIALS STORED AS OF THE
<br />LAST DAY OF EACH MONTH. PAYMENTS MAY BE MADE BY THE
<br />OWNER ON THE JOINT PAYEE BASISREIMBURSEMENTBASIS, OR CASH
<br />ADVANCE BASIS AT THE ELECTION OF THE OWNER CONTRACTOR IS
<br />TO FORWARD AUTHORIZED CHANGE ORDER DIRECTIVES, AIA
<br />DOCUMENT G101, WHICH HAVE BEEN INCURRED TO THAT POINT, WITH
<br />APPLICATION FOR PAYMENT. CONTRACTOR IS TO ADVISE OWNER OR
<br />ITS AGENT OF ANY ITEM HE OR SUBCONTRACTOR BELIEVES IS AN
<br />ADDITIONAL COST OVER CONTRACT AMOUNT PRIOR TO DOING WORK
<br />(1) JOINT PAYEE BASIS
<br />CONTRACTORS WILL MAKE APPLICATION TO AFCE ON OR BEFORE THE
<br />TENTH OF EACH MONTH FOR A CHECK PAYABLE JOINTLY TO THE
<br />SUBCONTRACTORS AND/OR MATERIAL SUPPLIERS AND THE
<br />CONTRACTOR THE REQUEST WILL BE SUPPORTED BY THE ORIGINALS
<br />OF THE FOLLOWING DOCUMENTATION (EXPLANATION OF THESE FORMS
<br />ARE GI)/EN UNDER STANDARD FORMS).
<br />(A)AIA DOCUMENT G102 - APPLICATION AND CERTIFICATE OF PAYMENT
<br />(B) AIA DOCUMENT G103 - CONTINUATION SHEET.
<br />(C)CONTRACTOR'S AFFIDAVIT OF DISCLOSURE OF DEBTS AND CLAIMS.
<br />XOTHIS FOR-1 WILL BE PROVIDED BY AFCE.
<br />INVOICES AND/OR TIME SHEETS WILL ACCOMPANY THE CERTIFICATE
<br />OF PAYMENT IN SUPPORT OF WORK AND MATERIALS PROVIDED
<br />DURING THE PERIOD OF THE APPLICATION FOR THE CONTRACTOR
<br />AND FOR EACH SUBCONTRACTOR AND MATERIAL SUPPLIER
<br />REFLECTED ON THE APPLICATION.
<br />CONTRACTOR'S PARTIAL WAIVER OF LIENS FOR ALL WORK AND
<br />MATERIALS COMPLETED THROUGH THE BILLING DATE FOR THE
<br />CONTRACTOR AND FOR EACH SUBCONTRACTOR AND MATERIAL
<br />SUPPLIER REFLECTED ON THE APPLICATION WILL BE EXECUTED BY
<br />THE JOINT PAYEE CHECK ENDORSEMENT AS FOLLOWS:
<br />ALL PAYEES MUST SIGN THIS DISCHARGE
<br />"ALL CLAIMS, INTEREST, AND DEMANDS OF THE UNDERSIGNED FOR
<br />LABOR DONE OR MATERIAL FURNISHED, AND FOR LIENS, JUDGMENTS,
<br />MORTGAGES, OR ANY ACCOUNT WHATSOEVER AGAINST THE
<br />PROPERTY (TO BE) OCCUPIED AS A POPEYE'S RESTAURANT AT:
<br />(ADDRESS HERE)
<br />5I0D M REQUIREMENTS (CONT.)
<br />"THE OWNER THEREOF, ARE PAID AND SATISFIED, RELEASED, AND
<br />DISCHARGED TO THE EXTENT OF THE AMOUNT OF THIS CHECK. THE
<br />ENDORSEMENT OF THIS CHECK IS FULL EXECUTION OF THE FOREGOING
<br />RELEASE AND SHALL BEAR MY SIGNATURE THEREON."
<br />EXCEPT FOR ANNOTATING THE ADDRESS OF THE CONSTRUCTION SITE,
<br />THE ENDORSEMENT MUST NOT BE ALTERED OR QUALIFIED IN ANY
<br />WAY.
<br />(2) REIMBURSEMENT BASIS
<br />CONTRACTORS WILL PAY ALL SUBCONTRACTORS AND MATERIAL
<br />SUPPLIERS AND MAKE PRESENTATION TO AFCE ENTERPRISES ON OR
<br />BEFORE THE TENTH OF EACH MONTH FOR REIMBURSEMENT. THEIR
<br />REQUEST WILL BE SUPPORTED BY THE ORIGINALS OF THE FOLLOWING
<br />DOCUMENTS (EXPLANATIONS OF THESE FORMS ARE GIVEN UNDER
<br />STANDARD FORMS):
<br />(A)AIA DOCUMENT G102 - APPLICATION AND CERTIFICATE FOR PAYMENT
<br />(B)AIA DOCUMENT G103 - CONTINUATION SHEET.
<br />(C)AIA DOCUMENT G10ro - CONTRACTOR'S AFFIDAVIT OF PAYMENT OF
<br />DEBTS AND CLAIMS.
<br />(D)AIA DOCUMENT G106A - CONTRACTOR'S AFFIDAVIT OF RELEASE OF
<br />LIENS.
<br />(E)PARTIAL WAIVER OF LIEN FORM.
<br />B. FINAL PAYMENT
<br />CONTRACTORS WILL MAKE APPLICATION TO AFCE ENTERPRISES FOR
<br />THE FINAL PAYMENT. THE REQUEST WILL BE SUPPORTED BY THE
<br />ORIGINALS OF THE FOLLOWING DOCUMENTATION (EXPLANATIONS OF
<br />THESE FORMS ARE GIVEN UNDER STANDARD FORMS):
<br />(1) AIA DOCUMENT G-102 - APPLICATION AND CERTIFICATE FOR PAYMENT
<br />(2) AIA DOCUMENT G103 - CONTINUATION SHEET.
<br />(3)AIA DOCUMENT G106, AIA DOCUMENT G106A AND FINAL WAIVER OF
<br />LIENS FORM PROPERLY EXECUTED AND ACKNOWLEDGED.
<br />(4)AIA DOCUMENT G805 - LIST OF SUBCONTRACTORS
<br />WITHIN THIRTY (30) DAYS AFTER RECEIPT OF THE FILING FOR FINAL
<br />PAYMENT, THE OWNER SHALL PAY TO THE CONTRACTOR THE AMOUNT
<br />THEREIN STATED, LESS ALL DEDUCTIONS AUTHORIZED BY THE TERMS
<br />OF THIS CONTRACT AND PRIOR PAYMENTS AND ADVANCES
<br />WHATSOEVER TO OR FOR THE ACCOUNT OF THE CONTRACTOR.
<br />ALL PRIOR ESTIMATES AND PAYMENTS INCLUDING THOSE RELATING
<br />TO EXTRA WORK SHALL BE SUBJECT TO CORRECTION AT THE TIME OF
<br />THIS PAYMENT, WHICH IS THROUGHOUT THIS CONTRACT CALLED FINAL
<br />PAYMENT. FINAL PAYMENT SHALL BE SUBJECT TO INSPECTION AND
<br />ACCEPTANCE BY THE OWNER OR DULY AUTHORIZED
<br />REPRESENTATIVES OF THE OWNER, AND BY THE REPRESENTATIVES OF
<br />ALL AGENCIES HAVING DIRECT INTEREST IN THE PROJECT.
<br />QUESTIONS REGARDING APPLICATIONS CAN BE RESOLVED BY
<br />CONTACTING POPEYE'S CONSTRUCTION MANAGER
<br />2. CERTIFICATE OF SUBSTANTIAL COMPLETION:
<br />THE DATE OF THIS CERTIFICATE SHALL SERVE AS THE TIME FOR
<br />COMPUTING THE GUARANTEE PERIOD OF THE BUILDING UNLESS
<br />OTHERWISE AGREED UPON.
<br />3. OWNER'S USE AND OCCUPANCY OF BUILDING BEFORE ACCEPTANCE
<br />OF CONSTRUCTION:
<br />THE OWNER, FOR OCCUPANCY OF THE BUILDING DESCRIBED IN THE
<br />DRAWINGS, MAY TAKE POSSESSION OF AND USE SAME AS HE SO
<br />DESIRES UPON A SUBSTANTIAL COMPLETION OF THE CONTRACT, ALSO
<br />FURTHER UPON RELIEVING THE CONTRACTOR OF ANY DAMAGE DONE
<br />TO THE BUILDING DUE SOLELY TO SUCH OCCUPANCY BY SAID OWNER
<br />BUT UNDER NO CIRCUMSTANCES SHALL SUCH OCCUPANCY BE AN
<br />ACCEPTANCE OF THE WORK FOR THE COMPLETION OF THE CONTRACT
<br />OR AN ACCEPTANCE OF THE LABOR DONE AND MATERIALS USED OR
<br />INSTALLED.
<br />4. MANUFACTURED ITEMS IN THE SPECIFICATIONS:
<br />WHERE ITEMS ARE LISTED IN THE SPECIFICATIONS AND/OR "OR
<br />EQUAL" IS MENTIONED, THE MATERIALS LISTED SHALL BE USED.
<br />THESE MATERIALS SHALL BE INCLUDED IN THE BID SUBMITTED ON
<br />THE BID FORM. NO DEVIATION FROM THE MATERIALS LISTED SHALL
<br />BE MADE BY THE CONTRACTORS SUBMITTING BIDS. AFTER AWARD OF
<br />THE CONTRACT, THE CONTRACTOR MAY SUBMIT A SUBSTITUTE
<br />MATERIAL FOR THE ITEMS SPECIFIED AS AN "EQUAL" TO THE
<br />MATERIAL. SUCH REQUEST SHALL BE SUPPORTED BY TECHNICAL
<br />DATA SHOWING THAT THE MATERIALS OR SERVICE IS EQUAL TO THE
<br />ITEMS SPECIFIED AND STATING THE AMOUNT OF DECREASE OR
<br />INCREASE IN THE CONTRACT SUM. IF NO CHANGE IN THE CONTRACT
<br />SUM WILL BE MADE, STATE "NO CHANGE". THE CONSULTANT'S
<br />ARCHITECTURE AND ENGINEERING DEPARTMENT WILL DETERMINE IF
<br />THE MATERIAL IS ACCEPTABLE AS A SUBSTITUTE FOR THE SPECIFIED
<br />ITEM AND MAKE NOTIFICATION IN WRITING TO THE CONTRACTOR, THIS
<br />RULING BEING FINAL. CHANGES TO THE CONTRACT SUM WILL BE
<br />HANDLED BY CHANGE ORDER AUTHORIZATION OR CHANGE ORDER
<br />FORM.
<br />5. SALES TAX:
<br />A. THIS PROJECT IS SUBJECT TO STATE AND LOCAL SALES TAX.
<br />INCLUDE SALES TAX ON ALL MATERIALS USED IN THE PROJECT.
<br />B. WITH EACH REQUEST FOR PAYMENT, PROVIDE A CERTIFIED
<br />STATEMENT OF THE AMOUNT PAID FOR SALES TAX IN THE REQUESTED
<br />SUM.
<br />6. NONDISCRIMINATION CLAUSE:
<br />THE CONTRACTOR, HIS AGENT, OR HIS EMPLOYEES SHALL NOT
<br />DISCRIMINATE IN ANY MANNER ON THE BASIS OF RACE, COLOR,
<br />CREED, SEX, OR NATIONAL ORIGIN WITH REFERENCE TO THE SUBJECT
<br />MATTER OF THIS CONTRACT, NO MATTER HOW REMOTE.
<br />8100ING REQUIREMENTS (CONT.)
<br />DIVISION I: GENERAL REQUIREMENTS
<br />SECTION ]A: GENERAL
<br />SCOPE OF THE WORK:
<br />WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL INCLUDE
<br />ALL DEMOLITION, SITE WORK, BUILDING CONSTRUCTION, AND
<br />IMPROVEMENTS TO THE PROPERTY DESIGNATED IN THE
<br />CONSTRUCTION DOCUMENTS. THE INTENT OF THE CONSTRUCTION
<br />CONTRACT IS TO PROVIDE A POPEYES RESTAURANT COMPLETE IN
<br />ALL RESPECTS WITH ALL WORK PERFORMED IN A QUALITY AND
<br />WORKMANLIKE MANNER WITH THE BUILDING READY FOR OCCUPANCY
<br />WHEN CONSTRUCTION IS COMPLETE.
<br />2. PROTOTYPE PLANS:
<br />THE PLANS ARE DRAWN AS A PROTOTYPE TO BE BUILT IN MANY
<br />LOCATIONS. THE PROTOTYPE PLANS WILL BE SITE ADAPTED BY
<br />ARCHITECT/ENGINEER, TO MEET ALL NATIONAL, LOCAL CODES, AND
<br />SITE DESIGN CRITERIA. THE LOCATION, SIZE, AND EXTENT OF SITE
<br />WORK AND SITE DETAILS ARE TO BE DETERMINED BY A FINAL SITE
<br />PLAN AND/OR GRADING PLAN AND/OR LANDSCAPING PLAN AND
<br />GEOTECHNICAL AND/OR ENVIRONMENTAL REPORTS TO BE PROVIDED
<br />BY THE OWNER
<br />3. DEFINITIONS:
<br />"THE OWNER" AS USED HEREIN SHALL BE TAKEN TO MEAN AFG
<br />ENTERPRISES, 5555 GLENRIDGE CONNECTOR, NE, SUITE 300, ATLANTA,
<br />GEORGIA 30342, IN CASE OF COMPANY OWNED CONSTRUCTION.
<br />IN THE CASE OF CONSTRUCTION BY A LICENSEE OF POPEYES, "THE
<br />OWNER" SHALL BE TAKEN TO MEAN THE INDIVIDUAL LICENSEE HAVING
<br />CONTRACTED FOR THE CONSTRUCTION PROJECT. IN THE CASE OF A
<br />"BUILD -TO -SUIT" LEASE CONTRACT, "THE OWNER" SHALL BE TAKEN TO
<br />MEAN THE ACTUAL PROPERTY OWNER OR LANDLORD.
<br />4. START OF WORK:
<br />WORK SHALL BE STARTED UPON WRITTEN ORDER OF THE OWNER, AND
<br />THE ENTIRE PROJECT SHALL BE COMPLETED AS STIPULATED IN
<br />ACCORDANCE WITH THE TERMS AND PROVISIONS OF THE CONTRACT
<br />DOCUMENTS.
<br />5. COOPERATION:
<br />THE PRIME CONTRACTOR AND ALL SUBCONTRACTORS SHALL
<br />COORDINATE ALL WORK, ONE WITH THE OTHER, SO AS TO FACILITATE
<br />THE GENERAL PROGRESS OF THE WORK EACH TRADE SHALL
<br />AFFORD ALL OTHER TRADES EVERY REASONABLE OPPORTUNITY FOR
<br />THE INSTALLATION OF THEIR WORK
<br />6. ENGINEERING AND LAYOUT -
<br />AS THE WORK PROGRESSES, THE GENERAL CONTRACTOR SHALL
<br />COOPERATE WITH ALL SUBCONTRACTORS IN CHECKING THE LOCATION
<br />OF ALL PARTITIONS, SO THAT ABSOLUTE ASSURANCE WILL BE
<br />OBTAINED THAT ALL ROUGHING IN OF CONCEALED WORK WILL BE
<br />CONFINED WITHIN PARTITIONS, OR SPACES AS INDICATED.
<br />1. STANDARDS:
<br />ANY MATERIAL SPECIFIED BY REFERENCE TO THE NUMBER, SYMBOL,
<br />OR TITLE OF A SPECIFIED STANDARD SUCH AS A COMMERCIAL
<br />STANDARD, A FEDERAL SPECIFICATION, A TRADE ASSOCIATION
<br />STANDARD, OR OTHER SIMILAR STANDARD, SHALL COMPLY WITH THE
<br />REQUIREMENTS IN THE LATEST REVISION THEREOF AND ANY
<br />AMENDMENTS THERETO.
<br />S. MANUFACTURER'S DIRECTIONS:
<br />ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT SHALL
<br />BE APPLIED, INSTALLED, CONNECTED, ERECTED, USED, CLEANED,
<br />AND CONDITIONED AS DIRECTED BY THE MANUFACTURERS UNLESS
<br />HEREIN SPECIFIED TO THE CONTRARY.
<br />S. CLEANING t TOUCH-UP:
<br />A. FOREIGN MATTER ON ANY EXPOSED SURFACE, WHICH WOULD AFFECT
<br />QUALITY OF FINISH PAINTING, SHALL BE REMOVED BY THE CRAFT
<br />RESPONSIBLE FOR ITS PRESENCE.
<br />B. RESTORATION OF SHOP -PRIMING IF DAMAGE OCCURS BEFORE,
<br />DURING, OR AFTER ERECTION SHALL BE INCLUDED IN THE DIVISION
<br />UNDER WHICH THE ITEM IS TO BE FURNISHED AND INSTALLED.
<br />10. SIGNS:
<br />NO SIGNS OR ADVERTISEMENTS WILL BE ALLOWED TO BE DISPLAYED
<br />WITHOUT THE APPROVAL OF THE OWNER
<br />WOOING REQUIREMENTS (CONT.)
<br />11. TEMPORARY UTILITIES:
<br />THE GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY WATER
<br />AND MINIMUM OF 120/240 SINGLE PHASE ELECTRICAL SERVICE FOR
<br />THE JOB SITE AND PAY FOR SAME. THE SUBCONTRACTORS ON THE
<br />JOB SHALL ARRANGE WITH THE GENERAL CONTRACTOR FOR THE USE
<br />OF THESE FACILITIES. THE GENERAL CONTRACTOR SHALL PROVIDE
<br />ANY HEAT OR TEMPORARY CLOSING -IN OF THE BUILDING WHICH MAY
<br />BE REQUIRED.
<br />12. TEMPORARY TOILET FACILITIES:
<br />THE GENERAL CONTRACTOR SHALL ERECT AND MAINTAIN IN A SAFE
<br />AND SANITARY CONDITION, A TOILET FACILITY FOR ALL WORKMEN ON
<br />THE JOB. THE TYPE OF FACILITY SHALL BE IN COMPLIANCE WITH THE
<br />REQUIREMENTS OF THE LOCAL HEALTH DEPARTMENT.
<br />13. WORK BY OTHERS:
<br />THE CONTRACT DOCUMENTS CALL FOR CERTAIN ITEMS TO BE
<br />SUPPLIED BY THE OWNER OR OTHERS AND INSTALLED BY THE
<br />GENERAL CONTRACTOR. OTHER ITEMS ARE TO BE FURNISHED AND
<br />INSTALLED BY THE OWNER OR OTHERS. THE GENERAL CONTRACTOR
<br />SHALL COORDINATE THE WORK OF ALL TRADES AND COOPERATE IN
<br />THE PREPARATION OF SURFACES, DIMENSIONS, AND UTILITIES FOR
<br />WORK TO BE PERFORMED BY THE OWNER OR BY OTHERS.
<br />SUBCONTRACTORS INSTALLING MECHANICAL, ELECTRICAL, AND
<br />PLUMBING SERVICES FOR FOOD SERVICE EQUIPMENT TO BE
<br />INSTALLED BY THE OWNER OR BY OTHERS ARE CAUTIONED THAT THE
<br />ROUGH -IN DIMENSIONS SHOWN ON THE PLANS ARE EXTREMELY
<br />CRITICAL. ERROR IN LOCATING SERVICES SHALL BE CORRECTED BY
<br />THE SUBCONTRACTOR PERFORMING THE ROUGH -IN WORK AT NO
<br />ADDITIONAL COST TO THE OWNER.
<br />FINAL ELECTRICAL CONNECTIONS TO FOOD SERVICE EQUIPMENT AND
<br />FINAL WATER DRAIN, GAS, AND VENTILATION CONNECTIONS TO FOOD
<br />SERVICE EQUIPMENT SHALL BE AS INDICATED IN THE EQUIPMENT
<br />SCHEDULE.
<br />14. CONFLICTS AND ERRORS:
<br />IF THERE IS A CONFLICT BETWEEN THE PLANS AND SPECIFICATIONS,
<br />THE SPECIFICATIONS SHALL TAKE PRECEDENCE UNLESS
<br />SPECIFICALLY INDICATED OTHERWISE BY THE OWNER OR OWNER'S
<br />REPRESENTATIVE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY
<br />TO NOTIFY THE OWNER OR THE OWNER'S AGENT OF ANY CONFLICTS,
<br />OMISSIONS, DELETIONS, OR ERRORS IN THE PLANS OR
<br />SPECIFICATIONS ENCOUNTERED DURING THE BIDDING PERIOD AND
<br />THE COURSE OF CONSTRUCTION BEFORE CONTINUING THE WORK
<br />AFFECTED.
<br />SECTION IB: BASE AND ALTERNATE BIDS
<br />GENERAL
<br />THE EXPLANATION IN THIS SECTION TOGETHER WITH THE INFORMATION
<br />LISTED IN OTHER SECTIONS OF THE SPECIFICATIONS SHOWN ON THE
<br />DRAWINGS AND/OR DESCRIBED IN THE INSTRUCTIONS TO BIDDERS
<br />IDENTIFY AREAS REQUIRED TO ACCOMPLISH THE BID REQUIREMENTS
<br />FOR ALTERNATE BIDS.
<br />BASE BID
<br />INCLUDE ALL WORK SHOWN AND SPECIFIED HEREIN AND EXCLUDE
<br />MODIFICATIONS OF THE WORK STATED FOR ALTERNATE BIDS.
<br />SUBM ITALS
<br />LITERATURE
<br />T USS WINGS
<br />R DRAWINGS
<br />AWNING DRAWINGS
<br />E.I.F.S. SYSTEM
<br />HVAC UNITS, DIFFUSERS, GRILLS t THERMOSTATS
<br />ELECTRICAL POWER DISTRIBUTION
<br />BUILDING AND SITE LIGHTING
<br />PLUMBING FIXTURES
<br />ST OOM ACCESSORIES
<br />RE R
<br />ROOF LADDER
<br />DRIVE-THRU BALCONY
<br />DUMPSTER GATES
<br />QUE-LINE, HAND RAIL AND DIVIDER RAILINGS
<br />SAMPLES
<br />BRICK AND GROUT COLORS
<br />E.I.F.S. COLORS OR EXTERIOR PAINTS
<br />FLOOR AND GROUT COLOR (KITCHEN t DINING)
<br />CHAIR RAIL AND STAIN
<br />WAINSCOT LAMINATE
<br />CEILING TILE AND GRID (KITCHEN t DINING)
<br />FRP
<br />METAL MANSARD
<br />SOLID SURFACE COUNTERTOP
<br />TYPICAL CONSTRUCTION SCHEDULE
<br />A55RE V I AT I ONS
<br />AC
<br />AIR CONDITIONING
<br />STL
<br />STEEL
<br />AFF
<br />ABOVE FINISH FLOOR
<br />STOR
<br />STORAGE
<br />AHU
<br />AIR HANDLING UNIT
<br />SUSP
<br />SUSPENDED
<br />AL
<br />ALUMINUM
<br />T
<br />TREAD
<br />ASPH
<br />ASPHALT
<br />TELE
<br />TELEPHONE
<br />AT
<br />ALUMINUM THRESHOLD
<br />TPD
<br />TOILET PAPER DISPENSER
<br />BD
<br />BOARD
<br />TYP
<br />TYPICAL
<br />BLKT
<br />BLANKET
<br />UNO
<br />UNLESS NOTED OTHERWISE
<br />CJ
<br />CONTROL JOINT
<br />VCT
<br />VINYL COMPOSITION TILE
<br />CLG
<br />CEILING
<br />CMU
<br />CONCRETE MASONRY UNIT
<br />VERY
<br />VERTICAL
<br />COL
<br />COLUMN
<br />VT
<br />VINYL THRESHOLD
<br />CONC
<br />CONCRETE
<br />WC
<br />WATER CLOSET
<br />CONT
<br />CONTINUOUS
<br />WD
<br />WOOD
<br />CPT
<br />CARPET
<br />CT
<br />CERAMIC TILE
<br />uJP
<br />WATERPROOF
<br />C/L
<br />CENTER LINE
<br />WWF
<br />WELDED WIRE FABRIC
<br />DBL
<br />DOUBLE
<br />W/
<br />WITH
<br />DF
<br />DRINKING FOUNTAIN
<br />DIA
<br />DIAMETER
<br />DIM
<br />DIMENSION
<br />DN
<br />DOWN
<br />DS
<br />DOWN SPOUT
<br />EA
<br />EACH
<br />EJ
<br />EXPANSION JOINT
<br />ELEC
<br />ELECTRICAL
<br />ELEV / EL
<br />ELEVATION
<br />EQ
<br />EQUAL
<br />EXIST
<br />EXISTING
<br />FD
<br />FLOOR DRAIN
<br />FE
<br />FIRE EXTINGUISHER
<br />FF
<br />FINISH FLOOR
<br />FIR
<br />FIRE RATED
<br />GALV
<br />GALVANIZED
<br />GYPBD
<br />GYPSUM BOARD
<br />HC
<br />HANDICAPPED
<br />HDW
<br />HARDWARE
<br />HIM
<br />HOLLOW METAL
<br />HVAC
<br />HEATING, AIR CONDITIONING, 8 VENT
<br />INFO
<br />INFORMATION
<br />INSUL
<br />INSULATION
<br />LAC
<br />LAY -IN ACOUSTICAL CEILING
<br />MAS
<br />MASONRY
<br />MAX
<br />MAXIMUM
<br />MECH
<br />MECHANICAL
<br />MFGR / MFR
<br />MANUFACTURER
<br />MIN
<br />MINIMUM
<br />MO
<br />MASONRY OPENING
<br />MR
<br />MI /1-1 I T I RROR O S URE RES STANT
<br />MT
<br />MARBLE THRESHOLD
<br />MTL
<br />METAL
<br />NA
<br />NOT APPLICABLE
<br />NIC
<br />NOT IN CONTRACT
<br />NOM
<br />NOMINAL
<br />NTS
<br />NOT TO SCALE
<br />OC
<br />ON CENTER
<br />OPP
<br />OPPOSITE
<br />PLYWD
<br />PLYWOOD
<br />PREFAB
<br />PREFABRICATED
<br />PSF
<br />POUNDS PER SQUARE FOOT
<br />PT
<br />PAINT / PRESSURE TREATED
<br />QT
<br />QUARRY TILE
<br />R
<br />RISER/RADIUS
<br />REBAR
<br />REINFORCING BAR
<br />REF
<br />REFERENCE
<br />RE INF
<br />RE INFORCE
<br />REQ'D
<br />REQUIRED
<br />RO
<br />ROUGH OPENING
<br />SB
<br />SPLASH BLOCK
<br />SHLVS
<br />SHELVES
<br />SIM
<br />SIMILAR
<br />SPEC
<br />SPECIFICATION
<br />SS
<br />STAINLESS STEEL
<br />CONSTRUCTION
<br />TRAINING
<br />OPEN
<br />SURVEYOR
<br />EQUIPMENT
<br />ESTABLISH
<br />CONTRACTOR
<br />BUILDING
<br />BUILDING SLAB
<br />BUILDING SLAB
<br />DUROCK
<br />EXTERIOR FINISH
<br />INSTALL
<br />INSTALL KITCHEN
<br />PLUMBING
<br />FINAL PUNCH AND
<br />TRAINING
<br />RESTAURANT
<br />CONSTRUCTION
<br />MOBILIZATION
<br />CORNERS AND
<br />ROUGN-IN
<br />AND ROUGH
<br />ROOFING
<br />INSULATION
<br />PLYWOOD
<br />BRICK/E.I.F.S.
<br />CEILING TILE
<br />SECURITY, MUSIC,
<br />EQUIPMENT
<br />ELECTRICAL
<br />-
<br />-
<br />TURN OVER
<br />-
<br />PROCESS
<br />OPEN
<br />SCHEDULE
<br />TBM
<br />FRAMING
<br />DRYWALL
<br />MURALS
<br />CONNECTIONS
<br />CONTRACTOR
<br />BUILDING LAYOUT
<br />UNDERGROUND
<br />INSTALL HOODS
<br />BUILDING
<br />STOREFRONT
<br />FRP FRONT
<br />ELECTRICAL
<br />DUMPSTER
<br />SIGNS, MENU
<br />SEATING, DECOR
<br />CONSTRUCTION
<br />FACILITIES
<br />RECEIVES NOTICE
<br />-
<br />FORMWORK
<br />ELECTRICAL
<br />AND HVAC ROOF
<br />ELECTRICAL
<br />GLASS &DOORS
<br />COUNTER
<br />BUILDING AND
<br />ENCLOSURE
<br />BOARDS, DRIVE
<br />COUNTERS
<br />EQUIPMENT
<br />-
<br />IDENTIFICATION
<br />TO PROCEED
<br />ROUGH -INS
<br />CURBS
<br />ROUGH -INS
<br />SITE
<br />THRU SYSTEM
<br />PUNCH LIST
<br />FINALIZE ALL
<br />INTERIOR
<br />NATIONAL
<br />UNDERGROUND
<br />LOT LIGHT
<br />BUILDING
<br />SITE WORK
<br />FINISHES
<br />SITE WORK
<br />AWNINGS,
<br />HOOD ANSUL
<br />LANDSCAPING
<br />PROJECT COSTS
<br />ACCOUNT
<br />ROUGH GRADING
<br />PLUMBING
<br />ANCHOR BOLTS
<br />PLUMBING
<br />CURBS
<br />_
<br />CARPENTRY DROP
<br />PAVING
<br />SHUTTERS
<br />SYSTEM
<br />IRRIGATION
<br />_
<br />_
<br />SUMMARIZED
<br />QUOTES
<br />ROUGH -INS
<br />ROUGH INS
<br />CEILING GRID
<br />SITE WORK
<br />BALCONY
<br />INTERIOR
<br />UTILITIES
<br />BUILDING HVAC
<br />DRIVE THRU
<br />INTERIOR DOORS,
<br />RAILINGS, HAND
<br />INSTALL UTILITY
<br />SIGNAGE, PLANTS,
<br />-
<br />_
<br />ELECTRICAL
<br />DUCTWORK
<br />DRIVE THRU LOOP
<br />BALCONY
<br />MILLWORK, STAIN
<br />RAILINGS,
<br />METERS,
<br />ARTWORK,
<br />-
<br />-
<br />-
<br />-
<br />PLUMBING STORM
<br />SEWER
<br />AND PAINT
<br />DUMPSTER GATES
<br />TELEPHONE
<br />WINDOW SHADES
<br />UNDERGROUND
<br />SMALLWARES
<br />INSTALL DRINK
<br />CLEANING
<br />_
<br />STORM SEWER
<br />-
<br />-
<br />-
<br />FLOOR TILE
<br />CHECKED -IN AND
<br />SYSTEM, CO2
<br />SUPPLIES, MATS
<br />-
<br />-
<br />-
<br />STORED
<br />CONSTRUCTION
<br />SITE WORK
<br />CONSTRUCTION
<br />IN -PROGRESS
<br />CONCRETE
<br />IN -PROGRESS
<br />-
<br />-
<br />VISIT POPEYES
<br />-
<br />-
<br />-
<br />-
<br />DRIVEWAYS
<br />VISIT POPEYES
<br />-
<br />-
<br />-
<br />-
<br />-
<br />CONSTRUCTION
<br />DUMPSTER
<br />CONTRUCTION
<br />MANAGER
<br />MANAGER
<br />RECEIVE
<br />BUILDING
<br />INSPECTION
<br />INSPECTION
<br />INSPECTION WALL
<br />CEILING
<br />BUILDING FINAL
<br />PRE
<br />ORDER NATIONAL
<br />APPROVALS FOR
<br />COVER-UP
<br />COVER-UP HVAC
<br />INSPECTIONS
<br />BUILDING
<br />CERTIFICATE OF
<br />OPENING
<br />CONSTRUCTION
<br />ACCOUNTS
<br />-
<br />BACK FILL
<br />-
<br />FRAMING
<br />-
<br />-
<br />ELECTRICAL
<br />-
<br />-
<br />-
<br />-
<br />MECHANICAL
<br />INSPECTIONS FIRE
<br />OCCUPANCY
<br />-
<br />SUPPORT
<br />OPEN
<br />MEkTING
<br />BUYOUTS
<br />UNDERGROUND
<br />ELECTRICAL
<br />PLUMBING, GAS,
<br />ELECTRICAL
<br />HEALTH
<br />UTILITIES
<br />PLUMBING
<br />FIRE MARSHAL
<br />PLUMBING
<br />SUBTOTAL SUBTOTAL TOTAL
<br />SCHEDULE
<br />STANDARD
<br />ESTIMATED DAYS
<br />1
<br />3
<br />6
<br />6
<br />5
<br />10
<br />4
<br />10
<br />13
<br />4
<br />2
<br />4
<br />5
<br />4
<br />2
<br />1
<br />80
<br />14
<br />94
<br />REVISIONS
<br />BY
<br />' , v
<br />00
<br />CO
<br />-0 .
<br />t` E
<br />0 o
<br />_5 ti
<br />Q rn 0
<br />Tt__ 3
<br />U N
<br />� v
<br />� c
<br />0
<br />n
<br />r N
<br />1�
<br />i
<br />11�
<br />A f
<br />04
<br />01
<br />0 0 M C
<br />III
<br />f
<br />tb
<br />CD
<br />N - =
<br />o 0
<br />o
<br />Y) a
<br />U
<br />c Q
<br />a�
<br />O
<br />t`
<br />O
<br />Z
<br />y W
<br />C
<br />O Y v
<br />o U �
<br />�L
<br />O O
<br />m
<br />U L`
<br />_
<br />w
<br />�-C
<br />� W
<br />X 4 d
<br />LLI W
<br />� nIV
<br />L
<br />L `'
<br />p
<br />•o
<br />� cL
<br />C
<br />Date: 03. 28. 13
<br />Scale: AS NOTED
<br />Project Mgr: MY
<br />Drawn: AZP
<br />Job: 13-03
<br />Sheet
<br />T2
<br />H:'�Prgjects\Projects 2013\13003 - Popeyes Zephyrhills\04-CD\01-CD.A\04-Architectural\T2-BIDDING.dwg, 3/28/2013 2:53:22 PM, Xerox 6030.pc3