Laserfiche WebLink
V-9" AFF. <br />BOTT. OF METAL <br />CANOPY <br />V-0" AFF. <br />BOTT. OF METAL <br />CANOPY <br />19'-0" AFF. <br />TOP OF <br />EXISTING <br />PARAPET <br />V-0" A.F.F. <br />BOTT. OF METAL <br />RIBBON <br />0'-0" A.F.F. <br />TOP OF SLAB <br />OIUJEST EXTERIOR ELEVATION <br />SCALE: 3/16" = I'-0" <br />GISOUTH EXTERIOR ELEVATION <br />SCALE: 3/16" = I'-0" <br />19'-0" AFF. <br />TOP OF <br />EXISTING <br />PARAPET <br />V-9" AFF. <br />BOTT. OF METAL <br />CANOPY <br />KEYED NOTES <br />OI <br />EXISTING CONCRETE CURB / SIDEWALK <br />O2 <br />NEW 2" EIFS WALL SYSTEM OVER EXISTING WALL SYSTEM- SEE <br />WALL SECTIONS <br />0 <br />EXISTING WINDOW SYSTEM - FRAME TO BE REPAINTED WITH <br />ELECTROSTATIC PROCESS TO MATCH SHERWIN WILLIAMS SW 6869 <br />"SAFETY RED" <br />OEXISTING <br />LOUVER <br />OEXISTING <br />OVERFLOW SCUPPER <br />OEXISTING <br />ROOF ACCESS LADDER, MODIFY AT NEW ROOF - PAINT <br />AS REQUIRED <br />ONEW <br />GUARDRAIL SYSTEM - SEE DETAIL 5/Ala <br />ONEW <br />LIGHT FIXTURES- SEE ELECTRICAL DRAWINGS <br />OE.IF.S <br />VENEER WITH HORIZONTAL REVEALS - SEE DETAILS 4/A5b <br />ID <br />EIFS BAND - SEE DETAIL 5/A5b <br />11 <br />NEW STOREFRONT WINDOW SYSTEM - SEE FLOOR PLAN <br />12 <br />NEW DOOR SYSTEM - SEE FLOOR PLAN AND DOOR SCHEDULE <br />13 <br />NEW DRIVE-THRU WINDOW SYSTEM - SEE FLOOR PLAN <br />14 <br />NEW CANOPY SUPPORT COLUMNS SYSTEM PROVIDED AND <br />INSTALLED BY ARBY'S VENDOR <br />15 <br />PRE -FINISHED / PRE FABRICATED CANOPY SYSTEM PROVIDED <br />16 <br />AND INSTALLED BY ARBY'S VENDOR <br />PRE -FINISHED METAL CANOPY RIBBON SYSTEM PROVIDED AND <br />INSTALLED BY ARBY'S VENDOR - SEE WALL SECTIONS <br />11 <br />CONT. METAL COPING / FLASHING - SEE WALL SECTIONS <br />18 <br />BUILDING SIGNAGE PROVIDED AND INSTALLED BY OWNER <br />19 <br />E.IF.S "CUSTOM BRICK" FINISH <br />A.F.F. <br />20 <br />CONT. METAL FLASHING BEYOND AT NEW ROOF AND EXISTING WALL <br />TOP OF <br />SYSTEM <br />EXISTING <br />PARAPET <br />21 <br />METAL FLASHING <br />22 <br />NEW RAIN DEFLECTOR <br />EXTERIOR FINIAH SCHEDULE <br />Al DRYVIT OUTSULATION PLUS MD EIFS SYSTEM 0310 CHINA <br />WHITE "SANDBLAST" TEXTURE (METAL COPING: <br />V-0" AFF. <br />DURO-LAST 0SR10/TE81 "REGAL WHITE" <br />BOTT. OF METAL <br />RIBBON <br />A2 DRYVIT OUTSULATION PLUS MD EIFS SYSTEM CUSTOM <br />BRICK SPECIALITY FINISH J" GROUT 28 PT. TEMPLATE %12 <br />MOONLIGHT NCB GROUT QUARTZPUTZ 0101 SUPER WHITE <br />DPR FINISH (METAL COPING: DURO-LAST "5R10/ TE.6-1 <br />"REGAL WHITE" <br />ElDRYVIT OUTSULATION PLUS MD EIFS SYSTEM WITH <br />REVEALS SHERWIN WILLIAMS "SW 2805 "ROCKWOOD <br />DARK BROWN" SATIN FINISH (METAL COPING: DURO-LAST <br />SR.26/ TE.81 "DARK BRONZE" <br />AFF. <br />CANOPY ELEMENT SHERWIN WILLIAMS •SW 566R38 <br />TOP OF SLAB <br />"SAFETY RED" <br />PRIMER. LOXON ACRYLIC MASONRY PRIMER, A-24-300 <br />TINT TO 5WP2 USE AT LEAST (2) COATS OF FINISH <br />E.IF.S BAND ELEMENT SHERWIN WILLIAMS SW 6869 <br />PRIMER: LOXON ACRYLIC MASONRY PRIMER, A-24-300 <br />FINISH: DTM ACRYLIC GLOSS, 566 R36 "SAFETY RED" <br />TINT PRIMER TO SWP2 USE AT LEAST (2) COATS OF FINISH <br />SHERWIN WILLIAMS -SW 1024 "FUNCTIONAL GRAY" SATIN <br />FINISH <br />K SHERWIN WILLIAMS *SW 2123 "WHITE" SATIN FINISH (METAL <br />COPING: DURO-LAST 05R10 / TE.81 "REGAL WHITE" <br />E.I F.S SYSTEM SPEC IF I C4T I ONS <br />I. WATER -DRAINAGE EXTERIOR INSULATION AND FINISH SYSTEM IE.fF.S) <br />APPLIED OVER WATER -RESISTIVE COATING OR "TYVEK" STUCCO WRAP <br />OVER SHEATING <br />2. CLASS PB (E.IF.S). WITH PHYSICAL PROPERTIES, DRAINAGE, AND <br />STRUCTURAL PERFORMANCE THAT COMPLY WITH ICC-ES AC235 <br />3. MANUFACTURER: DRYVIT SYSTEMS INC.- "OUTSULATION PLUS SYSTEM" <br />BASE SYSTEM WITH 1 1/2" INSULATION <br />4. G.0 TO PROVIDE E.IF.S. SYSTEM INSTALLATION SPECIFICATION AT <br />RECEIPT OF BUILDING PERMIT <br />GENERAL NOTES <br />I. GENERAL CONTRACTOR TO VERIFY ALL GRADE ELEVATIONS <br />TOP OF SLAB AFF. 2 PROVIDE PROPER FLASHING AT ALL REQUIRED AREAS TO ENSURE A <br />TOP WATERTIGHT CONDITION <br />(DIEAST EXTERIOR ELEVATION <br />SCALE: 3/16" a 1'-0" <br />O NORTH EXTERIOR ELEVATION <br />SCALE: 3/16" = 1'-0" <br />IV-0" AFF. <br />TOP OF <br />EXISTING <br />PARAPET <br />V-0" AFF. rL <br />BOTT. OF METAL <br />RIBBON <br />0'-0" AFF. I <br />TOP OF SLAB <br />3. PAINT ALL EXPOSED METERS, SERVICE ENTRANCES, GAS PIPE, ROOF <br />ACCESS LADDER, ETC. TO MATCH ADJACENT EXTERIOR WALL SURFAC <br />4. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS BEFORE <br />COMMENCING ANY WORK. NOTIFY ARCHITECT IMMEDIATELY IN WRITING <br />WITH ANY ISSUES. <br />5. PATCH AND REPAIR ALL EXISTING EXTERIOR WALLS TO MATCH AND <br />ALIGN WITH EXISTING, PREPARE TO RECEIVE NEW FINISHES. <br />ro. ALL EXISTING EXTERIOR WALLS TO BE PRESSURE WASHED, PATCH AP <br />REPAIR AS REQUIRED. <br />1. ALL EXTERIOR FINISHES AND PAINT COLOR SELECTIONS TO BE <br />VERIFIED WITH ARBY'S CONSTRUCTION MANAGER BEFORE ORDERING. <br />KEY PLAN <br />4 <br />\/ <br />2 <br />REVISIONS <br />BY <br />f, <br />x <br />T N <br />1�� <br />U 7 <br />C . <br />- <br />- � 3 <br />ti <br />s � s <br />2 <br />N <br />M <br />W <br />-x - <br />�h <br />:O <br />E <br />5 I <br />• � y ,t <br />O <br />L <br />O <br />to <br />C <br />O <br />0 <br />O <br />-0 •L <br />O <br />N <br />CC <br />(/ / m <br />� <br />0 <br />v vi <br />t <br />x <br />L <br />Q W <br />W <br />4 <br />D <br />N <br />i <br />O <br />c <br />Date: <br />06. 09. 15 <br />Scale: <br />AS NOTED <br />Project Mgr: RNS <br />Drawn: DC <br />Job: <br />15-50 <br />Sheet <br />A4 <br />11 \Projects\Projects 2015V15050 - Arbv's Gall B1vd\04-CDV01-CD.AV04-Architectural,,A04-E\EL.dwg. 6/10/2015 12:08 29 PM. dcosta. _AutoCAD PDF (High Quality Print).pc3 <br />