Laserfiche WebLink
x <br />SYMBOLOGY/LEGEND <br />ELEVATION NUMBER <br />SHEET NUMBER <br />0DETAIL, SECTION OR <br />OR PLAN NUMBER <br />-WALL SEGTION NUMBER, <br />BUILDING SECTION LETTER <br />SHEET NUMBER <br />C)or DETAIL NUMBER <br />- SHEET NUMBER <br />ABBREVIATIONS <br />AG <br />AFF <br />AHU <br />AL <br />ASPH <br />AT <br />BD <br />BLKT <br />CJ <br />GLG <br />GMU <br />COL <br />GONG <br />GONT <br />GPT <br />GT <br />GIL <br />DBL <br />DF <br />DIA <br />DIM <br />ON <br />DS <br />EA <br />EJ <br />ELEG <br />ELEV / EL <br />EG <br />EXIST <br />FD <br />FE <br />FF <br />FR <br />FRP <br />F.V. <br />GALV <br />GYPBD <br />HG <br />HDW <br />AIR CONDITIONING <br />ABOVE FINISH FLOOR <br />AIR HANDLING UNIT <br />ALUMINUM <br />ASPHALT <br />ALUMINUM THRESHOLD <br />BOARD <br />BLANKET <br />CONTROL JOINT <br />GEILING <br />GONGRETE MASONRY UNIT <br />COLUMN <br />GONGRETE <br />CONTINUOUS <br />CARPET <br />GERAMIG TILE <br />GENTER LINE <br />DOUBLE <br />DRINKING FOUNTAIN <br />DIAMETER <br />DIMENSION <br />DOWN <br />DOWN SPOUT <br />EAGH <br />EXFAN51 ON JOINT <br />ELEGTRIGAL <br />ELEVATION <br />EQUAL <br />EXISTING <br />FLOOR DRAIN <br />FIRE EXTINGUISHER <br />FINISH FLOOR <br />FIRE RATED <br />FIRE RETARDANT PLYWOOD <br />FIELD VERIFY <br />GALVANIZED <br />GYPSUM BOARD <br />HAND I GAPPED <br />HARD WARE <br />a -NOTE NUMBER <br />0- WINDOW NUMBER <br />0- - DOOR NUMBER <br />A-REV15ION NUMBER <br />O- <br />INTERIOR FINISH <br />NUMBER <br />O - <br />EXTERIOR FINISH <br />NUMBER <br />-ROOM NAME <br />- ROOM NUMBER <br />16,-0" ELEV DATUM POINT <br />TRUSS BR(;. <br />NEW COLUMN <br />GRID NUMBER <br />OR Y <br />HM <br />HOLLOW METAL <br />HVAG <br />HEATING, AIR GONDITIONINO, VENT <br />INFO <br />INFORMATION <br />INSUL <br />INSULATION <br />LAG <br />LAY -IN AGOUSTIGAL CEILING <br />MAS <br />MASONRY <br />MAX <br />MAXIMUM <br />MEGH <br />MEGHAN IGAL <br />MF R / MFR <br />MANUFAGTURER <br />MIN <br />MINIMUM <br />MO <br />MASONRY OPENING <br />MR <br />MIRROR/MOISTURE RESISTANT <br />MT <br />MARBLE THRESHOLD <br />MTL <br />METAL <br />NA <br />NOT APPL I GABLE <br />NI G <br />NOT IN CONTRACT <br />NOM <br />NOM I NAL <br />NTS <br />NOT TO SCALE <br />OC <br />ON CENTER <br />OPP <br />OPPOSITE <br />PLYWD <br />PLYWOOD <br />PREFAB <br />PREFABRICATED <br />PSF <br />POUNDS PER SQUARE FOOT <br />PT <br />PAINT / PRESSURE TREATED <br />GT <br />QUARRY TILE <br />R <br />RISER/RADIUS <br />REBAR <br />RE I NFORC I NO BAR <br />REF <br />REFERENGE <br />REINF <br />REINFORCE <br />REG'D <br />REQU I RED <br />RO <br />ROUGH OPEN I NO <br />SE3 <br />5PLA5HBLOGK <br />SHLVS <br />SHELVES <br />SIM <br />51MILAR <br />SPEC, <br />SPEGIFIGATION <br />SS <br />STAINLESS STEEL <br />5TL <br />STEEL <br />STO R <br />STORAGE <br />PRODUCT APPROVAL &BUILDING INFORMATION FORMS I LIFE SAFETY PLAN <br />PRODUCT TYPE <br />{ r <br />5NIN61N6-5TOREFRONT <br />MANUFACTURER <br />KAWNEER <br />MODEL #/SERIES <br />3501R <br />FL PRODUCT <br />APPR. NO. <br />MIAMI DADE <br />NOA <br />Oay012a . 01 <br />5LIDIN6 <br />5EGTIONAL/ROLL UP <br />SWINGING -HOLLOW MTL. <br />GEGO <br />IMPERIAL <br />FL 10725.1 <br />OG-0505 . OG <br />r <br />51NGLE/DOUBLE HUNG <br />HORIZONTAL SLIDER <br />CA5EMENT <br />FIXED -TELLER WINDOW <br />DIEBOLD <br />234-52 LEVEL 1 <br />05-0524 . 12 <br />MULLION <br />5KYL 16HT5 <br />OTHER <br />E.I.F.S. <br />�Ya. <br />STO <br />HI -GM <br />v <br />,s. <br />07-0104 05 <br />SOFFITS <br />STOREFRONT <br />KAWNEER <br />IR-501 <br />Od-0218 - 07 <br />ALUM. GOMP051TE PANELI <br />REYNOLDS METALS <br />RE'(NOBOND <br />08-0111 . 04 <br />GURTAINWALL <br />KAWNEER <br />1600 WALL 51'5TEM 2 <br />10-0406 . 03 <br />�'ri <br />ASPHALT SHIN6LE5 <br />GONG. TILE <br />MONIER <br />VANGUARD ROLL <br />07-1023 . 07 <br />ROOF HATCH <br />BILGO <br />5-20 <br />0&-12111.01 <br />51NGLE PLY ROOF <br />FIRESTONE <br />ULTRA PLY <br />07-0130 . 04 <br />- ROOF VENT5 <br />O'HAOIN <br />GLOAKED VENT M PROFILE <br />Oq-0510 04 <br />rOTHER <br />:rf�� ��� <br />J � � :. <br />�• y 6 <br />: i �t o aw <br />a 1 �.. i t <br />LINTELS <br />INSULATION FOAM <br />OTHER <br />IT 15 THE APPLICANT"S RESPONSIBILITY TO VERIFY THAT 5PEGIFIG PRODUCTS HAVE BEEN <br />INSTALLEDIN ACCORDANCE WITH THE MINIMUM REQUIRED DESIGN PRESSURES FOR THE STRUCTURE. <br />SPECIFIC, COMPLIANCE WILL BE VERIFIED DURING FIELD INSPECTIONS. <br />APPLICANT"5 SIGNATURE: <br />DATE: <br />EXISTING <br />COLUMN GRID <br />NUMBER OR <br />LETTER <br />SUSP <br />SUSPENDED <br />T <br />TREAD <br />TELE <br />TELEPHONE <br />TPD <br />TOILET PAPER DISPENSER <br />TYP <br />TYP I GAL <br />UNO <br />UNLESS NOTED OTHERWISE <br />VGT <br />VINYL COMPOSITION TILE <br />VERT <br />VERTICAL <br />VT <br />VINYL THRESHOLD <br />WG <br />WATER GLOSET <br />ND <br />WOOD <br />WP <br />WATERPROOF <br />WWF <br />WELDED WIRE FABRIC <br />W/ <br />WITH <br />LIFE SAFET\i' LIES END <br />EMERGENCY EXIT <br />(? (31 EXIT 51ON <br />a- � TRAVEL D 15TANGE <br />x' - -) COMMON PATH OF TRAVEL <br />F.E.G. RECESSED FIRE <br />EXTINGUISHER CABINET <br />SURFACE MOUNTED FIRE <br />EXTINOU15HER CABINET <br />RESPONSIBILITY MATRIX - OVERALL <br />T� <br />FURNISHED/ <br />IN5TALLED <br />BY <br />ONNER'5 <br />EQUIPMENT <br />GONTRAGTOR <br />FURNI5HED/ <br />IN5TALLED <br />BY <br />GENERAL_ <br />GONTRAGTOR <br />I (GG) <br />FURNISHED <br />BY OWNER/ <br />INSTALLED <br />BY GENERAL <br />GONTRAGTOR <br />(GG) <br />GOORDINATED <br />BY <br />GENERAL <br />GONTRAGTOR <br />((5C,) <br />PRE-FAB DRIVE -UP GANOPY (5EE NOTE ci) <br />REFER TO PREFAB CANOPY MATRIX <br />PYLON SIGN (SEE NOTE 10) <br />X <br />YES <br />EXTERIOR BLDG. 51GNAGE (SEE NOTE 4) <br />X <br />YES <br />AWNINGS (WHEN 5HOWN ON ELEVATION5) <br />X <br />YES <br />REMOTE TELLER DRIVE -UP UNITS <br />X <br />YES <br />TELLER WINDOW/ DEAL DRAWER <br />X <br />YES <br />ATM -WALK-UP/ DRIVE -UP (5EE NOTE 5) <br />X <br />YE5 <br />NIGHT DEPOSITORY/ PAGKAGE RECEIVER <br />X <br />YES <br />GASH VAULTS $ SAFE PEP051 T CHESTS <br />X <br />YES <br />MERCHANT AND TELLER LINE COUNTERS <br />X <br />YES <br />TELLER CASH DISPENSERS <br />X <br />YES <br />UNDER COUNTER BANK EQUIPMENT <br />X <br />YES <br />SYSTEMS WALL PARTITIONS <br />X <br />YES <br />FURNITURE <br />X <br />YES <br />GONGIERGE STAND (WHEN SHOWN ON PLAN5) <br />X <br />YES <br />PLASMA TV5 (WHEN SHOWN) <br />X <br />YES <br />EMPLOYEE LOCKERS <br />X <br />YES <br />TELECOMMUNICATIONS <br />X <br />YES <br />DATA PROCESSING <br />X <br />NO <br />5ECURITY SYSTEM (SEE NOTE 5) <br />REFERENCE RESPONSIBILIY MATRIX ON 5EGURITY DRAWINGS <br />GOPY MACHINE <br />X <br />NO <br />INTERIOR BLDG. 51GNAGE (SEE NOTE 4) <br />X <br />NO <br />TEMPORARY CONSTRUCTION SIGN <br />X <br />YES <br />TOILET ROOM SIGNS AND ALL AGGE55ORIE5 <br />X <br />YE5 <br />MOTORIZED $ MANUAL SHADES <br />X <br />YES <br />CARPET TILE & RESILIENT FLOORING <br />X <br />YES <br />VESTIBULE FLOOR CRATING <br />X <br />YES <br />PORCELAIN TILE FLOORING <br />X <br />YES <br />WOOD FLOORING (SEE NOTE 7) <br />X <br />YES <br />MILLWORK <br />X <br />YES <br />PAINTING � WALL COVERING <br />X <br />YES <br />G2UEIN07 ROPES <br />X <br />YES <br />MIGRONAVE, REFRIGERATOR, TV <br />X <br />YES <br />PERM. GORES/ KEYING (SEE NOTE 6) <br />X <br />NO <br />GHEGK DESKS <br />X <br />YES <br />WASTE CONTAINER (EXT.) <br />X <br />YES <br />UTILITIES AND FIREPROTEGTION SERVICES/ CONTACTS <br />X <br />YES <br />DOOR HARDWARE (SEE NOTE 6) <br />X <br />YES <br />COFFEE CART <br />X <br />YES <br />VACUUM AIR TUBE SYSTEM - DESIGN, FURNISH/INSTALL X <br />VAGUUM AIR TUBE 5Y5TEM - CEILING PENETRATION X <br />NOTES: <br />I. FOR OWNER'S EQUIPMENT GENERAL CONTRACTOR TO PROVIDE REQUIRED OPENING5, <br />ACCESS PANELS, AND ELECTRICAL REQUIREMENTS (INGLUDINO FINAL HOOK-UP). <br />2. MILLWORK ITEMS. GENERAL GONTRAGTOR TO PROVIDE "BAGK OF STORE" MILLWORK <br />NHICH INCLUDES BASE AND WALL CABINETS, WORK COUNTERS AND SHELVING. <br />5. ATM UNIT5, ATM BUILDING, ATM SURROUNDS. GENERAL CONTRACTOR TO PROVIDE <br />POKER AND CONDUITS. <br />4. 51GNAGE TO INCLUDE DIRECTIONAL SIONAGE, AND MAIN BUILDING LETTER 5ET. <br />GENERAL CONTRACTOR TO PROVIDE CONDUIT, ROUGH -IN 4 FINAL ELECTRICAL <br />CONNECTIONS. <br />5- ELECTRONIC SECURITY SYSTEM INCLUDING ALARM AND GGTV. GENERAL CONTRACTOR <br />TO PROVIDE CONDUITS, POWER, AND PLYWOOD AT PHONE ROOM. <br />6. FAGILITIES MANAGER TO HIRE LOCAL LOGKSMITH TO REKEY ALL LOOKS AT TURNOVER <br />DATE TO BRANCH PLANNING. <br />7. WOOD PLANK FLOORING TYPE ND -I. GENERAL GONTRAGTOR TO FURNISH G2UANTITY <br />TAKEOFF INGLUDING 10% ATTIC STOCK. <br />&. EQUIPMENT GONTRAGTOR 15 A SUBCONTRACTOR OF THE OWNER. <br />cl. PRE-FABRIGATED DRIVE -UP GANOPY DRANIN65 ARE INCLUDED IN SET FOR <br />REFERENCE. REFER TO PRE-FA13 CANOPY RESPONSIBILITY MATRIX FOR ITEMS TO BE <br />AGGOMMODATED IN GENERAL CONTRACTORS BASE BID. <br />10. MONUMENT 516N FOUNDATION/ MA50NRY BY OWNER'S 51ON VENDOR. ELECTRICAL BY <br />GENERAL GONTRAGTOR. <br />PRE-FAB CANOPY RESPONSIBILITY MATRIX <br />ITEM <br />w <br />ddLW <br />L° <br />GHA5E VENDORS <br />o 0 0 <br /><si m� <br />PLANNING/ZONING APPROVALS <br />x <br />BUILDING DEPARTMENT APPROVALS <br />x <br />STAMPED/SIGNED STRUCTURAL DRANIN65 S CALCULATIONS <br />x <br />GEOTEGHNIGAL INVE5TIGATION5/501L5 REPORT <br />x <br />FOUNDATIONS/FOOTINOS - DESIGN <br />x <br />FOUNDATIONS/FOOTINOS - FURNISH/INSTALL <br />x <br />BASE PLATE GROUT - DESION/SPEGIFIGATION <br />x <br />BASE PLATE GROUT - FURNI5H/IN5TALL <br />x <br />ANCHOR BOLTS - FURNISH <br />x <br />ANCHOR BOLTS - INSTALL <br />x <br />CURBS/ISLANDS - DESIGN <br />x <br />GURBS/ISLANDS - FURNISH/INSTALL <br />x <br />ASPHALT/GONGRETE PAVEMENT - DESIGN <br />x <br />ASPHALT/GONGRETE PAVEMENT - FURNISH/INSTALL <br />x <br />5TRUGTURAL STEEL - DE51ON <br />x <br />STRUCTURAL STEEL - FURNI5HANSTALL <br />x <br />STRUCTURAL STEEL - PAINT STEEL COLUMNS <br />x <br />CANOPY AGM CLADDING - DESIGN <br />x <br />CANOPY AGM GLAT7DING - FURNI5H/IN5TALL <br />x <br />FLASHING BETWEEN BUILDING & CANOPY <br />x <br />LIGHTING - DESIGN <br />x <br />LIGHTING - FURNISH/INSTALL <br />x <br />LIGHTING - FINAL GONNEGTION5 <br />x <br />LANE SIGN - DE51ON <br />x <br />LANE SIGN - FURNISH/INSTALL <br />x <br />LANE51ON - FINAL CONNECTIONS <br />x <br />VAGUUM AIR TUBE SYSTEM -DESIGN <br />x <br />VACUUM AIR TUBE SYSTEM - FURNISH/INSTALL <br />x <br />VAGUUM AIR TUBE SYSTEM - GEILING PENETRATION 4 GASKET <br />x <br />TELLER WINDOW - ROUGH OPENING/PREP <br />x <br />TELLER WINDOW - FURNI5H/IN5TALL <br />x <br />ATM CONDUITS <br />x <br />ATM PWNER <br />x <br />ATM DATA WIRING <br />x <br />ATM UNIT AND SURROUND - FURNI5H/IN57ALL <br />x <br />COORDINATION OF OWNER'S VENDORS ON SITE <br />x <br />NOTES: <br />I- CANOPY VENDOR'S COST NOT TO BE INCLUDED IN GENERAL CONTRACTOR'S BID. <br />2. FOUNDATION LAYOUT SHOWN ON STRUCTURAL SHEETS IS FOR CONCEPT PURPOSES ONLY. <br />3. GANOPY 5UBGONTRAGTOR SHALL FURNISH AND INSTALL CANOPY LIGHT FIXTURES- <br />4- GENERAL GONTRAGTOR SHALL PROVIDE NATERPROOF GONDUIT/HIRING SYSTEM FOR LANE <br />CONTROL SICNACE AS SHOWN ON ELECTRICAL SHEETS. <br />S. CANOPY SIZE, HEIGHT, FA5GIA PROFILE, AND FIN15HE5 SHALL COMPLY WITH ARCHITECTURAL <br />DRAM I NOS. <br />b. SEE CANOPY SPECS FOR ADDITIONAL INFORMATION, <br />GENERAL NOTES <br />I. ALL WORK SHALL BE IN COMPLIANCE WITH APPLICABLE <br />FEDERAL, STATE AND LOCAL BUILDING CODES, <br />REGULATIONS, ORDINANCES AND STANDARDS INGLUDINO <br />ADA AND OR OTHER HANDICAP ACCESSIBILITY CODES. <br />2. GEN. CONTRACTOR SHALL COORDINATE WITH THE <br />OWNER'S VENDORS REGARDING SCHEDULING AND <br />5EGUENG I NG OF THE WORK. <br />3. THE CONSTRUCTION NOTES AND DRAWINGS ARE <br />SUPPLIED TO ILLUSTRATE THE DESIGN AND GENERAL <br />TYPE OF CONSTRUCTION DESIRED AND ARE INTENDED <br />TO IMPLY THE FINEST QUALITY OF GONSTRUGTION, <br />MATERIAL AND WORKMANSHIP THROUGHOUT. <br />4. THE DRAWINGS ARE NOT TO BE SCALED. FOR <br />INFORMATION CONCERNING EXISTING CONDITIONS, ETC., <br />VERIFICATION MUST BE DONE IN THE FIELD. LARGE <br />5GALE DRAWINGS HAVE PRECEDENCE OVER SMALL <br />5GALE DRAWINGS. <br />5. PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION, <br />CONTRACTOR SHALL VERIFY EXISTENCE AND LOCATION <br />OF ALL EXISTING ABOVE AND BELOW GRADE, UTILITIES, <br />INCLUDING SANITARY SEWER, STORM SEWER, WATER, <br />GAS, ELECTRICAL, TELEPHONE, ETC. ANY <br />DISCREPANCIES IN UTILITY LOCATIONS SHALL BE <br />BROUGHT TO THE IMMEDIATE ATTENTION OF THE <br />ARCHITECT. <br />6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />VERIFICATION OF ALL BUILDING DIMENSIONS PRIOR TO <br />BEGINNING CONSTRUCTION AND SHALL IMMEDIATELY <br />NOTIFY THE ARCHITECT OF ANY VARIANCE OR <br />DI5GREPANGY AFFECTING NEW GON5TRUGTION PRIOR TO <br />PROGEEDING WITH WORK. <br />7. GONTRAGTOR SHALL PROVIDE ALL NECESSARY <br />BLOCKING IN WALLS FOR SUPPORT OF ALL EQUIPMENT, <br />5HELVIN6, ACCESSORIES, 51GNAGE, AND OTHER DEVICES <br />REQUIRED. <br />8. ALL PENETRATIONS SHALL RECEIVE GAULKING TO SEAL <br />ANY TYPE OF ENERGY LOSS. <br />ci. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL <br />APPL IC ABLE D I MEN5IONS OF FIXTURES AND EQUIPMENT <br />SUPPLIED AND/OR INSTALLED BY OTHERS. <br />10. UPON COMPLETION OF PROJECT, OBTAIN ALL FINAL <br />INSPECTIONS AS REQUIRED BY LOCAL JURISDICTIONS <br />AND FURNISH OWNER WITH EVIDENCE OF ALL 5UGH <br />INSPECTION5 AND CERTIFICATES OF OGGUPANGY. <br />II. GENERAL CONTRACTOR IS RE5PON51BLE FOR ALL SITE <br />GUT 4 FILL TO ATTAIN FINISH GRADES A5 INDIGATED ON <br />THESE DRAWINGS. GENERAL GONTRAGTOR SHALL <br />INCLUDE THE COST OF ANY TOP501L REQUIRED IN <br />ADDITION TO THAT ON SITE, AT THE TIME OF THE <br />PRE -BID MEETING, IN BASE BID. <br />12. GENERAL GONTRAGTOR SHALL INCLUDE THE COST OF <br />POWER COMPANY ELECTRICAL TRANSFORMER, PAD, <br />PRIMARY �$ SECONDARY CONDUITS, AND 5ECONDARY <br />GABLING IN BASE BID. <br />15. SIGNS, EXCEPT AS INDICATED ON CIVIL DRAWINGS AND <br />ADA TOILET ROOM SIGNS, ARE PROVIDED BY OWNER'S <br />SIGN GONTRACTOR. OWNER'S 51ON VENDOR WILL <br />PROVIDE MONUMENT SIGN BASE (GONGRETE, STONE, <br />BRIGK, ETC.) IF PROJECT REOUIRE5 DECORATIVE BASE. <br />SEE SHEET L- I TO VERIFY IF REQU I RED. GENERAL <br />CONTRACTOR TO PROVIDE ROUO H- I N s FINAL <br />CONNECTION. <br />14. GENERAL CONTRACTOR TO PROVIDE FOUR (4) 30 YARD <br />DUMP5TER5 DURING CHASE RETAIL MOVE -IN. <br />15. GENERAL CONTRACTOR SHALL PROVIDE ONE SKILLED <br />LABORER FOR ONE WEEK DURING CHASE RETAIL <br />MOVE -IN. (40 HOURS) <br />16. GENERAL CONTRACTOR IS RESPONSIBLE FOR <br />COORDINATING THE OWNER'5 VENDORS ON SITE DURING <br />CONSTRUCTION. REFER TO RESPONSIBILITY MATRIX - <br />SEE TH 15 SHEET. <br />1-1. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />SET-UP AND COORDINATION OF ALL THE UTILITY <br />SERVICES FOR THE PROJECT. GENERAL CONTRACTOR <br />SHALL AL50 OBTAIN FINAL SITE ADDRESS. <br />15. GENERAL CONTRACTOR SHALL PERFORM A <br />TOPOGRAPHIG SURVEY PRIOR TO STARTING <br />CONSTRUCTION AND REPORT ANY DISCREPANCIES IN <br />GRADES AS COMPARED TO EXISTING GRADES <br />INDICATED ON CIVIL DRAWINGS. SUBMIT A COPY OF <br />TOPOORAPHIG SURVEY TO ARCHITECT AND INDICATE <br />ANY DISCREPANCIES ON SURVEY PRIOR TO COMMENCING <br />EARTHWORK. <br />CANOPY NOTES <br />A. FOUNDATIONS <br />1. CANOPY SUPPLIER TO PROVIDE FOUNDATION <br />DESIGNS TO ARGHITEGT. ARGHITEGT TD UPDATE <br />DRAW I NG5 AGGORD I NOLY. <br />2. GENERAL CONTRACTOR TO PROVIDE <br />FOUNDATIONS, INCLUDING BASE PLATE GROUTING, <br />BASED ON DRAW I NG5 FROM ARCHITECT. <br />B. CANOPY L I GHT I NCB <br />I. CANOPY SUPPLIER TO PROVIDE ALL CANOPY <br />LIGHTING. <br />2. GENERAL CONTRACTOR TO PROVIDE ALL <br />LIGHTING CONDUIT, WIRING, AND FINAL CONNECTIONS. <br />C. CANOPY DOWNSPOUTS <br />1. CANOPY SUPPLIER TO PROVIDE ALL INTERNAL <br />CANOPY DOWNSPOUTS. <br />2. GENERAL CONTRAGTOR TO PROVIDE <br />STORMWATER SYSTEM AND CONNECTIONS TO <br />CANOPY DOWNSPOUTS. <br />D. 51GNAGE <br />I. CANOPY SUPPLIER TO PROVIDE ALL PENETRATIONS <br />FOR GANOPY SIGNAGE. <br />2. GENERAL CONTRACTOR TO PROVIDE SIGN CONDUIT <br />AND WIRING, FINAL CONNECTIONS BY OWNER 516N <br />VENDOR. <br />E. SECURITY <br />I- CANOPY SUPPLIER TO PROVIDE ALL PENETRATIONS <br />FOR CANOPY SECURITY. <br />2. GENERAL CONTRACTOR TO PROVIDE 5EGUiRITI' <br />CONDUIT, WIRING, INSTALL OWNER FURNISHED <br />DEVICES, AND PROVIDE FINAL CONNECTIONS. <br />F. PAINTING <br />I. FINAL PAINTING OF COLUMNS BY GENERAL <br />GONTRAGTOR. <br />c cm <br />to v <br />C <br />m c4 <br />m � <br />LL N <br />d <br />J_ <br />H <br />> C4 <br />Q `4 <br />LO co <br />ca are <br />W I- <br />� <br />CV <br />U_ <br />r <br />2 <br />-a <br />C <br />cc <br />-0 <br />@ `o <br />uJ <br />U_ <br />[If <br />m <br />M <br />0 - <br />w <br />n <br />u. E <br />Q <br />_ <br />U <br />M <br />O <br />E o <br />w <br />~a <br />Y_ <br />U) <br />Ln U) <br />0 <br />0 <br />Z <br />Q <br />J <br />J `0 <br />z <br />= 0 <br />0 <br />0 <br />w <br />N N <br />Florida Business License #: AAC001619 <br />Registered Architect: Kenneth Cowart <br />This drawing is the property of Associated Space <br />Design, Inc. and is not to be reproduced or copied in <br />whole or in part. It is not to be used on any other project <br />and is to be returned upon request. Scales as stated <br />herein are for reference only as normal reproduction <br />processes may alter the accuracy of original drawings. <br />Associated Space Design, Inc. 2006 <br />NO. DATE: REMARKS: <br />REVISIONS: <br />DRAWING TM E: <br />LIFE SAFETY <br />PLANS <br />AND NOTES <br />PROJECTNO.: ISSUE DATE: <br />50568.12 07.15.2011 <br />DRAWN BY CHECKED BY <br />kc. kc. <br />SHEETNUNDER: <br />-r, , �;�F , I - - � <br />