Laserfiche WebLink
810DINCx REQUIREMENTS <br />BIDDING REQUIREMENTS: INSTRUCTIONS TO BIDDERS <br />EXAMINATION OF SITE: <br />ALL BIDDERS SUBMITTING PROPOSALS FOR THIS WORK SHALL FIRST <br />EXAMINE THE SITE (PREMISES) AND`ALL SUCH CONDITIONS AS MAY <br />AFFECT THE WORK UNDER THIS CONTRACT. FAILURE TO EXAMINE THE <br />SITE WILL NOT RELIEVE THE SUCCESSFUL BIDDER FROM THE <br />NECESSITY TO PROVIDE WORK THAT MAY BE REQUIRED TO COMPLETE <br />THE WORK WITHOUT ADDITIONAL COST TO THE OWNER <br />EXPLANATION TO BIDDERS: <br />A. NO ORAL EXPLANATION IN REGARD TO THE MEANING OF THE <br />DRAWINGS AND SPECIFICATIONS WILL BE MADE AND NO ORAL <br />INSTRUCTIONS WILL BE GIVEN BEFORE THE AWARD OF THE CONTRACT. <br />DISCREPANCIES, OMISSIONS, OR DOUBTS AS TO MEANING OF THE <br />DRAWINGS AND SPECIFICATIONS SHALL BE COMMUNICATED IN WRITING <br />TO THE OWNER FOR INTERPRETATION. <br />IN THE EVENT OF UNRESOLVED DISCREPANCIES OR AMBIGUITY, <br />INTERPLAN LLC ARCHITECTURE AND ENGINEERING DEPARTMENT WILL <br />BE THE FINAL JUDGE ON PLAN INTERPRETATION. BIDDERS SHOULD <br />ACT PROMPTLY AND ALLOW SUFFICIENT TIME FOR A REPLY TO REACH <br />THEM BEFORE THE SUBMISSION OF THEIR BIDS. ANY REVISION MADE <br />WILL BE IN THE FOR"( OF AN ADDENDUM TO THE SPECIFICATIONS <br />BEARING THE APPROVAL OF THE OWNER AND WILL BE FORWARDED <br />TO ALL BIDDERS AND ITS RECEIPT BY THE BIDDER SHOULD BE <br />ACKNOWLEDGED BY THE BIDDER BY HIS SIGNATURE AFFIXED <br />THERETO AT THE TIME OF RECEIPT AND VERIFIED BY HIS <br />ACKNOWLEDGMENT ON THE BID FORM. <br />B. EACH PROSPECTIVE BIDDER WILL BE FURNISHED BIDDING <br />DOCUMENTS TO COMPLETE THEIR BID. <br />PREPARATION t SUBMISSION OF BIDS: <br />A. THE BIDDER IS REQUIRED TO BID ON ALL ALTERNATES AND/OR <br />ALLOWANCES OR ON ALL ITEMS CALLED FOR IN THE BID FORM, <br />EXCEPT WHEN ALTERNATES ARE CALLED FOR ON A TYPE OR METHOD <br />OF CONSTRUCTION AS TO WHICH BIDDER DOES NOT DESIRE TO BID, <br />HE MAY INSERT THE WORDS "NO BID" IN THE SPACE PROVIDED FOR <br />PRICES ON SUCH ALTERNATE TYPE OR METHOD OF CONSTRUCTION. <br />B. BIDS SHALL BE SUBMITTED ON THE FORMS FURNISHED AND SHALL BE <br />SIGNED IN INK ERASURES OR OTHER CHANGES IN A BID <br />MUST BE <br />EXPLAINED OR NOTED OVER THE SIGNATURE OF THE BIDDER. BIDS <br />CONTAINING ANY CONDITIONS, OMISSIONS, UNEXPLAINED ERASES OR <br />ALTERNATES, OR ITEMS NOT CALLED FOR IN THE PROPOSAL, OR <br />IRREGULARITIES OF ANY KIND, MAY BE REJECTED BY THE OWNER AS <br />BEING INCOMPLETE. <br />BID ANALYSIS: <br />BIDS SHALL BE ACCOMPANIED BY ONE (1) SIGNED COPY OF <br />POPEYEB STANDARD "BID ANALYSIS" FORM. AS INDICATED ON THE <br />FORM, INDIVIDUAL LINE ITEMS ARE TO BE SHOWN AT THE GENERAL <br />CONTRACTOR'S COST WITH NO MARKUP FOR OVERHEAD OR PROFIT <br />BY THE GENERAL CONTRACTOR HOWEVER, EACH LINE ITEM SHALL <br />INDICATE THE FULL VALUE OF SUBCONTRACTOR WORK INCLUDING <br />SUBCONTRACTOR'S OVERHEAD AND PROFIT. SUPERVISION, <br />OVERHEAD, AND PROFIT FOR THE GENERAL CONTRACTOR'S WORK <br />SHALL BE SHOWN ON THE APPROPRIATE LINES. <br />AWARD OF CONTRACT: <br />THE OWNER RESERVES THE RIGHT TO DETERMINE WHAT ARE <br />INFORMALITIES IN THE MAKING, RECEIVING, AND OPENING OF BIDS AND <br />THE AWARDING OF CONTRACTS THEREON, AND THE FURTHER RIGHT TO <br />WAIVE ANY SUCH INFORMALITY WHEN SUCH WAIVER IS, IN THE <br />DISCRETION OF THE OWNER, TO THE BEST INTEREST, ALSO. TO <br />ACCEPT ANY ITEM IN THE BID UNLESS OTHERWISE SPECIFIED. <br />REJECTION OF BIDS: <br />THE OWNER RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS. <br />STANDARD FORMS: <br />1. AIA DOCUMENT A305 - CONTRACTORS QUALIFICATIONS STATEMENT. <br />2. AIA DOCUMENT G101 - CHANGE ORDER. <br />3. AIA DOCUMENT G102 - APPLICATION AND CERTIFICATE OF PAYMENT. <br />THIS DOCUMENT SUMMARIZES THE CONTRACT AMOUNT, WORK <br />COMPLETED, STORED MATERIALS, RETAINAGE, PREVIOUS <br />CERTIFICATES OF PAYMENT, AND THE CURRENT AMOUNT DUE. <br />4. AIA DOCUMENT G103 - CONTINUATION SHEET (ONE (1) OR MORE <br />SHEETS AS REQUIRED). THIS DOCUMENT DETAILS THE AMOUNTS <br />SUMMARIZED ON DOCUMENTS G102. IT PROVIDES A PROJECT <br />BREAKDOWN AND DISCLOSES THE NAME OF THE COMPANY <br />PROVIDING LABOR AND MATERIALS. WHEN LABOR IS PAID BY THE <br />CONTRACTOR DIRECTLY TO INDIVIDUAL WORKERS, IT SHOULD BE <br />IDENTIFIED AS "G.C. LABOR". THIS DOES NOT INCLUDE ANY LABOR <br />PAID TO A THIRD PARTY. MATERIALS TAKEN FROM THE <br />CONTRACTOR'S INVENTORY SHOULD BE LISTED AS "G.C. MATERIALS" <br />THIS MAY NOT INCLUDE MATERIALS DELIVERED DIRECTLY TO THE <br />JOB SITE OR IDENTIFIED IN ANY WAY THE SUPPLIER WITH AFCE. <br />CONTRACTOR'S OVERHEAD AND PROFIT SHALL BE SHOWN AS A <br />SEPARATE LINE ITEM. IF SUBCONTRACTOR AMOUNTS CHANGE FROM <br />AMOUNTS SHOWN ON THE ORIGINAL PROJECT BREAKDOWN, THE <br />CHANGES SHALL BE SHOWN ON THE PAYMENT REQUEST WITH A <br />CORRESPONDING CHANGE TO THE CONTRACTOR'S OVERHEAD AND <br />PROFIT LINE. UNLESS A CHANGE ORDER IS INVOLVED, THE TOTAL <br />CONTRACT AMOUNT SHALL REMAIN THE SAME. <br />5. CERTIFICATE OF SUBSTANTIAL COMPLETION, AIA DOCUMENT A104. <br />6. CERTIFICATE OF INSURANCE, AIA DOCUMENT G105. <br />1. AIA DOCUMENT G106 - CONTRACTOR'S AFFIDAVIT OF PAYMENT OF <br />DEBTS AND CLAIMS - IN THIS DOCUMENT, THE CONTRACTOR SWEARS <br />THAT ALL SUBCONTRACTORS AND MATERIALMEN ARE DISCLOSED <br />ON G103 AND THAT EACH HAS BEEN PAID. <br />g, AIA DOCUMENT G106A - CONTRACTOR'S AFFIDAVIT OF RELEASE OF <br />LIENS - IN THIS DOCUMENT, THE CONTRACTOR SWEARS THAT ALL <br />SUBCONTRACTORS AND MATERIALMEN ARE LISTED ON G103 AND <br />THAT WAIVERS OF LIENS, HIS OWN INCLUDED, ARE ATTACHED. <br />S. AIA DOCUMENT G8O5 - LIST OF SUBCONTRACTORS <br />10. AIA DOCUMENT G113 - CHANGE ORDER AUTHORIZATIONS. <br />11. CONSENT OF SURETY (SURETY COMPANY'S FORM). <br />12. PARTIAL WAIVER OF LIEN FORM - IN THIS FOR"(, THE CONTRACTOR, <br />SUBCONTRACTORS AND MATERIALMEN WAIVE THEIR RIGHT TO FILE A <br />LIEN FOR WORK PERFORMED TO DATE. THIS DOCUMENT IS <br />ACCEPTABLE FOR INTERIM CERTIFICATES OF PAYMENT. <br />13. FINAL WAIVER OF LIEN FORM - IN THIS FORM, THE CONTRACTOR, <br />SUBCONTRACTORS AND MATERIALMEN WAIVE THEIR RIGHT TO FILE A <br />LIEN FOREVER. <br />14. CONTRACTOR'S AFFIDAVIT OF DISCLOSURE OF DEBTS AND CLAIMS. IN <br />THIS DOCUMENT, THE CONTRACTOR SWEARS THAT ALL DEBTS AND <br />CLAIMS ARE DISCLOSED. IT SUMMARIZES THE CURRENT AMOUNT DUE <br />EACH FIRM (CONTRACTOR, SUBCONTRACTOR, OR MATERIALMEN) <br />LISTED ON G103. IT ALSO PROVIDES THE ADDRESS, PHONE NUMBER, <br />AND REPRESENTATIVE OF EACH FIRM. <br />CONTRACT FORMS <br />1. THE CONTRACT FOR CONSTRUCTION SHALL BE AFC ENTERPRISES <br />"CONSTRUCTION CONTRACT AGREEMENT" FOR ALL CONSTRUCTION. <br />GENERAL CONDITIONS <br />GENERAL: <br />A. THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION", <br />STANDARD FORM OF THE AMERICAN INSTITUTE OF ARCHITECTS, FORM <br />A-201, LATEST EDITION, ARE HEREBY, EXCEPT AS THE SAME MAY BE <br />INCONSISTENT HEREWITH, MADE A PART OF THIS SPECIFICATION. <br />COPIES ARE ON FILE IN THE OFFICE OF INTERPLAN LLC ARCHITECTURE <br />AND ENGINEERING DEPARTMENT AND ARE INCORPORATED BY <br />REFERENCE AND HEREBY MADE A PART OF THE CONTRACT. <br />B. WHERE ANY ARTICLE OF THE AIA "GENERAL CONDITIONS" IS <br />SUPPLEMENTED HEREBY THE AIA PROVISION OF SUCH ARTICLE SHALL <br />REMAIN IN EFFECT. ALL THE SUPPLEMENTARY CONDITIONS SHALL BE <br />CONSIDERED AS IF ADDED THERETO. WHERE ANY PORTION OF SUCH <br />ARTICLE IS AMENDED, VOIDED OR SUPERSEDED THEREBY, THE <br />PROVISIONS OF SUCH ARTICLE NOT SO SPECIFICALLY AMENDED, <br />VOIDED, OR SUPERSEDED SHALL REMAIN IN EFFECT. <br />C. THE GENERAL CONDITION SUPPLEMENTARY CONDITIONS AND <br />APPLICABLE PORTIONS OF DIVISION I OF THE SPECIFICATIONS <br />APPLY TO ANY AND ALL SUBSEQUENT SECTIONS OF THESE <br />SPECIFICATIONS. <br />D. WHERE ANY ARTICLE OR PORTION OF AN ARTICLE CONFLICTS WITH THE <br />LAWS OF THE STATE OF THE LOCATION OF THE PROJECT, SUCH <br />ARTICLE, OR PORTION OF THE ARTICLE IS HEREBY STRICKEN. <br />E. "CONTRACTOR SHALL BE REQUIRED TO COMPLY WITH THE 1SSO <br />AMERICANS WITH DISABILITIES ACT (29CFR PART 1630). TITLE III AND <br />THE REGULATIONS PROMULGATED IN ACCORDANCE THEREIN. <br />CONTRACTOR SHALL INDEMNIFY AND HOLD OWNER AND ARCHITECT <br />HARMLESS FROM ANY AND ALL LOSSES, SUITS, CLAIMS, COSTS, <br />EXPENSES AND OTHER DAMAGES WHICH MAY BE INCURRED BY <br />OWNER/ARCHITECT AS A RESULT OF CONTRACTOR'S FAILURE TO <br />COMPLY WITH SAID ACT". <br />13100 INCx REQUIREMENTS (CONT.) <br />ARTICLE 3 - CONTRACTOR: <br />A. ARTICLE 3.4 LABOR AND MATERIALS OF SAID "GENERAL CONDITION" <br />PARAGRAPH 4A3 IS HEREBY ADDED AS FOLLOWS: <br />"ALL CONTRACTORS AND SUBCONTRACTORS EMPLOYED UPON THE <br />WORK SHALL BE REQUIRED TO CONFORM TO THE FEDERAL, STATE, <br />AND LOCAL LABOR LAWS AND VARIOUS ACTS AMENDATORY AND <br />SUPPLEMENTARY THERETO, AND TO ALL OTHER LAWS, ORDINANCES, <br />AND LEGAL REQUIREMENTS APPLICABLE THERETO." <br />B. ARTICLE 316 TAXES OF SAID "GENERAL CONDITIONS" PARAGRAPH <br />3b.1 IS HEREBY AMENDED AND SUPPLEMENTED AS FOLLOWS: <br />THE CONTRACTOR SHALL PAY FOR ALL TAXES NECESSARY FOR THE <br />PROPER EXECUTION AND COMPLETION OF THE WORK, BOTH <br />TEMPORARY AND PERMANENT." <br />C. ARTICLE 3.1 PERMITS, FEES AND NOTICES OF SAID "GENERAL <br />CONDITIONS" PARAGRAPH 4.13 DELETE IN ITS ENTIRETY AND <br />SUBSTITUTE IN LIEU THEREOF AS FOLLOWS: <br />"THE CONTRACTOR SHALL BRING TO THE ATTENTION OF THE OWNER <br />ANY CONFLICTS, OMISSIONS, DELETIONS, OR ERRORS IN THE <br />DRAWINGS AND/OR SPECIFICATIONS WHICH DO NOT CONFORM TO <br />APPLICABLE ZONING, CODE AND OTHER USE REGULATIONS AND/OR <br />TO THE'AMERICANS WITH DISABILITIES ACT AND REGULATIONS <br />PROMULGATED THEREUNDER THE CONTRACTOR SHALL NOT BE <br />LIABLE TO THE OWNER OR THE ARCHITECT FOR ANY DAMAGES <br />RESULTING FROM ANY SUCH ERRORS EXCEPT THAT CONTRACT SHALL <br />BE FULLY AND EXCLUSIVELY LIABLE UPON FAILURE TO PUT <br />ARCHITECT ON NOTICE OF SAID CONFLICTS, OMISSIONS, DELETIONS, <br />OR ERRORS." <br />D. ARTICLE 3.15 CLEANING UP OF SAID "GENERAL CONDITIONS" <br />PARAGRAPH 3.15.1 HEREBY AMENDED AND ADDED AS FOLLOWS: <br />HE SHALL REMOVE FROM THE JOB SITE ALL CRATES, PACKING, <br />DEBRIS, ETC. FROM KITCHEN EQUIPMENT. HE SHALL BROOM CLEAN <br />THE BUILDING INTERIOR DAILY. AT THE COMPLETION OF THE <br />PROJECT, THE CONTRACTOR SHALL LEAVE THE BUILDING CLEANED <br />DUST FREE, CLEAN ALL GLASS, REPLACE ANY BROKEN GLASS, <br />REMOVE STAINS, SPOTS, MARKS AND DIRT FROM DECORATED WORK, <br />CLEAN HARDWARE, REMOVE PAINT SPOTS FROM ALL SURFACES, <br />CLEAN FIXTURES, AND WASH ALL TILE FLOORS." <br />ARTICLE Il - INSURANCE: <br />A. ARTICLE 11.1 CONTRACTOR'S LIABILITY INSURANCE OF SAID "GENERAL <br />CONDITIONS" IS HEREBY MODIFIED AS FOLLOWS: <br />INSURANCE: COMPREHENSIVE, AUTOMOBILE, UMBRELLA LIABILITY <br />CERTIFICATES OF INSURANCE FROM CARRIERS APPROVED BY THE <br />OWNER SHALL BE FILED IN NOT LESS THAN THE FOLLOWING AMOUNTS <br />OR GREATER AMOUNTS AS REQUIRED BY LAW PRIOR TO <br />COMMENCEMENT OF THE WORK: <br />I. WORKMEN'S COMPENSATION: <br />AS REQUIRED BY LAW IN APPLICABLE STATE <br />2. COMPREHENSIVE GENERAL LIABILITY: <br />(A) $1,000000 PER OCCURRENCE COMBINED- SINGLE LIMIT <br />(B) $2,000000 AGGREGATE <br />3. OWNED AND NON -OWNED AUTOMOBILE LIABILITY: <br />$500 00 PER OCCURRENCE <br />ENCE <br />4. EXCESS (UMBRELLA) LIABILITY: <br />1 N 2 00 00 PER OCCURRENCE ALL INSURANCE POLICIES AND <br />CERTIFICATES FOR WORK PERFORMED FOR AFCE SHALL SHOW THE <br />OWNER'AS AN ADDITIONAL NAMED INSURED PARTY. THEY MUST ALSO <br />STATE THAT THE COVERAGE AFFORDED UNDER THE POLICIES SHALL <br />NOT BE CANCELED WITHOUT THIRTY (30) DAYS' PRIOR NOTICE TO THE <br />OWNER AS EVIDENCED BY THE RETURN RECEIPT OF A REGISTERED <br />LETTER AND BE IN FULL FORCE FOR 3 YEARS FOLLOWING <br />COMPLETION EXPIRATION OR TERMINATION OF THIS CONTRACT. <br />B. ARTICLE 11.3 PROPERTY INSURANCE OF SAID "GENERAL CONDITIONS" <br />IS HEREBY AMENDED AND MODIFIED AS FOLLOWS: <br />INSURANCE: FOR PROJECTS WHERE AFC ENTERPRISES IS THE OWNER, <br />THE CONTRACTOR SHALL PROVIDE THE BUILDER'S RISK INSURANCE. <br />THE INSURANCE SHALL BE IN AN AMOUNT EQUAL TO THE TOTAL <br />AMOUNT OF THE CONTRACT, LESS THE AMOUNT OF THE SITE WORK <br />INSURANCE WILL BE ON ALL RISK BASIS WITH $5000.00 DEDUCTIBLE. <br />THE t5,000 DEDUCTIBLE WILL BE PAID BY THE CONTRACTOR THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE TOTAL AMOUNT OF <br />LOSSES OF ALL BUILDING MATERIAL, TOOLS AND EQUIPMENT IN HIS <br />POSSESSION AND NOT PERMANENTLY AFFIXED TO THE BUILDING OR <br />SITE. <br />BUILDERS' RISK INSURANCE CERTIFICATES WILL BE FURNISHED UPON <br />REQUEST BY AFCE. ONE COPY WILL BE SENT DIRECTLY TO AFCE'S <br />CONSTRUCTION COORDINATOR <br />CLAIMS FOR DAMAGES MUST BE REPORTED TO AFCE'S INSURANCE <br />DEPARTMENT. IMMEDIATELY BY TELEPHONE (404) 391-TI500. <br />TELEPHONE REPORTS MUST BE FOLLOWED UP WITHIN TWENTY FOUR <br />(24) HOURS BY A WRITTEN REPORT. SEND THE FIRST COPY TO AFCE'S <br />INSURANCE DEPARTMENT, 5555 GLENRIDGE CONNECTOR, NE, SUITE <br />300, ATLANTA, GA 30342, AND SEND THE COPY TO AFCE'S <br />CONSTRUCTION DEPARTMENT (SAME ADDRESS). THE CONTRACTOR <br />SHALL RETAIN THE THIRD COPY FOR HIS FILES. BLANK FORMS ARE <br />AVAILABLE FROM AFCE'S INSURANCE DEPT. <br />ARTICLE 1 - CHANGES IN THE WORK: <br />A. ARTICLE 1.2 CHANGE ORDERS OF SAID "GENERAL CONDITIONS" <br />SUBPARAGRAPH 12.1 IS HEREBY EXTENDED AS FOLLOWS: <br />4. IN CONSIDERING PROPOSALS FOR CHANGES INVOLVING ADDED <br />WORK, OMITTED WORK, OR ANY COMBINATION OF THE TWO, CHECKING <br />OF ESTIMATES WILL BE MADE BY THE OWNER, UTILIZING UNIT PRICES <br />WHERE SPECIFIED OR AGREED UPON, WITH THE VIEW OF ARRIVING AT <br />EQUITABLE ADJUSTMENTS". <br />5. WITH EACH PROPOSAL FOR A CHANGE INVOLVING INCREASE OR <br />DECREASE IN THE AMOUNT OF THE CONTRACT, THE CONTRACTOR <br />SHALL SUBMIT SEPARATELY AN ITEMIZED BREAKDOWN THAT WILL <br />INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: <br />(A)MATERIAL QUANTITIES AND UNIT PRICES (SEPARATED INTO TRADES). <br />PROVIDE BONA FIDE MANUFACTURER'S OR SUPPLIERS' PROPOSALS <br />FOR MANUFACTURED OR PRE ASSEMBLED ITEMS. <br />(B) LABOR COST <br />(C) CONSTRUCTION EQUIPMENT <br />(D) WORKMEN'S COMPENSATION AND PUBLIC LIABILITY <br />(E) OVERHEAD <br />(F) PROFIT <br />(G) SOCIAL SECURITY TAX <br />SUPPLEMENTARY CONDITIONS <br />I. PAYMENT TO CONTRACTOR: <br />A. MONTHLY CONTRACT PAYMENT <br />MONTHLY PROGRESS PAYMENTS SHALL BE PAID BY THE OWNER FOR <br />1109. OF THE WORK COMPLETED AND MATERIALS STORED AS OF THE <br />LAST DAY OF EACH MONTH. PAYMENTS MAY BE MADE BY THE <br />OWNER ON THE JOINT PAYEE BASISREIMBURSEMENTBASIS, OR CASH <br />ADVANCE BASIS AT THE ELECTION OF THE OWNER CONTRACTOR IS <br />TO FORWARD AUTHORIZED CHANGE ORDER DIRECTIVES, AIA <br />DOCUMENT G101, WHICH HAVE BEEN INCURRED TO THAT POINT, WITH <br />APPLICATION FOR PAYMENT. CONTRACTOR IS TO ADVISE OWNER OR <br />ITS AGENT OF ANY ITEM HE OR SUBCONTRACTOR BELIEVES IS AN <br />ADDITIONAL COST OVER CONTRACT AMOUNT PRIOR TO DOING WORK <br />(1) JOINT PAYEE BASIS <br />CONTRACTORS WILL MAKE APPLICATION TO AFCE ON OR BEFORE THE <br />TENTH OF EACH MONTH FOR A CHECK PAYABLE JOINTLY TO THE <br />SUBCONTRACTORS AND/OR MATERIAL SUPPLIERS AND THE <br />CONTRACTOR THE REQUEST WILL BE SUPPORTED BY THE ORIGINALS <br />OF THE FOLLOWING DOCUMENTATION (EXPLANATION OF THESE FORMS <br />ARE GI)/EN UNDER STANDARD FORMS). <br />(A)AIA DOCUMENT G102 - APPLICATION AND CERTIFICATE OF PAYMENT <br />(B) AIA DOCUMENT G103 - CONTINUATION SHEET. <br />(C)CONTRACTOR'S AFFIDAVIT OF DISCLOSURE OF DEBTS AND CLAIMS. <br />XOTHIS FOR-1 WILL BE PROVIDED BY AFCE. <br />INVOICES AND/OR TIME SHEETS WILL ACCOMPANY THE CERTIFICATE <br />OF PAYMENT IN SUPPORT OF WORK AND MATERIALS PROVIDED <br />DURING THE PERIOD OF THE APPLICATION FOR THE CONTRACTOR <br />AND FOR EACH SUBCONTRACTOR AND MATERIAL SUPPLIER <br />REFLECTED ON THE APPLICATION. <br />CONTRACTOR'S PARTIAL WAIVER OF LIENS FOR ALL WORK AND <br />MATERIALS COMPLETED THROUGH THE BILLING DATE FOR THE <br />CONTRACTOR AND FOR EACH SUBCONTRACTOR AND MATERIAL <br />SUPPLIER REFLECTED ON THE APPLICATION WILL BE EXECUTED BY <br />THE JOINT PAYEE CHECK ENDORSEMENT AS FOLLOWS: <br />ALL PAYEES MUST SIGN THIS DISCHARGE <br />"ALL CLAIMS, INTEREST, AND DEMANDS OF THE UNDERSIGNED FOR <br />LABOR DONE OR MATERIAL FURNISHED, AND FOR LIENS, JUDGMENTS, <br />MORTGAGES, OR ANY ACCOUNT WHATSOEVER AGAINST THE <br />PROPERTY (TO BE) OCCUPIED AS A POPEYE'S RESTAURANT AT: <br />(ADDRESS HERE) <br />5I0D M REQUIREMENTS (CONT.) <br />"THE OWNER THEREOF, ARE PAID AND SATISFIED, RELEASED, AND <br />DISCHARGED TO THE EXTENT OF THE AMOUNT OF THIS CHECK. THE <br />ENDORSEMENT OF THIS CHECK IS FULL EXECUTION OF THE FOREGOING <br />RELEASE AND SHALL BEAR MY SIGNATURE THEREON." <br />EXCEPT FOR ANNOTATING THE ADDRESS OF THE CONSTRUCTION SITE, <br />THE ENDORSEMENT MUST NOT BE ALTERED OR QUALIFIED IN ANY <br />WAY. <br />(2) REIMBURSEMENT BASIS <br />CONTRACTORS WILL PAY ALL SUBCONTRACTORS AND MATERIAL <br />SUPPLIERS AND MAKE PRESENTATION TO AFCE ENTERPRISES ON OR <br />BEFORE THE TENTH OF EACH MONTH FOR REIMBURSEMENT. THEIR <br />REQUEST WILL BE SUPPORTED BY THE ORIGINALS OF THE FOLLOWING <br />DOCUMENTS (EXPLANATIONS OF THESE FORMS ARE GIVEN UNDER <br />STANDARD FORMS): <br />(A)AIA DOCUMENT G102 - APPLICATION AND CERTIFICATE FOR PAYMENT <br />(B)AIA DOCUMENT G103 - CONTINUATION SHEET. <br />(C)AIA DOCUMENT G10ro - CONTRACTOR'S AFFIDAVIT OF PAYMENT OF <br />DEBTS AND CLAIMS. <br />(D)AIA DOCUMENT G106A - CONTRACTOR'S AFFIDAVIT OF RELEASE OF <br />LIENS. <br />(E)PARTIAL WAIVER OF LIEN FORM. <br />B. FINAL PAYMENT <br />CONTRACTORS WILL MAKE APPLICATION TO AFCE ENTERPRISES FOR <br />THE FINAL PAYMENT. THE REQUEST WILL BE SUPPORTED BY THE <br />ORIGINALS OF THE FOLLOWING DOCUMENTATION (EXPLANATIONS OF <br />THESE FORMS ARE GIVEN UNDER STANDARD FORMS): <br />(1) AIA DOCUMENT G-102 - APPLICATION AND CERTIFICATE FOR PAYMENT <br />(2) AIA DOCUMENT G103 - CONTINUATION SHEET. <br />(3)AIA DOCUMENT G106, AIA DOCUMENT G106A AND FINAL WAIVER OF <br />LIENS FORM PROPERLY EXECUTED AND ACKNOWLEDGED. <br />(4)AIA DOCUMENT G805 - LIST OF SUBCONTRACTORS <br />WITHIN THIRTY (30) DAYS AFTER RECEIPT OF THE FILING FOR FINAL <br />PAYMENT, THE OWNER SHALL PAY TO THE CONTRACTOR THE AMOUNT <br />THEREIN STATED, LESS ALL DEDUCTIONS AUTHORIZED BY THE TERMS <br />OF THIS CONTRACT AND PRIOR PAYMENTS AND ADVANCES <br />WHATSOEVER TO OR FOR THE ACCOUNT OF THE CONTRACTOR. <br />ALL PRIOR ESTIMATES AND PAYMENTS INCLUDING THOSE RELATING <br />TO EXTRA WORK SHALL BE SUBJECT TO CORRECTION AT THE TIME OF <br />THIS PAYMENT, WHICH IS THROUGHOUT THIS CONTRACT CALLED FINAL <br />PAYMENT. FINAL PAYMENT SHALL BE SUBJECT TO INSPECTION AND <br />ACCEPTANCE BY THE OWNER OR DULY AUTHORIZED <br />REPRESENTATIVES OF THE OWNER, AND BY THE REPRESENTATIVES OF <br />ALL AGENCIES HAVING DIRECT INTEREST IN THE PROJECT. <br />QUESTIONS REGARDING APPLICATIONS CAN BE RESOLVED BY <br />CONTACTING POPEYE'S CONSTRUCTION MANAGER <br />2. CERTIFICATE OF SUBSTANTIAL COMPLETION: <br />THE DATE OF THIS CERTIFICATE SHALL SERVE AS THE TIME FOR <br />COMPUTING THE GUARANTEE PERIOD OF THE BUILDING UNLESS <br />OTHERWISE AGREED UPON. <br />3. OWNER'S USE AND OCCUPANCY OF BUILDING BEFORE ACCEPTANCE <br />OF CONSTRUCTION: <br />THE OWNER, FOR OCCUPANCY OF THE BUILDING DESCRIBED IN THE <br />DRAWINGS, MAY TAKE POSSESSION OF AND USE SAME AS HE SO <br />DESIRES UPON A SUBSTANTIAL COMPLETION OF THE CONTRACT, ALSO <br />FURTHER UPON RELIEVING THE CONTRACTOR OF ANY DAMAGE DONE <br />TO THE BUILDING DUE SOLELY TO SUCH OCCUPANCY BY SAID OWNER <br />BUT UNDER NO CIRCUMSTANCES SHALL SUCH OCCUPANCY BE AN <br />ACCEPTANCE OF THE WORK FOR THE COMPLETION OF THE CONTRACT <br />OR AN ACCEPTANCE OF THE LABOR DONE AND MATERIALS USED OR <br />INSTALLED. <br />4. MANUFACTURED ITEMS IN THE SPECIFICATIONS: <br />WHERE ITEMS ARE LISTED IN THE SPECIFICATIONS AND/OR "OR <br />EQUAL" IS MENTIONED, THE MATERIALS LISTED SHALL BE USED. <br />THESE MATERIALS SHALL BE INCLUDED IN THE BID SUBMITTED ON <br />THE BID FORM. NO DEVIATION FROM THE MATERIALS LISTED SHALL <br />BE MADE BY THE CONTRACTORS SUBMITTING BIDS. AFTER AWARD OF <br />THE CONTRACT, THE CONTRACTOR MAY SUBMIT A SUBSTITUTE <br />MATERIAL FOR THE ITEMS SPECIFIED AS AN "EQUAL" TO THE <br />MATERIAL. SUCH REQUEST SHALL BE SUPPORTED BY TECHNICAL <br />DATA SHOWING THAT THE MATERIALS OR SERVICE IS EQUAL TO THE <br />ITEMS SPECIFIED AND STATING THE AMOUNT OF DECREASE OR <br />INCREASE IN THE CONTRACT SUM. IF NO CHANGE IN THE CONTRACT <br />SUM WILL BE MADE, STATE "NO CHANGE". THE CONSULTANT'S <br />ARCHITECTURE AND ENGINEERING DEPARTMENT WILL DETERMINE IF <br />THE MATERIAL IS ACCEPTABLE AS A SUBSTITUTE FOR THE SPECIFIED <br />ITEM AND MAKE NOTIFICATION IN WRITING TO THE CONTRACTOR, THIS <br />RULING BEING FINAL. CHANGES TO THE CONTRACT SUM WILL BE <br />HANDLED BY CHANGE ORDER AUTHORIZATION OR CHANGE ORDER <br />FORM. <br />5. SALES TAX: <br />A. THIS PROJECT IS SUBJECT TO STATE AND LOCAL SALES TAX. <br />INCLUDE SALES TAX ON ALL MATERIALS USED IN THE PROJECT. <br />B. WITH EACH REQUEST FOR PAYMENT, PROVIDE A CERTIFIED <br />STATEMENT OF THE AMOUNT PAID FOR SALES TAX IN THE REQUESTED <br />SUM. <br />6. NONDISCRIMINATION CLAUSE: <br />THE CONTRACTOR, HIS AGENT, OR HIS EMPLOYEES SHALL NOT <br />DISCRIMINATE IN ANY MANNER ON THE BASIS OF RACE, COLOR, <br />CREED, SEX, OR NATIONAL ORIGIN WITH REFERENCE TO THE SUBJECT <br />MATTER OF THIS CONTRACT, NO MATTER HOW REMOTE. <br />8100ING REQUIREMENTS (CONT.) <br />DIVISION I: GENERAL REQUIREMENTS <br />SECTION ]A: GENERAL <br />SCOPE OF THE WORK: <br />WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL INCLUDE <br />ALL DEMOLITION, SITE WORK, BUILDING CONSTRUCTION, AND <br />IMPROVEMENTS TO THE PROPERTY DESIGNATED IN THE <br />CONSTRUCTION DOCUMENTS. THE INTENT OF THE CONSTRUCTION <br />CONTRACT IS TO PROVIDE A POPEYES RESTAURANT COMPLETE IN <br />ALL RESPECTS WITH ALL WORK PERFORMED IN A QUALITY AND <br />WORKMANLIKE MANNER WITH THE BUILDING READY FOR OCCUPANCY <br />WHEN CONSTRUCTION IS COMPLETE. <br />2. PROTOTYPE PLANS: <br />THE PLANS ARE DRAWN AS A PROTOTYPE TO BE BUILT IN MANY <br />LOCATIONS. THE PROTOTYPE PLANS WILL BE SITE ADAPTED BY <br />ARCHITECT/ENGINEER, TO MEET ALL NATIONAL, LOCAL CODES, AND <br />SITE DESIGN CRITERIA. THE LOCATION, SIZE, AND EXTENT OF SITE <br />WORK AND SITE DETAILS ARE TO BE DETERMINED BY A FINAL SITE <br />PLAN AND/OR GRADING PLAN AND/OR LANDSCAPING PLAN AND <br />GEOTECHNICAL AND/OR ENVIRONMENTAL REPORTS TO BE PROVIDED <br />BY THE OWNER <br />3. DEFINITIONS: <br />"THE OWNER" AS USED HEREIN SHALL BE TAKEN TO MEAN AFG <br />ENTERPRISES, 5555 GLENRIDGE CONNECTOR, NE, SUITE 300, ATLANTA, <br />GEORGIA 30342, IN CASE OF COMPANY OWNED CONSTRUCTION. <br />IN THE CASE OF CONSTRUCTION BY A LICENSEE OF POPEYES, "THE <br />OWNER" SHALL BE TAKEN TO MEAN THE INDIVIDUAL LICENSEE HAVING <br />CONTRACTED FOR THE CONSTRUCTION PROJECT. IN THE CASE OF A <br />"BUILD -TO -SUIT" LEASE CONTRACT, "THE OWNER" SHALL BE TAKEN TO <br />MEAN THE ACTUAL PROPERTY OWNER OR LANDLORD. <br />4. START OF WORK: <br />WORK SHALL BE STARTED UPON WRITTEN ORDER OF THE OWNER, AND <br />THE ENTIRE PROJECT SHALL BE COMPLETED AS STIPULATED IN <br />ACCORDANCE WITH THE TERMS AND PROVISIONS OF THE CONTRACT <br />DOCUMENTS. <br />5. COOPERATION: <br />THE PRIME CONTRACTOR AND ALL SUBCONTRACTORS SHALL <br />COORDINATE ALL WORK, ONE WITH THE OTHER, SO AS TO FACILITATE <br />THE GENERAL PROGRESS OF THE WORK EACH TRADE SHALL <br />AFFORD ALL OTHER TRADES EVERY REASONABLE OPPORTUNITY FOR <br />THE INSTALLATION OF THEIR WORK <br />6. ENGINEERING AND LAYOUT - <br />AS THE WORK PROGRESSES, THE GENERAL CONTRACTOR SHALL <br />COOPERATE WITH ALL SUBCONTRACTORS IN CHECKING THE LOCATION <br />OF ALL PARTITIONS, SO THAT ABSOLUTE ASSURANCE WILL BE <br />OBTAINED THAT ALL ROUGHING IN OF CONCEALED WORK WILL BE <br />CONFINED WITHIN PARTITIONS, OR SPACES AS INDICATED. <br />1. STANDARDS: <br />ANY MATERIAL SPECIFIED BY REFERENCE TO THE NUMBER, SYMBOL, <br />OR TITLE OF A SPECIFIED STANDARD SUCH AS A COMMERCIAL <br />STANDARD, A FEDERAL SPECIFICATION, A TRADE ASSOCIATION <br />STANDARD, OR OTHER SIMILAR STANDARD, SHALL COMPLY WITH THE <br />REQUIREMENTS IN THE LATEST REVISION THEREOF AND ANY <br />AMENDMENTS THERETO. <br />S. MANUFACTURER'S DIRECTIONS: <br />ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT SHALL <br />BE APPLIED, INSTALLED, CONNECTED, ERECTED, USED, CLEANED, <br />AND CONDITIONED AS DIRECTED BY THE MANUFACTURERS UNLESS <br />HEREIN SPECIFIED TO THE CONTRARY. <br />S. CLEANING t TOUCH-UP: <br />A. FOREIGN MATTER ON ANY EXPOSED SURFACE, WHICH WOULD AFFECT <br />QUALITY OF FINISH PAINTING, SHALL BE REMOVED BY THE CRAFT <br />RESPONSIBLE FOR ITS PRESENCE. <br />B. RESTORATION OF SHOP -PRIMING IF DAMAGE OCCURS BEFORE, <br />DURING, OR AFTER ERECTION SHALL BE INCLUDED IN THE DIVISION <br />UNDER WHICH THE ITEM IS TO BE FURNISHED AND INSTALLED. <br />10. SIGNS: <br />NO SIGNS OR ADVERTISEMENTS WILL BE ALLOWED TO BE DISPLAYED <br />WITHOUT THE APPROVAL OF THE OWNER <br />WOOING REQUIREMENTS (CONT.) <br />11. TEMPORARY UTILITIES: <br />THE GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY WATER <br />AND MINIMUM OF 120/240 SINGLE PHASE ELECTRICAL SERVICE FOR <br />THE JOB SITE AND PAY FOR SAME. THE SUBCONTRACTORS ON THE <br />JOB SHALL ARRANGE WITH THE GENERAL CONTRACTOR FOR THE USE <br />OF THESE FACILITIES. THE GENERAL CONTRACTOR SHALL PROVIDE <br />ANY HEAT OR TEMPORARY CLOSING -IN OF THE BUILDING WHICH MAY <br />BE REQUIRED. <br />12. TEMPORARY TOILET FACILITIES: <br />THE GENERAL CONTRACTOR SHALL ERECT AND MAINTAIN IN A SAFE <br />AND SANITARY CONDITION, A TOILET FACILITY FOR ALL WORKMEN ON <br />THE JOB. THE TYPE OF FACILITY SHALL BE IN COMPLIANCE WITH THE <br />REQUIREMENTS OF THE LOCAL HEALTH DEPARTMENT. <br />13. WORK BY OTHERS: <br />THE CONTRACT DOCUMENTS CALL FOR CERTAIN ITEMS TO BE <br />SUPPLIED BY THE OWNER OR OTHERS AND INSTALLED BY THE <br />GENERAL CONTRACTOR. OTHER ITEMS ARE TO BE FURNISHED AND <br />INSTALLED BY THE OWNER OR OTHERS. THE GENERAL CONTRACTOR <br />SHALL COORDINATE THE WORK OF ALL TRADES AND COOPERATE IN <br />THE PREPARATION OF SURFACES, DIMENSIONS, AND UTILITIES FOR <br />WORK TO BE PERFORMED BY THE OWNER OR BY OTHERS. <br />SUBCONTRACTORS INSTALLING MECHANICAL, ELECTRICAL, AND <br />PLUMBING SERVICES FOR FOOD SERVICE EQUIPMENT TO BE <br />INSTALLED BY THE OWNER OR BY OTHERS ARE CAUTIONED THAT THE <br />ROUGH -IN DIMENSIONS SHOWN ON THE PLANS ARE EXTREMELY <br />CRITICAL. ERROR IN LOCATING SERVICES SHALL BE CORRECTED BY <br />THE SUBCONTRACTOR PERFORMING THE ROUGH -IN WORK AT NO <br />ADDITIONAL COST TO THE OWNER. <br />FINAL ELECTRICAL CONNECTIONS TO FOOD SERVICE EQUIPMENT AND <br />FINAL WATER DRAIN, GAS, AND VENTILATION CONNECTIONS TO FOOD <br />SERVICE EQUIPMENT SHALL BE AS INDICATED IN THE EQUIPMENT <br />SCHEDULE. <br />14. CONFLICTS AND ERRORS: <br />IF THERE IS A CONFLICT BETWEEN THE PLANS AND SPECIFICATIONS, <br />THE SPECIFICATIONS SHALL TAKE PRECEDENCE UNLESS <br />SPECIFICALLY INDICATED OTHERWISE BY THE OWNER OR OWNER'S <br />REPRESENTATIVE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY <br />TO NOTIFY THE OWNER OR THE OWNER'S AGENT OF ANY CONFLICTS, <br />OMISSIONS, DELETIONS, OR ERRORS IN THE PLANS OR <br />SPECIFICATIONS ENCOUNTERED DURING THE BIDDING PERIOD AND <br />THE COURSE OF CONSTRUCTION BEFORE CONTINUING THE WORK <br />AFFECTED. <br />SECTION IB: BASE AND ALTERNATE BIDS <br />GENERAL <br />THE EXPLANATION IN THIS SECTION TOGETHER WITH THE INFORMATION <br />LISTED IN OTHER SECTIONS OF THE SPECIFICATIONS SHOWN ON THE <br />DRAWINGS AND/OR DESCRIBED IN THE INSTRUCTIONS TO BIDDERS <br />IDENTIFY AREAS REQUIRED TO ACCOMPLISH THE BID REQUIREMENTS <br />FOR ALTERNATE BIDS. <br />BASE BID <br />INCLUDE ALL WORK SHOWN AND SPECIFIED HEREIN AND EXCLUDE <br />MODIFICATIONS OF THE WORK STATED FOR ALTERNATE BIDS. <br />SUBM ITALS <br />LITERATURE <br />T USS WINGS <br />R DRAWINGS <br />AWNING DRAWINGS <br />E.I.F.S. SYSTEM <br />HVAC UNITS, DIFFUSERS, GRILLS t THERMOSTATS <br />ELECTRICAL POWER DISTRIBUTION <br />BUILDING AND SITE LIGHTING <br />PLUMBING FIXTURES <br />ST OOM ACCESSORIES <br />RE R <br />ROOF LADDER <br />DRIVE-THRU BALCONY <br />DUMPSTER GATES <br />QUE-LINE, HAND RAIL AND DIVIDER RAILINGS <br />SAMPLES <br />BRICK AND GROUT COLORS <br />E.I.F.S. COLORS OR EXTERIOR PAINTS <br />FLOOR AND GROUT COLOR (KITCHEN t DINING) <br />CHAIR RAIL AND STAIN <br />WAINSCOT LAMINATE <br />CEILING TILE AND GRID (KITCHEN t DINING) <br />FRP <br />METAL MANSARD <br />SOLID SURFACE COUNTERTOP <br />TYPICAL CONSTRUCTION SCHEDULE <br />A55RE V I AT I ONS <br />AC <br />AIR CONDITIONING <br />STL <br />STEEL <br />AFF <br />ABOVE FINISH FLOOR <br />STOR <br />STORAGE <br />AHU <br />AIR HANDLING UNIT <br />SUSP <br />SUSPENDED <br />AL <br />ALUMINUM <br />T <br />TREAD <br />ASPH <br />ASPHALT <br />TELE <br />TELEPHONE <br />AT <br />ALUMINUM THRESHOLD <br />TPD <br />TOILET PAPER DISPENSER <br />BD <br />BOARD <br />TYP <br />TYPICAL <br />BLKT <br />BLANKET <br />UNO <br />UNLESS NOTED OTHERWISE <br />CJ <br />CONTROL JOINT <br />VCT <br />VINYL COMPOSITION TILE <br />CLG <br />CEILING <br />CMU <br />CONCRETE MASONRY UNIT <br />VERY <br />VERTICAL <br />COL <br />COLUMN <br />VT <br />VINYL THRESHOLD <br />CONC <br />CONCRETE <br />WC <br />WATER CLOSET <br />CONT <br />CONTINUOUS <br />WD <br />WOOD <br />CPT <br />CARPET <br />CT <br />CERAMIC TILE <br />uJP <br />WATERPROOF <br />C/L <br />CENTER LINE <br />WWF <br />WELDED WIRE FABRIC <br />DBL <br />DOUBLE <br />W/ <br />WITH <br />DF <br />DRINKING FOUNTAIN <br />DIA <br />DIAMETER <br />DIM <br />DIMENSION <br />DN <br />DOWN <br />DS <br />DOWN SPOUT <br />EA <br />EACH <br />EJ <br />EXPANSION JOINT <br />ELEC <br />ELECTRICAL <br />ELEV / EL <br />ELEVATION <br />EQ <br />EQUAL <br />EXIST <br />EXISTING <br />FD <br />FLOOR DRAIN <br />FE <br />FIRE EXTINGUISHER <br />FF <br />FINISH FLOOR <br />FIR <br />FIRE RATED <br />GALV <br />GALVANIZED <br />GYPBD <br />GYPSUM BOARD <br />HC <br />HANDICAPPED <br />HDW <br />HARDWARE <br />HIM <br />HOLLOW METAL <br />HVAC <br />HEATING, AIR CONDITIONING, 8 VENT <br />INFO <br />INFORMATION <br />INSUL <br />INSULATION <br />LAC <br />LAY -IN ACOUSTICAL CEILING <br />MAS <br />MASONRY <br />MAX <br />MAXIMUM <br />MECH <br />MECHANICAL <br />MFGR / MFR <br />MANUFACTURER <br />MIN <br />MINIMUM <br />MO <br />MASONRY OPENING <br />MR <br />MI /1-1 I T I RROR O S URE RES STANT <br />MT <br />MARBLE THRESHOLD <br />MTL <br />METAL <br />NA <br />NOT APPLICABLE <br />NIC <br />NOT IN CONTRACT <br />NOM <br />NOMINAL <br />NTS <br />NOT TO SCALE <br />OC <br />ON CENTER <br />OPP <br />OPPOSITE <br />PLYWD <br />PLYWOOD <br />PREFAB <br />PREFABRICATED <br />PSF <br />POUNDS PER SQUARE FOOT <br />PT <br />PAINT / PRESSURE TREATED <br />QT <br />QUARRY TILE <br />R <br />RISER/RADIUS <br />REBAR <br />REINFORCING BAR <br />REF <br />REFERENCE <br />RE INF <br />RE INFORCE <br />REQ'D <br />REQUIRED <br />RO <br />ROUGH OPENING <br />SB <br />SPLASH BLOCK <br />SHLVS <br />SHELVES <br />SIM <br />SIMILAR <br />SPEC <br />SPECIFICATION <br />SS <br />STAINLESS STEEL <br />CONSTRUCTION <br />TRAINING <br />OPEN <br />SURVEYOR <br />EQUIPMENT <br />ESTABLISH <br />CONTRACTOR <br />BUILDING <br />BUILDING SLAB <br />BUILDING SLAB <br />DUROCK <br />EXTERIOR FINISH <br />INSTALL <br />INSTALL KITCHEN <br />PLUMBING <br />FINAL PUNCH AND <br />TRAINING <br />RESTAURANT <br />CONSTRUCTION <br />MOBILIZATION <br />CORNERS AND <br />ROUGN-IN <br />AND ROUGH <br />ROOFING <br />INSULATION <br />PLYWOOD <br />BRICK/E.I.F.S. <br />CEILING TILE <br />SECURITY, MUSIC, <br />EQUIPMENT <br />ELECTRICAL <br />- <br />- <br />TURN OVER <br />- <br />PROCESS <br />OPEN <br />SCHEDULE <br />TBM <br />FRAMING <br />DRYWALL <br />MURALS <br />CONNECTIONS <br />CONTRACTOR <br />BUILDING LAYOUT <br />UNDERGROUND <br />INSTALL HOODS <br />BUILDING <br />STOREFRONT <br />FRP FRONT <br />ELECTRICAL <br />DUMPSTER <br />SIGNS, MENU <br />SEATING, DECOR <br />CONSTRUCTION <br />FACILITIES <br />RECEIVES NOTICE <br />- <br />FORMWORK <br />ELECTRICAL <br />AND HVAC ROOF <br />ELECTRICAL <br />GLASS &DOORS <br />COUNTER <br />BUILDING AND <br />ENCLOSURE <br />BOARDS, DRIVE <br />COUNTERS <br />EQUIPMENT <br />- <br />IDENTIFICATION <br />TO PROCEED <br />ROUGH -INS <br />CURBS <br />ROUGH -INS <br />SITE <br />THRU SYSTEM <br />PUNCH LIST <br />FINALIZE ALL <br />INTERIOR <br />NATIONAL <br />UNDERGROUND <br />LOT LIGHT <br />BUILDING <br />SITE WORK <br />FINISHES <br />SITE WORK <br />AWNINGS, <br />HOOD ANSUL <br />LANDSCAPING <br />PROJECT COSTS <br />ACCOUNT <br />ROUGH GRADING <br />PLUMBING <br />ANCHOR BOLTS <br />PLUMBING <br />CURBS <br />_ <br />CARPENTRY DROP <br />PAVING <br />SHUTTERS <br />SYSTEM <br />IRRIGATION <br />_ <br />_ <br />SUMMARIZED <br />QUOTES <br />ROUGH -INS <br />ROUGH INS <br />CEILING GRID <br />SITE WORK <br />BALCONY <br />INTERIOR <br />UTILITIES <br />BUILDING HVAC <br />DRIVE THRU <br />INTERIOR DOORS, <br />RAILINGS, HAND <br />INSTALL UTILITY <br />SIGNAGE, PLANTS, <br />- <br />_ <br />ELECTRICAL <br />DUCTWORK <br />DRIVE THRU LOOP <br />BALCONY <br />MILLWORK, STAIN <br />RAILINGS, <br />METERS, <br />ARTWORK, <br />- <br />- <br />- <br />- <br />PLUMBING STORM <br />SEWER <br />AND PAINT <br />DUMPSTER GATES <br />TELEPHONE <br />WINDOW SHADES <br />UNDERGROUND <br />SMALLWARES <br />INSTALL DRINK <br />CLEANING <br />_ <br />STORM SEWER <br />- <br />- <br />- <br />FLOOR TILE <br />CHECKED -IN AND <br />SYSTEM, CO2 <br />SUPPLIES, MATS <br />- <br />- <br />- <br />STORED <br />CONSTRUCTION <br />SITE WORK <br />CONSTRUCTION <br />IN -PROGRESS <br />CONCRETE <br />IN -PROGRESS <br />- <br />- <br />VISIT POPEYES <br />- <br />- <br />- <br />- <br />DRIVEWAYS <br />VISIT POPEYES <br />- <br />- <br />- <br />- <br />- <br />CONSTRUCTION <br />DUMPSTER <br />CONTRUCTION <br />MANAGER <br />MANAGER <br />RECEIVE <br />BUILDING <br />INSPECTION <br />INSPECTION <br />INSPECTION WALL <br />CEILING <br />BUILDING FINAL <br />PRE <br />ORDER NATIONAL <br />APPROVALS FOR <br />COVER-UP <br />COVER-UP HVAC <br />INSPECTIONS <br />BUILDING <br />CERTIFICATE OF <br />OPENING <br />CONSTRUCTION <br />ACCOUNTS <br />- <br />BACK FILL <br />- <br />FRAMING <br />- <br />- <br />ELECTRICAL <br />- <br />- <br />- <br />- <br />MECHANICAL <br />INSPECTIONS FIRE <br />OCCUPANCY <br />- <br />SUPPORT <br />OPEN <br />MEkTING <br />BUYOUTS <br />UNDERGROUND <br />ELECTRICAL <br />PLUMBING, GAS, <br />ELECTRICAL <br />HEALTH <br />UTILITIES <br />PLUMBING <br />FIRE MARSHAL <br />PLUMBING <br />SUBTOTAL SUBTOTAL TOTAL <br />SCHEDULE <br />STANDARD <br />ESTIMATED DAYS <br />1 <br />3 <br />6 <br />6 <br />5 <br />10 <br />4 <br />10 <br />13 <br />4 <br />2 <br />4 <br />5 <br />4 <br />2 <br />1 <br />80 <br />14 <br />94 <br />REVISIONS <br />BY <br />' , v <br />00 <br />CO <br />-0 . <br />t` E <br />0 o <br />_5 ti <br />Q rn 0 <br />Tt__ 3 <br />U N <br />� v <br />� c <br />0 <br />n <br />r N <br />1� <br />i <br />11� <br />A f <br />04 <br />01 <br />0 0 M C <br />III <br />f <br />tb <br />CD <br />N - = <br />o 0 <br />o <br />Y) a <br />U <br />c Q <br />a� <br />O <br />t` <br />O <br />Z <br />y W <br />C <br />O Y v <br />o U � <br />�L <br />O O <br />m <br />U L` <br />_ <br />w <br />�-C <br />� W <br />X 4 d <br />LLI W <br />� nIV <br />L <br />L `' <br />p <br />•o <br />� cL <br />C <br />Date: 03. 28. 13 <br />Scale: AS NOTED <br />Project Mgr: MY <br />Drawn: AZP <br />Job: 13-03 <br />Sheet <br />T2 <br />H:'�Prgjects\Projects 2013\13003 - Popeyes Zephyrhills\04-CD\01-CD.A\04-Architectural\T2-BIDDING.dwg, 3/28/2013 2:53:22 PM, Xerox 6030.pc3 <br />