Laserfiche WebLink
----------------------------� <br />CLOAKED VENT TILES FOR GONG. <br />TILE ROOF (SEE 5PEG5) <br />1 (SIM, OPP. <br />TYPICAL ROOF CONSTRUCTION, G <br />I <br />I <br />A�6 1 HAND) <br />SEE 5HT. A3.0 <br />TRUSS ROOF <br />PRE-ENGINEERED TRUSS, SEE <br />TYPICAL TOWER <br />FRAMING REFER TO <br />5TRUGT. <br />ROOF GON5TRUGTION, <br />I <br />STRUCTURAL SHTS <br />SEE 5HT. A3.0 <br />EXTEND PLYWOOD SHEATHING <br />ALUMINUM <br />DOWN FROM TOP OF ROOF TO <br />TRU55 BRG./ I <br />GUTTER EDGE <br />TOP OF BLOGKING TO CREATE <br />T.O. GMU <br />; .; I I <br />DRAFT STOP SEPARATION <br />I <br />ALUM. COPING <br />201-8" I <br />' <br />(TYPJ <br />I <br />SLOPE <br />DIRECT APPLIED ACRYLIC, <br />/ <br />CONT. VENT <br />I/4' PER FT. MIN) <br />FIN. SYSTEM AT ROOF <br />- <br />OVERHANG (SEE 5PEG5) i' <br />16x1 OPEN 6 1/4" i�ER FT. IN <br />FOR IONIONA E <br />o <br />STOREFRONT SYSTEM - { <br />FULLY ADHERED ROOF MEMBRANE <br />ON VERTICAL TRANSITION WALL <br />PRE-ENGINEERED 3 <br />SIM. <br />TRU55, SEE 5TRUGT <br />MEGH. EQUIPMENT AREA <br />SEE MEGH SHEETS I <br />SLOPE <br />1/4" PER FT. (MIN) <br />I I 5U5P. AGOU5T. <br />STIB LE I TILE GLO. <br />V" <br />1 <br />a 101 <br />7FGG. HEI'G-10HT <br />BO. ST BM <br />-j'-I11 0" = STOREFRONT <br />WG-I WALL I _ (OFF.GLG <br />a. HE16 <br />GOVERING CHASEHT <br />CII' I Cp wI 1 <br />o u <br />GLAZED ALUMINUM HAND) 6 I I 5U5P. <br />STOREFRONT SYSTEM AGOUST. <br />ATM MACHINE- /� /, ( I TILE <br />I � I � /, I ,I°� GLG- � o D <br />ATA <br />SEE CIVIL FOR <br />�\ �� <br />SIDEWALK I N LOBBY TELLER LINE 1 \ � � <br />/GRADE 0 0 <br />5EE SHT. A1.2 // '/, / 1 V ` \ <br />T.O. SLAB � <br />O <br />ELE'\/. I S I FOR FLOOR <br />d <br />I I. <br />CONCRETE I TELLER DESK, I I GONCRETE SLAB, <br />FTC,., SEE CONCRETE SLAB, SEE 5TRUGT. SEE 5HT. A-f .2A ! J SEE 5TRUGT. <br />d.. <br />5TRUGT. - - - �-- - <br />Ak T.O. GMU <br />Y 1-11-411 <br />TRUSS ROOF <br />FRAMING REFER <br />TO STRUCTURAL <br />PLANS <br />GEILIN6 HT <br />8'-bll 3D <br />A8 <br />GLAZED ALUM. <br />WINDOW <br />3E <br />D EXTEND PLYWOOD SHEATHING DOWN FROM <br />TOP OF ROOF TO TOP OF BLOGKIN6 TO <br />CREATE DRAFT STOP SEPARATION <br />1/4" PER F (f <br />PAINTED GYP <br />BOARD SOFFIT <br />i <br />I�u <br />I <br />PAINTED <br />GYP <br />BOARD <br />SU5P. ACOU5T. I I SOFFIT <br />TILE GLG. <br />ALUM. GOPINO <br />(TYP.) ___\ <br />GEILIN6 HEIGHT <br />10'-101, <br />I <br />SU5P. GLG. <br />/ I I AT <br />A.F.F. <br />/ <br />I <br />LOUNGE /RINTER BGM CORRIDOR // \ <br />III 112 I I I l a 113 � i�� <br />7. <br />I I <br />I <br />-- T.O. GMU <br />CANOPY <br />I <br />SLOP <br />1/ " PER FT'(MIN) r-1--- <br />- II <br />I <br />I <br />GLG <br />HEIcsHT <br />I 8'-011 <br />I <br />/ 5USF. <br />/ AGOUST. <br />/ TILE <br />JANITOR GLG. 1 <br />I10 I I <br />I I <br />\ I I <br />\ I I <br />I <br />l 1 <br />BUILDING CROSS SECTION SCALE _0" 1 <br />TRUSS ROOF FRAMING REFER <br />TO STRUCTURAL PLANS <br />LOBBY <br />103 <br />1/4" PER FT. (MIN <br />BUILDING CROSS SECTION <br />BUILDING CROSS SECTION <br />T.O. GMU <br />OPP <br />HAND <br />I I <br />I I <br />I <br />I 1 <br />B.O. EIF5 BAND <br />I I 10'-6 1/2' <br />I I <br />I I I <br />I I <br />I I <br />I I <br />I I <br />I I I <br />I I <br />T.O. WAINSCOT <br />I <br />I <br />T.O. BLAB <br />01-0 <br />II II <br />l J <br />SCALE J <br />1/4"1'-0" 2 <br />S CALE <br />1 /4" = 1'-0" <br />' II .- . ik I_ J. <br />3 <br />STD. STEEL PIPE (5ALV) -FILLED <br />SOLID W/ CONCRETE - 4" 0. D. X <br />4'-6" HIGH <br />GONGRETE ISLAND - <br />R=3/4" <br />FI N I5HED PAVEMENT, <br />SEE G I V IL SHEETS - <br />T d � <br />O d^ a'-, <br />PLASTIC, BOLLARD COVER, SEE <br />BOLLARD COVER NOTES <br />- DOMED TOP <br />G.I.P. GONG. <br />- SEE PLAN <br />< <br />POSITIVE <br />z <br />DRAINAOE -1/8" <br />O <br />(TYP.) TYP)1_ <br />p <br />VAT BOLLARD DETAIL 1 SCALE <br />0" 4 <br />6" NOMINAL (C6.625" O.D.) CONCRETE DOMED TOP <br />STEEL PIPE. <br />BOLLARD COVER NOTES: <br />VENDER: IDEAL SHIELDS <br />2 1/2" NOMINAL (20-15'' O.D.) <br />STEEL PIPE, PLUG WELD WITH <br />DRILLED HOLES TO 6" STEEL <br />PIPE. FILL BOTH PIPES WITH <br />MODEL#(VAT LANES);BPD-OBE-4-54-5 <br />D_ <br />GONGRETE_ <br />MODEL#(ATM LANES): 5PD-OBE-6-54-5 <br />W <br />COLOR: TO MATCH OLE' BLUE EYES <br />Q <br />tl <br />O <br />BOLLARD <br />BOLLARD COVER - SEE <br />BOLLARD COVER NOTES FOR <br />BENJAMIN MOORE PAINT <br />CONTACT: MARTY VENGEAS <br />J <br />1- <br />TO BE <br />PRODUCT INFORMATION <br />PHONE: 4bO.380.2100 <br />I- <br />N <br />- <br />�9 <br />FAGTORY <br />E-MAIL:MVENEGA5®IDEALSHIELD.GOM <br />- <br />� <br />PRIMED <br />ADDRESS: 2525 GLARK ST. DETROIT,MI <br />� <br />POSITIVE <br />4820q <br />N <br />DRAINAGE <br />ORDERI NO: BY GENERAL CONTRACTOR <br />LL <br />(TYP.) <br />T.O. 15 AND <br />O� <br />� <br />p <br />.p <br />2 1/2" NOMINAL (2.8-fs" O.D.) <br />O <br />`\ ` <br />STEEL PIPE. <br />PLUG WELD <br />6" NOMINAL TOGETHER <br />(6.625" O.D.) AND FILL <br />STEEL PIPE. BOTH PIPES <br />a <br />WITH <br />GONGRETE. <br />a <br />EDGE OF GONG. SEE <br />a <br />15LAND PLAN <br />E30LLA D FLAN <br />E30LLA D 5EGTDN <br />ATM BOLLARD SECTION & PLAN <br />NOTE: THIS LAYOUT 15 BASED ON DIEBOLO OPTEVA 750 <br />DRIVE -UP ISLAND ATM. VERIFY LAYOUT WITH FINAL BANK <br />APPROVED MFR'5 DRAWINGS BEFORE CONSTRUCTION <br />SCALE 5 <br />1 /2" = 1'-0" <br />NOTE: THIS LAYOUT 15 BASED ON DIEBOLD VAT 21 #134-56 <br />CUSTOMER UNIT DETAILS. VERIFY LAYOUT WITH FINAL BANK <br />APPROVED MFR'5 DRAWINGS BEFORE CONSTRUCTION <br />5"x&"x6" PVC, PULL BOX W/ SIDEWALK RATED GASKET TOP FLUSH W/ <br />TOP OF GONG. ISLAND <br />8" 1'-0" UNDERGROUND <br />CONDUITS TO <br />BRANGH <br />vmom <br />LL <br />^\ <br />LL <br />O LL <br />-� DETAIL LL IN -SLAB GOONDUIT5 Florida Business License #: AAC001619 <br />TO PULL BOXES Registered Architect: Kenneth Cowart <br />ISLAND SLAB This drawing is the property of Associated Space <br />\ l <br />Design, Inc. and is not to be reproduced or copied in <br />/01whole or in part. It is not to be used on any other project <br />N-SLAB CONDUITS 1- I and is to be returned upon request. Scales as stated <br />8 I _ <br />WE TO PULL BOXES I l'-0" O 01 8 DETAIL herein are for reference only as normal reproduction <br />10 4/A5.1 <br />N I I I processes may alter the accuracy of original drawings. <br />N ISLAND SLAB <br />N / � Associated Space Design, Inc. 2006 <br />�1 i1 1 Oil <br />81 - <br />m dJ ` <br />III <br />_ I <br />LL 4 APPROX. OUTL I NE <br />J O , OF ATM ON CURB VAT <br />LL <br />- - 6" PVC, PULL <br />1 12"xl2"x6" PVC, PULL O 12"xI2"x <br /><Y - BOX WGASKET <br />BOX W/ 6A5KPT 25 8 cv <br />TOP FLUSH WTOP N 0 3/4" TOP FLUSH 1^V TOP <br />4" 7" OF GONG. 15LAND v OF GONG. ISLAND <br />_ �r m <br />_ - <br />C�V - <br />` N _ 2 "x4" WEATHER <br />nl N 2 x4 WEATHER N PROOF PVC, <br />m PROOF PVC <br />6" 6" JUNCTION BOX JUNCTION BOX <br />OF COL. FLUSH W/ TOP OF OF <br />W/ TOP OF <br />GONG. ISLAND FOR GONG. ISLAND FOR <br />m \ ATM TOPPER / / ATM TOPPER <br />GONG. PIER, <br />54" TALL 4" 1 -411 411 -� T11P. SEE <br />ONG. PIE BOLLARDS -f it ol 5TRUGT. DWG'S <br />YP. SEE \ / \ SEE PET 5/A5.1 <br />TRUGT. DW6'5 <br />FDLA N PROVIDE P051TIVE DRAINAGE (TYP.) FLAN <br />54 TALL <br />NOTE: SEE BANK EQUIP. SHOP BOLLARDS - <br />DWO5S FOR ADDITIONAL SEE DET 4/A5.I <br />a BOLTS, GONPU I T5 ET6.o v <br />o d °9_vp ° v. s v d °d_v _a Q a o °d„ <br />aa <br />d d p v ° d d p v p <br />d <br />G <br />!\ SECT ON '!/ �'\ SEGT ON <br />ATM DETAIL SC�1'_0,. 6 VAT DETAIL 3 CALE 7 <br />In m <br />to v <br />N <br />M <br />_J <br />N J <br />LL N <br />�m <br />C <br />ca" <br />VJ <br />CO <br />c <br />N <br />C6 <br />c*) <br />Q <br />�C6 <br />C <br />ca <br />w �- <br />[!3 <br />N <br />U_ <br />C7 <br />a <br />c m <br />@ `o <br />W U_ <br />W <br />T cl3 <br />0 <br />L <br />D <br />F- <br />U <br />_ <br />Lo <br />L) <br />U_ <br />a <br />� <br />Qm <br />,a <br />~ <br />W <br />o <br />z <br />@ �' <br />C �E <br />@ cc <br />Q � <br />9 E& <br />Y <br />(/) <br />Ln C/) <br />0 <br />Z <br />Q <br />U) <br />J U <br />J z <br />_ 0 _ <br />0 <br />W <br />a <br />N N <br />TOP OF GONG. ISLAND <br />UNDERGROUND <br />GONDU I TS TO <br />BRANCH <br />NO: DATE: REMARKS_ <br />REVISIONS: <br />DRAWIlVG TITLE: <br />BLDG SECTIONS <br />AND <br />DETAILS <br />PROJECT -NO.: ISSUE DATE: <br />50568.12 07.15.2011 <br />DRAWN BY CHECKED BY <br />kc. kc. <br />SHEETNUNBER <br />A5ml <br />