MECHANICAL GENERAL NOTES <br />FURNISH ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES REQUIRED <br />XISTING MECHANICAL SYSTEMS INCLUDING HEATING, <br />VENTILATION, AIR CONDITIONING, AND MISCELLANEOUS SYSTEMS AS INDICATED ON THE <br />DESIGN DRAWINGS AND AS OUTLINED IN THE SPECIFICATIONS. <br />THE ENTIRE SYSTEM AND ALL COMPONENTS SHALL HEREIN MEET ALL STATE, COUNTY, <br />DINANCES IN EVERY RESPECT. <br />MECHANICAL CONTRACTOR SHALL OBTAIN ALL PERMITS AND PAY ALL FEES REQUIRED <br />FOR HIS PORTION OF THE WORK. <br />REFER TO DRAWINGS FOR NEW AND REUSED EXISTING EQUIPMENT. ALL NEW <br />EQUIPMENT, ETC. SHALL BE OF THE BEST QUALITY, FREE OF DEFECTS, AS SHOWN ON <br />THE DRAWINGS, AND AS INDICATED IN THE SPECIFICATIONS. <br />ALL SYSTEMS SHALL BE FABRICATED AND INSTALLED IN A NEAT AND PROFESSIONAL <br />MANNER WITH THE COORDINATION OF ALL INVOLVED TRADES TO AVOID INTERFERENCE <br />OF COORDINATION. NO ALLOWANCES WILL BE MADE FOR <br />REWORK DUE TO COORDINATION DIFFICULTIES OR INTERFERENCE BETWEEN INVOLVED <br />TRADES. <br />EXISTING SYSTEMS SHOWN ON THIS PLAN ARE BASED ON FIELD OBSERVATIONS AND <br />AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS PARTIALLY UNVERIFIED. <br />CONTRACTOR ACCEPTS RESPONSIBILITY FOR FIELD VERIFICATION AND INVESTIGATION <br />PRIOR TO SUBMITTING BID. DO NOT SCALE THESE PLANS. <br />MECHANICAL CONTRACTOR SHALL INCLUDE IN HIS BASE BID THE COST OF PREPARING <br />A FINAL TEST AND BALANCE REPORT. TEST AND BALANCE SHALL BE BY T&B <br />COMPANY CERTIFIED BY AABC OR NEBB ONLY. EXISTING AIR QUANTITY SHALL BE <br />REBALANCED TO AIR QUANTITY NOTED ON PLAN. TEST & BALANCE CONTRACTOR <br />MAY NOT SHUT OFF OTHER PORTIONS OF THE FLOOR IN ORDER TO OBTAIN SUFFICIENT <br />STATIC PRESSURE TO COMPLETE THEIR BALANCE FOR THIS SPACE. THIS SPACE MUST <br />BE SYMBIOTIC WITH THE BALANCE OF THE REST OF THE FLOOR IN A FULLY OCCUPIED <br />MANNER. <br />LOW PRESSURE DUCTWORK SHALL BE GALVANIZED STEEL OF GAUGES CONFORMING TO <br />LATEST EDITION OF SMACNA STANDARDS BASED ON 2* W.G. PRESSURE UNLESS <br />SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS. THE GALVANIZED DUCT COATING <br />IS TO BE G-90. JOHNS MANVILLE SUPERDUCT IS ACCEPTABLE FOR LOW PRESSURE <br />T ONLY. ALTERNATE PRICING: PROVIDE AN ALTERNATE <br />PRICE TO USE JOHNS MANVILLE FR-800 (SUPERDUCT) IN LIEU OF SHEET METAL DUCT <br />TWORK. THE R-VALUE OF THE <br />INSULATION SHALL MATCH INSULATION VALUES LISTED BELOW FOR SHEET METAL DUCT <br />INSULATION. ALL JOINTS SHALL BE SEALED WITH GLASS FABRIC AND MASTIC. <br />FLEXIBLE DUCTWORK SHALL BE ACOUSTICAL LOW PRESSURE TYPE WITH INTERIOR <br />LINER, METAL HELIX, 1" FIBERGLASS INSULATION, AND COPOLYMER SEAMLESS OUTSIDE <br />SLEEVE. THE ENTIRE FLEXIBLE DUCT ASSEMBLY SHALL BE LISTED IN ACCORDANCE <br />WITH UL-181 CLASS 1 AIR DUCT MATERIAL THE MAXIMUM LENGTH OF ANY FLEX DUCT <br />SHALL BE 8'-Om. THIS APPLIES TO NEW FLEXIBLE DUCTWORK ONLY. EXISTING <br />FLEXIBLE DUCTWORK EXCEEDING EIGHT FEET IN LENGTH MAY REMAIN (AT BUILDING <br />OWNER'S DISCRETION) PROVIDED IT IS PROPERLY HUNG AND SUPPORTED PER ASHRAE <br />RECOMMENDATIONS AND ALLOWS FOR UNRESTRICTED AIRFLOW. EXCESSIVE NOISE OR <br />INSUFFICIENT AIRFLOW SHALL BE CAUSE FOR REPLACEMENT OF FLEXIBLE DUCTWORK <br />TO COMPLY WITH THE ABOVE MENTIONED LENGTH RESTRICTIONS. REPLACE EXISTING <br />FLEX DUCT WHICH EXCEEDS 8'-Om IN LENGTH WITH ROUND SHEET METAL DUCT. <br />"DAISY CHAIN" OF MORE THAN ONE 8'-O" SECTION OF FLEX WITH RIGID DUCT IN <br />BETWEEN IS NOT ACCEPTABLE. <br />ALL DIMENSIONS ARE INSIDE NET FREE AREA. <br />NEW THERMOSTATS SHALL BE INSTALLED 48" ABOVE FINISHED FLOOR. MASTER <br />THERMOSTATS FOR EACH AHU AND VAV SHALL BE LOCATED IN REMOTE LOCATION <br />DICTATED BY TENANT. CONFIRM LOCATION. EACH THERMOSTAT SHOWN ON PLAN IS <br />TO BE A SENSOR THAT REPORTS TO THE CONTROL SYSTEM. <br />DIFFUSER, REGISTER AND GRILLE INSTALLATIONS SHALL BE COORDINATED WITH OTHER <br />TRADES. <br />EXISTING DUCTWORK SHOWN IS FOR REFERENCE ONLY. VERIFY EXISTING LOCATIONS <br />SIZE OF DUCT RUNOUT, FLEX AND SPIN -IN TAP SHALL EQUAL DIFFUSER NECK SIZE. <br />ALL DUCT INSULATION SHALL COMPLY WITH FLORIDA MODEL ENERGY EFFICIENCY CODE. <br />SHEETMETAL DUCT WILL INCLUDE 1-1/2- DUCT WRAP. DUCTBOARD SHALL BE JOHNS <br />MANVILLE FR-800, l-, R-4.2 SUPERDUCT MINIMUM. THIS APPLIES TO NEW DUCTWORK <br />ONLY, EXISTING UNINSULATED SHALL REMAIN AS IS UNLESS OTHERWISE REQUIRED BY <br />THE AUTHORITY HAVING JURISDICTION. <br />ALL EXHAUST AND OUTSIDE AIR DUCTWORK SHALL BE SHEETMETAL <br />THERE ARE NO FIRE RATED CEILINGS. <br />ALL DUCTBOARD DUCT AND DUCT INSULATION SHALL BE SEALED WITH GLASS FABRIC <br />AND MASTIC. <br />SEE PLANS FOR ROUTING OF CONDENSATE. NO CONDENSATE SHALL BE ROUTED TO <br />HARD SURFACES. PIPE TO STORM DRAIN, DRYWELL OR GRASSY AREA AS INDICATED <br />ON PLANS, OR ALLOWED BY LOCAL AUTHORITY. <br />MENDED SERVICE CLEARANCE FOR ALL EQUIPMENT SHALL BE <br />MAINTAINED. <br />ALL DUCTWORK SHALL BE SUPPORTED IN STRICT COMPLIANCE WITH SMACNA OR <br />FLORIDA MODEL ENERGY EFFICIENCY CODES WHICHEVER IS STRICTER. <br />PRIOR TO COMMENCEMENT OF DEMOLITION, CONTRACTOR SHALL INSPECT ALL SYSTEMS <br />AND EQUIPMENT WITHIN THE AREA OF WORK TO DETERMINE FITNESS FOR OPERATION. <br />CONTRACTOR SHALL PROVIDE A FULLY OPERATIONAL FINISHED SYSTEM AS DESCRIBED. <br />PATCH AND MAKE GOOD ALL LEAKS IN EXISTING DUCT. SEAL LEAKS WITH MASTIC. <br />REPAIR AS REQUIRED TO RESTORE VAPOR BARRIER AND INSULATION SYSTEM. <br />CONTRACTOR SHALL INSPECT MECHANICAL EQUIPMENT INCLUDING, BUT NOT LIMITED <br />TO, FAN POWERED BOXES, VAVS, FANS, SUPPLEMENT HVAC EQUIPMENT AND RELATED <br />BEING REUSED IN THE RENOVATION OF THE SPACE. <br />MECHANICAL CONTRACTOR SHALL LIST IN WRITING TO THE BUILDING OWNER ALL ITEMS <br />FOUND TO BE INOPERABLE, DAMAGED, OR BEYOND REPAIR AND PROVIDE LINE ITEM <br />LACEMENT. CONTRACTOR SHALL NOT PROCEED WITH <br />REPAIRS/REPLACEMENT UNTIL RECEIVING WRITTEN DIRECTION FROM THE BUILDING <br />OWNER. <br />EXHAUST FAN SHALL BE PROVIDED WITH BACKDRAFT DAMPER AND BLADE SEAL. <br />CLEAN EVAPORATOR COIL(S) AND DRAIN PAN(S), LUBRICATE MOTOR(S) AND PROVIDE <br />NEW SET OF FARR FILTERS FOR EACH UNIT. <br />CONFIRM OPERATION OF EXISTING SMOKE DETECTORS AND THAT ALL SMOKE <br />ATH ASSOCIATED AHU. <br />DETECTORS ARE INTERCONNECTED V <br />MECHANICAL CONTRACTOR SHALL EXAMINE ARCHITECTURAL, STRUCTURAL, ELECTRICAL, <br />PLUMBING AND FIRE PROTECTION DRAWINGS FOR ESTIMATING AND CONSTRUC11ON OF <br />THIS PROJECT. SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE <br />THAT SUCH EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, <br />EQUIPMENT OR MATERIALS REQUIRED FOR ANY CORREC11ONS REQUIRED DUE TO <br />CONFLICTS WITH OTHER TRADES WILL NOT BE RECOGNIZED. <br />ALL DUCTWORK AND PIPING NOT OPERATIONAL DURING CONSTRUCTION SHALL BE <br />CAPPED UNTIL FINAL CONNECTIONS ARE MADE. <br />ALL RETURN GRILLES ON ALL HVAC SYSTEMS BEING OPERATED DURING CONSTRUCTION <br />SHALL HAVE FILTER MEDIA COVERING RETURN AIR OPENINGS TO PRE-FiLTER AIR. <br />FILTER MEDIA TO BE REMOVED AT THE COMPLE11ON OF CONSTRUCTION. <br />INSULATION USED WITHIN THIS PROJECT DESIGN MEETS THE CRITERIA AS PRESCRIBED <br />IN 2020 FMC SECTIONS 604.1 THROUGH 604.13. 1 <br />MECHANICAL CONTRACTOR SHALL PROVIDE ALL CONTROLS REQUIRED TO OPERATE THE <br />MECHANICAL SYSTEM INSTALLED. CONTROLS SHALL MATCH BASE BUILDING <br />STANDARDS AND SHALL BE INSTALLED IN ACCORDANCE WITH THE GENERAL PRACTICES <br />OF THE BUILDING. ALL CONTROLS SHALL BE COORDINATED WITH AND AGREED TO BY <br />THE BUILDING ENGINEER PRIOR TO PURCHASE AND INSTALLATION. NEW EQUIPMENT <br />SHALL BE CONNECTED TO EXISTING BUILDING MANAGEMENT SYSTEM NTH UPGRADES <br />APHICS. <br />BUILDING OYMER'S SPECIFICATIONS AND CRITERIA FOR MATERIALS AND PROCEDURES <br />SHALL GOVERN MEN IN CONFLICT VATH MEMANICAL SPECFICATIONS AND NOTES. IT <br />IS THE CON17RACTOR'S RESPONSOLITY TO OBTAIN A COPY OF THE OWNEWS <br />SPECIFICATIONS PRIOR TO SUBMITTING BID. <br />MECHANICAL DRAWING INDEX <br />SHEE7 If <br />SHFJ=7 1)r=SCFdFTM <br />MO.1 <br />MECHANICAL SPECIFICATIONS <br />M1.0 <br />MECHANICAL RENOVATION PLAN <br />M2.1 <br />MECHANICAL RENOVA11ON PLAN - ROOF <br />I M4.0 <br />MECHANICAL DETAILS <br />I M5.0 <br />I MECHANICAL SCHEDULES I <br />MECHANICAL SPECIFICATIONS <br />GENERAL MECHANICAL REQUIREMENTS <br />DIVISION 23 <br />SCOPE OF WORK <br />WORK SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: <br />PROVIDE ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES REQUIRED <br />FOR THE FABRICATION, INSTALLATION, AND/CIR RENOVATION OF MECHANICAL SYSTEMS <br />INCLUDING HEATING, VENTILATING, AIR COND1110NING AND MISCELLANEOUS SYSTEMS AS <br />INDICATED ON THE DESIGN DRAWINGS AND AS OUTLINED IN THESE SPECIFICATIONS. <br />RELATED WORK SPECIFI <br />REFER TO ELECTRICAL SPECIFICATION (DIV. 26) FOR ELECTRICAL WORK TO BE DONE IN <br />CONJUNCTION WITH THE MECHANICAL WORK. THIS CONTRACTOR IS RESPONSIBLE FOR <br />ALL CONDUIT, WRING, JUNCTION BOXES, ETC., REQUIRED FOR HVAC CONTROLS. <br />INSTALL DUCT SMOKE DETECTOR FURNISHED BY DIVISION 26 IN SUPPLY AIR DUCTS OF <br />AIR HANDLING UNITS EXCEEDING 2000 CFM AND MERE INDICATED ON DRAWINGS. <br />DETECTOR TO SHUT UNIT DOWN WHEN ACTIVATED. <br />EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN DRAWINGS AND WITHIN <br />THESE SPECIFICATIONS SHALL BE CONSIDERED AS SPECIFIED STANDARD OF QUALITY. <br />NO SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE <br />ENGINEER. <br />ANY DEVIATION FROM SPECIFIED EQUIPMENT THAT AFFECTS THE ELECTRICAL <br />REQUIREMENTS SHALL BE COORDINATED BY THE MECHANICAL CONTRACTOR AND <br />EQUIPMENT VENDOR WITH THE ELECTRICAL CONTRACTOR PRIOR TO SUBMITTING BIDS. <br />FAILURE OF MECHANICAL CONTRACTOR AND VENDOR TO DO SO WILL NOT BE CAUSE <br />FOR CHANGE OF BID AT A LATER TIME. IT WILL NOT BE THE RESPONSIBILITY OF THE <br />ELECTRICIAN TO COORDINATE REVISED ELECTRICAL REQUIREMENTS DUE TO EQUIPMENT <br />CHANGES INITIATED BY THE MECHANICAL CONTRACTOR AND VENDOR. IN ADDITION, THE <br />MECHANICAL CONTRACTOR SHALL BE FINANCIALLY RESPONSIBLE FOR ANY AND ALL <br />CHANGES TO ENGINEERING PLANS REQUIRED BY AUTHORITY HAVING JURISDICTION. <br />- 2020 FLORIDA BUILDING CODE (SEVENTH EDITION) - MECHANICAL <br />- 2020 FLORIDA BUILDING CODE (SEVENTH EDITION) - EXISTING BUILDING <br />- 2020 FLORIDA BUILDING CODE (SEVENTH EDITION) - ENERGY CONSERVATION <br />- NFPA 90A, 2018 EDITION <br />- NFPA 72, 2016 EDITION (TO COVER THE AIR DUCT DETECTOR) <br />- FLORIDA FIRE PREVENTION CODE (FFPC), SEVENTH EDITION <br />THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS, INSPECTIONS AND PAY ALL <br />FEES. <br />=61 llll"� <br />REFER TO PLANS FOR NEW AND REUSED EXISTING EQUIPMENT. ALL NEW EQUIPMENT, <br />ETC., SHALL BE AS SPECIFIED, FREE OF DEFECTS, AS SHOWN ON THE DRAWINGS, AND <br />AS INDICATED IN THESE SPECIFICATIONS. ALL ELECTRICALLY POWERED EQUIPMENT <br />SHALL BE U.L OR E.T.L. LISTED. <br />WORKMANSHIP <br />ALL MATERIALS SHALL BE FABRICATED AND INSTALLED IN A NEAT AND WORKMANLIKE <br />MANNER WITH THE COORDINATION OF ALL INVOLVED TRADES TO AVOID INTERFERENCES <br />OF COORDINATION. NO ALLOWANCES WILL BE MADE FOR <br />ATION DIFFICULTIES OR INTERFERENCES BETWEEN INVOLVED <br />TRADES. <br />MECHANICAL CONTRACTOR SHALL DAILY REMOVE REFUSE AND DEBRIS ACCUMULATING <br />STRUC11ON AND PRIOR TO ACCEPTANCE OF THIS WORK. LEAVE <br />THE PREMISES BROOM CLEAN INSOFAR AS AFFECTED BY MECHANICAL WORK. <br />ALL DUCTWORK AND PIPING NOT OPERATIONAL DURING CONSTRUCTION SHALL BE <br />CAPPED UNTIL FINAL CONNECTIONS ARE MADE. <br />ALL RETURN GRILLES ON ALL HVAC SYSTEMS BEING OPERATED DURING CONSTRUCTION <br />SHALL HAVE FILTER MEDIA COVERING RETURN AIR OPENINGS TO PRE -FILTER AIR. <br />FILTER MEDIA TO BE REMOVED AT THE COMPLETION OF CONSTRUCTION. <br />SHOP DRAWINGS AND SUBMITTALS <br />SUBMIT FOR ENGINEER'S APPROVAL, A MINIMUM OF 2 PRINTED COPIES OF SHOP <br />DRAWINGS AND MANUFACTURER'S DATA FOR ALL NEW EQUIPMENT AND ACCESSORIES <br />PRIOR TO PURCHASE AND/OR FABRICATION. <br />SHOP DRAWINGS FOR EQUIPMENT REQUIRING ELECTRIC POWER OR CONTROL WRING <br />CONNECTIONS SHALL INCLUDE COMPLETE WRING DIAGRAMS. <br />SUBMITTAL PACKAGE FOR HVAC EQUIPMENT SHALL INCLUDE A COPY OF THE <br />CERTIFICATION OF PROPOSED TEST AND BALANCE SUBCONTRACTOR. THE TEST AND <br />HALL BE CERTIFIED BY ASSOCIATED AIR BALANCE COUNCIL <br />(AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). HVAC SUBMITTALS <br />WILL NOT BE REVIEWED WITHOUT TEST AND BALANCE CERTIFICATION DOCUMENTATION. <br />QUALIFICATIONS OF MULTIPLE TEST AND BALANCE CONTRACTORS ARE ACCEPTABLE (TO <br />ACCOMPLISH COMPETITIVE BIDDING OF WORK). CONTRACTOR SHALL SUBMIT FOR <br />APPROVAL THE PROPOSED TEST AND BALANCE CONTRACTOR AT THE TIME OF BID. <br />WHEN PROVIDED, THE DUCTWORK SHOP DRAWINGS WILL ONLY BE REVIEWED FOR <br />COMPLIANCE WITH THE DRAWINGS AND SPECIFICATIONS. THE DUCTWORK SHOP <br />DRAWINGS WILL NOT BE CHECKED FOR COORDINATION WITH OTHER TRADES OR <br />BUILDINGS STRUCTURE. IT IS THE RESPONSIBILITY OF THE CONTRACTORS TO <br />COORDINATE AND VERIFY ROUTING AND EXACT LOCATION OF SYSTEM COMPONENTS. <br />�V:cfllivlmlml MIN& <br />VIDE THE ENGINEER TWO (2) SETS OF COMPLETE HVAC <br />RECORD DRAWINGS AT THE TIME OF SUBSTANTIAL COMPLETION. RECORD DRAWINGS IN <br />PDF FORMAT, AUTOCAD [RELEASE 2016 OR NEWER] OR AUTODESK REMT [RELEASE <br />2014 OR NEWER] SHALL BE PROVIDED ON A CD. RECORD DRAWINGS SHALL CONSIST OF <br />AN ACCURATE AS -BUILT RECORD OF THE INSTALLED WORK. PROJECT WILL NOT BE <br />COMPLETE UNTIL ACCURATE RECORD DRAWINGS ARE DELIVERED. <br />EXECUTION <br />COORDINATE AND SCHEDULE THE WORK WITH THE OWNER TO MINIMIZE DISRUPTIONS TO <br />THE NORMAL OPERATIONS AT THE BUILDING. <br />ALL LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC., INDICATED ON THE DRAWINGS <br />IS DIAGRAMMATIC AND SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE TO THE PLANS <br />SUBJECT TO BUILDING CONSTRUCTION AND INTERFERENCES WITH OTHER TRADES. ALL <br />WORK SHALL BE INSTALLED TO ENSURE MAXIMUM HEADROOM, BALANCED OPERATION <br />AND SUITABLE AESTHETIC APPEARANCE. CONTRACTOR IS RESPONSIBLE FOR MY FIELD <br />MEASUREMENTS REQUIRED TO PROVIDE AN APPROVED AND FUNCTIONAL INSTALLATION. <br />COORDINATE WITH OTHER TRADES AND FIELD -VERIFY EXISTING CONDITIONS FOR EXACT <br />TI OF SYSTEMS. PROVIDE OFFSETS, TRANSITIONS AND ADAPTORS <br />AS REQUIRED. <br />QUIRED FOR A COMPLETE INSTALLATION ARE SHOWN ON <br />THESE DRAWINGS. REFER TO EQUIPMENT INSTALLATION INSTRUCTION, SCHEDULES AND <br />APPLICABLE CODES FOR ADDITIONAL INFORMATION, INCLUDING REQUIRED CONNECTION <br />LOCATIONS, TYPES AND SIZES. <br />PERFORM ALL WORK NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION <br />OF THE WORK. ALL HOLES, OPENINGS AND DAMAGED MATERIALS CREATED DURING <br />CONSTRUCTION SHALL BE REPAIRED AND FINISHED BY EXPERIENCED WORKMEN. <br />PROVIDE ALL PENETRATIONS REQUIRED TO COMPLETE INSTALLATION AND REMOVAL OF <br />WORK (MAINTAIN FIRE RATING OF EXISTING STRUCTURE). ALL PENETRATIONS SHALL BE <br />PATCHED AND FINISHED TO MATCH SURROUNDING SURFACES AND FINISHES. ALL <br />PENETRATIONS SHALL BE SLEEVED AND SEALED SO AS TO BE WATER AND AIR TIGHT. <br />CLEANING, TESTING AND ADJUSTING: <br />THE MECHANICAL CONTRACTOR, AT HIS EXPENSE, SHALL CLEAN, REPAIR, ADJUST, <br />CHECK, BALANCE, AND PLACE IN SERVICE THE VARIOUS SYSTEMS HEREIN SPECIFIED <br />WITH THOR RESPECTIVE EQUIPMENT, ACCESSORIES AND PIPING. HE SHALL FURNISH <br />ALL LABOR, MATERIALS, EQUIPMENT, AND TOOLS REQUIRED FOR PERFORMANCE TESTS <br />REQUIRED BY THESE SPECIFICATIONS AND BY THE GOVERNING AUTHORITIES. NO WORK <br />SHALL BE COVERED OR CONCEALED UN11L PROPERLY INSPECTED AND TESTED. <br />EXCAVATION AND BACKFILL: <br />PROVIDE ALL EXCAVATION AND TRENCHING TO THE CORRECT ELEVATIONS, FOR THE <br />INSTALLATION OF ALL PIPING, VALVE, VALVE PITS AND FOUNDATIONS INCLUDED UNDER <br />THIS DIVISION OF THE WORK. <br />PROVIDE ALL BACKFILL AND COMPACTION IN STRICT ACCORDANCE WITH THE <br />EXCAVATION AND BACKFILL SECTION OF DIVISION 1 SPECIFICATIONS. <br />TESTING: <br />RILY PLUGGING ALL OUTLETS AND <br />FILLING THE SYSTEM NTH WATER TO THE LEVEL OF THE HIGHEST VENT STACK. THE <br />SYSTEM MUST BE INSPECTED AND ALL LEAKS REPAIRED AND THE TEST REPEATED <br />UNTIL THE WATER LEVEL DOES NOT DECREASE FOR A PERIOD OF 24 HOURS. <br />ADJUST THE AIR CONDIT10NING SYSTEMS, VENTILATING SYSTEMS, FANS, ETC., TO <br />DELIVER NOT LESS THAN THE REQUIRED AIR QUANTITY WITH QUAN11TIES IN EXCESS TO <br />BE SUBJECT TO THE APPROVAL OF THE ENGINEER IF FOUND TO NOT HAVE <br />OBJECTIONABLE EFFECTS SUCH AS NOISE, DRAFTS, OR MOTOR OVERLOAD. <br />PRIOR APPROVAL BY THE ENGINEER OF TESTING AND BALANCING CONTRACTOR IS <br />REQUIRED. REFER TO SHOP DRAWINGS AND SUBMITTAL SECTION. TEST AND BALANCE <br />REPORTS BY NON -APPROVED CONTRACTORS WILL BE REJECTED. <br />THIS CONTRACTOR SHALL PROVIDE A MINIMUM OF THREE (3) COPIES OF A TEST AND <br />BALANCE REPORT TO THE ENGINEER AT TIME OF SUBSTANTIAL COMPLETION INSPECTION. <br />THE TEST AND BALANCE REPORT SHALL BE PREPARED BY A CONTRACTOR CERTIFIED <br />BY ASSOCIATED AIR BALANCE COUNCIL OR NATIONAL ENVIRONMENTAL BALANCING <br />BUREAU <br />EPORT SHALL BE TYPEWRITTEN AND CONTAIN THE FOLLOWING <br />DATA: <br />1. DATE, TIME, WEATHER, MEN TEST TAKEN. <br />2. VOWMETRIC AIR FLOW RATES AT EACH UNIT/FAN, INCLUDING SUPPLY, RETURN, <br />EXHAUST AND OUTSIDE AIR AS APPLICABLE. <br />3. STATIC PRESSURE THROUGH UNITS AND UNIT COMPONENTS. <br />4. MOTOR OPERATING VOLTAGE AND AMPERAGE. <br />5. DRIVE TYPES, SIZES AND SPEED RANGE. <br />6. AIR FLOW PROPERTIES BEFORE AND AFTER UNIT INCLUDING: DRY BULB, WET BULB <br />AND DEW POINT FOR SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR AS <br />APPLICABLE. <br />7. AIR FLOW PROPERTIES BEFORE AND AFTER ALL HEAT EXCHANGE DEVICE (COILS, <br />FANS, ENERGY RECOVERY DEVICES, ETC.) INCLUDING: DRY BULB, WET BULB AND <br />DEW POINT. <br />7. FLUID FLOW PROPERTIES BEFORE AND AFTER ALL HEAT EXCHANGE DEVICE (COILS, <br />ETC.) INCLUDING: ENTERING WATER TEMPERATURE, LEAVING WATER TEMPERATURE, <br />FLOW RATE AND FLUID PRESSURE DROP THROUGH COMPONENT. <br />9. IDENTIFICATION OF ALL VARIABLE AIR VOLUME DEVICES WTH DESIGN AIRFLOW, <br />MINIMUM AIRFLOW, ENTERING AIR TEMPERATURE AND LEAVING AIR TEMPERATURE. <br />10. PLAN IDENTIFYING ALL AIR TERMINAL DEVICES WITH DESIGN CFM AND ACTUAL CFM. <br />MAINTENANCE MANUALS <br />PROVIDE COMPLETE MAINTENANCE MANUALS (3 REQUIRED) ON ALL NEW EQUIPMENT. <br />ORGANIZE OPERATING AND MAINTENANCE DATA INTO SUITABLE SETS OF MANAGEABLE <br />SIZE. BIND PROPERLY INDEXED DATA IN INDIVIDUAL, HEAVY-DUTY, 2-INCH, 3-RING <br />VINYL -COVERED BINDERS NTH POCKET FOLDERS FOR FOLDED SHEET INFORMATION. <br />MARK APPROPRIATE IDENTIFICATION ON FRONT AND SPINE OF EACH BINDER. INCLUDE <br />THE FOLLOWING TYPES OF INFORMATION. THE INFORMATION WILL BE TURNED OVER TO <br />THE OWNER AT TIME OF SUBSTANTIAL COMPLETION: <br />:OPERATING AND MAINTENANCE INSTRUCTIONS <br />SPARE PARTS LIST <br />0 <br />0 WRING DIAGRAMS <br />0 INSPECTION REPORTS & APPROVALS <br />* SHOP DRAWINGS AND PRODUCT DATA <br />0 TEST AND BALANCE INFORMATION <br />TRAINING SERVICES <br />THOROUGHLY INSTRUCT THE OWNER'S REPRESENTATIVE IN THE OPERATION OF ALL <br />EQUIPMENT FURNISHED AND LOCATION OF ALL VALVES AND CONTROL DEVICES. <br />TRAIN BUILDING OWNER'S PERSONNEL DURING NORMAL WORKING HOURS ON START-UP <br />ES, TROUBLESHOOTING PROCEDURES, SERVICING AND <br />PREVENTATIVE MAINTENANCE SCHEDULE AND PROCEDURES. REVIEW WITH THE OWNER'S <br />PERSONNEL, THE DATA CONTAINED IN THE OPERATING AND MAINTENANCE MANUALS. <br />SCHEDULE TRAINING WITH OMER, PROVIDE AT LEAST 7-DAYS PRIOR NOTICE TO <br />ARCHITECT/ENGINEER. <br />SYSTEM IDENTIFICATION <br />EQUIPMENT TAGS ON DESIGN DRAVANGS DO NOT NECESSARILY REFLECT BUILI)ING <br />EQUIPMENT TAGS. DRAVANG TAGS ARE FOR INS PROJECT ONLY AND AM 70 BE USED <br />ONLY FOR REFERENCE COORDINATE SPECIFIC EQUIPMENT TAG INDICATIONS WTH <br />BUILDING ENGINEER AND MY BUILDING AUTOMA11ON SOFTWARE FOR CORRECT AND <br />ACCURATE REFERENCE TAGS. <br />PROVIDE IDENTIFICA11ON LABELS ON OR NEAR EACH PIECE OF MAJOR EQUIPMENT AND <br />EACH OPERATIONAL DEVICE AND DISCONNECT. THE LABELS SHALL BE CONSTRUCTED <br />OF ENGRAVED PLAS11C LAMINATE SIGN OR PLAS11C EQUIPMENT MARKER PERMANENTLY <br />SECURED TO EQUIPMENT. THE LETTERING SHALL BE A MINIMUM OF r INCH HIGH FOR <br />EQUIPMENT NAME AND W FOR EQUIPMENT INFORMATION. <br />MECHANICAL CONTRACTOR SHALL MAKE AN EFFORT TO PRESERVE AND MAINTAIN <br />READABILITY OF THE MANUFACTURER'S EQUIPMENT TAG INFORMATION AND SHALL <br />CLEARLY INDICATE ADJACENT TO THE TAG THE KW OF THE HEATER INSTALLED IN UNIT. <br />mr�izIe�;ga.*N-Ik�ibs�icallizt&0 <br />PROVIDE ALL NECESSARY DUCTWORK AND PIPE SUPPORTS, HANGERS, RODS, CLAMPS <br />AND ATTACHMENTS TO PROPERLY INSTALL AND SUPPORT DUCTWORK, PIPING AND <br />EQUIPMENT FROM THE BUILDING STRUCTURE. PROVIDE ANY ANGLE IRON OR UNISTRUT <br />AND SUSPENSION RODS REQUIRED TO INSTALL EQUIPMENT, PIPING AND DUCTWORK. <br />ALL SUPPORTS EXPOSED TO OUTDOORS SHALL BE CLEANED, PRIMED AND PAINTED TO <br />PREVENT RUSTING. FINISH COLOR AS SELECTED BY OWNER. <br />THE USE OF BALING WIRE, NATURAL OR SYNTHETIC FABRIC STRAPS, OR PERFORATED <br />METAL STRAPPING IS NOT ACCEPTABLE FOR SUPPORTS. <br />WARRANTY/GUARANTEE: <br />THE CONTRACTOR SHALL WARRANTY/GUARANTEE AND MAINTAIN THE STABILITY OF <br />WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION OF THE <br />PERIOD OF ONE (1) YEAR. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR <br />MATERIALS APPEARING DURING THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY <br />TRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACT10N <br />M TECT AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS <br />SHALL INCLUDE ALL DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING <br />RESULTING FROM THE ORIGINAL DEFECT OR REPAIRS THERETO. <br />HEA11NIGZVEN11LA11NIGZAIR COND11IONING SPECIFICATIONS <br />FURNISH AND INSTALL COMPLETE AIR CONDITIONING SYSTEMS AS INDICATED ON THE <br />DESIGN DRAWINGS AND AS OUTLINED WITHIN THESE SPECIFICATIONS. WORK SHALL <br />INCLUDE BUT NOT BE LIMITED TO THE FABRICATION AND/IOR INSTALLATION OF THE <br />SCHEDULED AIR CONDITIONING UNITS, EXHAUST FANS, VARIABLE VOLUME BOXES, AIR <br />DISTRIBUTION AND DUCTWORK. <br />EQUIPMENT-. <br />AIR CONDITIONING UNITS: <br />UNITS SHALL BE SINGLE PACKAGE AIR-TO-AIR ELECTRIC AIR CONDITIONING SYSTEMS <br />AS SCHEDULED ON THE DESIGN DRAWINGS. UNITS NTH INTEGRAL ELECTRIC <br />RESISTANCE HEATERS SHALL HAVE A SINGLE -POINT ELECTRIC CONNECTION. <br />TOTAL COOLING CAPACITY OF THE UNITS SHALL BE AS SCHEDULED ON DRAWNGS. <br />UNIT CABINET SHALL BE CONSTRUCTED OF GALVANIZED STEEL, ZINC COATED AND <br />COATED NTH BAKED ENAMEL CABINET INSULATION SHALL COMPLY WITH FLORIDA <br />ENERGY CONSERVATION CODE REQUIREMENTS. <br />REFRIGERATION SYSTEM - THE UNITS SHALL CONTAIN HERMETIC COMPRESSORS WITH <br />SERVICE VALVES AND VIBRATION ISOLATION. UNITS SHALL HAVE DUAL COMPRESSORS <br />AND DUAL REFRIGERATION CIRCUITS OR CAPACITY REDUCTION STEPS WHERE INDICATED <br />ON EQUIPMENT SCHEDULE. <br />FANS AND MOTORS - THE INDOOR AIR FANS SHALL BE OF THE FORWARD -CURVED <br />CENTRIFUGAL CLASS 1 TYPE OR DIRECT DIRECT PLENUM STYLE. THE OUTDOOR AIR <br />FANS SHALL BE OF THE PROPELLER TYPE, EACH DIRECTLY DRIVEN BY AN INHERENTLY <br />PROTECTED MOTOR. MOTOR AND DRIVE TO PROVIDE HIGHER FAN OUTPUT WHEN JOB <br />REQUIREMENTS EXCEED STANDARD FAN CAPACITY SHALL BE PROVIDED. <br />SAFETY CONTROLS - COOLING SYSTEM SHALL BE PROTECTED BY. LOSS OF CHARGE <br />PROTECTION, HIGH AND LOW PRESSURESTAT, COMPRESSOR MOTOR OVERLOADS, AND A <br />TIMING DEVICE WHICH WILL PROHIBIT THE COMPRESSOR MOTOR FROM BEING SUBJECTED <br />TO A STARTING CURRENT MORE THAN ONCE EVERY FIVE MINUTES. <br />CONTROLS - PROVIDE PROGRAMMABLE, WALL MOUNTED, HEAT/COOL ON -OFF -AUTO <br />THERMOSTAT FOR EACH UNIT. <br />UNITS RECEIVING OUTSIDE AIR FOR THE PURPOSE OF VENTILATION SHALL BE PROVIDED <br />WI SITION, OUTSIDE AIR INTAKE DAMPER WITH HOOD <br />PROVIDE A ONE (1) YEAR WARRANTY ON THE COMPLETE SYSTEM AND AN ADDITIONAL <br />FOUR (4) YEAR FACTORY WARRANTY ON ALL COMPRESSORS. LOSS OF REFRIGERANT <br />WILL BE REPLACED AT NO COST TO OWNER FOR A PERIOD OF ONE (1) YEAR. <br />CONDENSATE DRAINS: <br />SCHEDULE 40 PVC ROUTED AS INDICATED ON PLANS. INSULATE WITH 1/2- <br />ELASTOMERIC FOAM INSULATION RATED FOR PLENUM APPLICATION. INSTALL PER <br />'S RECOMMENDATIONS. COPPER PIPING THAT PENETRATES MASONRY <br />WALLS SHALL BE PROPERLY SLEEVED AND SEALED WEATHERTIGHT AT EACH MASONRY <br />PENETRATION. <br />CONDENSATE PIPING INSULATION EXPOSED TO OUTDOORS SHALL BE INSULATED WITH <br />1/2- FOAMGLASS CLOSED -CELL INSULATION AND PROTECTED MTH 0.032- EMBOSSED <br />ALUMINUM JACKET SECURED NTH BANDS (NOT SCREWS). JACKET SHALL BE INSTALLED <br />WITH THE SEAM ON THE BOTTOM TO PREVENT WATER ACCUMULATION MEN EXPOSED <br />TO THE OUTDOORS. <br />REFRIGERATION PIPING: <br />ALL WORK DESCRIBED IN THIS SEC11ON SHALL BE PERFORMED ONLY BY SKILLED <br />REFRIGERATION MECHANICS. REFRIGERATION PIPING SHALL BE FIELD FABRICATED. <br />WORKMANSHIP ON THESE SYSTEMS MUST BE GOOD, AND CLEANUNESS OF THE PIPING <br />SYSTEMS IS MANDATORY. WORK THAT DOES NOT MEET THESE CRITERIA SHALL BE <br />REMOVED AND REPLACED AT NO COST TO THE OWNER. THE ENGINEER SHALL <br />DETERMINE METHER THE WORK MEETS THESE CRITERIA. <br />PIPING SHALL BE ASTM B280 MUELLER STREAMLINE ACR OR READING TYPE ACR <br />FACTORY SEALED NITROGEN CHARGED SPECIAL REFRIGERATION DUTY COPPER TUBING. <br />FITTINGS SHALL BE MUELLER OR NIBCO WROUGHT COPPER LONG RADIUS REFRIGERATION <br />TYPE. <br />REFRIGERANT PIPING BELOW GRADE SHALL BE ROUTED IN MINIMUM 4 IN. DIAMETER PVC <br />PIPE SLEEVES TO EACH CONDENSING UNIT. ALL UNDERGROUND REFRIGERANT PIPING <br />SHALL BE CONTINUOUS SOFT -DRAWN TUBING WITH NO UNDERGROUND JOINTS ALLOWED. <br />REFRIGERANT PIPE SIZES SHALL BE SIZED PER A/C EQUIPMENT MANUFACTURER-S <br />ON LENGTH OF RUN BETWEEN CONDENSING UNITS AND AHU'S. <br />SOLDER SHALL BE 4% SILVER/96% TIN WITH MELTING POINT OF 430-F WITH TENSILE <br />STRENGTH OF 14,000 PSI AND SHEAR STRENGTH OF 10,600 PSI, BRIGHT SILVER <br />NON -OXIDIZING COLOR. 95-5 SOLDER WILL NOT BE PERMITTED. DO NOT BRAZE. <br />J.W. HARRIS STAY-BRITE AND ENGELHARD BRAZE -IT 430 ARE ACCEPTABLE. <br />FILL PIPING WITH OIL PUMPED DRY NITROGEN DURING ALL SOLDERING OPERATIONS. <br />BUILD UP 20 PSIG IN SYSTEM NTH R-410A AND THEN INCREASE PRESSURE TO 150 <br />PSIG IN SYSTEM WITH R-410A AND THEN INCREASE PRESSURE TO 150 PSIG IN SUCTION <br />PIPING WITH 350 PSIG IN HIGH SIDE PIPING WITH DRY NITROGEN. TAP ALL FITTINGS <br />WITH RUBBER MALLET. LEAK TEST WITH HALIDE TORCH. REPAIR ANY LEAKS <br />DISCOVERED BY COMPLETELY REMAKING THE LEAKING JOINTS. REPEAT PROCEDURE <br />UNTIL SYSTEM IS PROVEN TIGHT FOR A 24 HOUR PERIOD. <br />U EVACUATE SYSTEM TO 0.1' HG ABSOLUTE, MEASURING SAME <br />WITH ZIMMERLI VACUUM GAUGE OR MANOMETER. BREAK VACUUM BY INJECTING <br />R-410A INTO SYSTEM AT FARTHEST POINT IN PIPING FROM COMPRESSOR. <br />RE -EVACUATE TO 0.1" HG ABSOLUTE. SYSTEM MUST HOLD THIS VACUUM FOR 15 <br />MINUTES. REPAIR LEAKS AS REQUIRED UNTIL IT DOES. CHARGE SYSTEM WITH PROPER <br />QUANTITY OF REFRIGERANT. <br />ING (INDOORS AND OUTDOORS), FITTINGS, VALVES, ETC., <br />VES, HANGERS, ETC., WITH 3/4- ELASTOMERIC INSULATION <br />(ARMACELL MODEL# AP-ARMAFLEX). INSTALLATION SHALL BE CONDENSATION -FREE, <br />AND INSTALLED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. PROTECT ALL <br />INSULATION EXPOSED TO OUTDOORS WITH 0.032" EMBOSSED ALUMINUM JACKET <br />SECURED WITH BANDS (NOT SCREWS). JACKET SHALL BE INSTALLED WITH THE SEAM <br />ON THE BOTTOM TO PREVENT WATER ACCUMULATION WHEN EXPOSED TO THE <br />OUTDOORS. <br />PIPE HANGERS, WHERE NEEDED, SHALL BE ANVIL/GRINNELL #260 CLEMS TYPE, 5 FEET <br />ON CENTER, SECURELY ATTACHED TO BUILDING CONSTRUCTION. <br />COPPER PIPING THAT PENETRATES MASONRY WALLS SHALL BE PROPERLY SLEEVED AND <br />SEALED WEATHERTIGHT AT EACH MASONRY PENETRATION. <br />NES SECURELY ALONG PAD/FLOOR/EQUIPMENT/STRUCTURE <br />TO PREVENT MOVEMENT. SUPPORT IN A MANNER THAT LINES THAT DO NOT HANG <br />FROM EVAPORATOR CONNECTIONS OR BLOCK ACCESS TO FILTERS, CONTROLS, ETC. <br />TRAP OIL IN SUCTION LINE AT EVAPORATOR COIL NO OTHER COIL TRAPS PERMITTED. <br />PROVIDE SUCTION RISERS, CHECK VALVES, SOLENOID VALVES, OR OTHER DEVICES <br />REQUIRED IN PIPING SYSTEM BY MANUFACTURERS INSTALLATION INSTRUCTIONS. <br />FURNISH ALL LABOR AND MATERIALS TO REPLACE REFRIGERANT LOST DURING THE ONE <br />YEAR WARRANTY PERIOD. <br />CONTROLS <br />FACTORY MOUNTED CONTROL SHALL BE PROVIDED TO ACCOMPLISH THE SEQUENCE OF <br />OPERATION. ALL INTERIOR CONTROLS SHALL BE FACTORY FURNISHED AND INSTALLED. <br />HVAC LEGEND <br />11 SUPPLY AIR DIFFUSER 0 RETURN AIR GRILLE 11 EXHAUST AIR GRILLE <br />rl_ = .4 rr ��;Al rr = __41 <br />if ),/ I EXISTING SUPPLY AIR DIFFUSER 11 ' 11 EXISTING RETURN AIR GRILLE 11 11 EXISTING EXHAUST AIR GRILLE <br />a L�__ A L�m <br />94, DEMOLISHED SUPPLY AIR DIFFUSER 0, GRILLE to, DEMOLISHED EXHAUST AIR GRILLE <br />TAG DIFFUSER DESIGNATION *_____4 NEW DUCTWORK (SINGLE LINE) ?______z <br />CFM <br />.*�� NEW FLEX DUCT 4=1- SPIN -IN COLLAR WITH DUCTWORK TO BE REMOVED <br />VOLUME DAMPER <br />VDF_ VOLUME DAMPER FD_�_, EXISTING DUCTWORK & POINT OF CONNECTION <br />2-- WITH EXITING FIRE DAMPER <br />(1) THERMOSTAT T F/SD _4, X <br />2-- _, E isTING DUCTWORK NTH <br />@ SMOKE DETECTOR :Ak�s WITH NEW FIRE DAMPER . / I EXISTING FIRE/SMOKE DAMPER <br />' EXISTING DUCTWORK <br />I TAG ft NEW DUCTWORK WITH WITH NEW FIRE/SMOKE DAMPER <br />I CFM I EQUIPMENT TAG ll�� . NEW FIRE DAMPER F/ <br />NEW DUCTWORK WITH <br />NEW FIRE/SMOKE DAMPER <br />AIR DISTRIBUTION EQUIPMENT: <br />GRILLES AND RETURN AIR REGISTERS AS SCHEDULED ON THE <br />DESIGN DRAWINGS. TITUS, PRICE AND METALAIRE MAY BE SUBSTITUTED AS AN EQUAL. <br />GRILLES, REGISTERS, AND CEILING DIFFUSERS SHALL BE FURNISHED AS SCHEDULED ON <br />THE DESIGN DRAWINGS AND SHALL BE ALL METAL CONSTRUCTION. AIR DISTRIBUTION <br />SHALL NOT EXCEED NC-30 NOISE CRITERIA AS DEFINED IN THE LATEST ASHRAE GUIDE. <br />DUCTWORK: <br />CONSTRUCTED TO CONFORM TO LATEST EDITION OF SMACNA STANDARDS BASED ON <br />THE FOLLOWNG CRITERIA. <br />1. SUPPLY AIR: 2 IN. W.G. POSITIVE PRESSURE (CLASS C) <br />2. RETURN AIR: 1 IN. W.G. NEGATIVE PRESSURE (CLASS C) <br />3. OUTSIDE AIR: 2 IN. W.G. PosiTivE/NEGATIVE PRESSURE (CLASS C) <br />4. EXHAUST AIR: 1 IN. W.G. POSITIVE/NEGATIVE PRESSURE (CLASS C) <br />K: <br />0 GALVANIZED STEEL OF GAUGES CONFORMING TO LATEST EDITION OF SMACNA <br />RITERIA ABOVE. THE GALVANIZED DUCT COATING SHALL BE <br />G-90. (APPLICABLE FOR SUPPLY, RETURN AND EXHAUST) <br />FLEXIBLE DUCTWORK SHALL BE ACOUS11CAL LOW PRESSURE TYPE WITH INTERIOR LINER, <br />METAL HELIX, 1- FIBERGLASS INSULATION, AND COPOLYMER SEAMLESS OUTSIDE SLEEVE. <br />THE ENTIRE FLEXIBLE DUCT ASSEMBLY SHALL BE LISTED IN ACCORDANCE WITH UL-181 <br />CLASS 1 AIR DUCT MATERIAL THE MAXIMUM LENGTH OF ANY FLEX DUCT SHALL BE <br />8'-O". THIS APPLIES TO NEW FLEXIBLE DUCTWORK ONLY. EXISTING FLEXIBLE <br />DUCTWORK EXCEEDING EIGHT FEET IN LENGTH MAY REMAIN (AT BUILDING OWNER'S <br />DISCRETION) PROVIDED IT IS PROPERLY HUNG AND SUPPORTED PER ASHRAE <br />ALLOWS FOR UNRESTRICTED AIRFLOW. EXCESSIVE NOISE OR <br />INSUFFICIENT AIRFLOW SHALL BE CAUSE FOR REPLACEMENT OF FLEXIBLE DUCTWORK TO <br />COMPLY WITH THE ABOVE MENTIONED LENGTH RESTRICTIONS. REPLACE EXISTING FLEX <br />DUCT WHICH EXCEEDS 8'-Om IN LENGTH WITH ROUND SHEET METAL DUCT. "DAISY <br />CHAIN" OF MORE THAN ONE 8'-Om SECTION OF FLEX WITH RIGID DUCT IN BETWEEN IS <br />NOT ACCEPTABLE. <br />FLEXIBLE DUCTWORK SHALL BEAR MANUFACTURER APPLIED LABELING INDICATING DUCT <br />DIAMETER ON OUTER FACE (8' MAXIMUM SPACING). <br />ALL DIMENSIONS ARE INSIDE NET FREE AREA. <br />ADJUSTABLE SPUTTERS AND DAMPERS SHALL BE INSTALLED IN EVERY SPLIT AND <br />BRANCH DUCT AND SHALL BE PROVIDED WITH LOCKING QUADRANTS ON EXPOSED OR IN <br />ACCESSIBLE AREAS OF THE DUCT FOR EASE OF OPERATION. <br />ELBOWS OR CHANGES IN DUCT DIRECTION GREATER THAN 45 DEGREES SHALL BE <br />FITTED WITH AIR TURNS CONSISTING OF CURVED AIRFOIL BLADES OR VANES MICH WILL <br />PERMIT THE AIR TO MAKE ABRUPT TURNS WITHOUT APPRECIABLE TURBULENCE. <br />FIRE SAFETY CONTROLS: <br />AS A MINIMUM REQUIREMENT, INSTALL DUCT SMOKE DETECTOR FURNISHED AND WRED <br />BY DIVISION 26 IN SUPPLY AIR DUCTS OF UNITS EXCEEDING 2,000 CFM AND IN THE <br />RETURN AIR DUCTS OF UNITS EXCEEDING 15,000 CFM. DETECTOR TO SHUT UNIT OFF <br />MEN ACTIVATED. <br />VIBRATION ISOLATION: <br />ALL BLOWER UNITS AND VIBRATING TYPE EQUIPMENT SHALL BE PROPERLY FITTED WITH <br />MASON INDUSTRIES VIBRATION ISOLATION EQUIPMENT SIZED IN ACCORDANCE WITH <br />EQUIPMENT WEIGHT AND DUTY. <br />VI ECTORS AT ALL SUPPLY AND TO AIR <br />HANDLING EQUIPMENT CONSISTING OF HEAVY CANVAS OR NEOPRENE FABRIC WITH <br />AIR -TIGHT SEAMS AND CONNECTIONS TO THE EQUIPMENT. <br />AIR FILTERS: <br />FILTERS SHALL BE 20% EFFICIENT lm PLEATED MEDIA, DISPOSABLE TYPE IN A RIGID <br />FRAME WITH A SUPPORTING MAZE ACROSS BOTH ENTERING AND LEAVING SURFACES. <br />SUPPLY ONE COMPLETE SET OF EXTRA FILTERS AFTER OWNER'S FINAL ACCEPTANCE. <br />FARR 20/20 OR EQUAL <br />INSULATION: <br />RED BY CERTAINTEED, OWENS-CORNING, JOHNS MANVILLE, <br />PITTSBURGH CORNING, ARMSTRONG, OR APPROVED EQUAL INSULATION SUNDRIES AND <br />ADHESIVES SHALL BE AS MANUFACTURED BY BENJAMIN FOSTER, CHILDERS, \AMASCO, <br />INSULA11ON SHALL BE SUITABLE FOR INSTALLATION IN A <br />RETURN AIR PLENUM. <br />INSULATE ALL SHEETMETAL DUCTWORK EXCEPT EXHAUST DUCTWORK EXTERNALLY WITH <br />MANVILLE MICROUTE FSK INSULATION (TYPE 75 OR 100) OR APPROVED EQUAL <br />INSULA11ON TO HAVE FSK FACING AND UL FIRE HAZARD CLASSIFICATION OF- FLAME <br />SPREAD 25, SMOKE DEVELOPED 50, FUEL CONTRIBUTED 50. INSTALL INSULATION PER <br />SMACNA, FLORIDA MODEL ENERGY EFFICIENCY CODE AND MANUFACTURER'S <br />RECOMMENDATIONS. ALL INSULATION JOINTS SHALL BE SEALED NTH GLASS FABRIC <br />AND MASTIC. <br />MINIMUM INSULATION VALUES (THICKNESSES) ARE AS FOLLOWS: <br />0 R IN UNCONDITIONED SPACE: R-4.2 MIN. (1.5-) <br />0 OUTSIDE AIR: R-6.0 MIN. (2") <br />ABOVE REQUIREMENTS ARE BASED ON THE 2020 FLORIDA BUILDING CODE, 7TH EDITION, <br />ENERGY CONSERVATION. CONTRACTOR SHALL MATCH EXISTING INSULATION CONDITIONS <br />WHERE THEY EXCEED THE ABOVE TABLE. <br />PIPING INSULATION EXPOSED TO OUTDOORS SHALL BE INSULATED NTH CLOSED -CELL <br />FOAMGLAS INSULATION WITH AN INSULATING VALUE IN COMPLIANCE WITH FLORIDA <br />ENERGY CODE TABLE C403.2.10 BASED ON FLUID TEMPERATURES. PIPING SHALL BE <br />PROTECTED WITH 0.032' EMBOSSED ALUMINUM JACKET SECURED WITH BANDS (NOT <br />SCREWS). JACKET SHALL BE INSTALLED WITH THE SEAM ON THE BOTTOM TO PREVENT <br />WATER ACCUMULATION WHEN EXPOSED TO THE OUTDOORS. <br />SPONSIBLE FOR FURNISHING AND INSTALLING ADEQUATE AND <br />PROPER INSULATION AND MOISTURE -SEAL IN A MANNER THAT WILL PERMANENTLY <br />PREVENT THE ACCUMULATION OF MY OBJECTIONABLE MOISTURE ON THE EXTERIOR OF <br />AIR CONDITIONING UNITS, REFRIGERANT PIPING, CONDENSATE DRAIN PIPING, AIR DUCTS <br />YSTEM. CONTRACTOR SHALL CORRECT THE CAUSE OF MY <br />CONDENSATION AND FULLY REPAIR, WITHOUT COST TO THE OWNER, MY DAMAGES TO <br />BUILDING SURFACES, FURNISHINGS OR EQUIPMENT CAUSED BY CONDENSATION FROM <br />THIS SYSTEM, FOR THE FULL PERIOD OF THE GUARANTEE. <br />MEP CONSULTING <br />ENGINEERS <br />SINCE 1977 <br />FL REG NO. 3089 <br />2016 ALDEN RD. <br />ORLANDO, FL <br />32803 <br />(407) 246-1688 <br />WWW.PEIFLA.COM <br />PEI PROJECT A <br />22121 <br />1W <br />L A <br />A <br />I <br />-_ - <br />- � <br />CAMPBELL + VAN DUSEN <br />IA RCH ITE CT U RE IN-ERIOR DE.31,aN <br />www.CVDstudio.com <br />CAMPBELL + VAN DUSEN Design Studio, LLC <br />255 South Orange Avenue Suite # 1 240 <br />Orlando, Florida 32801 <br />Phone: 407.930.6016 <br />FL. Lic. No. AA26003339 <br />ARCHITECT OF RECORD <br />FRANK W. CAMPBELL AIA <br />FL LIC NO. AROO 1 6053 <br />COPY OF THIS PLAN IS NOT VALID UNLESS SIGNED, <br />SEALED AND DATED BY THE ARCHITECT OF RECORD <br />,\,\ <br />. � oft JA // <br />� <br />�� _-k'� . . . ......... � � ///,- <br />"", , �� <br />':� A��;" i� I c R ***"-%. <ON .." <br />Z'� . 0� � ..' <br />Z�- * / NO lk -::� <br />= : . .1 .- <br />.0 : - <br />- 1 90018 U) <br />. - <br />- ;a '. * I = <br />=: 0 I .. S7A : *:z <br />.- % <br />�' ..6 .% 7"e OF '� �_ <br />' <br />I <br />.� . A�, J.. <br />.,., 0. -, Z ,4 <br />_� 4p, \ of? I N -`4'.k_, !:�,� <br />" 0,.,. D ­0 "'., �­' <br />;e Z, ...... ' <br />'_l <br />////- % "', Vt% ��' <br />G N <br />� Fit �\\'� <br />* ... ", <br />///////IIIIl0\ q'.z.s-�,2 <br />I, --- <br />FL Reg. No. 90018 <br />Taylor J. Lewis, PE, <br />COPY OF THIS PLAN IS NOT VALID UNLESS SIGNED, <br />SEALED AND DATED BY THE ENGINEER OF RECORD <br />-_ - <br />_j <br />U_ <br />vi <br />j <br />_j <br />= <br />:z <br />Q� <br />0 <br />>_ <br />= <br />�-_ <br />2= <br />= <br />CL <br />LLJ <br />cle <br />�-- <br />r�4 <br />U <br />1 <br />< <br />6 <br />L.') <br />LU <br />LU <br />(/) <br />I <br />> <br />I <br />0 <br />= <br />I <br />_= <br />ca <br />I- <br />I--- <br />+ <br />LO <br />_j <br />_j <br />U----*w <br />0 <br />W <br />< <br />LLJ <br />___) <br />LU <br />I <br />>- <br />() <br />0 <br />> <br />Il <br />= <br />cl- <br />- <br />NO llq <br />ck� <br />CL <br />C) <br />Lu <br />3: <br />PL-U4 <br />-_0 LO <br />or-?. ccyo) <br />< <br />CONSTRUCTION DOCUMENTS <br />03.24.2023 <br />PRINCIPAL IN CHARGE <br />F. CAMPBELL <br />.................................................................... <br />PROJECT MANAGER <br />M. TORRES <br />......................................................... I .......... <br />- <br />ADVENT HEALTH <br />WELL 65+ <br />ZEPHYRHILLS <br />22-0328-01 <br />MECHANICAL <br />SPECIFICATIONS <br />MO* I <br />