PAIIENT CARE AFF-A 8YMBOL LEGEND
<br />40GENERAL CARE - CATEGORY 2
<br />NOTES:
<br />1. THERE ARE NO CRITICAL OR WET PATIENT AREAS IN THE SCOPE OF
<br />WORK.
<br />2. GENERAL PATIENT CARE AREAS REQUIRE A WRING METHOD WTH A
<br />REDUNDANT GROUND AS PER ARTICLE 517.13 OF THE NEC.
<br />GROUNDING 0 FALL RECEPTACLES, LIGHTING AND FIXED EQUIPMENT IN
<br />PATIENT CARE AREAS SHALL COMPLY WITH NEC ARTICLE 517.13 (A)
<br />AND (B)
<br />TESTING, INSPECTIONS -
<br />AND CERTIFICATIONS. -
<br />A. EQUIPOTENTIAL GROUNDING TEST FOR PATIENT CARE AREAS
<br />NFPA 99, 2018 EDITION, SECTION 6.3.3 REQUIRES TESTING OF NEW CONSTRUCTION
<br />AND EXISTING CONSTRUCTION AND REPEATED MEN MAJOR RENOVATIONS OCCUR.
<br />MOST EXISTING FACILITIES HAVE NO RECORDS OF EXIS11NG CONDITIONS, HOWEVER,
<br />LOGS SHOULD BE CHECKED ANNUALLY BY AHCA. THEREFORE, ALL PATIENT AREAS
<br />WITHIN ANY SCOPE OF WORK WILL NEED TO BE TESTED BY THE CONTRACTOR. (ALSO
<br />SEE NEC 517-13, 14 & 16).
<br />B. WHAT NEEDS TO BE TESTED? ONLY METAL CONDUCTIVE SURFACES LIKELY TO BECOME
<br />ENERGIZED WITHIN THE PATIENT VICINITY. PATIENT VICINITY IS DEFINED AS:
<br />1. AN AREA WHERE PATIENTS ARE NORMALLY CARED FOR.
<br />2. THE SPACE WITH SURFACES LIKELY TO BE CONTACTED BY PATIENT OR ATTENDANT
<br />TOUCHING THE PATIENT. (BEDS, HEADWALLS, A/C UNITS, SINK, TRIM, ETC.)
<br />3. IN A PATIENT ROOM BASICALLY THE ENTIRE ROOM INCLUDING TOILET/SHOWER ROOM.
<br />PATIENTS SHOULD BE IN WHEELCHAIRS OR SITTING IN CHAIRS.
<br />- 69-0m - 69-0"
<br />PATIENT BED
<br />30-15"
<br />6*-Ow
<br />71-60 VERTICALLI
<br />I I ABOVE FLOOR
<br />TYPICAL PATIENT ROOM
<br />. PATIENT VICINITY DISTANCES
<br />C. GROUND TEST DOES NOT INCLUDE:
<br />1. SMALL WALL MOUNTED CONDUCTIVE SURFACES, TOWEL AND SOAP DISPENSERS,
<br />MIRRORS, BED PANS, ETC.
<br />2. LARGE METAL SURFACES NOT LIKELY TO BECOME ENERGIZED, WINDOW FRAMES, DOOR
<br />FRAMES, FLOOR DRAINS AND MOVABLE CABINETS.
<br />D. TEST METHOD:
<br />1. BOTH VOLTAGE AND IMPEDANCE MEASUREMENTS MUST BE MADE.
<br />2. ALL MEASUREMENTS MUST BE TAKEN TO A REFERENCE POINT OR IN NEAR AREA
<br />BEING TESTED.
<br />0. GROUND BAR IN A PANEL SERVING AN AREA.
<br />b. GROUND JACK IF ONE EXISTING.
<br />c BUS.
<br />d. AN ALL METAL COLD WATER PIPE.
<br />e. BE CAREFUL OF WASTE PIPE OR SPRINKLER PIPE BECAUSE OF NO -HUB AND
<br />VITAULIC FITTINGS.
<br />f. GROUNDING CONTACT OR A RECEPTACLE THAT IS POWERED FROM A DIFFERENT
<br />CIRCUIT FROM THE RECEPTACLE UNDER TEST.
<br />3. VOLTAGE MEASUREMENTS ARE TO BE MADE BETWEEN REFERENCE POINT AND
<br />APPROPRIATE CONDUCTIVE SURFACES INCLUDING RECEPTACLE GROUND CONTACTS.
<br />4. IMPEDANCE MEASUREMENTS ARE TO BE MADE ONLY BETWEEN REFERENCE POINT AND
<br />E. REQUIRED RESULTS:
<br />1. NEW/EXISTING CONSTRUCTION
<br />0. VOLTAGE - MAXIMUM 20MV +/-20% (24 TO 20MV)
<br />b. IMPEDANCE - MAXIMUM 0.1 OHM +/-20% (0.12 TO 0.1 OHM)
<br />C* IMPEDANCE (ISOLATED GROUND) - MAXIMUM 0.2 OHM +/- 20% (0.28 TO 0.12 OHM)
<br />F * GENERAL COMMENTS:
<br />1. THE IMPEDANCE MEASUREMENTS FOR NEW AND EXISTING CONSTRUCTION SHALL BE
<br />THE RATIO OF 60HZ VOLTAGE DEVELOPED BETWEEN A POINT UNDER TEST AND A
<br />REFERENCE POINT TO 60HZ CURRENT APPLIED TO THE POINT UNDER TEST. IF
<br />EXISTING CONSTRUCTION 60HZ OR DC MAY BE USED, AND THE TEST MUST NOT
<br />ENDANGER PATIENT.
<br />2. ALSO, TESTS MUST INCLUDE CORRECT POLARITY OF HOT AND NEUTRAL AND
<br />GROUNDING BLADE RETENTION FORCE (40Z. MIN.)
<br />G. TEST EQUIPMENT:
<br />- 1. USE A MILLIVOLT METER DESIGNED FOR THIS PURPOSE WITH 1 K OHM INPUT
<br />RESISTANCE (+/-10%) AT FREQUENCIES OF 1000HZ OR LESS.
<br />2. USE A HIGH Z MV METER NTH EXTERNAL FREQUENCY SHAPING NETWORK.
<br />. 3. RECEPTACLE POLARITY TESTER.
<br />. 4. RETENTION FORCE TESTER OR MANUFACTURER'S DATA VERIFYING COMPLIANCE
<br />THROUGH U.L, NEMA OR OTHER TESTS.
<br />.
<br />EXISTING CONDMONS GENERAL NOTES
<br />1. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING
<br />AND SITE AFFECTED BY THIS WORK BEFORE SUBMITTING PROPOSALS,
<br />SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND
<br />DIFFICULTIES THAT WILL AFFECT EXECUTION OF THE WORK.
<br />SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT
<br />SUCH EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR,
<br />EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES
<br />ENCOUNTERED WILL NOT BE RECOGNIZED.
<br />2. ELECTRICAL CONTRACTOR SHALL TRACE LIGHTING AND POWER BRANCH
<br />CIRCUITS TO IDENTIFY CIRCUITS SERVING AREA WITHIN SCOPE OF
<br />WORK. PROVIDE UPDATED TYPEWRITTEN PANEL SCHEDULES AT
<br />COMPLETION OF WORK.
<br />3. DISCONNECT ELECTRICAL SYSTEMS IN WALLS, FLOORS AND CEILINGS TO
<br />BE REMOVED. REMOVE EXISTING POWER, LIGHTING, SYSTEMS, MATERIAL
<br />AND EQUIPMENT MICH ARE MADE OBSOLETE OR WHICH INTERFERE
<br />NTH THE CONSTRUCTION OF THE PROJECT.
<br />3.a. REINSTALL ANY SUCH POWER, LIGHTING, SYSTEMS, MATERIALS AND
<br />EQUIPMENT MICH ARE REQUIRED TO REMAIN AC71VE FOR THE
<br />FACILITY TO BE FULLY FUNCTIONAL
<br />4. EXISTING OUTLET BOXES AND CONDUIT MICH ARE LOCATED PROPERLY
<br />FOR NEW WORK MAY BE REUSED FOR NEW DEVICES AND WIRE.
<br />.
<br />5. ALL CONDUIT AND WIRE REMOVED SHALL BE TAKEN BACK TO THE
<br />SOURCE OF SUPPLY.
<br />-
<br />6. ALL UNUSED RACEWAYS WITHIN ACCESSIBLE SPACES SHALL BE
<br />COMPLETELY REMOVED. REMOVE ALSO ASSOCIATED CONDUCTORS,
<br />JUNCTION BOXES, FASTENERS AND SUPPORTS.
<br />7. REMOVE CONDUCTORS FROM EXISTING FLOOR BOXES BEING DEMOLISHED
<br />ATCH SURFACES AS DIRECTED BY GENERAL
<br />CONTRACTOR.
<br />. 8. WHERE EXISTING EQUIPMENT OR MATERIALS ARE REMOVED OR
<br />CHANGED, ALL BRANCH CONDUITS, WHICH NO LONGER ARE IN SERVICE,
<br />SHALL BE REMOVED AS DIRECTED BY THE ARCHITECT. IF, IN THE
<br />�
<br />COURSE OF THE WORK, OUTLETS ARE COVERED UP OR OTHERWISE
<br />RENDERED INACCESSIBLE, ALL WRING TO SAME SHALL BE REMOVED TO
<br />THE SOURCE. IF A CIRCUIT THAT MUST REMAIN IN SERVICE IS
<br />INTERRUPTED THEREBY, IT SHALL BE RECONNECTED BY THE MOST
<br />INCONSPICUOUS MEANS SO AS TO REMAIN OPERATIONAL, NTH SAME
<br />CAPACITY AS BEFORE. ALL BUILDING SURFACES DAMAGED, AND
<br />OPENINGS LEFT BY REMOVAL OF BOXES, PIPING OR OTHER EQUIPMENT
<br />SHALL BE REPAIRED BY THE CONTRACTOR. ALL HOLES LEFT IN
<br />JUNCTION BOXES, SWITCHES, PANELS, ETC. SHALL BE CLOSED.
<br />9. WHERE NEW OPENINGS ARE CUT AND CONCEALED CONDUITS, ETC., ARE
<br />ENCOUNTERED, THEY SHALL BE REMOVED OR RELOCATED AS
<br />REQUIRED. MERE CONDUIT TO BE REMOVED STUBS THROUGH FLOORS,
<br />WALLS, AND CEILINGS, SUCH CONDUIT SHALL BE REMOVED TO THE
<br />POINT WHERE THE FINISH SURFACES CAN BE PATCHED ADEQUATELY
<br />SO THAT NO EVIDENCE OF THE FORMER INSTALLATION REMAINS.
<br />10. ALL REUSABLE DEVICES, FIXTURES AND EQUIPMENT SHALL BECOME THE
<br />PROPERTY OF THE OWNER. ALL OTHER SALVAGE AND DEBRIS SHALL
<br />BE REMOVED FROM THE PREMISES DAILY.
<br />11. ABANDONED LOW VOLTAGE CABLES WITHIN CEILING SPACES SHALL BE
<br />REMOVED AS PER ARTICLE 725.25 OF THE NFPA-70.
<br />- :�;�:7_1114=;'._Ibl�__7� 0,0 � --'OIC1711(0�: =': 1:1 =-:
<br />0- 0 0 - I '111=;.- 1; "I �0.1 'OF_-1 m -_-'� - =
<br />,
<br />- " I
<br />I , :' 0 i'l�l-o,,;§;I;,,O;I"t,v,IZ-14-'=i�V-111�Z ��
<br />- , , - ' - =
<br />' 'F'P
<br />0,11-1 . -, OF
<br />" -1 0 111111111;� = 7. =; m f0j =*1' im, 7 = � I
<br />:' 1= 1j: ,-Pkbltzil�--�'�vllfOk-7-1:fALOII.0,7.;Wi=lq b I 0 I -,:I,
<br />I
<br />D � - ;' D" 0 F-A I =1 *'fffei fi;' =W�11' ;� -- V -- 01 I rill
<br />."m "�:' -1�k -0, � w --g -
<br />I , D_ �:!&_' _I'Afe:� _'FA=�_-
<br />� & 0"w A"
<br />ELECTRICAL SPECIFICAMONS
<br />GENERAL PROMSIONS
<br />A. PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT FOR A COMPLETE
<br />ATING ELECTRICAL SYSTEM. INCLUDE NECESSARY
<br />FEES AND PERMITS WITHIN BASE BID.
<br />ARCHITECTURAL, MECHANICAL, PLUMBING AND FIRE PROTECTION
<br />WI DERED PART OF THESE CONSTRUCTION
<br />DINATION, EQUIPMENT CONNECTION, HEIGHTS
<br />AND LOCATIONS.
<br />B. CODES AND STANDARDS: ALL ELECTRICAL WORK SHALL BE IN STRICT
<br />COMPLIANCE NTH THE PROVISIONS OF THE LOCAL GOVERNMENT
<br />AUTHORITY, THE NATIONAL ELECTRIC CODE 2017 EDITION; SEVENTH
<br />EDITION (2020) FLORIDA BUILDING CODE, THE FLORIDA FIRE
<br />PREVENTION CODE 2020 EDITION, NATIONAL FIRE ALARM CODE NFPA
<br />72 2016 EDITION AND THE CODES AND STANDARDS REFERENCED
<br />THEREIN. ALL MATERIALS SHALL BE NEW AND FREE FROM DEFECTS,
<br />AND SHALL BEAR THE UNDERWRITER'S LABEL
<br />C. CONTRACTOR SHALL THOROUGHLY INVESTIGATE SITE BEFORE BIDDING.
<br />WI OWED IN CONTRACT PRICE FOR WORK
<br />REQUIRED TO COMPLY WITH EXISTING CONDITIONS.
<br />D. ALL ELECTRICAL WORK SHALL BE DONE IN A NEAT AND WORKMANLIKE
<br />MANNER.
<br />E. CONTRACTOR SHALL SCHEDULE ALL DOWN -TIME NTH THE OWNER
<br />PRIOR TO BEGINNING THE WORK. PREMIUM /OVERTIME RATES MAY BE
<br />REQUIRED AND MUST BE INCLUDED IN BASE BID.
<br />F. CONTRACTOR SHALL THOROUGHLY REVIEW CONSTRUCTION DOCUMENTS
<br />AND WALK SITE. WHEN CONFLICTS ARISE WITHIN CONSTRUCTION
<br />DOCUMENTS, CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO
<br />SUBMITTING A BID. SUBMISSION OF A BID SHALL INDICATE THAT
<br />LY REVIEWED CONSTRUCTION DOCUMENTS AND
<br />WALKED THE SITE PRIOR TO BID SUBMISSION.
<br />WHEN ENGINEER IS NOT AVAILABLE, OR TIME DOES NOT
<br />PERMIT,CON TRACTOR SHALL INCLUDE THE MOST STRINGENT (COSTLY)
<br />REQUIREMENTS WITHIN BASE BID.
<br />G. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANY AND
<br />TELECOMMUNICATION COMPANY FOR LOCATIONS, REQUIREMENTS AND
<br />CONDUITS ROUTING PRIOR TO COMMENCEMENT OF WORK OR ROUGH -IN.
<br />H. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
<br />MANUFACTURERS, SUB -CON TRACTORS, VENDORS AND SUPPLIERS, WITH
<br />A COMPLETE SET OF THESE DOCUMENTS PRIOR TO SUBMITTING A BID.
<br />1. GUARANTEE ALL ELECTRICAL SYSTEM MATERIALS AND WORKMANSHIP
<br />TO BE FREE FROM DEFECTS FOR A PERIOD OF ONE (1) YEAR FROM
<br />THE DATE OF FINAL ACCEPTANCE AND PROPERLY CORRECT LATENT
<br />DEFECTS ARISING WITHIN THIS PERIOD UPON NOTIFICATION BY THE
<br />VE WITHOUT ADDITIONAL COMPENSATION.
<br />J. DAILY REMOVE REFUSE AND DEBRIS ACCUMULATING FROM ELECTRICAL
<br />CONSTRUCTION AND PRIOR TO ACCEPTANCE OF THIS WORK, LEAVE THE
<br />PREMISES "BROOM CLEAN" INSOFAR AS AFFECTED BY ELECTRICAL
<br />WORK.
<br />K. ELECTRICAL CONTRACTOR SHALL EXAMINE ARCHITECTURAL,
<br />MECHANICAL, PLUMBING AND FIRE PROTECTION DRAWINGS FOR
<br />ESTIMATING AND CONSTRUCTION OF THIS PROJECT. SUBMISSION OF A
<br />THAT SUCH
<br />EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR,
<br />EQUIPMENT OR MATERIALS REQUIRED FOR CONNECTING AND
<br />ENERGIZING EQUIPMENT SHOWN ON THOSE DRAWINGS WILL NOT BE
<br />RECOGNIZED. ELECTRICAL CONTRACTOR SHALL COMMUNICATE
<br />DISCREPANCIES TO ENGINEER PRIOR SUBMITTING A BID.
<br />L. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN
<br />DRAWINGS AND WITHIN THESE SPECIFICATIONS SHALL BE CONSIDERED
<br />AS "SPECIFIED STANDARD" OF QUALITY. NO SUBSTITU11ONS SHALL BE
<br />WIH PROVAL OF THE ENGINEER AT LEAST 10
<br />DAYS PRIOR TO BID DATE.
<br />ANY DEVIATION FROM SPECIFIED EQUIPMENT THAT AFFECT THE
<br />INSTALLATION, OPERATION, PERFORMANCE, QUALITY OR LONGEVITY OF
<br />THE ELECTRICAL SYSTEMS AS DEFINED HEREIN, SHALL BE REPLACED
<br />BY THE ELECTRICAL CONTRACTOR WITH NO ADDITIONAL COST TO THE
<br />CLIENT, IN ADDITION, ELECTRICAL CONTRACTOR SHALL PROVIDE THE
<br />ENGINEERING WITH PHOTOMETRIC FLOOR PLANS FOR ANY LIGHTING
<br />APPROVAL AT LEAST 10 DAYS PRIOR TO BID
<br />DATE.
<br />BASIC MATERIALS AND METHODS
<br />A. RACEWAYS AND FITTINGS: ALL RACEWAYS AND FITTINGS SHALL BE
<br />GALVANIZED RIGID STEEL OR INTERMEDIATE METAL CONDUIT WITH
<br />LOCKNUTS AND BUSHINGS, WITH THE EXCEPTION THAT WERE
<br />SPECIFICALLY ALLOWED BY THE NATIONAL ELECTRICAL CODE AND
<br />APPLICABLE LOCAL CODES. ELECTRICAL METALLIC TUBING (E.M.T) MAY
<br />BE USED FOR ALL INTERIOR EXPOSED AND CONCEALED WORK MERE
<br />IT IS NOT SUBJECT TO PHYSICAL DAMAGE OR CORROSION. FITTINGS
<br />REW TYPE. PVC SCHEDULE 40 WITH TAR
<br />COATED GALVANIZED RIGID STEEL ELBOWS SHALL BE USED FOR BELOW
<br />GRADE INSTALLATIONS. MC CABLE SHALL BE ALLOWED WHEN
<br />APPROVED BY TENANT AND LANDLORD AND IT SHALL BE INSTALLED
<br />THE NEC, NO BX CABLE ALLOWED. INSTALL
<br />EXPANSION FITTINGS IN RACEWAYS EVERY 200' LINEAR RUN OR
<br />WHEREVER STRUCTURAL EXPANSION JOINTS ARE CROSSED.
<br />FOR MEDICAL, DENTAL AND SIMILAR OFFICES AS DEFINED BY NEC
<br />ARTICLE 517, NO NON-METALIC RACEWAYS SHALL BE USED ANYWHERE
<br />LI
<br />RECEPTACLE CIRCUITS, FIXED EQUIPMENT CIRCUITS, SWITCH LEGS AND
<br />LIGHT FIXTURE MIPS.
<br />B. PROVIDE PULL STRING IN ALL EMPTY CONDUITS.
<br />C. FINAL CONNECTIONS TO MOTORS OR EQUIPMENT SUBJECT TO
<br />VIBRATION SHALL BE MADE UP NTH GREENFIELD IN DRY LOCATIONS
<br />AND WITH JACKETED, LIQUID -TIGHT, FLEXIBLE, GALVANIZED STEEL
<br />CONDUIT IN WET OR DAMP LOCATIONS.
<br />D. CONDUCTORS: FEEDER AND BRANCH CIRCUIT CONDUCTORS SHALL BE
<br />THWN-2 COPPER (MINIMUM SIZE #12 UNLESS OTHERWISE NOTED). PER
<br />NEC 110.14 (c)(1)(a)Ab) CONDUCTOR AMPACITY BASED ON 60*C
<br />COLUMN FOR CIRCUITS RATED 100 AMPS OR LESS, OR #1 AWG OR
<br />75*C COLUMN FOR CIRCUITS RATED OVER 100
<br />AMPS, OR LARGER THAN #1 AWG CONDUCTORS PER TABLE NEC
<br />310.15(B)(16). NO ALUMINUM SHALL BE PERMITTED UNLESS
<br />SPECIFICALLY NOTED OTHERWISE. INSTALL ALL WRING IN CONDUIT OR
<br />APPROVED RACEWAYS UNLESS OTHERWISE INDICATED. PROVIDE #10
<br />AWG FOR BRANCH CIRCUITS OVER 100 FEET IN LENGTH TO ACCOUNT
<br />FOR VOLTAGE DROP. PROVIDE #10 GROUND TO CORRESPOND. ALL
<br />BRANCH CIRCUITS SHALL CARRY AN EQUIPMENT GROUNDING
<br />CONDUCTOR, AND BE WIRED WITH COLOR -CODED WIRE WITH SAME
<br />-CODE SHALL BE AS
<br />FOLLOWS:
<br />120/208 VOLT-
<br />LU
<br />NEUTRAL - WHITE
<br />GROUND - GREEN.
<br />PUSH -IN WIRE CONNECTORS ARE NOT PERMITTED.
<br />E. LOCATE ALL DEVICES AND EQUIPMENT WERE SHOWN ON DRAWINGS. ALL
<br />DIMENSIONS SHOWN ON THE DRAWINGS ARE FROM FINISHED FLOOR TO THE
<br />CENTER OF THE DEVICE UNLESS OTHERWISE INDICATED. STANDARD
<br />MOUNTING HEIGHTS ARE AS FOLLOWS:
<br />DEVICES HEIGHT AFF AT DEVICE CENTER
<br />ELECTRICAL OUTLETS 18"
<br />ELECTRICAL OUTLETS ABOVE COUNTER 420
<br />TELEPHONE 180
<br />WALL TELEPHONE 46"
<br />LIGHT SWTCHES 420
<br />FIRE ALARM DEVICES 80m TO BOTTOM OF GLASS
<br />EXIT SIGNS AS NECESSARY
<br />SPECIAL DEVICES
<br />NOTE: ELECTRICAL CONTRACTOR SHALL FIELD VERIFY AND COORDINATE NTH
<br />PROJECT SUPERINTENDENT FOR OVER COUNTER OUTLETS MOUNTING
<br />HEIGHT AND DIRECTION (VERTICAL OR HORIZONTAL) PRIOR TO ROUGH -IN.
<br />F. DISCONNECT SWTCHES: HEAVY DUTY, FUSED OR NON -FUSED AS CALLED
<br />FOR ON DRAWINGS. PROVIDE SOLID NEUTRAL CONNECTION MERE
<br />REQUIRED. USE NEMA-1 INDOORS AND NEMA-3R OUTDOORS. ALL
<br />DISCONNECT SWITCHES SHALL BE PROVIDED WITH GROUND KIT.
<br />G. PROVIDE PANELBOARDS OF THE DEAD FRONT TYPE, NO LESS THAN 20
<br />INCHES WIDE AND 5 3/4 INCHES DEEP WITH QUANTITY OF BRANCH
<br />CIRCUITS/CIRCUIT BREAKERS AS INDICATED ON THE PANELBOARD
<br />SCHEDULE NTH THE VOLTAGE, PHASE AND AMPERE RATING AS REQUIRED.
<br />ALL PANELBOARDS SHALL HAVE PHASE SEQUENCE CIRCUITS AND BOLT -ON
<br />CIRCUIT BREAKERS. MAIN BREAKERS SHALL BE MOLDED CASE. CIRCUIT
<br />BREAKERS FEEDING HVAC LOADS SHALL BE HACR TYPE THAT SERVE AS
<br />DISCONNECTING MEANS FOR EQUIPMENT SHALL BE PROVIDED WITH
<br />PERMANENTLY INSTALLED LOCK -OFF KIT. TYPEWRITTEN PANEL DIRECTORIES
<br />SHALL BE PROVIDED AT COMPLETION OF THE PROJECT.
<br />H. ELECTRICAL CONTRACTOR SHALL REVIEW ONE LINE POWER RISER DIAGRAM
<br />IN CONJUNCTION WITH SWITCHGEAR MANUFACTURER REPRESENTATIVE TO
<br />CROSS REFERENCE POWER RISER NTH PANEL SCHEDULES AND VERIFY
<br />VOLTAGES, AMPS, LUGS SIZES/NUMBER AND CABINETS DIMENSIONS PRIOR
<br />TO SUBMITTING A BID.
<br />1. EXERCISE CARE IN CONNECTING THE VARIOUS ELECTRICAL LOADS TO THE
<br />PANELS IN ORDER TO ARRIVE AT A REASONABLE BALANCE BETWEEN
<br />LOADS IN EACH PHASE AT EACH PANEL MAKE TESTS AND ADJUST
<br />LOADS AT EACH PANEL TO RESULT IN REASONABLY BALANCED LOAD
<br />CONDITION. SATISFACTORY TO THE UTILITY COMPANY. ENGINEER, OWNER
<br />AND INSPECTION AGENCIES. DOCUMENT ALL SAID LOAD ADJUSTMENTS.
<br />J. MANUFACTURERS: BASE OF DESIGN IS SQUARE D, EQUAL PRODUCTS BY
<br />GENERAL. ELECTRIC, SIEMENS OR CUTLER HAMMER WILL BE CONSIDERED.
<br />K. MATERIALS SHALL BE NEW AND UNUSED AND THE CATALOGUED PRODUCTS
<br />OF MANUFACTURERS REGULARLY ENGAGED IN THE PRODUCTION OF SUCH
<br />MATERIALS. THE MATERIALS SHALL BE OF THE MANUFACTURER'S LATEST
<br />OMPLIES WITH THE SPECIFICATION REQUIREMENTS.
<br />ALL MATERIALS SHALL BE PROVIDED WITH UL LABELS.
<br />M. LIGHTING
<br />M.1. LIGHTING FIXTURES SHALL BE AS SHOW ON THE DRAWING AND SHALL
<br />BE FURNISHED WITH LAMPS INSTALLED.
<br />M.2. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
<br />CEILING TYPES PRIOR TO ORDERING LIGHT FIXTURES.
<br />M.3. LIGHT FIXTURES SHALL BE SUPPORTED WITH #12 GAUGE WIRE FROM
<br />BUILDING STRUCTURE AND NOT FROM CEILING GRID. SECURE TWO
<br />OPPOSITE CORNERS TO STRUCTURE.
<br />M.4. LUMINAIRES MUST NOT BE INSTALLED LESS THAN 1 2/2 INCHES
<br />BELOW METAL ROOF DECKING.
<br />N. ALL GROUNDING SHALL CONFORM TO AR11CLE 250 OF THE NEC
<br />REQUIREMENTS. IN ADDITION THERETO AS IMPOSED BY THE DRAWINGS AND
<br />THE LOCAL CODE ENFORCEMENT AUTHORITIES HAVING JURISDICTION.
<br />0. SUBMITTALS: SUBMIT ELECTRONIC SUBMITTALS VIA E-MAIL FORMATTED AS
<br />PDF FILE.
<br />P. CONDUIT PENETRATIONS THROUGH FIRE RATED PARTITIONS SHALL BE
<br />OVED SYSTEM. REFER TO ARCHITECTURAL
<br />FLOOR PLAN FOR LOCATION OF FIRE RATED PARTITIONS. PROVIDE
<br />ACOUSTICAL FOAM SEALANT AT ALL DEVICES ON DEMISING PARTITIONS. IF
<br />PAR11TION IS FIRE RATED, PROVIDE FIREPROOF COMPOUND ON BACK AND
<br />SIDES OF THE BOX. MERE TELEPHONE AND ELECTRICAL OUTLETS APPEAR
<br />ON PLANS AS BACK TO BACK, OUTLETS SHALL BE STAGGERED TO REDUCE
<br />NOISE TRANSMISSION. WERE WALLS AND PARTITIONS ARE REQUIRED TO
<br />HAVE A MINIMUM OF 1-HOUR FIRE -RESISTANCE RATING, BOXES SHALL BE
<br />SEPARATED BY A MINIMUM HORIZONTAL DISTANCE OF 24 INCHES OR
<br />PROTECTED NTH UL LISTED PUTTY PADS.
<br />Q. ELECTRICAL CONTRACTOR SHALL REVIEW THE ARCHITECTURAL DRAWINGS
<br />FOR DEVICES EXACT LOCATIONS, MOUNTING HEIGHTS AND QUANTITIES
<br />PRIOR TO BID AND PRIOR TO ROUGH -IN. NOTIFY THE ENGINEER
<br />IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND.
<br />'
<br />R. REVIEW AND COORDINATE WITH MECHANICAL CONTRACTOR DRAWNGS FOR
<br />EQUIPMENT, CONDUIT, DEVICES, ETC. REQUIRED FOR A COMPLETE AND
<br />OPERATING HVAC SYSTEM. LOW VOLTAGE CONTROL WRING FURNISHED AND
<br />INSTALLED BY DIVISION 15. CHECK ALL MOTORS AND ROTATING EQUIPMENT
<br />FOR PROPER ROTATION.
<br />S. FINAL QUANTITY OF EXIT AND EMERGENCY LIGHTS TO BE DETERMINED BY
<br />FIRE MARSHALL INCLUDE CONTINGENCY FOR 6 ADDITIONAL EXIT LIGHTS AND
<br />6 ADDITIONAL EMERGENCY LIGHTS IN BASE BID.
<br />T. PROVIDE BACK BOXES AND RACEWAY FOR DOOR ACCESS CARD READERS
<br />AND ELECTRIC STRIKES AS PER SECURITY CONTRACTOR DIRECTIONS.
<br />PROVIDE 120VAC TO EACH ELECTRIC STRIKE DOOR LOCATION AND TO
<br />ACCESS CONTROL SYSTEM PANEL ACCESS CONTROL SYSTEM MUST
<br />DEACTIVATE OR OPEN ANY DOOR LOCKING MECHANISM AND REMAIN IN
<br />FAIL SAFE POSITION WHENEVER FIRE ALARM SYSTEM IS ACTIVATED OR
<br />BUILDING POWER FAILS. PROVIDE *PUSH-TO-EXI'r PUSHBUTTON AND
<br />MOTION DETECTOR AT EACH ACCESS DOOR LOCATION. INTERLOCK WTH
<br />FIRE ALARM SYSTEM. ANY CARD READERS PREVENTING FREE EGRESS
<br />SHALL BE IN ACCORDANCE WTH SECTION 1010.1.9.9 OF CHAPTER 10 OF
<br />THE FLORIDA BUILDING CODE.
<br />U. ELECTRICAL CONTRACTOR MAY COMBINE CIRCUITS IN A COMMON RACEWAY
<br />C TABLE 310-15.
<br />SHARED NEUTRAL SHALL NOT BE ALLOWED UNLESS OTHERWSE INDICATED.
<br />CIRCUITS SHARING A COMMON NEUTRAL MUST HAVE COMMON TRIP CIRCUIT
<br />BREAKERS TO ALLOW ALL TO BE TURNED OFF SIMULTANEOUSLY, AS PER
<br />NEC 210.4�13).
<br />V. ELECTRICAL CONTRACTOR SHALL INCLUDE CORE DRILLING, CUTTING AND
<br />PATCHING FOR THE INSTALLATION OF HIS/HER WORK WITHIN BASE BID.
<br />W. CLEAN ALL NEW AND EXISTING LIGHT FIXTURES, LAMPS AND LENSES AND
<br />PANELBOARD INTERIORS PRIOR TO FINAL ACCEPTANCE.
<br />X. PROVIDE DISK FILE ON CAD 2015 OR NEWER RELEASE WITH ACCURATE
<br />ELECTRICAL RECORD DRAWINGS AT THE COMPLETION OF THE PROJECT.
<br />Y. CONTRACTOR REPRESENTS THAT HIS BID IS BASED UPON THE
<br />MANUFACTURER'S MATERIALS AND EQUIPMENT DESCRIBED IN THE
<br />CONTRACT DOCUMENTS.
<br />Z. ELECTRICAL CONTRACTOR SHALL FILL UTILITY SERVICE INFORMATION LOAD
<br />FORMS AND BUILDING DEPARTMENT ELECTRICAL PERMIT FORMS.
<br />AA. ELECTRICAL CONTRACTOR SHALL INSTRUCT OWNER REPRESENTATIVE
<br />REGARDING EQUIPMENT OPERATION AND MAINTENANCE AT COMPLETION OF
<br />WORK. PROVIDE OMER NTH ALL MANUALS PERTAINING TO THE PROJECT.
<br />AB. LOW VOLTAGE CABLES FOR SECURITY SYSTEM, AV SYSTEM, TELEPHONE
<br />SYSTEM AND DATA SYSTEM ARE NOT PART OF THIS ENGINEER'S SCOPE OF
<br />WORK. ELECTRICAL CONTRACTOR SHALL COORDINATE NTH LOW VOLTAGE
<br />VENDOR(S) FOR BOXES AND RACEWAYS LOCATIONS, SIZES AND ROUTING
<br />PRIOR TO ROUGH -IN.
<br />AC. MINIMUM EMERGENCY ILLUMINATION SHALL BE PROVIDED FOR A PERIOD OF
<br />1 1/2 HOURS IN THE EVENT OF FAILURE OR NORMAL LIGHTING, WITHIN THE
<br />Y LIGHTING FACILITIES SHALL BE ARRANGED TO
<br />PROVIDE INITIAL ILLUMINATION THAT IS AT LEAST AN AVERAGE OF 1
<br />FOOTCANDLE (10 LUX) AND A MINIMUM AT ANY POINT OF 0.1 FOOTCANDLE
<br />(1 LUX) MEASURED ALONG THE PATH OF EGRESS AT FLOOR LEVEL
<br />FIRE ALARM:
<br />1. PROVIDE A COMPLETE DESIGN -BUILT ADDRESSABLE FIRE ALARM
<br />SYSTEM TO COMPLY NTH FLORIDA FIRE PREVENTION CODE 2020
<br />EDITION, NFPA 72 2013 EDITION, FLORIDA ACCESSIBILITY CODE FOR
<br />BUILDING CONSTRUCTION 2020 EDITION, AND LOCAL JURISDICTION
<br />REQUIREMENTS. DO NOT BID PER PLANS. DEVICES SHOWN FOR
<br />ARM CONTRACTOR SHALL PROVIDE A FIRE
<br />ALARM SYSTEM THAT PASSES ALL APPLICABLE CODES.
<br />2. HORN/STROBE TO MEET DB AND CANDELA AS PER ADA AND
<br />NFPA-72 REQUIREMENTS. REFER TO NFPA 72 TABLES 18.5.5.4.1(A),
<br />18.5.5.4.1(B), AND A.18.4.3 AS A BASE POINT AND FIGURE
<br />18.5.5.4.1.
<br />3. ALL BE FURNISHED BY ELECTRICAL
<br />CONTRACTOR, INSTALLED BY MECHANICAL CONTRACTOR AND WRED BY
<br />ELECTRICAL CONTRACTOR. PROVIDE RELAY LOCATED (SUPERVISED)
<br />WITHIN 3 FT OF DISCONNECT RELAY TO SHUT DOWN HVAC UNIT AIR
<br />P WTH BATTERY BACKUP. DUCT SMOKE
<br />DETECTORS SHALL BE CONNECTED TO THE PROTECTIVE SIGNALING
<br />SYSTEM IN ACCORDANCE NTH NFPA 72 AND CAUSE AN AUDIBLE AND
<br />VISIBLE SUPERVISORY SIGNAL TO BE INDICATED AT A CONSTANTLY
<br />ATTENDED LOCATION UPON INITIATION. PROVIDE A REMOTE DUCT
<br />SMOKE DETECTOR REMOTE TEST INDICATOR PER EACH DUCT SMOKE
<br />DETECTOR, LOCATE AT A VISIBLE ATTENDED LOCATION NEAR DUCT IT
<br />SUPERVISES.
<br />4. TOR SHALL REVIEW MECHANICAL DRAWINGS FOR
<br />DUCT SMOKE DETECTORS AND FIRE/SMOKE DAMPERS REQUIREMENTS.
<br />INCLUDE CONNECTION COST WTHIN BASE BID.
<br />5. ELECTRICAL CONTRACTOR SHALL OBTAIN THE SERVICES OF THE
<br />LANDLORD FIRE ALARM CONTRACTOR FOR DESIGN, INSTALLATION AND
<br />PERMITTING OF THE FIRE ALARM WORK. INCLUDE COST WTHIN BASE
<br />BID.
<br />6. PROVIDE SIGNED AND SEALED FIRE ALARM SHOP DRAWINGS PREPARED
<br />IONAL ENGINEER IN THE EMPLOYMENT OF THIS
<br />CONTRACTOR FOR BUILDING DEPARTMENT REVIEW AND PERMIT.
<br />7. SMOKE DETECTORS SHALL NOT BE LOCATED LESS THAN 3'-Om FROM
<br />HVAC GRILLES. (DRAWINGS SHOW GENERAL LOCATION ONLY.)
<br />8. FIRE ALARM SYSTEM CABLES SHALL BE #14 COPPER MINIMUM
<br />ENCLOSED IN 3/4- OR LARGER EMT CONDUIT FOR NOTIFICATION.
<br />SIGNAL LINE CIRCUIT PER MANUFACTURER'S SPECIFICATIONS. BOXES
<br />FOR DEVICES SHALL BE 2 1/8' DEEP.
<br />9. PROVIDE M01ION DETECTOR, PUSHBUTTON TO EXIT AND RRE ALARM
<br />INTERLOCK FOR EACH ELECTRICALLY HELD DOOR.
<br />10. F1NAL QUANTITY OF STROBE/HORNS MAY BE INCREASED BY FIRE MARSHAL
<br />INCLUDE CONTINGENCY FOR 6 ADDITIONAL STROBE/HORNS AND 6 SMOKE
<br />DETECTORS IN BASE BID. FIRE ALARM CONTRACTOR SHALL REFER TO FIR
<br />PROTECTION DRAWINGS AND PROVIDE TAMPER SWTCHES AND FLOW
<br />SWITCHES AT EACH FIRE PROTECTION SHUT-OFF VALVE/RISER/BACKFLOW.
<br />11. 61G15 FLORIDA ADMINISTRATIVE CODE COMPLIANCE:
<br />a) PROVIDE 24 HOUR BATTERY BACK-UP WITH 15 MINUTES OF RUN TIME
<br />AT END FOR ALL EQUIPMENT AND DEVICES. PROVIDE BATTERY
<br />CALCULATIONS VOLTAGE DROP CALCULATIONS PER UL 864 9TH
<br />EDITION NTH SHOP DRAWINGS AND SUBMITTALS.
<br />b) SHOW REQUIRED INTER -TIES TO ALL EXISTING FIRE ALARM SYSTEM
<br />COMPONENTS AND/OR EXISTING AND NEW SYSTEMS REQUIRED TO
<br />MAKESYSTEMS OPERATE AS ONEPER NFPA.
<br />c) PROVIDE AUDIBLE NOTIFICATION 15 DECIBEL ABOVE AMBIENT NOISE
<br />LEVELS. SEE NFPA 72 APPENDIX A TABLE A.18.4.3 AS BASE PONT.
<br />PROVIDE VISUAL NOTIFICATION PER NFPA 72 18.5 AND FLORIDA
<br />BUILDING CODE.
<br />d) STROBES WITHIN SAME VISUAL RANGE SHALL SYNCHRONIZE. IF THIS
<br />REQUIREMENT CANNOT BE ACCOMPLISHED NTH THE EXISTING DEVICES,
<br />FIRE ALARM CONTRACTOR SHALL INCLUDE COST OF REPLACEMENT IN
<br />BASE BID. PROVIDE SYNCHRONIZING MODULES AS NECESSARY.
<br />e) TWO GROUPS OF VISIBLE NOTIFICATION APPLIANCES, WHERE VISUAL
<br />APPLIANCES OF EACH GROUP ARE SYNCHRONIZED, IN THE SAME ROOM
<br />OR ADJACENT SPACE WITHIN THE FIELD OF VIEW SHALL SYNCHRONIZE.
<br />THIS SHALL INCLUDE SYNCHRONIZATION OF STROBES OPERATED BY
<br />SEPARATE SYSTEMS.
<br />f) MORE THAN TWO VISIBLE NOTIFICATION APPLIANCES OR GROUPS OF
<br />LICES IN THE SAME ROOM OR ADJACENT SPACE
<br />WITHIN THE FIELD OF VIEW THAT FLASH IN SYNCHRONIZATION.
<br />g) MEN AN EXISTING SPACE OPENS INTO AN ADJACENT SPACE DUE TO
<br />WALLS BEING DEMOLISHED, NOTIFICATION DEVICES OF BOTH SIDES
<br />WITHIN SAME FIELD OF VIEW SHALL SYNCHRONIZE. REFER TO
<br />ARCHITECTURAL DRAWINGS.
<br />h) CONDUCTORS SHALL BE U.L LISTED FPLR MANUFACTURED AND
<br />INSTALLED PER NFPA 70 SECTION 760. PROVIDE POWER LIMITED
<br />SYSTEM. EXPOSED CABLES IN PLENUMS SHALL BE RATED FOR THE
<br />R THAN 7'-O* AFF SHALL BE SLEEVED.
<br />12. 760.49 NPLFA CIRCUIT CONDUCTORS.
<br />0. SIZES AND USE. ONLY COPPER CONDUCTORS SHALL BE
<br />PERMITTED TO BE USED FOR FIRE ALARM SYSTEMS. SIZE 18 AWG
<br />AND 16 AWG CONDUCTORS SHALL BE PERMITTED TO BE USED,
<br />PROVIDED THEY SUPPLY LOADS THAT DO NOT EXCEED THE
<br />AMPACITIES GIVEN IN TABLE 402.5 AND ARE INSTALLED IN A
<br />RACEWAY, AN APPROVED ENCLOSURE, OR A LISTED CABLE.
<br />CONDUCTORS LARGER THAN 16 AWG SHALL NOT SUPPLY LOADS
<br />GREATER THAN THE AMPACITIES GIVEN IN 310.15, AS APPLICABLE.
<br />b. INSULATION. INSULATION ON CONDUCTORS SHALL BE SUITABLE
<br />FOR 600 VOLTS. CONDUCTORS LARGER THAN 16 AWG SHALL
<br />COMPLY WITH ARTICLE 310. CONDUCTORS 18 AWG AND 16 AING
<br />SHALL BE TYPE KF-2, KFF-2, PAFF, PTFF, PF, PFF, PGF, PGFF,
<br />RFH-2, RFHH-2, RFHH-3, SF-2, SFF-2, TF, TFF, TFN, 18,16
<br />14/12 THHN OR THWN, ZF, OR ZFF. CONDUCTORS WTH OTHER
<br />TYPES AND THICKNESS OF INSULATION SHALL BE PERMITTED IF
<br />LISTED FOR NON -POWER -LIMITED FIRE ALARM CIRCUIT USE.
<br />C. CONDUCTOR MATERIALS. CONDUCTORS SHALL BE SOLID OR
<br />STRANDED COPPER FOR FPLR OR FPLP CONDUCTORS SHALL BE
<br />SOLID.
<br />d. CONDUCTORS UNDERGROUND OR UNDER THE SLAB SHALL BE WET
<br />ENVIRONMENT OR DIRECT BURIAL RATED AND SURGE PROTECTED.
<br />TERMINATE PER MANUFACTURER'S INSTRUCTIONS.
<br />13. AUDIO/VISUAL DEVICES SHALL BE SET AS REQUIRED BY BUILDING USE
<br />CONDITIONS, MINIMUM OF 0.25W IN COMMON AREA AND 0.125W IN
<br />PRIVATE OFFICES. PROVIDE AMPLIFIER CALCS (WATTS USED/WATTS
<br />SPARE)
<br />14. PROVIDE FIRE ALARM MODULE AND INTERFACE FROM KITCHEN HOOD
<br />F1RE SUPPRESSION CONTROL PANEL TO BUILDING FIRE ALARM SYSTEM.
<br />ELECTRICAL OUTLETS AND BOXES NOTES
<br />1. AN OUTLET BOX OF THE APPROPRIATE SIZE AND TYPE SHALL BE PROVIDED
<br />FOR ALL LIGHTING FIXTURES, SWITCHES, RECEPTACLES, ETC.
<br />2. ALL SWTCHES AND RECEPTACLES SHALL BE SPECIFICATION GRADE 20A
<br />MINIMUM UNLESS OTHERWISE NOTED. COORDINATE COLOR NTH ARCHITECT
<br />PRIOR TO ORDERING.
<br />3. ALL RECEPTACLES LOCATED OUTDOOR SHALL BE WEATHER RESISTANT.
<br />COVERS SHALL BE "WHILE -IN -USE* TYPE. COVER SHALL BE IDENTIFIED AND
<br />LISTED AS nEXTRA-DUTY".
<br />4. PROVIDE 4 11/16*x 4 11/16"x 2 1/8" SQUARE BOX AND 1n CONDUIT
<br />STUB -UP TO ACCESSIBLE CEILING FOR TELEPHONE AND DATA OUTLETS.
<br />TERMINATE CONDUITS 6* ABOVE CEILING IN ACCESSIBLE SPACE NTH 90'
<br />BEND INSULATED BUSHINGS AND PULL STRING. COORDINATE WITH TENANTS
<br />DATA/TELEPHONE CONTRACTOR FOR FURTHER ELECTRICAL AND RACEWAYS
<br />REQUIREMENTS PRIOR TO ROUGH -IN. CABLING BY OTHERS.
<br />5. ALL JUNCTION BOX COVERS SHALL BE MARKED WITH PANEL, CIRCUIT
<br />N MANENT BLACK MARKER.
<br />6. JUNCTION BOXES SHALL NOT BE MOUNTED TO THE PARTITION TOP PLATE.
<br />7. PROVIDE ACOUSTICAL FOAM AND SEALANT AT ALL DEVICES ON DEMISING
<br />PARTITIONS. IF PARTITION IS ARE RATED, PROVIDE FIREPROOF COMPOUND
<br />ON BACK AND SIDES OF THE BOX.
<br />8. MERE TELEPHONE AND ELECTRICAL OUTLETS APPEAR ON PLANS AS BACK
<br />TO BACK, OUTLETS SHALL BE STAGGERED TO REDUCE NOISE TRANSMISSION.
<br />WHERE WALLS AND PARTITIONS ARE REQUIRED TO HAVE A MINIMUM OF
<br />1-HOUR FIRE -RESISTANCE RATING, BOXES SHALL BE SEPARATED BY A
<br />MINIMUM HORIZONTAL DISTANCE OF 24' INCHES OR PROTECTED NTH UL
<br />LISTED PUTTY PADS.
<br />9. GROUNDING OF RECEPTACLES AND FIXED EQUIPMENT IN PATIENT CARE
<br />AREAS SHALL COMPLY WITH NEC ARTICLE 517,13 (A) AND (B).
<br />10. GFCl RECEPTACLES FOR ALL APPLIANCES MUST BE READILY ACCESSIBLE. IF
<br />RECEPTACLE CANNOT BE MADE ACCESSIBLE, PROVIDE GFC1 CIRCUIT
<br />BREAKER.
<br />WIRE SIZE REOUIRED FOR
<br />BRANCH CIRCUITS AT LESS
<br />THAN 3% VOLTAGE DROP
<br />-
<br />1 FT
<br />m
<br />50 FT
<br />51 FT
<br />TO
<br />75 FT
<br />76 FT
<br />TO
<br />100 FT
<br />101 FT
<br />m
<br />125 FT
<br />126 FT
<br />70
<br />150 FT
<br />151 FT
<br />m
<br />200 FT
<br />120V
<br />1
<br />20A
<br />#12
<br />fI0
<br />#8
<br />#B
<br />#6
<br />06
<br />30A
<br />#10
<br />JB
<br />40A
<br />#8
<br />.
<br />#6
<br />1 #6
<br />#4
<br />1 J4
<br />#3
<br />50A
<br />#B
<br />#6
<br />208V
<br />10
<br />20A
<br />#1 2
<br />J12
<br />#12
<br />#10
<br />fIO
<br />#B
<br />30A
<br />fI0
<br />fIO
<br />#10
<br />#B
<br />#8
<br />#6
<br />40A
<br />#8
<br />.
<br />.
<br />50A
<br />#B
<br />f4
<br />60A
<br />#5
<br />#6
<br />70A
<br />#4
<br />14
<br />BOA
<br />#3
<br />#3
<br />. #3
<br />#3
<br />. #2
<br />#1
<br />90A
<br />#2
<br />12
<br />100A
<br />#1
<br />30
<br />I
<br />I
<br />.
<br />30A
<br />#10
<br />#10
<br />. #10
<br />#8
<br />#B
<br />#6
<br />40A
<br />#0
<br />JB
<br />#8
<br />#B
<br />I
<br />60A
<br />#6
<br />#6
<br />70A
<br />#4
<br />.
<br />80A
<br />#3
<br />#3
<br />90A .
<br />#2
<br />12
<br />100A
<br />I #1
<br />, #1
<br />, #I
<br />#1
<br />#1/0
<br />�r NO
<br />CALCULATED USING COPPER WIRE AT 750 C.
<br />TABLE ABOVE FOR REFERENCE ASSUMING FULLY RATED
<br />CIRCUIT AT 80% OF AMPACITY.
<br />NO MORE THAN 2% VOLTAGE DROP MAXIMUM FOR
<br />FEEDERS. AS PER FBC ENERGY CONSERVATION, CHAPTER
<br />4 ARTICLE C405.7.3.1.
<br />NO MORE THAN 3% VOLTAGE DROP MAXIMUM FOR BRANCH
<br />FEEDERS. AS PER FBC ENERGY CONSERVATION, CHAPTER
<br />4 ARTICLE C405.7.3.2.
<br />WH NDUCTORS ARE INCREASED IN
<br />SIZE, EQUIPMENT GROUNDING CONDUCTORS SHALL BE
<br />INCREASED IN SIZE PROPORTIONATELY ACCORDING TO THE
<br />CIRCULAR MILL AREA OF THE UNGROUNDED CONDUCTORS.
<br />ENERGY CONSERVAIION
<br />CODE COMPLIANCE
<br />1. THIS DESIGN COMPLIES NTH F.B.C. ENERGY CONSERVATION SEVENTH EDITION
<br />(2020) CHAPTER 4. SECTION C405 FOR ELECTRICAL POWER AND LIGHTING
<br />SYSTEMS.
<br />2. THIS DESIGN COMPLIES WITH 7TH EDITION (2020) OF F.B.C. ENERGY CONSERVATION
<br />CHAPTER 4 ARTICLE C405.5.3 FOR FEEDER AND BRANCH CIRCUIT VOLTAGE DROP.
<br />3. WITHIN 30 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF
<br />THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER, INCLUDING:
<br />a. A SINGLE DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM AND
<br />b. FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR ALL DISTRIBUTION.
<br />(REF. FBC-EC C405.5.4.1 - 7TH EDITION).
<br />4. AN OPERATING MANUAL AND MAINTENANCE MANUAL BE PROVIDED TO THE BUILDING
<br />OWNER. THE MANUALS SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING:
<br />a. SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH
<br />PIECE OF EQUIPMENT REQUIRING MAINTENANCE.
<br />b. OPERATION MANUALS AND MAINTENANCE MANUALS FOR EACH PIECE OF
<br />EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS
<br />SHALL BE CLEARLY IDENTIFIED.
<br />c. NAMES AND ADDRESSES OF AT LEAST ONE QUALIFIED SERVICE AGENCY.
<br />(REF. FBC-EC 405.5.4.2 - 7TH EDITION).
<br />LIGHTING SYSTEM FUNCTIONAL TESTING
<br />CONTROLS FOR AUTOMATIC LIGHTING SYSTEMS SHALL COMPLY NTH SECTION C408.3.
<br />TESTING SHALL ENSURE THAT CONTROL HARDWARE AND SOFTWARE ARE CALIBRATED,
<br />ADJUSTED, PROGRAMMED AND IN PROPER WORKING CONDITION IN ACCORDANCE NTH
<br />THE CONSTRUCTION DOCUMENTS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
<br />FUNCTIONAL TESTING SHALL BE PERFORMED BY CONTRACTOR AND MANUFACTURER'S
<br />REPRESENTATIVE IN THE PRESENCE OF THE CLIENT REPRESENTATIVE AT THE
<br />COMPLETION OF THE PROJECT. SCHEDULE A SECOND TESTING WITH OWNER
<br />ACILITY HAS BEEN IN OPERATION FOR TWO OR THREE
<br />MONTHS. WERE REQUIRED BY THE CODE OFFICIAL, AN APPROVED PARTY
<br />INDEPENDENT FROM THE DESIGN OR CONSTRUCTION OF THE PROJECT SHALL BE
<br />RESPONSIBLE FOR THE FUNCTIONAL TESTING AND SHALL PROVIDE DOCUMENTATION TO
<br />THE CODE OFFICIAL CERTIFYING THAT THE INSTALLED LIGHTING CONTROLS MEET THE
<br />PROVISIONS OF SECTION C405.
<br />FOR OCCUPANT SENSORS, TIME SWITCHES, PROGRAMMABLE SCHEDULE CONTROL
<br />PHOTOSENSORS OR DAY LIGHTING CONTROLS THE FOLLOWNG PROCEDURES SHALL BE
<br />PERFORMED.
<br />1. CONFIRM THAT THE PLACEMENT, SENSITIVITY AND TIME-OUT ADJUSTMENTS FOR
<br />YILD ACCEPTABLE PERFORMANCE.
<br />2. CONFIRM THAT THE TIME SWITCHES AND PROGRAMMABLE SCHEDULE CONTROLS
<br />ARE PROGRAMMED TO TURN THE LIGHTS OFF.
<br />3. CONFIRM THAT THE PLACEMENT AND SENSITIVITY ADJUSTMENTS FOR
<br />PHOTOSENSOR CONTROLS REDUCE ELECTRIC LIGHT BASED ON THE AMOUNT OF
<br />USABLE DAYUGHT IN THE SPACE AS SPECIFIED.
<br />ELECTRICAL SYMBOL LEGEND
<br />(NOT ALL
<br />SYMBOLS USED ON THIS PROJECT)
<br />= [:]
<br />RECESSED LUMINAIRE
<br />[;a
<br />EMERGENCY RECESSED LUMINAIRE. CONNECT AS 24-HOUR
<br />NIGHTLIGHT UNLESS OTHERNSE NOTED.
<br />0 9
<br />LED, INCANDESCENT, COMPACT FLUORESCENT FIXTURE - CEILING
<br />MOUNTED, WALL MOUNTED
<br />0 1P
<br />EXIT SIGN FIXTURE, SHADED QUADRANT INDICATES FACE, WITH
<br />AN - CEILING MOUNTED, WALL MOUNTED
<br />$ $2 $3 $4
<br />-
<br />1-POLE, 2-POLE, .3-WAY, 4-WAY SWITCH
<br />0
<br />DIMMER SWITCH, LUTRON, VERIFY LAMP TYPE
<br />(LEDANCANDESCENT/FLUORESCENT) PRIOR TO ORDER
<br />$m $mp $VP
<br />MANUAL MOTOR STARTER TOGGLE SWTCH AS NOTED; *P"
<br />INDICATES PILOT LIGHT, "WP* INDICATES WEATHERPROOF
<br />PRI 92
<br />OCCUPANCY SENSORS
<br />12
<br />POWERPACK
<br />000
<br />DUPLEX RECEPTACLE AT 18% ABOVE COUNTER AT 42% ISOLATED
<br />Ic
<br />GROUND TYPE
<br />G[F OG
<br />TYPE SELF TESTING DUPLEX RECEPTACLE
<br />LI LEX RECEPTACLE
<br />* *
<br />(2) DUPLEX RECEPTACLES IN SINGLE OUTLET BOX WITH
<br />SINGLE COVER PLATE AT 18% ABOVE COUNTER AT 42-
<br />V
<br />TELEPHONE/DATA OUTLET, PROVIDE 4 11/16"x 4 11/16"x 2 1/8"
<br />SQUARE BOX AND 1" CONDUIT TO ACCESSIBLE CEILING.
<br />CONFIRM WITH VENDOR PRIOR TO ROUGH -IN
<br />0 [j] [j
<br />SPECIAL RECEPTACLE, PUSHBUTTON AS NOTED,
<br />TELEPOWER POLE
<br />gfl fo
<br />FLOOR MOUNTED DUPLEX RECEPTACLE, FLOOR MOUNTED
<br />TELEPHONE/DATA OUTLET
<br />r___1_1
<br />FINAL CONNECTION TO EQUIPMENT
<br />[00'a
<br />JUNCTION BOXES, MOTOR CONNECTION
<br />E:3J cEm [s3J
<br />DISCONNECT SWITCH, STARTER OR CONTACTOR,
<br />/DISCONNECT
<br />�
<br />�
<br />277/480VPANELBOARD
<br />TELEPHONE TERMINAL BOARD
<br />m
<br />ELECTRIC DOOR STRIKE/CARD READER
<br />V
<br />TV OUTLET, PROVIDE 4 11/16"x 4 11/16"x 2 1/8"
<br />SQUARE BOX AND 1' CONDUIT TO ACCESSIBLE CEILING.
<br />COORDINATE MOUNTING HEIGHT PRIOR TO ROUGH -IN.
<br />10
<br />MANUAL PULL STATION
<br />[D4
<br />HORN/STROBE, FLUSH MOUNTED ON WALL
<br />"C* INDICATES CEILING MOUNTED
<br />19
<br />STROBE ONLY, FLUSH MOUNT ON WALL
<br />wC* INDICATES CEILING MOUNTED
<br />JA
<br />SMOKE DETECTOR
<br />k4=
<br />DUCT -SMOKE DETECTOR
<br />BRANCH CIRCUIT CONDUIT CONCEALED ABOVE CEILING OR IN
<br />WALL, SLASH MARKS INDICATE NUMBER OF CONDUCTORS,
<br />14v`� LONGER SLASH IS NEUTRAL, (GROUND WIRE NOT SHOWN);
<br />2 #12 - 1 #12 GROUND MINIMUM (UNLESS OTHERWISE NOTED
<br />OR MARKED); LONGER SLASH NTH HATCH MARK INDICATES
<br />ISOLATED GROUND. ISOLATED GROUND CONDUCTOR SHALL BE
<br />GREEN NTH A YELLOW STRIPE. QUANTITY OF ARROWS
<br />INDICATE QUANTITY OF HOMERUNS TO PANELBOARD.
<br />PROVIDE EQUIPMENT GROUNDING CONDUCTOR IN ALL BRANCH
<br />CIRCUITS. CIRCUITS SHARING A COMMON NEUTRAL MUST HAVE
<br />A COMMON TIE HANDLE ON THE CIRCUIT BREAKERS TO
<br />ALLOW ALL TO BE TURNED OFF SIMULTANEOUSLY.
<br />"0,.,- -.;I
<br />'."' BRANCH CIRCUIT CONDUIT CONCEALED BELOW SLAB OR
<br />.4, UNDERGROUND. CIRCUITS SHARING A COMMON NEUTRAL MUST
<br />HAVE A COMMON TIE HANDLE ON THE CIRCUIT BREAKERS TO
<br />ALLOW ALL TO BE TURNED OFF SIMULTANEOUSLY.
<br />SUBSCRIFT LEGEND:
<br />E EXISTING DEVICE/LIGHT AND ASSOCIATED CIRCUIT WRING TO REMAIN. PROVIDE
<br />ALL NECESSARY EXTENSION OF CONDUIT AND WRING AS REQUIRED, IN ORDER
<br />TO MAINTAIN CIRCUIT CONTINUITY TO EXISTING EQUIPMENT TO REMAIN.
<br />.
<br />ERL EXISTING DEVICE/UGHT TO BE RELOCATED. JUNCTION AND EXTEND EXISTING
<br />CONDUIT AND WRING TO NEW LOCATION AS REQUIRED.
<br />RL NEW LOCATION OF EXISTING DEVICE/LIGHT. PROVIDE EXTENSION OF EXISTING
<br />CONDUIT AND WRING AS REQUIRED. (PROVIDE NEW SWITCHING AS INDICATED)
<br />R EXISTING DEVICE/LIGHT TO BE REMOVED. MERE EXISTING EQUIPMENT TO
<br />REMAIN IS FED VIA EXISTING EQUIPMENT TO BE REMOVED, PROVIDE ALL
<br />NECESSARY EXTENSION OF CONDUIT AND WRING AS REQUIRED IN ORDER TO
<br />MAINTAIN CIRCUIT CONTINUITY TO EXISTING EQUIPMENT.
<br />N DEVICE/LJGHT TO MATCH EXISTING BUILDING STANDARDS.
<br />1�0�f �00"X 0 1 1 � 0
<br />BASE BID:
<br />URE THE SERVICES OF A THIRD PARTY VENDOR
<br />TO TEST THE PUBLIC SAFETY RF RADIO COVERAGE, WITHIN THE PROJECT
<br />SCOPE OF WORK, AND DETERMINE WHETHER A NEW DAS SYSTEM IS
<br />REQUIRED PER FLORIDA FIRE PREVENTION CODE 7TH EDITION CHAPTER 11
<br />SECTION 11.10.1 AND NFPA 72 2016 EDITION CHAPTER 24 SECTION 24.9.
<br />CONTRACTOR SHALL SUBMIT TEST REPORTS AND RECOMMENDATIONS TO
<br />THE FIRE MARSHALL AS REQUESTED BY BUILDING PERMIT COMMENTS.
<br />BID ALTERNATE:
<br />CONTRACTOR TO PROVIDE PRICING FOR A COMPLETE IN-BULDING RF RADIO
<br />COVERAGE SYSTEM FOR THE PUBLIC SAFETY RADIO AS SET FORTH IN
<br />FLORIDA FIRE PREVENTION CODE 7TH EDITION CHAPTER 11 SECTION 11.10.1
<br />AND NFPA 72 2016 EDITION CHAPTER 24 SECTION 24.9 AND SHALL BE
<br />VERIFIED AS COMPLIANT PER THE CODES ABOVE AND THE AHJ. THE
<br />SYSTEM SHALL BE INSTALLED BY A TURN -KEY FIRM SPECIALIZING IN THE
<br />TRADE, TO INCLUDE NECESSARY SHOP DRAWINGS, FREQUENCY ENHANCING
<br />EQUIPMENT, INSTALLATION, TESTING, AND MONITORING TO SATISFY CODE
<br />AND AHJ REQUIREMENTS. CHANGE ORDERS FOR ADD111ONAL EQUIPMENT
<br />SHALL NOT BE PERMITTED. CONTRACTOR PROVIDING THIS PRICING SHALL
<br />BE INDEPENDENT OF THE THIRD PARTY VENDOR THAT PERFORMED THE
<br />PUBLIC SAFETY RADIO TEST AS PART OF BASE BID.
<br />MEP CONSULTING
<br />ENGINEERS
<br />SINCE 1977
<br />FL REG NO. 3089
<br />2016 ALDEN RD.
<br />ORLANDO, FL
<br />32803
<br />(407) 246-1688
<br />WWW.PEIFLA.COM
<br />PEI PROJECT #
<br />22121
<br />ILTA
<br />I i
<br />-
<br />';
<br />I ;
<br />, I :
<br />I
<br />� , i
<br />I , I I
<br />, -
<br />I
<br />-_ ___ - -
<br />11111111
<br />CAMPBELL +VAN DUSEN
<br />IA R C H I T E C T U R E INTERIOR DESIGNI
<br />www.CVDstudio.com
<br />CAMPBELL + VAN DUSEN Design Studio, LLC.
<br />255 South Orange Avenue Suite # 1 240
<br />Orlando, Florida 32801
<br />Phone: 407.930.6016
<br />FL. Lic. No. AA26003339
<br />ARCHITECT OF RECORD
<br />FRANK W. CAMPBELL AIA
<br />FL LIC NO. AR001 6053
<br />COPY OF THIS PLAN IS NOT VALID UNLESS SIGNED,
<br />SEALED AND DATED BY THE ARCHITECT OF RECORD
<br />%% 11
<br />,%\ ' G, S PA /V, `�',,
<br />�% I **
<br />_z1_ * N r,EN.S -- '1�25 '.',
<br />.- ��'- -\1 '�' % -:.
<br />, ca ...
<br />z : No. 64601 1'. '-
<br />r, * : * : * -
<br />.
<br />:j -a % ST)kTE OF .0' CC .
<br />.. -P -. - -�
<br />- �. I
<br />'..
<br />10 0 --- PtOR\0�_ e.. -zo
<br />" xs -. 6
<br />'0 ;:!�' "..*.*.** -�'
<br />%,%
<br />""6119/0 \\%
<br />-0 N %\ (/ .
<br />.'I/,,, 1111110 �42:�
<br />Bryan G. Spangler, PE,
<br />FL Reg. No. 64601
<br />COPY OF THIS PLAN IS NOT VALID UNLESS SIGNED,
<br />SEALED AND DATED BY THE ENGINEER OF RECORD
<br />_j
<br />L1_
<br />c/i
<br />_j
<br />=
<br />:i
<br />Q:�
<br />0
<br />>_
<br />=
<br />11--
<br />a-
<br />=
<br />CL
<br />LU
<br />E
<br />�
<br />r_4
<br />U
<br />1
<br /><
<br />ci
<br />C/)
<br />C/1)
<br />>
<br />LU
<br />LU
<br />I
<br />_j
<br />0
<br />=
<br />I
<br />co
<br />II-_
<br />F__
<br />+
<br />L0
<br />=
<br />_j
<br />i
<br />U
<br />:z
<br />"o
<br />ck�
<br /><
<br />LU
<br />_-)
<br />LU
<br />I
<br />>-
<br />()
<br />0
<br />>
<br />I
<br />=
<br />�
<br />._0 "IT
<br />CL-
<br />0
<br />LLJ
<br />"o Lr)
<br />Cie
<br />CL
<br /><
<br />3::
<br />rL-U4
<br />or-2 (cyll))
<br />CONSTRUCTION DOCUMENTS
<br />03.24.2023
<br />PRINCIPAL IN CHARGE
<br />F. CAMPBELL
<br />....................................................................
<br />PROJECT MANAGER
<br />M. TORRES
<br />...... I .............................................................
<br />ADVENT HEALTH
<br />WELL 65+
<br />ZEPHYRHILLS
<br />22-0328-01
<br />ELECTRICAL
<br />SPECIFICATIONS
<br />El .1
<br />
|