Laserfiche WebLink
4 <br />PAMENT CARE AREA SYMBOL LEGEND <br />4�> GENERAL CARE - CATEGORY 2 <br />NOTES: <br />1. THERE ARE NO CRITICAL OR WET PATIENT AREAS IN THE SCOPE OF <br />WORK. <br />2. GENERAL PATIENT CARE AREAS REQUIRE A WRING METHOD WTH A <br />REDUNDANT GROUND AS PER ARTICLE 517.13 OF THE NEC. <br />GROUNDING 0 FALL RECEPTACLES, LIGHTING AND FIXED EQUIPMENT IN <br />PATIENT CARE AREAS SHALL COMPLY WTH NEC ARTICLE 517.13 (A) <br />AND (B) <br />TESTING, INSPECTIONS - <br />AND CERTIFICATIONS: <br />A. EQUIPOTENTIAL GROUNDING TEST FOR PATIENT CARE AREAS <br />NFPA 99, 2018 EDITION, SECTION 6.3.3 REQUIRES TESTING OF NEW CONSTRUCTION <br />AND EXISTING CONSTRUCTION AND REPEATED WIEN MAJOR RENOVATIONS OCCUR. <br />MOST EXISTING FACIU11ES HAVE NO RECORDS OF EXISTING CONDITIONS, HOWEVER, <br />LOGS SHOULD BE CHECKED ANNUALLY BY AHCA. THEREFORE, ALL PATIENT AREAS <br />WTHIN ANY SCOPE OF WORK WLL NEED TO BE TESTED BY THE CONTRACTOR. (ALSO <br />SEE NEC 517-13, 14 & 16). <br />B. WHAT NEEDS TO BE TESTED? ONLY METAL CONDUCTIVE SURFACES LIKELY TO BECOME <br />ENERGIZED WTHIN THE PATIENT VICINITY. PATIENT VICINITY IS DEFINED AS: <br />1. AN AREA MERE PATIENTS ARE NORMALLY CARED FOR. <br />2. THE SPACE NTH SURFACES LIKELY TO BE CONTACTED BY PATIENT OR ATTENDANT <br />TOUCHING THE PATIENT. (BEDS, HEADWALLS, A/C UNITS, SINK, TRIM, ETC.) <br />3. IN A PATIENT ROOM BASICALLY THE ENTIRE ROOM INCLUDING TOILET/SHOWER ROOM. <br />PATIENTS SHOULD BE IN WHEELCHAIRS OR SITTING IN CHAIRS. <br />C. <br />1. <br />2. <br />D. <br />2. <br />a. <br />b. <br />C. <br />d. <br />e. <br />f. <br />3. <br />4. <br />E. <br />b. <br />C. <br />F. <br />1. <br />2. <br />G. <br />1. <br />2. <br />3. <br />4. <br />60-0w 69-Ow <br />PATIENT BED <br />31-6" <br />6'-On <br />7'-6- VERTICALLT <br />ABOVE FLOOR I <br />TYPICAL PATIENT ROOM <br />PATIENT VICINITY DISTANCES <br />GROUND TEST DOES NOT INCLUDE: <br />SMALL WALL MOUNTED CONDUCTIVE SURFACES, TOWEL AND SOAP DISPENSERS, <br />MIRRORS, BED PANS, ETC. <br />LARGE METAL SURFACES NOT LIKELY TO BECOME ENERGIZED, WNDOW FRAMES, DOOR <br />FRAMES, FLOOR DRAINS AND MOVABLE CABINETS. <br />TEST METHOD: <br />BOTH VOLTAGE AND IMPEDANCE MEASUREMENTS MUST BE MADE. <br />ALL MEASUREMENTS MUST BE TAKEN TO A REFERENCE POINT OR IN NEAR AREA <br />BEING TESTED. <br />GROUND BAR IN A PANEL SERVING AN AREA. <br />GROUND JACK IF ONE EXISTING. <br />ESTABLISHED GROUND BUS. <br />AN ALL METAL COLD WATER PIPE. <br />BE CAREFUL OF WASTE PIPE OR SPRINKLER PIPE BECAUSE OF NO -HUB AND <br />VITAULIC FITTINGS. <br />GROUNDING CONTACT OR A RECEPTACLE THAT IS POWERED FROM A DIFFERENT <br />CIRCUIT FROM THE RECEPTACLE UNDER TEST. <br />VOLTAGE MEASUREMENTS ARE TO BE MADE BETWEEN REFERENCE POINT AND <br />APPROPRIATE CONDUCTIVE SURFACES INCLUDING RECEPTACLE GROUND CONTACTS. <br />IMPEDANCE MEASUREMENTS ARE TO BE MADE ONLY BETWEEN REFERENCE POINT AND <br />RECEPTACLE GROUND CONTACTS. <br />REQUIRED RESULTS: <br />NEW/EXISTING CONSTRUCTION <br />VOLTAGE - MAXIMUM 20MV +/-20% (24 TO 20MV) <br />IMPEDANCE - MAXIMUM 0.1 OHM +/-20% (0.12 TO 0.1 OHM) <br />IMPEDANCE (ISOLATED GROUND) - MAXIMUM 0.2 OHM +/- 20% (0.28 TO 0.12 OHM) <br />GENERAL COMMENTS: <br />THE IMPEDANCE MEASUREMENTS FOR NEW AND EXISTING CONSTRUCTION SHALL BE <br />THE RATIO OF 60HZ VOLTAGE DEVELOPED BETWEEN A POINT UNDER TEST AND A <br />REFERENCE POINT TO 60HZ CURRENT APPLIED TO THE POINT UNDER TEST. IF <br />EXISTING CONSTRUCTION 60HZ OR DC MAY BE USED, AND THE TEST MUST NOT <br />ENDANGER PATIENT. <br />ALSO, TESTS MUST INCLUDE CORRECT POLARITY OF HOT AND NEUTRAL AND <br />GROUNDING BLADE RETENTION FORCE (40Z. MIN.) <br />JEST EQUIPMENT: <br />USE A MILLIVOLT METER DESIGNED FOR THIS PURPOSE NTH 1 K OHM INPUT <br />RESISTANCE (+/-10%) AT FREQUENCIES OF 1000HZ OR LESS. <br />USE A HIGH Z MV METER WTH EXTERNAL FREQUENCY SHAPING NETWORK. <br />RECEPTACLE POLARITY TESTER. <br />RETEN11ON FORCE TESTER OR MANUFACTURER'S DATA VERIFYING COMPLIANCE <br />THROUGH U.L, NEMA OR OTHER TESTS. <br />ELECTRICAL SPECIFICA11ONS <br />GENERAL PROVISIONS <br />A. PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT FOR A COMPLETE <br />AND PROPERLY OPERATING ELECTRICAL SYSTEM. INCLUDE NECESSARY <br />FEES AND PERMITS WITHIN BASE BID. <br />ARCHITECTURAL, MECHANICAL, PLUMBING AND FIRE PROTECTION <br />DRAWNGS ARE CONSIDERED PART OF THESE CONSTRUCTION <br />DOCUMENTS FOR COORDINATION, EQUIPMENT CONNECTION, HEIGHTS <br />AND LOCATIONS. <br />B. CODES AND STANDARDS: ALL ELECTRICAL WORK SHALL BE IN STRICT <br />COMPLIANCE WTH THE PROVISIONS OF THE LOCAL GOVERNMENT <br />AUTHORITY, THE NATIONAL ELECTRIC CODE 2017 EDITION; SEVENTH <br />ED11ION (2020) FLORIDA BUILDING CODE, THE FLORIDA FIRE <br />PREVENTION CODE 2020 EDITION, NATIONAL FIRE ALARM CODE NFPA <br />72 2016 EDITION AND THE CODES AND STANDARDS REFERENCED <br />THEREIN. ALL MATERIALS SHALL BE NEW AND FREE FROM DEFECTS, <br />AND SHALL BEAR THE UNDERWRITER'S LABEL. <br />C. CONTRACTOR SHALL THOROUGHLY INVESTIGATE SITE BEFORE BIDDING. <br />NO CHANGES WLL BE ALLOWED IN CONTRACT PRICE FOR WORK <br />REQUIRED TO COMPLY WTH EXISTING CONDITIONS. <br />D. ALL ELECTRICAL WORK SHALL BE DONE IN A NEAT AND WORKMANLIKE <br />MANNER. <br />E. CONTRACTOR SHALL SCHEDULE AH DOWN -TIME NTH THE OWNER <br />PRIOR TO BEGINNING THE WORK. PREMIUM /OVERTIME RATES MAY BE <br />REQUIRED AND MUST BE INCLUDED IN BASE BID. <br />F. CONTRACTOR SHALL THOROUGHLY REVIEW CONSTRUCTION DOCUMENTS <br />AND WALK SITE. MEN CONFLICTS ARISE WTHIN CONSTRUCTION <br />DOCUMENTS, CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO <br />SUBMITTING A BID. SUBMISSION OF A BID SHALL INDICATE THAT <br />CONTRACTOR THOROUGHLY REVIEWED CONSTRUCTION DOCUMENTS AND <br />WALKED THE SITE PRIOR TO BID SUBMISSION. <br />MEN ENGINEER IS NOT AVAILABLE, OR TIME DOES NOT <br />PERMI TCON TRACTOR SHALL INCLUDE THE MOST STRINGENT (COSTLY) <br />REQUIREMENTS WTHIN BASE BID. <br />G. CONTRACTOR SHALL COORDINATE WTH UTILITY COMPANY AND <br />TELECOMMUNICATION COMPANY FOR LOCATIONS, REQUIREMENTS AND <br />CONDUITS ROUTING PRIOR TO COMMENCEMENT OF WORK OR ROUGH -IN. <br />H. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING <br />MANUFACTURERS, SUB- CONTRACTORS, VENDORS AND SUPPLIERS, WTH <br />A COMPLETE SET OF THESE DOCUMENTS PRIOR TO SUBMITTING A BID. <br />1. GUARANTEE ALL ELECTRICAL SYSTEM MATERIALS AND WORKMANSHIP <br />TO BE FREE FROM DEFECTS FOR A PERIOD OF ONE (1) YEAR FROM <br />THE DATE OF FINAL ACCEPTANCE AND PROPERLY CORRECT LATENT <br />DEFECTS ARISING WTHIN THIS PERIOD UPON NOTIFICATION BY THE <br />OWNER'S REPRESENTATIVE WTHOUT ADD11IONAL COMPENSATION. <br />J. DAILY REMOVE REFUSE AND DEBRIS ACCUMULATING FROM ELECTRICAL <br />CONSTRUCTION AND PRIOR TO ACCEPTANCE OF THIS WORK, LEAVE THE <br />PREMISES "BROOM CLEAN" INSOFAR AS AFFECTED BY ELECTRICAL <br />WORK. <br />K. ELECTRICAL CONTRACTOR SHALL EXAMINE ARCHITECTURAL, <br />MECHANICAL, PLUMBING AND FIRE PROTECTION DRAWNGS FOR <br />ES11MATING AND CONSTRUCTION OF THIS PROJECT. SUBMISSION OF A <br />PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT SUCH <br />EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, <br />EQUIPMENT OR MATERIALS REQUIRED FOR CONNECTING AND <br />ENERGIZING EQUIPMENT SHOWN ON THOSE DRAWNGS WLL NOT BE <br />RECOGNIZED. ELECTRICAL CONTRACTOR SHALL COMMUNICATE <br />DISCREPANCIES TO ENGINEER PRIOR SUBMITTING A BID. <br />L. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN <br />DRAWNGS AND WTHIN THESE SPECIFICATIONS SHALL BE CONSIDERED <br />AS "SPECIFIED STANDARD" OF QUALITY. NO SUBSTITUTIONS SHALL BE <br />MADE WTHOUT WRITTEN APPROVAL OF THE ENGINEER AT LEAST 10 <br />DAYS PRIOR TO BID DATE. <br />ANY DEVIATION FROM SPECIFIED EQUIPMENT THAT AFFECT THE <br />INSTALLATION, OPERATION, PERFORMANCE, QUALITY OR LONGEVITY OF <br />THE ELECTRICAL SYSTEMS AS DEFINED HEREIN, SHALL BE REPLACED <br />BY THE ELECTRICAL CONTRACTOR NTH NO ADDITIONAL COST TO THE <br />CLIENT, IN ADDITION, ELECTRICAL CONTRACTOR SHALL PROVIDE THE <br />ENGINEERING WTH PHOTOMETRIC FLOOR PLANS FOR ANY LIGHTING <br />FIXTURES CHANGES FOR APPROVAL AT LEAST 10 DAYS PRIOR TO BID <br />DATE. <br />BASIC MATERIALS AND METHODS <br />A. RACEWAYS AND FITTINGS: ALL RACEWAYS AND FITTINGS SHALL BE <br />GALVANIZED RIGID STEEL OR INTERMEDIATE METAL CONDUIT WTH <br />LOCKNUTS AND BUSHINGS, NTH THE EXCEPTION THAT WERE <br />SPECIFICALLY ALLOWED BY THE NATIONAL ELECTRICAL CODE AND <br />APPLICABLE LOCAL CODES. ELECTRICAL METALLIC TUBING (E.M.T) MAY <br />BE USED FOR ALL INTERIOR EXPOSED AND CONCEALED WORK WHERE <br />IT IS NOT SUBJECT TO PHYSICAL DAMAGE OR CORROSION. FITTINGS <br />SHALL BE STEEL SET SCREW TYPE. PVC SCHEDULE 40 WTH TAR <br />COATED GALVANIZED RIGID STEEL ELBOWS SHALL BE USED FOR BELOW <br />GRADE INSTALLATIONS. MC CABLE SHALL BE ALLOWED MEN <br />APPROVED BY TENANT AND LANDLORD AND IT SHALL BE INSTALLED <br />AS PER ARTICLE 330 OF THE NEC, NO BX CABLE ALLOWED. INSTALL <br />EXPANSION FITTINGS IN RACEWAYS EVERY 200' LINEAR RUN OR <br />WHEREVER STRUCTURAL EXPANSION JOINTS ARE CROSSED. <br />FOR MEDICAL, DENTAL AND SIMILAR OFFICES AS DEFINED BY NEC <br />ARTICLE 517, NO NON-METALIC RACEWAYS SHALL BE USED ANYWHERE <br />AND ONLY MC CABLE LISTED FOR HEALTHCARE USE MAY BE USED FOR <br />RECEPTACLE CIRCUITS, FIXED EQUIPMENT CIRCUITS, SWTCH LEGS AND <br />LIGHT FIXTURE MIPS. <br />B. PROVIDE PULL STRING IN ALL EMPTY CONDUITS. <br />C. FINAL CONNECTIONS TO MOTORS OR EQUIPMENT SUBJECT TO <br />VIBRATION SHALL BE MADE UP WTH GREENFIELD IN DRY LOCATIONS <br />AND WTH JACKETED, LIQUID -TIGHT, FLEXIBLE, GALVANIZED STEEL <br />CONDUIT IN WET OR DAMP LOCATIONS. <br />D. CONDUCTORS: FEEDER AND BRANCH CIRCUIT CONDUCTORS SHALL BE <br />THWN-2 COPPER (MINIMUM SIZE #12 UNLESS OTHERWSE NOTED). PER <br />NEC 110.14 (c)(1)(a)Ab) CONDUCTOR AMPACITY BASED ON 60*C <br />COLUMN FOR CIRCUITS RATED 100 AMPS OR LESS, OR #1 AWG OR <br />LESS CONDUCTORS AND 75*C COLUMN FOR CIRCUITS RATED OVER 100 <br />AMPS, OR LARGER THAN #1 AWG CONDUCTORS PER TABLE NEC <br />310.15(B)(16). NO ALUMINUM SHALL BE PERMITTED UNLESS <br />SPECIFICALLY NOTED OTHERNSE. INSTALL ALL WRING IN CONDUIT OR <br />APPROVED RACEWAYS UNLESS OTHERWSE INDICATED. PROVIDE #10 <br />AWG FOR BRANCH CIRCUITS OVER 100 FEET IN LENGTH TO ACCOUNT <br />FOR VOLTAGE DROP. PROVIDE #10 GROUND TO CORRESPOND. ALL <br />BRANCH CIRCUITS SHALL CARRY AN EQUIPMENT GROUNDING <br />CONDUCTOR, AND BE WIRED WTH COLOR -CODED WIRE WTH SAME <br />COLOR USED FOR A PHASE THROUGHOUT. COLOR -CODE SHALL BE AS <br />FOH OWS: <br />120/208 VOLT - <br />PHASE A - BLACK <br />PHASE 8 - RED <br />PHASE C - BLUE <br />NEUTRAL - WHITE <br />GROUND - GREEN. <br />PUSH -IN WIRE CONNECTORS ARE NOT PERMITTED. <br />E. LOCATE ALL DEVICES AND EQUIPMENT MERE SHOYM ON DRAWNGS. ALL <br />DIMENSIONS SHOINN ON THE DRAWNGS ARE FROM FINISHED FLOOR TO THE <br />CENTER OF THE DEVICE UNLESS OTHERWSE INDICATED. STANDARD <br />MOUNTING HEIGHTS ARE AS FOLLOWS: <br />DEVICES HEIGHT AFF AT DEVICE CENTER <br />ELECTRICAL OUTLETS 18, <br />ELECTRICAL OUTLETS ABOVE COUNTER 42" <br />TELEPHONE 18w <br />WALL TELEPHONE 46" <br />LIGHT SWTCHES 42" <br />FIRE ALARM DEVICES 80" TO BOTTOM OF GLASS <br />EXIT SIGNS AS NECESSARY <br />SPECIAL DEVICES AS NECESSARY <br />NOTE: ELECTRICAL CONTRACTOR SHALL FIELD VERIFY AND COORDINATE WTH <br />PROJECT SUPERINTENDENT FOR OVER COUNTER OUTLETS MOUNTING <br />HEIGHT AND DIREC11ON (VERTICAL OR HORIZONTAL) PRIOR TO ROUGH -IN. <br />F. DISCONNECT SWTCHES: HEAVY DUTY, FUSED OR NON -FUSED AS CALLED <br />FOR ON DRAWNGS. PROVIDE SOLID NEUTRAL CONNEC11ON MERE <br />REQUIRED. USE NEMA-1 INDOORS AND NEMA-3R OUTDOORS. ALL <br />DISCONNECT SWTCHES SHALL BE PROVIDED NTH GROUND KIT. <br />G. PROVIDE PANELBOARDS OF THE DEAD FRONT TYPE, NO LESS THAN 20 <br />INCHES WDE AND 5 3/4 INCHES DEEP WTH QUANTITY OF BRANCH <br />CIRCUITS/CIRCUIT BREAKERS AS INDICATED ON THE PANELBOARD <br />SCHEDULE NTH THE VOLTAGE, PHASE AND AMPERE RATING AS REQUIRED. <br />ALL PANELBOARDS SHALL HAVE PHASE SEQUENCE CIRCUITS AND BOLT -ON <br />CIRCUIT BREAKERS. MAIN BREAKERS SHALL BE MOLDED CASE. CIRCUIT <br />BREAKERS FEEDING HVAC LOADS SHALL BE HACR TYPE THAT SERVE AS <br />DISCONNECTING MEANS FOR EQUIPMENT SHALL BE PROVIDED WTH <br />PERMANENTLY INSTALLED LOCK -OFF KIT. TYPEWRITTEN PANEL DIRECTORIES <br />SHALL BE PROVIDED AT COMPLETION OF THE PROJECT. <br />H. ELECTRICAL CONTRACTOR SHALL REVIEW ONE LINE POWER RISER DIAGRAM <br />IN CONJUNCTION NTH SWTCHGEAR MANUFACTURER REPRESENTATIVE TO <br />CROSS REFERENCE POWER RISER WTH PANEL SCHEDULES AND VERIFY <br />VOLTAGES, AMPS, LUGS SIZES/NUMBER AND CABINETS DIMENSIONS PRIOR <br />TO SUBMITTING A BID. <br />1. EXERCISE CARE IN CONNECTING THE VARIOUS ELECTRICAL LOADS TO THE <br />PANELS IN ORDER TO ARRIVE AT A REASONABLE BALANCE BETWEEN <br />LOADS IN EACH PHASE AT EACH PANEL MAKE TESTS AND ADJUST <br />LOADS AT EACH PANEL TO RESULT IN REASONABLY BALANCED LOAD <br />CONDITION. SATISFACTORY TO THE U11LITY COMPANY. ENGINEER, OYMER <br />AND INSPECTION AGENCIES. DOCUMENT ALL SAID LOAD ADJUSTMENTS. <br />J. MANUFACTURERS: BASE OF DESIGN IS SQUARE D, EQUAL PRODUCTS BY <br />GENERAL ELECTRIC, SIEMENS OR CUTLER HAMMER WLL BE CONSIDERED. <br />K. MATERIALS SHALL BE NEW AND UNUSED AND THE CATALOGUED PRODUCTS <br />OF MANUFACTURERS REGULARLY ENGAGED IN THE PRODUCTION OF SUCH <br />MATERIALS. THE MATERIALS SHALL BE OF THE MANUFACTURER'S LATEST <br />STANDARD DESIGN THAT COMPLIES WTH THE SPECIFICATION REQUIREMENTS. <br />ALL MATERIALS SHALL BE PROVIDED WTH UL LABELS. <br />M. LIGHTING <br />M.1. LIGHTING FIXTURES SHALL BE AS SHOYM ON THE DRAWNG AND SHALL <br />BE FURNISHED WTH LAMPS INSTALIfD. <br />M.2. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING <br />CEILING TYPES PRIOR TO ORDERING LIGHT FIXTURES. <br />M.3. LIGHT FIXTURES SHALL BE SUPPORTED NTH #12 GAUGE WRE FROM <br />BUILDING STRUCTURE AND NOT FROM CEILING GRID. SECURE TWO <br />OPPOSITE CORNERS TO STRUCTURE. <br />M.4. LUMINAIRES MUST NOT BE INSTALLED LESS THAN 1 2/2 INCHES <br />BELOW METAL ROOF DECKING. <br />N. ALL GROUNDING SHALL CONFORM TO ARTICLE 250 OF THE NEC <br />REQUIREMENTS. IN ADDITION THERETO AS IMPOSED BY THE DRAWNGS AND <br />THE LOCAL CODE ENFORCEMENT AUTHORITIES HAVING JURISDICTION. <br />0. SUBMITTALS: SUBMIT ELECTRONIC SUBMITTALS VIA E-MAIL FORMATTED AS <br />PDF FILE. <br />P. CONDUIT PENETRATIONS THROUGH FIRE RATED PARTITIONS SHALL BE <br />SEALED USING AN UL APPROVED SYSTEM. REFER TO ARCHITECTURAL <br />FLOOR PLAN FOR LOCA11ON OF FIRE RATED PARTITIONS. PROVIDE <br />ACOUSTICAL FOAM SEALANT AT ALL DEVICES ON DEMISING PARTITIONS. IF <br />PARTITION IS FIRE RATED, PROVIDE FIREPROOF COMPOUND ON BACK AND <br />SIDES OF THE BOX. MERE TELEPHONE AND ELECTRICAL OUTLETS APPEAR <br />ON PLANS AS BACK TO BACK, OUTLETS SHALL BE STAGGERED TO REDUCE <br />NOISE TRANSMISSION. WERE WALLS AND PARTITIONS ARE REQUIRED TO <br />HAVE A MINIMUM OF 1-HOUR FIRE -RESISTANCE RATING, BOXES SHALL BE <br />SEPARATED BY A MINIMUM HORIZONTAL DISTANCE OF 24 INCHES OR <br />PROTECTED WTH UL LISTED PUTTY PADS. <br />Q. ELECTRICAL CONTRACTOR SHALL REVIEW THE ARCHITECTURAL DRAWNGS <br />FOR DEVICES EXACT LOCATIONS, MOUNTING HEIGHTS AND QUANTITIES <br />PRIOR TO BID AND PRIOR TO ROUGH -IN. NOTIFY THE ENGINEER <br />IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND. <br />R. REVIEW AND COORDINATE WTH MECHANICAL CONTRACTOR DRAWNGS FOR <br />EQUIPMENT, CONDUIT, DEVICES, ETC. REQUIRED FOR A COMPLETE AND <br />OPERATING HVAC SYSTEM. LOW VOLTAGE CONTROL WRING FURNISHED AND <br />INSTALLED BY DIVISION 15. CHECK ALL MOTORS AND ROTATING EQUIPMENT <br />FOR PROPER ROTATION. <br />S. FINAL QUANTITY OF EXIT AND EMERGENCY LIGHTS TO BE DETERMINED BY <br />FIRE MARSHALL INCLUDE CONTINGENCY FOR 6 ADDITIONAL EXIT LIGHTS AND <br />6 ADDITIONAL EMERGENCY LIGHTS IN BASE BID. <br />T. PROVIDE BACK BOXES AND RACEWAY FOR DOOR ACCESS CARD READERS <br />AND ELECTRIC STRIKES AS PER SECURITY CONTRACTOR DIRECTIONS. <br />PROVIDE 120VAC TO EACH ELECTRIC STRIKE DOOR LOCATION AND TO <br />ACCESS CONTROL SYSTEM PANEL ACCESS CONTROL SYSTEM MUST <br />DEACTIVATE OR OPEN ANY DOOR LOCKING MECHANISM AND REMAIN IN <br />FAIL SAFE POSITION WHENEVER FIRE ALARM SYSTEM IS ACTIVATED OR <br />BUILDING POWER FAILS. PROVIDE "PUSH-TO-EXIr PUSHBUTTON AND <br />MOTION DETECTOR AT EACH ACCESS DOOR LOCATION. INTERLOCK NTH <br />FIRE ALARM SYSTEM. ANY CARD READERS PREVENTING FREE EGRESS <br />SHALL BE IN ACCORDANCE NTH SECTION 1010.1.9.9 OF CHAPTER 10 OF <br />THE FLORIDA BUILDING CODE. <br />U. ELECTRICAL CONTRACTOR MAY COMBINE CIRCUITS IN A COMMON RACEWAY <br />AS LONG AS CONDUCTORS ARE DERATED AS PER NEC TABLE 310-15. <br />SHARED NEUTRAL SHALL NOT BE ALLOWED UNLESS OTHERNSE INDICATED. <br />CIRCUITS SHARING A COMMON NEUTRAL MUST HAVE COMMON TRIP CIRCUIT <br />BREAKERS TO ALLOW ALL TO BE TURNED OFF SIMULTANEOUSLY, AS PER <br />NEC 210.4(B). <br />V. ELECTRICAL CONTRACTOR SHALL INCLUDE CORE DRILLING, CUTTING AND <br />PATCHING FOR THE INSTALLATION OF HIS/HER WORK WTHIN BASE BID. <br />W. CLEAN ALL NEW AND EXISTING LIGHT FIXTURES, LAMPS AND LENSES AND <br />PANELBOARD INTERIORS PRIOR TO FINAL ACCEPTANCE. <br />X. PROVIDE DISK FILE ON CAD 2015 OR NEWER RELEASE WTH ACCURATE <br />ELECTRICAL RECORD DRAWNGS AT THE COMPLETION OF THE PROJECT. <br />Y. CONTRACTOR REPRESENTS THAT HIS BID IS BASED UPON THE <br />MANUFACTURER'S MATERIALS AND EQUIPMENT DESCRIBED IN THE <br />CONTRACT DOCUMENTS. <br />Z. ELECTRICAL CONTRACTOR SHALL FILL UTILITY SERVICE INFORMATION LOAD <br />FORMS AND BUILDING DEPARTMENT ELECTRICAL PERMIT FORMS. <br />AA. ELECTRICAL CONTRACTOR SHALL INSTRUCT OWNER REPRESENTATIVE <br />REGARDING EQUIPMENT OPERA11ON AND MAINTENANCE AT COMPLETION OF <br />WORK. PROVIDE OWNER NTH ALL MANUALS PERTAINING TO THE PROJECT. <br />AB. LOW VOLTAGE CABLES FOR SECURITY SYSTEM, AV SYSTEM, TELEPHONE <br />SYSTEM AND DATA SYSTEM ARE NOT PART OF THIS ENGINEER'S SCOPE OF <br />WORK. ELECTRICAL CONTRACTOR SHALL COORDINATE NTH LOW VOLTAGE <br />VENDOR(S) FOR BOXES AND RACEWAYS LOCATIONS, SIZES AND ROUTING <br />PRIOR TO ROUGH -IN. <br />AC. MINIMUM EMERGENCY ILLUMINATION SHALL BE PROVIDED FOR A PERIOD OF <br />1 1/2 HOURS IN THE EVENT OF FAILURE OR NORMAL LIGHTING, WTHIN THE <br />WORK AREAS. EMERGENCY LIGHTING FACIU11ES SHALL BE ARRANGED TO <br />PROVIDE INITIAL ILLUMINATION THAT IS AT LEAST AN AVERAGE OF 1 <br />FOOTCANDLE (10 LUX) AND A MINIMUM AT ANY POINT OF 0.1 FOOTCANDLE <br />(1 LUX) MEASURED ALONG THE PATH OF EGRESS AT FLOOR LEVEL <br />'Elm, <br />ENERGY CONSERVAT'ION <br />CODE COMPLIANCE <br />1. THIS DESIGN COMPLIES WTH F.B.C. ENERGY CONSERVATION SEVENTH EDITION <br />(2020) CHAPTER 4, SECTION C405 FOR ELECTRICAL POWER AND LIGHTING <br />SYSTEMS. <br />2. THIS DESIGN COMPLIES WTH 7TH EDITION (2020) OF F.B.C. ENERGY CONSERVATION <br />CHAPTER 4 ARTICLE C405.5.3 FOR FEEDER AND BRANCH CIRCUIT VOLTAGE DROP. <br />3. WTHIN 30 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF <br />THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER, INCLUDING: <br />a. A SINGLE DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM AND <br />b. FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR ALL DISTRIBUTION. <br />(REF. FBC-EC C405.5.4.1 - 7TH EDITION). <br />4. AN OPERATING MANUAL AND MAINTENANCE MANUAL BE PROVIDED TO THE BUILDING <br />OWNER. THE MANUALS SHALL INCLUDE� AT A MINIMUM, THE FOLLOWNG. <br />a. SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH <br />PIECE OF EQUIPMENT REQUIRING MAINTENANCE. <br />b. OPERATION MANUALS AND MAINTENANCE MANUALS FOR EACH PIECE OF <br />EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS <br />SHALL BE CLEARLY IDENTIFIED. <br />c. NAMES AND ADDRESSES OF AT LEAST ONE QUALIFIED SERVICE AGENCY. <br />(REF: FBC-EC 405.5.4.2 - 7TH EDITION). <br />LIGHTING COMMISSIONING <br />LIGHTING SYSTEM FUNCTIONAL TESTING <br />CONTROLS FOR AUTOMATIC UGFITING SYSTEMS SHALL COMPLY WTH SECTION C408.3. <br />FUNCTIONAL TESTING <br />TESTING SHALL ENSURE THAT CONTROL HARDWARE AND SOFTWARE ARE CALIBRATED, <br />ADJUSTED, PROGRAMMED AND IN PROPER WORKING CONDIT10N IN ACCORDANCE WTH <br />THE CONSTRUCTION DOCUMENTS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br />FUNCTIONAL TESTING SHALL BE PERFORMED BY CONTRACTOR AND MANUFACTURER'S <br />REPRESENTATIVE IN THE PRESENCE OF THE CLIENT REPRESENTATIVE AT THE <br />COMPLETION OF THE PROJECT. SCHEDULE A SECOND TESTING WTH ONSIER <br />REPRESENTATIVE AFTER FACILITY HAS BEEN IN OPERATION FOR TWO OR THREE <br />MONTHS. MERE REQUIRED BY THE CODE OFFICIAL, AN APPROVED PARTY <br />INDEPENDENT FROM THE DESIGN OR CONSTRUCTION OF THE PROJECT SHALL BE <br />RESPONSIBLE FOR THE FUNCTIONAL TESTING AND SHALL PROVIDE DOCUMENTATION TO <br />THE CODE OFFICIAL CERTIFYING THAT THE INSTALLED LIGHTING CONTROLS MET THE <br />PROVISIONS OF SECTION C405. <br />FOR OCCUPANT SENSORS, TIME SWTCHES, PROGRAMMABLE SCHEDULE CONTROL <br />PHOTOSENSORS OR DAY LIGHTING CONTROLS THE FOLLOWNG PROCEDURES SHALL BE <br />PERFORMED. <br />1. CONFIRM THAT THE PLACEMENT, SENSITIVITY AND TIME-OUT ADJUSTMENTS FOR <br />OCCUPANT SENSORS YIELD ACCEPTABLE PERFORMANCE. <br />2. CONFIRM THAT THE TIME SWTCHES AND PROGRAMMABLE SCHEDULE CONTROLS <br />ARE PROGRAMMED TO TURN THE LIGHTS OFF. <br />3. CONFIRM THAT THE PLACEMENT AND SENSITIVITY ADJUSTMENTS FOR <br />PHOTOSENSOR CONTROLS REDUCE ELECTRIC LIGHT BASED ON THE AMOUNT OF <br />USABLE DAYLIGHT IN THE SPACE AS SPECIFIED. <br />EXISTING CONDITIONS GENERAL NOTES <br />1. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING <br />AND SITE AFFECTED BY THIS WORK BEFORE SUBMITTING PROPOSALS, <br />SO AS TO BECOME FAMILIAR WTH EXISTING CONDITIONS AND <br />DIFFICULTIES THAT WLL AFFECT EXECUTION OF THE WORK. <br />SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT <br />SUCH EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, <br />EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES <br />ENCOUNTERED WLL NOT BE RECOGNIZED. <br />2. ELECTRICAL CONTRACTOR SHALL TRACE LIGHTING AND POWER BRANCH <br />CIRCUITS TO IDENTIFY CIRCUITS SERVING AREA WTHIN SCOPE OF <br />WORK. PROVIDE UPDATED TYPEWRITTEN PANEL SCHEDULES AT <br />COMPLETION OF WORK. <br />3. DISCONNECT ELECTRICAL SYSTEMS IN WALLS, FLOORS AND CEILINGS TO <br />BE REMOVED. REMOVE EXISTING POWER, LIGHTING, SYSTEMS, MATERIAL <br />AND EQUIPMENT WHICH ARE MADE OBSOLETE OR MICH INTERFERE <br />WTH THE CONSTRUCTION OF THE PROJECT. <br />3.o. REINSTALL ANY SUCH POWER, LIGHTING, SYSTEMS, MATERIALS AND <br />EQUIPMENT MICH ARE REQUIRED TO REMAIN ACTIVE FOR THE <br />FACILITY TO BE FULLY FUNCTIONAL <br />4. EXISTING OUTLET BOXES AND CONDUIT MICH ARE LOCATED PROPERLY <br />FOR NEW WORK MAY BE REUSED FOR NEW DEVICES AND WRE. <br />5. ALL CONDUIT AND WIRE REMOVED SHALL BE TAKEN BACK TO THE <br />SOURCE OF SUPPLY. <br />6. ALL UNUSED RACEWAYS WTHIN ACCESSIBLE SPACES SHALL BE <br />COMPLETELY REMOVED. REMOVE ALSO ASSOCIATED CONDUCTORS, <br />JUNCTION BOXES, FASTENERS AND SUPPORTS. <br />7. REMOVE CONDUCTORS FROM EXISTING FLOOR BOXES BEING DEMOLISHED <br />TO SOURCE OF SUPPLY. PATCH SURFACES AS DIRECTED BY GENERAL <br />CONTRACTOR. <br />8. WHERE EXISTING EQUIPMENT OR MATERIALS ARE REMOVED OR <br />CHANGED, ALL BRANCH CONDUITS, MICH NO LONGER ARE IN SERVICE, <br />SHALL BE REMOVED AS DIRECTED BY THE ARCHITECT. IF, IN THE <br />COURSE OF THE WORK, OUTLETS ARE COVERED UP OR OTHERWSE <br />RENDERED INACCESSIBLE, ALL WRING TO SAME SHALL BE REMOVED TO <br />THE SOURCE. IF A CIRCUIT THAT MUST REMAIN IN SERVICE IS <br />INTERRUPTED THEREBY, IT SHALL BE RECONNECTED BY THE MOST <br />INCONSPICUOUS MEANS SO AS TO REMAIN OPERATIONAL, NTH SAME <br />CAPACITY AS BEFORE. ALL BUILDING SURFACES DAMAGED, AND <br />OPENINGS LEFT BY REMOVAL OF BOXES, PIPING OR OTHER EQUIPMENT <br />SHALL BE REPAIRED BY THE CONTRACTOR. ALL HOLES LEFT IN <br />JUNCTION BOXES, SWTCHES, PANELS, ETC. SHALL BE CLOSED. <br />9. MERE NEW OPENINGS ARE CUT AND CONCEALED CONDUITS, ETC., ARE <br />ENCOUNTERED, THEY SHALL BE REMOVED OR RELOCATED AS <br />REQUIRED. MERE CONDUIT TO BE REMOVED STUBS THROUGH FLOORS, <br />WALLS, AND CEILINGS, SUCH CONDUIT SHALL BE REMOVED TO THE <br />POINT MERE THE FINISH SURFACES CAN BE PATCHED ADEQUATELY <br />SO THAT NO EVIDENCE OF THE FORMER INSTALLATION REMAINS. <br />10. ALL REUSABLE DEVICES, FIXTURES AND EQUIPMENT SHALL BECOME THE <br />PROPERTY OF THE OWNER. ALL OTHER SALVAGE AND DEBRIS SHALL <br />BE REMOVED FROM THE PREMISES DAILY. <br />11. ABANDONED LOW VOLTAGE CABLES WTHIN CEILING SPACES SHALL BE <br />REMOVED AS PER ARTICLE 725.25 OF THE NFPA-70. <br />ELECTRICAL OUTLETS AND BOXES NOTES <br />1. AN OUTLET BOX OF THE APPROPRIATE SIZE AND TYPE SHALL BE PROVIDED <br />FOR ALL LIGHTING FIXTURES, SWTCHES, RECEPTACLES, ETC. <br />2. ALL SWITCHES AND RECEPTACLES SHALL BE SPECIFICATION GRADE 20A <br />MINIMUM UNLESS OTHERWSE NOTED. COORDINATE COLOR WTH ARCHITECT <br />PRIOR TO ORDERING. <br />3. ALL RECEPTACLES LOCATED OUTDOOR SHALL BE WEATHER RESISTANT. <br />COVERS SHALL BE "MILE -IN -USE" TYPE. COVER SHALL BE IDENTIFIED AND <br />LISTED AS "EXTRA-DUT'r. <br />4. PROVIDE 4 11/16"x 4 11/16"x 2 1/8' SQUARE BOX AND 1" CONDUIT <br />STUB -UP TO ACCESSIBLE CEILING FOR TELEPHONE AND DATA OUTLETS. <br />TERMINATE CONDUITS 6" ABOVE CEILING IN ACCESSIBLE SPACE WTH 90* <br />BEND INSULATED BUSHINGS AND PULL STRING. COORDINATE WTH TENANTS <br />DATA/TELEPHONE CONTRACTOR FOR FURTHER ELECTRICAL AND RACEWAYS <br />REQUIREMENTS PRIOR TO ROUGH -IN. CABLING BY OTHERS. <br />5. ALL JUNCTION BOX COVERS SHALL BE MARKED NTH PANEL, CIRCUIT <br />NUMBER AND VOLTAGE WTH PERMANENT BLACK MARKER. <br />6. JUNCTION BOXES SHALL NOT BE MOUNTED TO THE PARTITION TOP PLATE. <br />7. PROVIDE ACOUSTICAL FOAM AND SEALANT AT ALL DEVICES ON DEMISING <br />PARTITIONS. IF PARTITION IS FIRE RATED, PROVIDE FIREPROOF COMPOUND <br />ON BACK AND SIDES OF THE BOX. <br />8. MERE TELEPHONE AND ELECTRICAL OUTLETS APPEAR ON PLANS AS BACK <br />TO BACK, OUTLETS SHALL BE STAGGERED TO REDUCE NOISE TRANSMISSION. <br />WERE WALLS AND PARTITIONS ARE REQUIRED TO HAVE A MINIMUM OF <br />1-HOUR FIRE -RESISTANCE RATING, BOXES SHALL BE SEPARATED BY A <br />MINIMUM HORIZONTAL DISTANCE OF 24" INCHES OR PROTECTED NTH UL <br />LISTED PUTTY PADS. <br />9. GROUNDING OF RECEPTACLES AND FIXED EQUIPMENT IN PATIENT CARE <br />AREAS SHALL COMPLY WTH NEC ARTICLE 517,13 (A) AND (B). <br />10. GFC1 RECEPTACLES FOR ALL APPLIANCES MUST BE READILY ACCESSIBLE. IF <br />RECEPTACLE CANNOT BE MADE ACCESSIBLE, PROVIDE GFCl CIRCUIT <br />BREAKER. <br />WIRE SIZE REOUIRED FOR <br />BRANCH CIRCUITS AT LESS <br />THAN 3% VOLTAGE DROP <br />I FT <br />TO <br />50 FT <br />51 FT <br />m <br />75 FT <br />76 FT <br />TO <br />100 FT <br />101 FT <br />70 <br />125 FT <br />12SEFT <br />TO <br />I FT <br />151 FT <br />70 <br />200 FT <br />120V <br />20A <br />#12 <br />#10 <br />#8 <br />#13 <br />#6 <br />#6 <br />30A <br />110 <br />#B <br />#6 <br />#6 <br />#6 <br />#4 <br />40A <br />#B <br />#6 <br />#6 <br />#4 <br />#4 <br />#3 <br />F50A <br />#8 <br />0 <br />0 <br />0 <br />0 <br />9 <br />208V <br />10 <br />20A <br />f12 <br />#12 <br />#12 <br />#10 <br />#10 <br />#8 <br />30A <br />#10 <br />#10 <br />#10 <br />#8 <br />#8 <br />#6 <br />40A <br />#8 <br />#B <br />#B <br />#8 <br />#6 <br />#6 <br />50A <br />#B <br />#8 <br />#B <br />#6 <br />#6 <br />#4 <br />60A <br />#6 <br />#6 <br />#6 <br />#6 <br />#4 <br />#4 <br />70A <br />14 <br />#4 <br />#4 <br />14 <br />#4 <br />#3 <br />80A <br />#3 <br />#3 <br />#3 <br />#3 <br />#2 <br />#1 <br />90A <br />#2 <br />#2 <br />#2 <br />#2 <br />#2 <br />#1 <br />100A <br />#1 <br />#1 <br />#1 <br />#1 <br />NO <br />NO <br />208V <br />30 <br />I <br />20A <br />#12 <br />#12 <br />#12 <br />#10 <br />#10 <br />#8 <br />30A <br />#10 <br />#10 <br />#10 <br />#8 <br />#8 <br />#6 <br />40A <br />#8 <br />#8 <br />#8 <br />#8 <br />#6 <br />#6 <br />50A <br />#8 <br />#8 <br />#8 <br />#6 <br />#6 <br />#4 <br />60A <br />#6 <br />#6 <br />#6 <br />#6 <br />#6 <br />#4 <br />70A <br />#4 <br />14 <br />14 <br />J4 <br />f4 <br />#4 <br />80A <br />#3 <br />#3 <br />#3 <br />#3 <br />#2 <br />#1 <br />90A <br />#2 <br />#2 <br />#2 <br />J2 <br />#2 <br />#1 <br />100A <br />#1 <br />0 <br />#1 <br />#1 <br />#170-1 <br />#1/01 <br />CALCULATED USING COPPER WIRE AT 750 C. <br />TABLE ABOVE FOR REFERENCE ASSUMING FULLY RATED <br />CIRCUIT AT 80% OF AMPACITY. <br />NO MORE THAN 2% VOLTAGE DROP MAXIMUM FOR <br />FEEDERS. AS PER FBC ENERGY CONSERVATION, CHAPTER <br />4 ARTICLE C405.7.3.1. <br />NO MORE THAN 3% VOLTAGE DROP MAXIMUM FOR BRANCH <br />FEEDERS. AS PER FBC ENERGY CONSERVATION, CHAPTER <br />4 ARTICLE C405.7.3.2. <br />WERE UNGROUNDED CONDUCTORS ARE INCREASED IN <br />SIZE, EQUIPMENT GROUNDING CONDUCTORS SHALL BE <br />INCREASED IN SIZE PROPORTIONATELY ACCORDING TO THE <br />CIRCULAR MILL AREA OF THE UNGROUNDED CONDUCTORS. <br />ELECTRICAL SYMBOL LEGEND <br />(NOT ALL SYMBOLS USED ON THIS PROJECT) <br />RECESSED LUMINAIRE <br />EMERGENCY RECESSED LUMINAIRE. CONNECT AS 24-HOUR <br />NIGHTLIGHT UNLESS OTHERWSE NOTED. <br />0 rX) LED, INCANDESCENT, COMPACT FLUORESCENT FIXTURE - CEILING <br />MOUNTED, WALL MOUNTED <br />I& 4P EXIT SIGN FIXTURE, SHADED QUADRANT INDICATES FACE, WTH <br />ARROWS AS SHOWN ON PLAN - CEILING MOUNTED, WALL MOUNTED <br />$ $2 $3 $4 <br />H <br />sm smp sw <br />w 9 <br />19 <br />(000 <br />IG <br />GW ($G <br />oc <br />El [A <br />RN fm <br />we--% <br />121010 <br />=P cm mmj <br />1-POLE, 2-POLE, 3-WAY, 4-WAY SWTCH <br />DIMMER SWTCH, LUTRON, VERIFY LAMP TYPE <br />(LED/INCANDESCENT/FLUORESCENT) PRIOR TO ORDER <br />MANUAL MOTOR STARTER TOGGLE SWTCH AS NOTED; *P" <br />INDICATES PILOT LIGHT; -WP- INDICATES WEATHERPROOF <br />OCCUPANCY SENSORS <br />POWER PACK <br />DUPLEX RECEPTACLE AT 18-, ABOVE COUNTER AT 42% ISOLATED <br />GROUND TYPE <br />GROUND FAULT AT 42" TYPE SELF TESTING DUPLEX RECEPTACLE <br />CEILING MOUNTED DUPLEX RECEPTACLE <br />(2) DUPLEX RECEPTACLES IN SINGLE OUTLET BOX WTH <br />SINGLE COVER PLATE AT 18% ABOVE COUNTER AT 42- <br />TELEPHONE/DATA OUTLET, PROMDE 4 11/16"x 4 11/16"x 2 1/8" <br />SQUARE BOX AND 1" CONDUIT TO ACCESSIBLE CEILING. <br />CONFIRM WTH VENDOR PRIOR TO ROUGH -IN <br />SPECIAL RECEPTACLE, PUSHBUTTON AS NOTED, <br />TELEPOWER POLE <br />FLOOR MOUNTED DUPLEX RECEPTACLE, FLOOR MOUNTED <br />TELEPHONE/DATA OUTLET <br />FINAL CONNECTION TO EQUIPMENT <br />JUNCT10N BOXES, MOTOR CONNEC11ON <br />DISCONNECT SWTCH, STARTER OR CONTACTOR, <br />COMBINATION STARTER/DISCONNECT <br />120/208V PANELBOARD <br />277/480V PANELBOARD <br />TELEPHONE TERMINAL BOARD <br />ELECTRIC DOOR STRIKE/CARD READER <br />TV OUTLET, PROVIDE 4 11/16*x 4 11/16"x 2 1/8" <br />SQUARE BOX AND 1* CONDUIT TO ACCESSIBLE CEILING. <br />COORDINATE MOUNTING HEIGHT PRIOR TO ROUGH -IN. <br />BRANCH CIRCUIT CONDUIT CONCEALED ABOVE CEILING OR IN <br />WALL, SLASH MARKS INDICATE NUMBER OF CONDUCTORS, <br />LONGER SLASH IS NEUTRAL, (GROUND WIRE NOT SHOWN); <br />2 #12 - 1 #12 GROUND MINIMUM (UNLESS OTHERWSE NOTED <br />OR MARKED); LONGER SLASH WTH HATCH MARK INDICATES <br />ISOLATED GROUND. ISOLATED GROUND CONDUCTOR SHALL BE <br />GREEN WTH A YELLOW STRIPE. QUANTITY OF ARROWS <br />INDICATE QUANTITY OF HOMERUNS TO PANELBOARD. <br />PROVIDE EQUIPMENT GROUNDING CONDUCTOR IN ALL BRANCH <br />CIRCUITS. CIRCUITS SHARING A COMMON NEUTRAL MUST HAVE <br />A COMMON TIE HANDLE ON THE CIRCUIT BREAKERS TO <br />ALLOW ALL TO BE TURNED OFF SIMULTANEOUSLY. <br />BRANCH CIRCUIT CONDUIT CONCEALED BELOW SLAB OR <br />UNDERGROUND. CIRCUITS SHARING A COMMON NEUTRAL MUST <br />HAVE A COMMON TIE HANDLE ON THE CIRCUIT BREAKERS TO <br />ALLOW ALL TO BE TURNED OFF SIMULTANEOUSLY. <br />SUBSCRIPT LEGEND <br />E EXISTING DEVICE/UGHT AND ASSOCIATED CIRCUIT WRING TO REMAIN. PROVIDE <br />ALL NECESSARY EXTENSION OF CONDUIT AND WRING AS REQUIRED, IN ORDER <br />TO MAINTAIN CIRCUIT CONTINUITY TO EXISTING EQUIPMENT TO REMAIN. <br />ERL EXISTING DEVICE/LIGHT TO BE RELOCATED. JUNCTION AND EXTEND EXISTING <br />CONDUIT AND WRING TO NEW LOCATION AS REQUIRED. <br />RL NEW LOCATION OF EXISTING DEVICEAIGHT. PROVIDE EXTENSION OF EXISTING <br />CONDUIT AND WRING AS REQUIRED. (PROVIDE NEW SWTCHING AS INDICATED) <br />R EXISTING DEVICE/LICNT TO BE REMOVED. MERE EXISTING EQUIPMENT TO <br />REMAIN IS FED VIA EXISTING EQUIPMENT TO BE REMOVED, PROVIDE ALL <br />NECESSARY EXTENSION OF CONDUIT AND WRING AS REQUIRED IN ORDER TO <br />MAINTAIN CIRCUIT CONTINUITY TO EXISTING EQUIPMENT. <br />N DEVICE/UGHT TO MATCH EXISTING BUILDING STANDARDS. <br />f9REF9GHTERS RADIO NOTE <br />BASE BID: <br />CONTRACTOR SHALL PROCURE THE SERVICES OF A THIRD PARTY VENDOR <br />TO TEST THE PUBLIC SAFETY RF RADIO COVERAGE, WTHIN THE PROJECT <br />SCOPE OF WORK, AND DETERMINE WHETHER A NEW DAS SYSTEM IS <br />REQUIRED PER FLORIDA FIRE PREVENTION CODE 7TH EDITION CHAPTER 11 <br />SECTION 11.10.1 AND NFPA 72 2016 EDITION CHAPTER 24 SECTION 24.9. <br />CONTRACTOR SHALL SUBMIT TEST REPORTS AND RECOMMENDATIONS TO <br />THE FIRE MARSHALL AS REQUESTED BY BUILDING PERMIT COMMENTS. <br />BID ALIERNAIE: <br />CONTRACTOR TO PROVIDE PRICING FOR A COMPLETE IN-BULDING RF RADIO <br />COVERAGE SYSTEM FOR THE PUBLIC SAFETY RADIO AS SET FORTH IN <br />FLORIDA FIRE PREVENTION CODE 7TH EDITION CHAPTER 11 SECTION 11.10.1 <br />AND NFPA 72 2016 ED11ION CHAPTER 24 SECTION 24.9 AND SHALL BE <br />VERIFIED AS COMPLIANT PER THE CODES ABOVE AND THE AHJ. THE <br />SYSTEM SHALL BE INSTALLED BY A TURN -KEY FIRM SPECIALIZING IN THE <br />TRADE, TO INCLUDE NECESSARY SHOP DRAWNGS, FREQUENCY ENHANCING <br />EQUIPMENT, INSTALLATION, TESTING, AND MONITORING TO SATISFY CODE <br />AND AHJ REQUIREMENTS. CHANGE ORDERS FOR ADDITIONAL EQUIPMENT <br />SHALL NOT BE PERMITTED. CONTRACTOR PROVIDING THIS PRICING SHALL <br />BE INDEPENDENT OF THE THIRD PARTY VENDOR THAT PERFORMED THE <br />PUBLIC SAFETY RADIO TEST AS PART OF BASE BID. <br />MEP CONSULTING <br />ENGINEERS <br />SINCE 1977 <br />FL REG NO. 3089 <br />2016 ALDEN RD. <br />ORLANDO, FL <br />32803 <br />(407) 246-1688 <br />WWW.PEIFLA.COM <br />PEI PROIECT it <br />22121 <br />CAMPBELL + VAN DUSEN <br />IIARCH IT ECTU RE IIN_E�IQF DE31ro-N <br />www.CVDstudio.com <br />CAMPBELL + VAN DUSEN Design Studio, LLC. <br />255 South Orange Avenue Suite # 1240 <br />Orlando, Florida 32801 <br />Phone: 407.930.6016 <br />FL. Lic. No. AA26003339 <br />ARCHITECT OF RECORD <br />FRANK W. CAMPBELL AIA <br />FL LIC NO. AROO 16053 <br />COPY OF THIS PLAN IS NOT VALID UNLESS SIGNED, <br />SEALED AND DATED BY THE ARCHITECT OF RECORD <br />I I 111111,f <br />�PA)V <br />C, <br />S N S 4,., % op <br />4Z- <br />\V <br />z C, a 140. SAIlro-w % <br />CC <br />sTxTS OF <br />'P % PL ovkO.*6 <br />C2 <br />%% <br />Bryan G. Spangler, PE, <br />FL Reg. No. 64601 <br />COPY OF THIS PLAN IS NOT VALID UNLESS SIGNED, <br />SEALED AND DATED BY THE ENGINEER OF RECORD <br />-1 <br />LL_ <br />(/i <br />_j <br />CL <br />LLJ <br />U <br />< <br />C/) <br />LU <br />LLJ <br />> <br />_j <br />0 <br />CIO <br />+ <br />L0 <br />-'0 <br />0e <br />< <br />LU <br />LU <br />0 <br />> <br />-0 1- <br />C) <br />Lu <br />'0 Lo <br />w <br />< <br />3: <br />or-11) lcyt)l <br />CL <br />rL_U_4 <br />CONSTRUCTION DOCUMENTS <br />03.24.2023 <br />00 <br />PRINCIPAL IN CHARGE <br />F. CAMPBELL <br />. .................................................................. <br />PROJECT MANAGER <br />M. TORRES <br />.................................................................... <br />ADVENT HEALTH <br />WELL 65+ <br />ZEPHYRHILLS <br />22-0328-01 <br />ELECTRICAL <br />SPECIFICATIONS <br />El I <br />