SPECIFICATIONS: PLUM8113 LEGEND PLUMS IW3 GENERAL MOTES
<br />DESCRIPTION ABBREV. SYMBOL
<br />I. PLUMBING CONTRACTOR SHALL EXECUTE ALL WORK SO
<br />SECTION 15A: PLUMBING COPPER TUBE, HARD DRAWN, WITH COPPER OR BRASS DRAINAGE PATTERN FITTINGS AND SANITARY PIPING SAN THAT IT PRECEDES WITH A MINIMUM OF INTERFERENCE WITH
<br />OTHER TRADES.
<br />SOLDERED JOINTS.
<br />GENERAL PROVISIONS VENT PIPING V 2. VERIFY EXACT ROUGH -IN AND FINAL EQUIPMENT
<br />G. INSULATION: INSULATE ALL ABOVEGROUND INDIRECT OR CONDENSATE DRAIN LINES REQUIREMENTS IN FIELD.
<br />1. SCOPE: PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT IN ACCORDANCE WITH THESE COLLECTING COLD CONDENSATE FROM REFRIGERATION OR HVAC EQUIPMENT. INSULATION SHALL
<br />SPECIFICATIONS AND THE ACCOMPANYING DRAWINGS TO PROVIDE A COMPLETE AND PROPERLY BE 1/2" THICK ARMAFLEX, OR EQUAL, GOLD WATER PIPING GW 13, THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />OPERATING PLUMBING SYSTEM FOR THE BUILDING.ALL FINAL CONNECTIONS TO PLUMBING FIXTURES AND
<br />D. NEAT TRACING: HEAT TRACE ALL CONDENSATE DRAIN LINES INSIDE COOLERS AND FREEZERS AT 5
<br />OBTAIN WATER, SEWER, GAS TAPS, AND ANY OTHER REQUIRED UTILITIES AND EXTEND SERVICE FROM WATTS/LINEAR FOOT (MINIMUM). NOT WATER PIPING HW KITCHEN EQUIPMENT. THIS INCLUDES, BUT NOT LIMITED TO
<br />SAME TO BUILDING AS SHOWN ON DRAWINGS. VISIT THE SITE FOR UNDERSTANDING OF THE WORK TO BE FURNISHINGS AND INSTALLING ALL TRAPS, DRAINS AND
<br />DONE BEFORE SUBMITTING BID. REFER TO CIVIL DWGS FOR SITE UTILITIES. 1. PIPE SLEEVES/ESCUTCHEONS: PROVIDE CHROME -PLATED ESCUTCHEONS ON ALL PIPES PASSING SUPPLIES WITH STOPS.
<br />THROUGH WALLS, FLOORS, OR CEILINGS OF FINISHED ROOMS. ESCUTCHEONS TO BE BEATON t TRAP PRIMER PIPING TPP TPP- -TPP- -TPP- -TPP- -TPP
<br />COORDINATE THIS WORK WITH THE WORK OF THE OTHER TRADES ON THE PROJECT. ALL PLUMBING CADWELL, 010, 40, 6A OR EQUIVALENT WITH SET -SCREWS. PROVIDE ESCUTCHEONS ON ALL WASTE 4. THE PLUMBING CONTRACTOR SHALL VERIFY THAT ALL
<br />IS TO BE ROUGHED IN WHILE THE BUILDING IS BEING CONSTRUCTED AT SUCH TIMES AS NOT TO DELAY LINES FROM PLUMBING FIXTURES, WHETHER THROUGH WALLS, FLOORS, AND WHETHER CONCEALED GREASE PIPING GR •GR GR GR GR CR PIPING, AS SHOWN ON THESE DRAWINGS WILL NOT CONFLICT
<br />THE GENERAL CONTRACTOR ON THE BUILDING. BEHIND COUNTERS OR EXPOSED. PIPE SLEEVES SHALL BE PROVIDED WHEN PIPES PENETRATE WITH ANY DRAINS, SCUTTLES, JOINTS, VENTS, EQUIPMENT, ETC.
<br />FOUNDATION AND SHALL BE P LARGER THAN PIPE, SEAL SLEEVE WITH CAULKING.
<br />2. GENERAL REQUIREMENTS: COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REQUIREMENTS, GAS PIPING G -G G G G G 5. COORDINATE ROUTING AND LOCATIONS OF WASTE AND
<br />CODES, RULES, AND ORDINANCES GOVERNING WORK ON THIS CHARACTER PAY FOR AND OBTAIN 6. PLUMBING FIXTURES: FURNISH AND INSTALL PLUMBING FIXTURES AS SHOWN ON DRAWINGS WITH ALL VENT PIPING WITH ALL OTHER TRADES.
<br />NECESSARY CONSTRUCTION PERMITS AND CERTIFICATES OF INSPECTION. ACCESSORIES AND TRIM AS LISTED. ALL FIXTURES SHALL BE PROTECTED THROUGH THE COURSE OF FILTERED WATER FW FW FW FW FW FW
<br />THE CONSTRUCTION. ANY FIXTURE DAMAGED SHALL BE REPLACED WITHOUT ADDITIONAL EXPENSE TO 6. THE PLUMBING CONTRACTOR SHALL COORDINATE WITH THE
<br />A. DRAWINGS: THE LOCATION OF THE PIPING RUNS ARE APPROXIMATE AND THE CONTRACTOR THE OWNER GENERAL CONTRACTOR AND OTHER TRADES, ALL
<br />MUST MAKE ANY NECESSARY CHANGES IN THE PIPING RUNS, ETC., AND AT NO ADDITIONAL EXISTING PIPING TO REMAIN REQUIRED OPENINGS AND EXCAVATIONS. ALL REQUIRED
<br />COST TO THE OWNER. OUTLET LOCATIONS ARE CRITICAL AND MUST BE LOCATED EXACTLY 9. CONNECTION t0 OTHER FIXTURES: CONNECT BUILDING SERVICE PIPING, INCLUDING BUT NOT OPENINGS IN FOUNDATIONS, FLOORS, WALLS, AND ROOFS
<br />ACCORDING TO THE PLUMBING PLAN. COORDINATE THIS WORK WITH THE INSTALLERS OF LIMITED TO WATER, DRAIN, AND GAS PIPES TO FOOD SERVICE EQUIPMENT AS INDICATED IN SHALL BE DESIGNED INTO THE STRUCTURE INITIALLY BY
<br />EQUIPMENT FURNISHED AND INSTALLED BY OTHERS. REFER TO THE OTHER DRAWINGS FOR DETAILS EQUIPMENT SPECIFICATIONS. PROVIDE BACKFLOW PROTECTION ON ICE MACHINES AND BEVERAGE EXISTING PIPING TO BE REMOVED THE USE OF SLEEVES, CURBS, ETC. CUTTING AND PATCHING
<br />OF THE BUILDING CONSTRUCTION AND THE OTHER MECHANICAL, ELECTRICAL, AND EQUIPMENT EQUIPMENT SUPPLY CONNECTIONS.
<br />��
<br />SHALL BE HELD TO MINIMUM.
<br />10. TESTS: GATE VALVE Gv
<br />B. COORDINATION AND WORKMANSHIP: SCHEDULE THIS WORK SO THAT It WILL BE PROPERLY 7. ALL ITEMS PROJECTING THROUGH ROOFS SHALL BE
<br />COORDINATED WITH ALL OTHER TRADES. WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE BEST A. DRAINAGE AND VENT PIPING - DRAINAGE AND VENT PIPING SHALL BE TESTED BEFORE THE TP FLASHED, A MINIMUM OF 12" ABOVE THE ROOF. ALL VENTS
<br />PRACTICE FOR THE CLASS OF WORK INVOLVED. WORKMANSHIP SHALL ALLOW THE APPLIANCE TO PLUMBING FIXTURES ARE INSTALLED BY CAPPING THE OPENINGS AND FILLING THE ENTIRE SYSTEM CRAP PRIMER TP SHALL BE A MINIMUM OF IO' FROM ANY OUTSIDE AIR INTAKE.
<br />OPERATE AS INTENDED AND BE INSTALLED TO BEST PROTECT THE PUBLIC AND OPERATORS FROM WITH WATER AND ALLOWING IT TO STAND THUS FILLED NOT LESS THAN ONE (1) HOUR. INSPECT
<br />INJURY OR DAMAGE, AND TO PRESENT A NEAT, PLEASING, AND ORDERLY APPEARANCE. WATER LEVEL TO DETERMINE IF PIPING IS TIGHT. GAS COCK GG t=i 8. ALL FLOOR DRAINS SHALL HAVE 6" DEEP SEAL TRAPS.
<br />MATERIALS AND PERFORMANCE B. WATER PIPING - THE WATER SUPPLY PIPING LINES SHALL BE TESTED BEFORE THE PLUMBING 9. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />FIXTURES ARE CONNECTED BY FILLING THE ENTIRE SYSTEM WITH POTABLE WATER AND APPLYING TEMPERING VALVE TV TV CONNECTING WATER SUPPLY TO THE COFFEE MAKERS TEA
<br />I. MATERIALS: ALL MATERIALS SHALL BE NEW AND OF THE QUALITY INDICATED BY THE HYDROSTATIC PRESSURE OF 100 PSI AND ALLOWING TO STAND FOR NOT LESS THAN FOUR (4) BREWERS AND ICE MACHINES.
<br />SPECIFIED BRAND NAMES. SUBSTITUTIONS OF MATERIAL OF EQUAL QUALITY BY OTHER FIRST -LINE HOURS AT THIS PRESSURE TO PROVE PLUMBING INTEGRITY. CLEAN OUT CO
<br />MANUFACTURERS MAY BE ACCEPTABLE PROVIDED A LIST OF SUCH SUBSTITUTIONS IS APPROVED IN 10. WRAP ALL CONDENSATE PIPE IN FREEZER WITH HEAT
<br />WRITING BY MRP'S ARCHITECTURE AND ENGINEERING DEPARTMENT. A SUBSTITUTIONS LIST SHALL BE C. GAS PIPING - IN LIEU OF LOCAL REQUIREMENTS, GAS PIPING SHALL BE FILLED WITH COMPRESSED TRACING TAPE AND INSULATE ALL CONDENSATE DRAIN
<br />SUBMITTED IN TRIPLICATE WITHIN FIVE (5) DAYS AFTER THE CONTRACT IS LET. AIR TO 150 PSI AND HELD FOR A PERIOD OF FOUR (4) HOURS. EACH JOINT SHALL BE CHECKED BY CLEAN OUT TO GRADE COTG
<br />LIQUID SOAP OR SPECIAL LIQUID CHEMICAL FOR LEAKS. NOTE: REMOVE ALL GAS VALVES AND PIPING. ROUTE COOLER CONDENSATE DRAIN PIPING TO HUB
<br />2. BACKFILLING: PERFORM ALL NECESSARY EXCAVATING AND BACKFILLING REQUIRED FOR THIS PROTECT FROM DAMAGE BEFORE TESTING SYSTEM. DRAIN/FLOOR DRAIN AS INDICATED.
<br />INSTALLATION. PREPARE A PROPER BED OF SAND OR GRAVEL OR EQUIVALENT IN ROCK WALL CLEAN OUT WCO WCO I 1
<br />SCREENINGS SO AS TO ELIMINATE 5HIMMING AND VOID SPACE UNDER ANY OF THE UTILITY SERVICE 11. DISINFECTION OF POTABLE WATER SYSTEM: UPON COMPLETION OF INSTALLATION DISINFECT THE 11. INSULATE ALL WATER AND WASTE PIPING UNDER
<br />PIPES. BENDING OF ANY HARD PIPE WILL NOT BE PERMITTED. WHERE A CHANGE IN DIRECTION IS WATER SYSTEM BY FILLING IT WITH SOLUTION CONTAINING 50 PARTS PER MILLION OF CHLORINE AND FCO ^ LAVATORIES WITH HANDY -SHIELD JACKET BY PLUMBEREX:
<br />NECESSARY ON PRESSURE PIPES, "COMPATIBLE" COUPLINGS OR EQUAL SHALL BE USED AND BENDS ALLOW IT TO STAND FOR NOT LESS THAN SIX (6FLOOR CLEAN OUT FCO ) HOURS BEFORE FLUSHING THOROUGHLY AND (619) 633-11-72.
<br />MAY NOT EXCEED 90 DEGREES. ALL EXCAVATION BELOW THE BOTTOM OF FOOTINGS SHALL BE RETURNING TO SERVICE. FURNISH GLEAN WATER SAMPLES TO THE LOCAL AUTHORITY FOR TESTING
<br />BACKFILLED WITH 2O00 PSI CONCRETE. OTHER BACKFILL SHALL CONSIST OF 2-3" OF SAND OR ROCK AFTER THE LINES HAVE BEEN DISINFECTED. THIS PROCEDURE TO BE IN ACCORDANCE WITH STATE FLOOR DRAIN FD ® 12. POT SINKS TO BE ANCHORED TO WALL AND SEALED WITH
<br />SCREENINGS AND EARTH TO A FINAL LEVEL EQUAL t0 ITS ORIGINAL CONDITION. IN THE EVENT THE PLUMBING CODE. SILICONE CAULKING.
<br />BACKFILL SHOULD SETTLE BEFORE THE FINAL TOP SURFACE IS APPLIED, APPLY ADDITIONAL
<br />BACKFILL TO SUSTAIN THE ORIGINAL LEVEL. CARE SHOULD BE TAKEN TO ADDITIONAL BACKFILL TO 12. CLEANUP: CLEAN ALL PLUMBING FIXTURES AND EQUIPMENT THOROUGHLY BEFORE FINAL FLOOR SINK FS ® 13. INSTALL GAS VALVE (FBC) IN GAS LINE TO COOKING
<br />SUSTAIN THE ORIGINAL LEVEL. CARE SHOULD BE TAKEN TO MINIMIZE THE DUST LEVEL WHEN INSPECTION, LEAVING ALL READY FOR USE. EQUIPMENT. INTERLOCK WITH HOOD FIRE PROTECTION
<br />EXCAVATING AND BACKFILLING SO AS TO COMPLY WITH FEDERAL AND STATE E.F.A. SY5TEM.VERIFY REQUIREMENTS WITH HOOD SUPPLIER.
<br />REGULATIONS RELATING TO THIS TYPE OF WORK (FUGITIVE DUST). 13. EXTENDED WARRANTY: WARRANT IN WRITING ANY EQUIPMENT OR MATERIALS USED IN THE HUB DRAIN HD INSTALLATIONINSTALLATION HAVING AN EXTENDED WARRANTY AS OFFERED BY THE MANUFACTURER. PROVIDE NEW O INSTALL UNIONS AT THE SOLENOID VALVE.
<br />3. PIPING INSTALLATION: CLEANOUTS MUST BE INSTALLED ON MINIMUM DROP LINES EVEN THOUGH NOT OR REBUILT ASSEMBLIES TO THE SITE FOR ANY SUCH EQUIPMENT OR MATERIALS WHICH FAIL DURING TYPICAL (TYP) 14. PLUMBING CONTRACTOR TO PROVIDE AND INSTALL SHUTOFF
<br />SHOWN ON THE PLANS. USE REDUCING FITTINGS IN MAKING REDUCTIONS IN SIZE OF PIPE. REAM ALL THIS PERIOD, AND INSTALL AT NO ADDITIONAL COST TO THE OWNER COCKS, QUICK DISCONNECTS AND FLEXIBLE LINES AT GAS
<br />PIPE AFTER CUTTING, THEN TURN PIPES ON END AND KNOCK OUT ALL LOOSE DIRT AND SCALE
<br />BEFORE INSTALLING. MAKE CHANGES IN HORIZONTAL DIRECTION OF SOIL AND WASTE PIPES WITH 14. OWNER'S MANUAL: PROVIDE THE OWNER, AT THE COMPLETION OF THIS CONTRACT, WITH AN "OWNER'S NEW CONNECTION TO EXISTING EQUIPMENT.
<br />LONG RADIUS FITTINGS OR WITH COMBINATION "Y" BRANCHES AND I/8TH BENDS. CONNECT SOIL MANUAL" SO LABELED. A SECOND LIKE MANUAL SHALL BE PREPARED AND FORWARDED TO THE
<br />STACKS AT BASE TO HORIZONTAL RUNS WITH COMBINATION "Y" AND 1/8TH BENDS. MRP'S ARCHITECTURE AND ENGINEERING DEPARTMENT FOR "JOB RECORDS". THE MANUAL SHALL 15. PROVIDE VACUUM BREAKERS AT FIXTURES WITH HOSE
<br />CONSIST OF A THREE-RING LOOSE-LEAF BINDER CONTAINING ALL PRINTED MATTER SUCH AS: CAP CAP E THREAD CONNECTIONS.
<br />TI T TIN MANUALS, AN
<br />WATER SUPPLY PIPES t0 FIXTURES AND WASTE PIPES FROM FIXTURES SHALL BE CENTERED IN THE GUARANTEE CARDS, CLEANING INSTRUCTIONS, NOTICES O OWNER, OPERATING L D
<br />PROPER PLACE RELATIVE TO THE CENTER LINE OF THE FIXTURE. NO OFFSETS WILL BE ALLOWED. ALL MAINTENANCE INSTRUCTIONS THAT MAY BE CONTAINED IN THE SHIPPING CARTONS OR HOUSING OF WALL HYDRANT WH WH rn Iro. PROVIDE DIELECTRIC UNIONS AT ALL DISSIMILAR METAL
<br />PIPES SHALL BE RUN MECHANICALLY STRAIGHT AND SQUARE WITH BUILDING LINES, EXCEPT FOR EQUIPMENT AND ARCHITECTURAL SPECIALTIES. PIPE CONNECTIONS.
<br />REQUIRED PITCH ON HORIZONTAL LINES, AND ALL CHANGES IN DIRECTION SHALL BE MADE WITH
<br />FITTINGS. WATER PIPING TO BE ROUTED IN WALLS, UNDER THE FLOOR SLAB, AND ABOVE SUSPENDED VENT THRU ROOF VTR 11, LAVATORY FAUCETS SHALL LIMIT HOT WATER FLOW TO 0.5
<br />CEILINGS AS NOTED. WHERE WATER LINES ARE ROUTED UNDER THE FLOOR SLAB, NO MECHANICAL GPM AND HOT WATER TEMPERATURE TO 110" F
<br />JOINTS SHALL BE MADE UNDER THE SLAB EXCEPT AS LISTED BELOW. WATER PIPING SHALL BE BACKFLOW PREVENTER BFP
<br />INSTALLED NOT TO EXERT VERTICAL NOR HORIZONTAL STRESSES ON THE SEATING OF UNIONS, UNIONS
<br />SHALL BE COPPER TYPE NIBCO 0133 OR EQUAL.
<br />NO WAX, PUTTY, OR VARNISH WILL BE PERMITTED. CRACKED FITTINGS SHALL BE REMOVED AND
<br />REPLACED WITH NEW FITTINGS. MAKE THREADED JOINTS IN BRASS PIPE AND FITTING WITH PIPE
<br />THREADING TO THE SHOULDER OF THE FITTINGS. NO SLIP JOINTS OR COUPLING JOINTS IN BRASS PIPE
<br />WILL BE PERMITTED, EXCEPT ON THE FIXTURE SIDE OF THE TRAP.
<br />4. NATURAL GAS PIPING: FOR ABOVEGROUND INSTALLATIONS, ALL FITTINGS TO BE JOINED WITH TEFLON _
<br />TAPE SEAL OR OTHER SUITABLE SEAL AND MADE IN CONFORMANCE WITH THE 5E5T PRACTICES OF: I r r O
<br />AGA AND NFPA 54. UNIONS SHALL BE CAST BLACK IRON AND INSTALLED IN A MANNER SUCH THAT NO I I R I
<br />STRESS WILL BE PLACED ON THE MALE -FEMALE SEALING SURFACES. PROPER ALIGNMENT WILL BE \ L _ J
<br />MADE AT TIME OF INSTALLATION. ALL JOINTS AND CONNECTIONS SHALL BE THOROUGHLY CLEANED
<br />OF OIL, THREAD CUTTINGS AND RESIDUALS t0 ACCEPT ENAMEL PAINT. ROUGH OR SHARP EXPOSED
<br />THREAD SURFACES SHALL BE FILED SMOOTH. TESTING SHALL BE AS OUTLINED UNDER SECTION 15A, I I it
<br />PARAGRAPH 11, TESTS. (II
<br />FS
<br />A. MATERIALS: BLACK CARBON STEEL, SCH. 40 WITH MALLEABLE IRON THREADED FITTINGS.
<br />` EXISTINGCOOLER
<br />I ;
<br />B. PAINTING: PAINT ALL GAS PIPING EXPOSED TO WEATHER WITH ONE COAT OF PRIMER, FREEZER
<br />AND TWO COATS OF RUST -PROOF PAINT. COLOR SHALL MATCH BUILDING COLORS.
<br />COORDINATE WITH G.C.
<br />5. WATER PIPE:
<br />EXISTING
<br />WATER METER d BACKFLOW REQUIREMENTS SHALL BE IN ACCORDANCE W/ LOCAL CODES d UTILITY I KITCHEN AREA
<br />COMPANIES. REFER TO CIVIL DRAWINGS FOR METER, SERVICE LINES, AND CONTAINMENT BACKFLOW _ MATERIAL SPECIFICATIONS
<br />PRE VENTER
<br />H
<br />JOINTS SHALL BE CLEANED AND DEBURRED AS RECOMMENDED BY THE MANUFACTURER AND�U L) I ® 1. HOT t COLD WATER PIPING SHALL BE CPVC AND TYPE L COPPER IN
<br />FEDERAL STATE AND LOCAL CODES AND SOLDERED AS LISTED BELOW. FLUX SHALL BE FIRE RATED WALL WI A v I W
<br />NON-CORROSIVE.D ALL PIPE JOINT MATERIALS SHALL BE LEA -FREE. FS PROVIDE 12 GA. TRACER RE BO E PIPE BELOW
<br />ITPIPING &WALL BE
<br />INSULATED. 2. SANITARY WASTE PIPINGS ALLBE SCHEDULE 40 PVC
<br />ABOVE GRADE - WHERE FITTINGS ARE SOLDERED BOTH FITTINGS AND TUBING SHALL BE CLEANED AS I FS LJ O PIPE WITH SOLVENT FITTINGS. PIPING IN FIRE RATED WALLS TO BE
<br />DESCRIBED ABOVE. UNDER NO CIRCUMSTANCES SHALL DISSIMILAR METALS COME INTO DIRECT I S CAST IRON. CONFORMING TO ASTM STANDARDS.
<br />CONTACT WITH COPPER TUBING, E.G., GALVANIZED STRAPPING, HANGERS, OR CLAMPS TO SECURE THE I Fs O ® 3. INSULATION SHALL BE FLEXIBLE UNICELLULAR - SELF -SEAL
<br />TUBING. O Fp ARMAFLEX 2000 �" THICK FOR HOT WATER PIPING UP TO 2" SIZE -
<br />® PROVIDE SHEET METAL SADDLES AT EACH HANGER
<br />BELOW GRADE, OR FLOOR SLAB ON EARTH OR STONE FILL - HIGH TEMPERATURE, SOLDER, 1200 DEG. FD
<br />F OR GREATER MELTING POINT.
<br />NOTE: WATER PIPE TO BE PROPERLY SECURED AND ALIGNED SO AS NOT TO EXERT EXISTING I \ PGO ` O
<br />VERTICAL OR HORIZONTAL STRESSES ON THE SEATING OF THE MATING (MALE AND FEMALE) SURFACES OF DINING \
<br />THE UNIONS. I \ 4A -
<br />HD
<br />A. MATERIALS - UNDERGROUND: TYPE "K" COPPER TUBE, SOFT TEMPER \ /�
<br />B. MATERIALS - ABOVEGROUND: TYPE "L" COPPER TUBE, HARD DRAWN
<br />EXISTING
<br />C. INSULATION: INSULATION FOR HOT AND GOLD WATER PIPING SHALL BE 1/2" THICK ARMAFLEX UL \ < \ MEN
<br />LABELED OR P FIBERGLASS 25/50 WITH ASJ/SSL FOIL/VINYL JACKET OR EQUAL. INSULATE ALL
<br />PIPING AND FITTINGS. \ \ FD ® 01
<br />� I
<br />6. WASTE PIPING: INSTALL HORIZONTAL DRAIN AND WASTE PIPES WITH 1/4" FT. SLOPE. \ /> - O3 O®D 3 O EXISTING
<br />ND b--
<br />A. MATERIALS (SANITARY/GREASE WASTE t VENT): PVC SCH. 40, SOLID GORE (ASTM 2665), WITH SCH.
<br />40 DRAINAGE PATTERN PVC FITTING$ AND SOLVENT CEMENTED JOINTS WITH TINTED PRIMER III 3
<br />EXCEPTION: SEE PLAN NOTES AND RISER DIAGRAM FOR U/G GREASE WASTE LINE BETWEEN III
<br />COOKING LINE FLOOR DRAIN AND GREASE WASTE MAIN. THIS LINE SHALL BE INSTALLED WITH
<br />SERVICE WEIGHT, COATED t LINED, CAST IRON SOIL PIPE WITH MECHANICAL HUB E SPIGOT -
<br />PUSH -ON JOINTS. /
<br />WCo MS DEMOLITION NOTES:
<br />B. MATERIALS (ABOVEGROUND INDIRECT DRAIN AND CONDENSATE DRAIN LINES): TYPE 111'1" _ O O
<br />02 2
<br />OEXISTING PLUMBING FIXTURES TO BE REMOVED. CAP
<br />I ( 3 F WASTE, WATER AND VENT PIPING IN WALL, BELOW SLAB AND
<br />7 O ABOVE CEILING.
<br />EXISTING 2 EXISTING PLUMBING FIXTURE TO REMAIN.
<br />WOMEN < ® WH
<br />O
<br />\ F D
<br />\ II \ O O O3 EXISTING PLUMBING FIXTURE TO BE REPLACED.
<br />Fr-
<br />0 DEMOL ITIM PLAN
<br />SCALE: 1/4" = I'-0"
<br />REVISIONS
<br />BY
<br />•f
<br />U
<br />� N
<br />_ � O
<br />C
<br />N
<br />U
<br />_
<br />O L7 cJ
<br />Q _ J
<br />ti
<br />i
<br />Q
<br />Q00
<br />ti e
<br />a
<br />G •`N•J
<br />1
<br />Q
<br />zw �p
<br />a0
<br />ox..
<br />1 �
<br />. 1 {r..
<br />�0Lu
<br />4
<br />0
<br />co
<br />V M O
<br />c
<br />�o
<br />coul
<br />w N
<br />'w�
<br />UW yM
<br />� om
<br />L � v
<br />C ,�
<br />W O 13
<br />^W` O 1:L�
<br />'C7 16-
<br />� Z a
<br />a=
<br />W �0
<br />L
<br />O
<br />� Z
<br />0 Ll
<br />C
<br />O �[ 0
<br />0 U
<br />O - O
<br />C U m
<br />0 vi
<br />N
<br />o,
<br />�� W
<br />X >- d
<br />Lw LLJ r- 0
<br />i CL r4
<br />o p
<br />•N cL
<br />C
<br />Date: 03. 28. 13
<br />Scale: AS NOTED
<br />Project Mgr: GGS
<br />Drawn: CC
<br />Job: 13-03
<br />Sheet
<br />P1