My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7646 Gall Blvd
Zephyrhills
>
Building Department
>
Building Plans
>
7646 Gall Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 7:51:40 AM
Creation date
2/18/2025 3:43:17 PM
Metadata
Fields
Template:
Building Plans
Street #
7646
Location
Gall Blvd
Contractor
Chipotle Restaurant
Building Plans - Permit #
2638
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.I. .. 11111 1111, I„ IN , _ _ L I _ <br />13A0' <br />F- 7 F-7 <br />374W <br />S <br />.rr <br />DETECTOR <br />REMOTE MANUAL <br />PULL STATION <br />REMOVABLE STAINLESS <br />STEEL SERVICE DOOR <br />AGENT TANK <br />OEM RELEASE/ - <br />BRACKET ASSEMBLY <br />0 <br />ll: <br />2L� 29.23' <br />9Av <br />243 243 <br />sNs <br />OPTIONAL PRE —WIRED ELECTRICAL <br />TERMINAL BOX WITH TERMINAL STRIPS, <br />3—PHASE CONTACTORS AND OVERLOADS <br />FAN AND LIGHT (IF APPLICABLE) <br />CONTROL PANEL <br />JOB #1 4681827. <br />JOB NAMEi CHIPOTLE ZEPHYRHILLS #3687. <br />SYSTEM SIZEo ANSUL-3.0/3.0-MANIFOLD TOTAL FP REQUIREDi 13. <br />HOOD # 1 13" 0.00' LONG x 54' WIDE x 24' HIGH. <br />RISER # 1 SIZEt 10' x 14'. <br />RISER # 2 SIZEi 10' x 141. <br />u <br />GAS VALVE FOR FSP- <br />NOTES INCLUDES FIELD INSTALLATION AND HOOKUP DURING NORMAL. BUSINESS HOURS <br />- FIELD PIPE DROPS AS SHOWN BY CERTIFIED INSTALLERS ONLY IN THE LOCATION NOTED ABOVE, TWO SITE <br />SLEEVING, ELBOWS, TEES, AND NOZZLES SUPPLIED BY CAS SITS [PLY COME VISIT TO SET �- STATION & SYSTEM HOOKUP AND ONE <br />- RELOCATE NOZZLES IF FLOW PATTERN IS BLOCKED BY SHELVING, CHARGESVISIT ), UK U E IICALL GAS VALVE PEVISITS R SYSTEM RESULTILL �A MAXIMUM OF <br />SALAMANDERS, ETC. 20, PERMIT, AND SYSTEM TEST. <br />- MAXIMUM 9 ELBOWS IN SUPPLY LINE. EXCL UDM UNION LABOR S PREVAILING WAGE (LABOR S WAGES WILL BE <br />- MINIMUM 72 INCHES OF AGENT LINE FROM TANK TO FIRST NOZZLE. ADDED IT APPLICABLE), GAS VALVE INSTALLATION, ELECTRICAL HOOKIUP AND <br />- IF APPLICABLE, PRE -PIPED CHARBROILER DROPS ARE SHIPPED LOOSE. CONNECTIONS, HANGING OF FINE COS' SHUNT TRIP' HANDHELD <br />- FACTORY PIPING EXTENDS A MAXIMUM OF 6' ABOVE THE TOP OF THE HOOD.' ON -SITE RE -PIPING DUE TO EQUIPMENT LAYOUT CHIANGE& <br />- APPLIANCE DIMENSIONS LISTED REPRESENT THE COOKING SURFACE <br />SIZE, NOT THE OVERALL APPLIANCE SIZE. <br />- THIS FIRE SYSTEM COMPLIES WITH U.L. 300 REQUIREMENTS <br />Job #o 4681827 <br />Job Namei CHIPOTLE ZEPHYRHILLS #3687 <br />System Sizei ANSUL-3.0/3.0-MANIFOLD Total FP requiredi 13 <br />Hood # 1 13' 0.00' Lon x 54' Wide x 24' High <br />Riser # i Slzei 10' x ij' <br />Riser # 2 Sizei 10' x 14' <br />Hood # i Metal Blow -Off Caps Included. <br />LEGEND - PLRE CABnMT "SUL SYSIWJ( <br />IA 1.5 GALLON TANK <br />1B 3 GALLON TANK <br />2 OEM AUTOMAN RELEASE <br />3 OEM REGULATED RELEASE <br />4 OEM REGULATED ACTUATOR <br />5 ANSULEX LIQUID AGENT (3 GAL.) <br />6 ANSULEX LIQUID AGENT (1.5 GAL.) <br />7 CARTRIDGE (101-20) <br />8 CARTRIDGE (101-10) <br />9 CARTRIDGE (101-30) <br />9A CARTRIDGE (LT-A-101-30) <br />9B DOUBLE TANK CARTRIDGE <br />10 TEST LINK <br />it DOUBLE MICROSWITCH <br />12 HOSE ASSEMBLY <br />1100 DUCT NOZZLE (430913) <br />2W DUCT NOZZLE (419337) <br />iW NOZZLE ASSEMBLY (419336) <br />1F NOZZLE ASSEMBLY (419333) <br />1N NOZZLE ASSEMBLY (419335) <br />1/2N NOZZLE ASSEMBLY (419334) <br />3N NOZZLE ASSEMBLY (419338) <br />245 NOZZLE ASSEMBLY (419340) <br />230 NOZZLE ASSEMBLY (419339) <br />2120 NOZZLE ASSEMBLY (419343) <br />290 NOZZLE ASSEMBLY (419342) <br />260 NOZZLE ASSEMBLY (419341) <br />28 DETECTOR BRACKET <br />29 LOW TEMP FUSIBLE LINK <br />30 HIGH TEMP FUSIBLE LINK <br />MGV MECHANICAL GAS VALVE <br />EGV ELECTRICAL GAS VALVE <br />34 REMOTE MANUAL PULL STATION <br />S SWIVEL ADAPTOR <br />NOTES <br />- FIELD PIPE DROPS AS SHOWN <br />SLEEVING, ELBOWS, TEES, AND NOZZLES SUPPLIED BY CAS. <br />- RELOCATE NOZZLES IF FLOW PATTERN IS BLOCKED BY SHELVING, <br />SALAMANDERS, ETC. <br />- MAXIMUM 9 ELBOWS IN SUPPLY LINE. <br />- MINIMUM 72 INCHES OF AGENT LINE FROM TANK TO FIRST NOZZLE <br />COVERING A RANGE, FRYER, OR WOK TO REFLECT GENERAL PIPING REQUIREMENTS. <br />- IF APPLICABLE, PRE -PIPED CHARBROILER DROPS ARE SHIPPED LOOSE. <br />- FACTORY PIPING EXTENDS A MAXIMUM OF 6' ABOVE THE TOP OF THE HOOD. <br />- APPLIANCE DIMENSIONS LISTED REPRESENT THE COOKING SURFACE <br />SIZE, NOT THE OVERALL APPLIANCE SIZE. <br />SPECIFICATIONS <br />THE RESTAURANT FIRE SUPPRESSION SYSTEM SHALL BE THE PRE—ENGINEERED <br />TYPE WITH A FIXED NOZZLE AGENT DISTRIBUTION NETIl1W IT SHALL BE LISTED <br />WITH UNDERWRITERS LABORATORIES, INC. (UL) <br />THE SYSTEM SHALL BE CAPABLE OF AUTOMATIC DETECTION AND ACTUATION <br />WITH LOCAL OR REMOTE MNANUAL ACTUATIOK ACCESSORIES SHALT. BE AVAILABLE <br />FOR MECHANICAL OR ELECTRICAL GAS LINE SHUT—OFF APPLICATMNS. <br />THE EXTINGUISHING AGENT SHALL BE A POTASSIUM CARBONATE, POTASSUM <br />ACETATE —BASED FORMULATION DESIGNED FOR FLAME KNOCKDOWN AND SECURENENT <br />OF GREASE RELATED FIRES. IT SHALL BE AVAILABLE IN PLASTIC CONTAINERS <br />WITH INSTRUCTIONS FOR LIQUID AGENT HANDLING AND USAGE. <br />THE REGULATED RELEASE PECHANNISH SHALL BE COMPATIBLE WITH A FUSIBLE <br />LINK DETECTION SYSTEML THE FUSIBLE LINK SHALL BE SELECTED AND <br />INSTALLED ACCORDING TO THE OPERATING TEMPERATURE IN THE VENTILATING <br />SYSTEML THE FUSIBLE LINK SHALL BE SUPPORTED BY A DETECTOR BRACKET/ <br />LINKAGE ASSEMBLY. <br />GAS VALVES AND STRAINERS <br />GAS VALVE SUM <br />GAS VALVE DIwENSMS <br />MNSTALlATKNNN <br />PART NUMBERS <br />TV" <br />8 Z <br />VOLTAGE <br />YN. NLET <br />P�lE <br />MAX NLET <br />PREP <br />1 <br />FLAW AT 1 N.W.Q <br />AS DROP NATURAL G <br />FLOW AT 1 KW.Q <br />DROP PROPANE <br />DM 'A' <br />DIY air <br />DM *00 <br />DM V <br />DM or <br />OM b" <br />YOUNING <br />ORIMAIION <br />GAS VANE <br />PART NJI�NBER <br />SIRAER PART <br />NJYBERR <br />GAS <br />VK TOT <br />I FNANN',AL <br />k;if <br />1-1 <br />N/A <br />0 PS <br />(0 DLVLQ) <br />10 P81 <br />(277 N.W.C.) <br />Z,MOW BWAR <br />1.70S.SSN1 SWA*t <br />6-3/S" <br />4-7/ir <br />a-3/4" <br />6-3AIr <br />12-54,Ar <br />11-3ff <br />HORIZONTAL <br />27-55W <br />4417NU <br />MGVA1-1/Z <br />PROPER CLEARANCE Mw BE PRO m N ORDER IN) SERVICE THE <br />$WAERS A Mi OF 4' CLEARANCE DISTANCE MUST BE <br />PROVIM AT THE BASE OF THE SIRANOt CLWO ER MUST VEItFY <br />BTU CONSUMPTION AS VEIL AS PRESSURE RAING 8PECF GRAVITY <br />OF NAWRAL GAS - OJK SPEOFIC GRAWrY OF LP - 1.82. <br />DIM. wGw <br />70 CALCULATE GAS FLOW FOR OILER THAN 1 KW.C: PEE DROP <br />saw 81 Aft - (mAft AT 1 N.w.C. PMJRE DROP) X NEW PEE &w" <br />10 A <br />ft — "FLAA <br />W FT 0 NEW ." X (0." / NEW WMFIC GRAVITY)". <br />M or <br />4" <br />GAS VALVE. <br />-----FLOW. <br />—DIM �c = <br />. DIM OD' <br />
The URL can be used to link to this page
Your browser does not support the video tag.