Laserfiche WebLink
PAIIENT CARE AFF-A 8YMBOL LEGEND <br />40GENERAL CARE - CATEGORY 2 <br />NOTES: <br />1. THERE ARE NO CRITICAL OR WET PATIENT AREAS IN THE SCOPE OF <br />WORK. <br />2. GENERAL PATIENT CARE AREAS REQUIRE A WRING METHOD WTH A <br />REDUNDANT GROUND AS PER ARTICLE 517.13 OF THE NEC. <br />GROUNDING 0 FALL RECEPTACLES, LIGHTING AND FIXED EQUIPMENT IN <br />PATIENT CARE AREAS SHALL COMPLY WITH NEC ARTICLE 517.13 (A) <br />AND (B) <br />TESTING, INSPECTIONS - <br />AND CERTIFICATIONS. - <br />A. EQUIPOTENTIAL GROUNDING TEST FOR PATIENT CARE AREAS <br />NFPA 99, 2018 EDITION, SECTION 6.3.3 REQUIRES TESTING OF NEW CONSTRUCTION <br />AND EXISTING CONSTRUCTION AND REPEATED MEN MAJOR RENOVATIONS OCCUR. <br />MOST EXISTING FACILITIES HAVE NO RECORDS OF EXIS11NG CONDITIONS, HOWEVER, <br />LOGS SHOULD BE CHECKED ANNUALLY BY AHCA. THEREFORE, ALL PATIENT AREAS <br />WITHIN ANY SCOPE OF WORK WILL NEED TO BE TESTED BY THE CONTRACTOR. (ALSO <br />SEE NEC 517-13, 14 & 16). <br />B. WHAT NEEDS TO BE TESTED? ONLY METAL CONDUCTIVE SURFACES LIKELY TO BECOME <br />ENERGIZED WITHIN THE PATIENT VICINITY. PATIENT VICINITY IS DEFINED AS: <br />1. AN AREA WHERE PATIENTS ARE NORMALLY CARED FOR. <br />2. THE SPACE WITH SURFACES LIKELY TO BE CONTACTED BY PATIENT OR ATTENDANT <br />TOUCHING THE PATIENT. (BEDS, HEADWALLS, A/C UNITS, SINK, TRIM, ETC.) <br />3. IN A PATIENT ROOM BASICALLY THE ENTIRE ROOM INCLUDING TOILET/SHOWER ROOM. <br />PATIENTS SHOULD BE IN WHEELCHAIRS OR SITTING IN CHAIRS. <br />- 69-0m - 69-0" <br />PATIENT BED <br />30-15" <br />6*-Ow <br />71-60 VERTICALLI <br />I I ABOVE FLOOR <br />TYPICAL PATIENT ROOM <br />. PATIENT VICINITY DISTANCES <br />C. GROUND TEST DOES NOT INCLUDE: <br />1. SMALL WALL MOUNTED CONDUCTIVE SURFACES, TOWEL AND SOAP DISPENSERS, <br />MIRRORS, BED PANS, ETC. <br />2. LARGE METAL SURFACES NOT LIKELY TO BECOME ENERGIZED, WINDOW FRAMES, DOOR <br />FRAMES, FLOOR DRAINS AND MOVABLE CABINETS. <br />D. TEST METHOD: <br />1. BOTH VOLTAGE AND IMPEDANCE MEASUREMENTS MUST BE MADE. <br />2. ALL MEASUREMENTS MUST BE TAKEN TO A REFERENCE POINT OR IN NEAR AREA <br />BEING TESTED. <br />0. GROUND BAR IN A PANEL SERVING AN AREA. <br />b. GROUND JACK IF ONE EXISTING. <br />c BUS. <br />d. AN ALL METAL COLD WATER PIPE. <br />e. BE CAREFUL OF WASTE PIPE OR SPRINKLER PIPE BECAUSE OF NO -HUB AND <br />VITAULIC FITTINGS. <br />f. GROUNDING CONTACT OR A RECEPTACLE THAT IS POWERED FROM A DIFFERENT <br />CIRCUIT FROM THE RECEPTACLE UNDER TEST. <br />3. VOLTAGE MEASUREMENTS ARE TO BE MADE BETWEEN REFERENCE POINT AND <br />APPROPRIATE CONDUCTIVE SURFACES INCLUDING RECEPTACLE GROUND CONTACTS. <br />4. IMPEDANCE MEASUREMENTS ARE TO BE MADE ONLY BETWEEN REFERENCE POINT AND <br />E. REQUIRED RESULTS: <br />1. NEW/EXISTING CONSTRUCTION <br />0. VOLTAGE - MAXIMUM 20MV +/-20% (24 TO 20MV) <br />b. IMPEDANCE - MAXIMUM 0.1 OHM +/-20% (0.12 TO 0.1 OHM) <br />C* IMPEDANCE (ISOLATED GROUND) - MAXIMUM 0.2 OHM +/- 20% (0.28 TO 0.12 OHM) <br />F * GENERAL COMMENTS: <br />1. THE IMPEDANCE MEASUREMENTS FOR NEW AND EXISTING CONSTRUCTION SHALL BE <br />THE RATIO OF 60HZ VOLTAGE DEVELOPED BETWEEN A POINT UNDER TEST AND A <br />REFERENCE POINT TO 60HZ CURRENT APPLIED TO THE POINT UNDER TEST. IF <br />EXISTING CONSTRUCTION 60HZ OR DC MAY BE USED, AND THE TEST MUST NOT <br />ENDANGER PATIENT. <br />2. ALSO, TESTS MUST INCLUDE CORRECT POLARITY OF HOT AND NEUTRAL AND <br />GROUNDING BLADE RETENTION FORCE (40Z. MIN.) <br />G. TEST EQUIPMENT: <br />- 1. USE A MILLIVOLT METER DESIGNED FOR THIS PURPOSE WITH 1 K OHM INPUT <br />RESISTANCE (+/-10%) AT FREQUENCIES OF 1000HZ OR LESS. <br />2. USE A HIGH Z MV METER NTH EXTERNAL FREQUENCY SHAPING NETWORK. <br />. 3. RECEPTACLE POLARITY TESTER. <br />. 4. RETENTION FORCE TESTER OR MANUFACTURER'S DATA VERIFYING COMPLIANCE <br />THROUGH U.L, NEMA OR OTHER TESTS. <br />. <br />EXISTING CONDMONS GENERAL NOTES <br />1. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING <br />AND SITE AFFECTED BY THIS WORK BEFORE SUBMITTING PROPOSALS, <br />SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND <br />DIFFICULTIES THAT WILL AFFECT EXECUTION OF THE WORK. <br />SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT <br />SUCH EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, <br />EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES <br />ENCOUNTERED WILL NOT BE RECOGNIZED. <br />2. ELECTRICAL CONTRACTOR SHALL TRACE LIGHTING AND POWER BRANCH <br />CIRCUITS TO IDENTIFY CIRCUITS SERVING AREA WITHIN SCOPE OF <br />WORK. PROVIDE UPDATED TYPEWRITTEN PANEL SCHEDULES AT <br />COMPLETION OF WORK. <br />3. DISCONNECT ELECTRICAL SYSTEMS IN WALLS, FLOORS AND CEILINGS TO <br />BE REMOVED. REMOVE EXISTING POWER, LIGHTING, SYSTEMS, MATERIAL <br />AND EQUIPMENT MICH ARE MADE OBSOLETE OR WHICH INTERFERE <br />NTH THE CONSTRUCTION OF THE PROJECT. <br />3.a. REINSTALL ANY SUCH POWER, LIGHTING, SYSTEMS, MATERIALS AND <br />EQUIPMENT MICH ARE REQUIRED TO REMAIN AC71VE FOR THE <br />FACILITY TO BE FULLY FUNCTIONAL <br />4. EXISTING OUTLET BOXES AND CONDUIT MICH ARE LOCATED PROPERLY <br />FOR NEW WORK MAY BE REUSED FOR NEW DEVICES AND WIRE. <br />. <br />5. ALL CONDUIT AND WIRE REMOVED SHALL BE TAKEN BACK TO THE <br />SOURCE OF SUPPLY. <br />- <br />6. ALL UNUSED RACEWAYS WITHIN ACCESSIBLE SPACES SHALL BE <br />COMPLETELY REMOVED. REMOVE ALSO ASSOCIATED CONDUCTORS, <br />JUNCTION BOXES, FASTENERS AND SUPPORTS. <br />7. REMOVE CONDUCTORS FROM EXISTING FLOOR BOXES BEING DEMOLISHED <br />ATCH SURFACES AS DIRECTED BY GENERAL <br />CONTRACTOR. <br />. 8. WHERE EXISTING EQUIPMENT OR MATERIALS ARE REMOVED OR <br />CHANGED, ALL BRANCH CONDUITS, WHICH NO LONGER ARE IN SERVICE, <br />SHALL BE REMOVED AS DIRECTED BY THE ARCHITECT. IF, IN THE <br />� <br />COURSE OF THE WORK, OUTLETS ARE COVERED UP OR OTHERWISE <br />RENDERED INACCESSIBLE, ALL WRING TO SAME SHALL BE REMOVED TO <br />THE SOURCE. IF A CIRCUIT THAT MUST REMAIN IN SERVICE IS <br />INTERRUPTED THEREBY, IT SHALL BE RECONNECTED BY THE MOST <br />INCONSPICUOUS MEANS SO AS TO REMAIN OPERATIONAL, NTH SAME <br />CAPACITY AS BEFORE. ALL BUILDING SURFACES DAMAGED, AND <br />OPENINGS LEFT BY REMOVAL OF BOXES, PIPING OR OTHER EQUIPMENT <br />SHALL BE REPAIRED BY THE CONTRACTOR. ALL HOLES LEFT IN <br />JUNCTION BOXES, SWITCHES, PANELS, ETC. SHALL BE CLOSED. <br />9. WHERE NEW OPENINGS ARE CUT AND CONCEALED CONDUITS, ETC., ARE <br />ENCOUNTERED, THEY SHALL BE REMOVED OR RELOCATED AS <br />REQUIRED. MERE CONDUIT TO BE REMOVED STUBS THROUGH FLOORS, <br />WALLS, AND CEILINGS, SUCH CONDUIT SHALL BE REMOVED TO THE <br />POINT WHERE THE FINISH SURFACES CAN BE PATCHED ADEQUATELY <br />SO THAT NO EVIDENCE OF THE FORMER INSTALLATION REMAINS. <br />10. ALL REUSABLE DEVICES, FIXTURES AND EQUIPMENT SHALL BECOME THE <br />PROPERTY OF THE OWNER. ALL OTHER SALVAGE AND DEBRIS SHALL <br />BE REMOVED FROM THE PREMISES DAILY. <br />11. ABANDONED LOW VOLTAGE CABLES WITHIN CEILING SPACES SHALL BE <br />REMOVED AS PER ARTICLE 725.25 OF THE NFPA-70. <br />- :�;�:7_1114=;'._Ibl�__7� 0,0 � --'OIC1711(0�: =': 1:1 =-: <br />0- 0 0 - I '111=;.- 1; "I �0.1 'OF_-1 m -_-'� - = <br />, <br />- " I <br />I , :' 0 i'l�l-o,,;§;I;,,O;I"t,v,IZ-14-'=i�V-111�Z �� <br />- , , - ' - = <br />' 'F'P <br />0,11-1 . -, OF <br />" -1 0 111111111;� = 7. =; m f0j =*1' im, 7 = � I <br />:' 1= 1j: ,-Pkbltzil�--�'�vllfOk-7-1:fALOII.0,7.;Wi=lq b I 0 I -,:I, <br />I <br />D � - ;' D" 0 F-A I =1 *'fffei fi;' =W�11' ;� -- V -- 01 I rill <br />."m "�:' -1�k -0, � w --g­ - <br />I , D_ �:!&_' _I'Afe:� _'FA=�_- <br />� & 0"w A" <br />ELECTRICAL SPECIFICAMONS <br />GENERAL PROMSIONS <br />A. PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT FOR A COMPLETE <br />ATING ELECTRICAL SYSTEM. INCLUDE NECESSARY <br />FEES AND PERMITS WITHIN BASE BID. <br />ARCHITECTURAL, MECHANICAL, PLUMBING AND FIRE PROTECTION <br />WI DERED PART OF THESE CONSTRUCTION <br />DINATION, EQUIPMENT CONNECTION, HEIGHTS <br />AND LOCATIONS. <br />B. CODES AND STANDARDS: ALL ELECTRICAL WORK SHALL BE IN STRICT <br />COMPLIANCE NTH THE PROVISIONS OF THE LOCAL GOVERNMENT <br />AUTHORITY, THE NATIONAL ELECTRIC CODE 2017 EDITION; SEVENTH <br />EDITION (2020) FLORIDA BUILDING CODE, THE FLORIDA FIRE <br />PREVENTION CODE 2020 EDITION, NATIONAL FIRE ALARM CODE NFPA <br />72 2016 EDITION AND THE CODES AND STANDARDS REFERENCED <br />THEREIN. ALL MATERIALS SHALL BE NEW AND FREE FROM DEFECTS, <br />AND SHALL BEAR THE UNDERWRITER'S LABEL <br />C. CONTRACTOR SHALL THOROUGHLY INVESTIGATE SITE BEFORE BIDDING. <br />WI OWED IN CONTRACT PRICE FOR WORK <br />REQUIRED TO COMPLY WITH EXISTING CONDITIONS. <br />D. ALL ELECTRICAL WORK SHALL BE DONE IN A NEAT AND WORKMANLIKE <br />MANNER. <br />E. CONTRACTOR SHALL SCHEDULE ALL DOWN -TIME NTH THE OWNER <br />PRIOR TO BEGINNING THE WORK. PREMIUM /OVERTIME RATES MAY BE <br />REQUIRED AND MUST BE INCLUDED IN BASE BID. <br />F. CONTRACTOR SHALL THOROUGHLY REVIEW CONSTRUCTION DOCUMENTS <br />AND WALK SITE. WHEN CONFLICTS ARISE WITHIN CONSTRUCTION <br />DOCUMENTS, CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO <br />SUBMITTING A BID. SUBMISSION OF A BID SHALL INDICATE THAT <br />LY REVIEWED CONSTRUCTION DOCUMENTS AND <br />WALKED THE SITE PRIOR TO BID SUBMISSION. <br />WHEN ENGINEER IS NOT AVAILABLE, OR TIME DOES NOT <br />PERMIT,CON TRACTOR SHALL INCLUDE THE MOST STRINGENT (COSTLY) <br />REQUIREMENTS WITHIN BASE BID. <br />G. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANY AND <br />TELECOMMUNICATION COMPANY FOR LOCATIONS, REQUIREMENTS AND <br />CONDUITS ROUTING PRIOR TO COMMENCEMENT OF WORK OR ROUGH -IN. <br />H. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING <br />MANUFACTURERS, SUB -CON TRACTORS, VENDORS AND SUPPLIERS, WITH <br />A COMPLETE SET OF THESE DOCUMENTS PRIOR TO SUBMITTING A BID. <br />1. GUARANTEE ALL ELECTRICAL SYSTEM MATERIALS AND WORKMANSHIP <br />TO BE FREE FROM DEFECTS FOR A PERIOD OF ONE (1) YEAR FROM <br />THE DATE OF FINAL ACCEPTANCE AND PROPERLY CORRECT LATENT <br />DEFECTS ARISING WITHIN THIS PERIOD UPON NOTIFICATION BY THE <br />VE WITHOUT ADDITIONAL COMPENSATION. <br />J. DAILY REMOVE REFUSE AND DEBRIS ACCUMULATING FROM ELECTRICAL <br />CONSTRUCTION AND PRIOR TO ACCEPTANCE OF THIS WORK, LEAVE THE <br />PREMISES "BROOM CLEAN" INSOFAR AS AFFECTED BY ELECTRICAL <br />WORK. <br />K. ELECTRICAL CONTRACTOR SHALL EXAMINE ARCHITECTURAL, <br />MECHANICAL, PLUMBING AND FIRE PROTECTION DRAWINGS FOR <br />ESTIMATING AND CONSTRUCTION OF THIS PROJECT. SUBMISSION OF A <br />THAT SUCH <br />EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, <br />EQUIPMENT OR MATERIALS REQUIRED FOR CONNECTING AND <br />ENERGIZING EQUIPMENT SHOWN ON THOSE DRAWINGS WILL NOT BE <br />RECOGNIZED. ELECTRICAL CONTRACTOR SHALL COMMUNICATE <br />DISCREPANCIES TO ENGINEER PRIOR SUBMITTING A BID. <br />L. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN <br />DRAWINGS AND WITHIN THESE SPECIFICATIONS SHALL BE CONSIDERED <br />AS "SPECIFIED STANDARD" OF QUALITY. NO SUBSTITU11ONS SHALL BE <br />WIH PROVAL OF THE ENGINEER AT LEAST 10 <br />DAYS PRIOR TO BID DATE. <br />ANY DEVIATION FROM SPECIFIED EQUIPMENT THAT AFFECT THE <br />INSTALLATION, OPERATION, PERFORMANCE, QUALITY OR LONGEVITY OF <br />THE ELECTRICAL SYSTEMS AS DEFINED HEREIN, SHALL BE REPLACED <br />BY THE ELECTRICAL CONTRACTOR WITH NO ADDITIONAL COST TO THE <br />CLIENT, IN ADDITION, ELECTRICAL CONTRACTOR SHALL PROVIDE THE <br />ENGINEERING WITH PHOTOMETRIC FLOOR PLANS FOR ANY LIGHTING <br />APPROVAL AT LEAST 10 DAYS PRIOR TO BID <br />DATE. <br />BASIC MATERIALS AND METHODS <br />A. RACEWAYS AND FITTINGS: ALL RACEWAYS AND FITTINGS SHALL BE <br />GALVANIZED RIGID STEEL OR INTERMEDIATE METAL CONDUIT WITH <br />LOCKNUTS AND BUSHINGS, WITH THE EXCEPTION THAT WERE <br />SPECIFICALLY ALLOWED BY THE NATIONAL ELECTRICAL CODE AND <br />APPLICABLE LOCAL CODES. ELECTRICAL METALLIC TUBING (E.M.T) MAY <br />BE USED FOR ALL INTERIOR EXPOSED AND CONCEALED WORK MERE <br />IT IS NOT SUBJECT TO PHYSICAL DAMAGE OR CORROSION. FITTINGS <br />REW TYPE. PVC SCHEDULE 40 WITH TAR <br />COATED GALVANIZED RIGID STEEL ELBOWS SHALL BE USED FOR BELOW <br />GRADE INSTALLATIONS. MC CABLE SHALL BE ALLOWED WHEN <br />APPROVED BY TENANT AND LANDLORD AND IT SHALL BE INSTALLED <br />THE NEC, NO BX CABLE ALLOWED. INSTALL <br />EXPANSION FITTINGS IN RACEWAYS EVERY 200' LINEAR RUN OR <br />WHEREVER STRUCTURAL EXPANSION JOINTS ARE CROSSED. <br />FOR MEDICAL, DENTAL AND SIMILAR OFFICES AS DEFINED BY NEC <br />ARTICLE 517, NO NON-METALIC RACEWAYS SHALL BE USED ANYWHERE <br />LI <br />RECEPTACLE CIRCUITS, FIXED EQUIPMENT CIRCUITS, SWITCH LEGS AND <br />LIGHT FIXTURE MIPS. <br />B. PROVIDE PULL STRING IN ALL EMPTY CONDUITS. <br />C. FINAL CONNECTIONS TO MOTORS OR EQUIPMENT SUBJECT TO <br />VIBRATION SHALL BE MADE UP NTH GREENFIELD IN DRY LOCATIONS <br />AND WITH JACKETED, LIQUID -TIGHT, FLEXIBLE, GALVANIZED STEEL <br />CONDUIT IN WET OR DAMP LOCATIONS. <br />D. CONDUCTORS: FEEDER AND BRANCH CIRCUIT CONDUCTORS SHALL BE <br />THWN-2 COPPER (MINIMUM SIZE #12 UNLESS OTHERWISE NOTED). PER <br />NEC 110.14 (c)(1)(a)Ab) CONDUCTOR AMPACITY BASED ON 60*C <br />COLUMN FOR CIRCUITS RATED 100 AMPS OR LESS, OR #1 AWG OR <br />75*C COLUMN FOR CIRCUITS RATED OVER 100 <br />AMPS, OR LARGER THAN #1 AWG CONDUCTORS PER TABLE NEC <br />310.15(B)(16). NO ALUMINUM SHALL BE PERMITTED UNLESS <br />SPECIFICALLY NOTED OTHERWISE. INSTALL ALL WRING IN CONDUIT OR <br />APPROVED RACEWAYS UNLESS OTHERWISE INDICATED. PROVIDE #10 <br />AWG FOR BRANCH CIRCUITS OVER 100 FEET IN LENGTH TO ACCOUNT <br />FOR VOLTAGE DROP. PROVIDE #10 GROUND TO CORRESPOND. ALL <br />BRANCH CIRCUITS SHALL CARRY AN EQUIPMENT GROUNDING <br />CONDUCTOR, AND BE WIRED WITH COLOR -CODED WIRE WITH SAME <br />-CODE SHALL BE AS <br />FOLLOWS: <br />120/208 VOLT- <br />LU <br />NEUTRAL - WHITE <br />GROUND - GREEN. <br />PUSH -IN WIRE CONNECTORS ARE NOT PERMITTED. <br />E. LOCATE ALL DEVICES AND EQUIPMENT WERE SHOWN ON DRAWINGS. ALL <br />DIMENSIONS SHOWN ON THE DRAWINGS ARE FROM FINISHED FLOOR TO THE <br />CENTER OF THE DEVICE UNLESS OTHERWISE INDICATED. STANDARD <br />MOUNTING HEIGHTS ARE AS FOLLOWS: <br />DEVICES HEIGHT AFF AT DEVICE CENTER <br />ELECTRICAL OUTLETS 18" <br />ELECTRICAL OUTLETS ABOVE COUNTER 420 <br />TELEPHONE 180 <br />WALL TELEPHONE 46" <br />LIGHT SWTCHES 420 <br />FIRE ALARM DEVICES 80m TO BOTTOM OF GLASS <br />EXIT SIGNS AS NECESSARY <br />SPECIAL DEVICES <br />NOTE: ELECTRICAL CONTRACTOR SHALL FIELD VERIFY AND COORDINATE NTH <br />PROJECT SUPERINTENDENT FOR OVER COUNTER OUTLETS MOUNTING <br />HEIGHT AND DIRECTION (VERTICAL OR HORIZONTAL) PRIOR TO ROUGH -IN. <br />F. DISCONNECT SWTCHES: HEAVY DUTY, FUSED OR NON -FUSED AS CALLED <br />FOR ON DRAWINGS. PROVIDE SOLID NEUTRAL CONNECTION MERE <br />REQUIRED. USE NEMA-1 INDOORS AND NEMA-3R OUTDOORS. ALL <br />DISCONNECT SWITCHES SHALL BE PROVIDED WITH GROUND KIT. <br />G. PROVIDE PANELBOARDS OF THE DEAD FRONT TYPE, NO LESS THAN 20 <br />INCHES WIDE AND 5 3/4 INCHES DEEP WITH QUANTITY OF BRANCH <br />CIRCUITS/CIRCUIT BREAKERS AS INDICATED ON THE PANELBOARD <br />SCHEDULE NTH THE VOLTAGE, PHASE AND AMPERE RATING AS REQUIRED. <br />ALL PANELBOARDS SHALL HAVE PHASE SEQUENCE CIRCUITS AND BOLT -ON <br />CIRCUIT BREAKERS. MAIN BREAKERS SHALL BE MOLDED CASE. CIRCUIT <br />BREAKERS FEEDING HVAC LOADS SHALL BE HACR TYPE THAT SERVE AS <br />DISCONNECTING MEANS FOR EQUIPMENT SHALL BE PROVIDED WITH <br />PERMANENTLY INSTALLED LOCK -OFF KIT. TYPEWRITTEN PANEL DIRECTORIES <br />SHALL BE PROVIDED AT COMPLETION OF THE PROJECT. <br />H. ELECTRICAL CONTRACTOR SHALL REVIEW ONE LINE POWER RISER DIAGRAM <br />IN CONJUNCTION WITH SWITCHGEAR MANUFACTURER REPRESENTATIVE TO <br />CROSS REFERENCE POWER RISER NTH PANEL SCHEDULES AND VERIFY <br />VOLTAGES, AMPS, LUGS SIZES/NUMBER AND CABINETS DIMENSIONS PRIOR <br />TO SUBMITTING A BID. <br />1. EXERCISE CARE IN CONNECTING THE VARIOUS ELECTRICAL LOADS TO THE <br />PANELS IN ORDER TO ARRIVE AT A REASONABLE BALANCE BETWEEN <br />LOADS IN EACH PHASE AT EACH PANEL MAKE TESTS AND ADJUST <br />LOADS AT EACH PANEL TO RESULT IN REASONABLY BALANCED LOAD <br />CONDITION. SATISFACTORY TO THE UTILITY COMPANY. ENGINEER, OWNER <br />AND INSPECTION AGENCIES. DOCUMENT ALL SAID LOAD ADJUSTMENTS. <br />J. MANUFACTURERS: BASE OF DESIGN IS SQUARE D, EQUAL PRODUCTS BY <br />GENERAL. ELECTRIC, SIEMENS OR CUTLER HAMMER WILL BE CONSIDERED. <br />K. MATERIALS SHALL BE NEW AND UNUSED AND THE CATALOGUED PRODUCTS <br />OF MANUFACTURERS REGULARLY ENGAGED IN THE PRODUCTION OF SUCH <br />MATERIALS. THE MATERIALS SHALL BE OF THE MANUFACTURER'S LATEST <br />OMPLIES WITH THE SPECIFICATION REQUIREMENTS. <br />ALL MATERIALS SHALL BE PROVIDED WITH UL LABELS. <br />M. LIGHTING <br />M.1. LIGHTING FIXTURES SHALL BE AS SHOW ON THE DRAWING AND SHALL <br />BE FURNISHED WITH LAMPS INSTALLED. <br />M.2. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING <br />CEILING TYPES PRIOR TO ORDERING LIGHT FIXTURES. <br />M.3. LIGHT FIXTURES SHALL BE SUPPORTED WITH #12 GAUGE WIRE FROM <br />BUILDING STRUCTURE AND NOT FROM CEILING GRID. SECURE TWO <br />OPPOSITE CORNERS TO STRUCTURE. <br />M.4. LUMINAIRES MUST NOT BE INSTALLED LESS THAN 1 2/2 INCHES <br />BELOW METAL ROOF DECKING. <br />N. ALL GROUNDING SHALL CONFORM TO AR11CLE 250 OF THE NEC <br />REQUIREMENTS. IN ADDITION THERETO AS IMPOSED BY THE DRAWINGS AND <br />THE LOCAL CODE ENFORCEMENT AUTHORITIES HAVING JURISDICTION. <br />0. SUBMITTALS: SUBMIT ELECTRONIC SUBMITTALS VIA E-MAIL FORMATTED AS <br />PDF FILE. <br />P. CONDUIT PENETRATIONS THROUGH FIRE RATED PARTITIONS SHALL BE <br />OVED SYSTEM. REFER TO ARCHITECTURAL <br />FLOOR PLAN FOR LOCATION OF FIRE RATED PARTITIONS. PROVIDE <br />ACOUSTICAL FOAM SEALANT AT ALL DEVICES ON DEMISING PARTITIONS. IF <br />PAR11TION IS FIRE RATED, PROVIDE FIREPROOF COMPOUND ON BACK AND <br />SIDES OF THE BOX. MERE TELEPHONE AND ELECTRICAL OUTLETS APPEAR <br />ON PLANS AS BACK TO BACK, OUTLETS SHALL BE STAGGERED TO REDUCE <br />NOISE TRANSMISSION. WERE WALLS AND PARTITIONS ARE REQUIRED TO <br />HAVE A MINIMUM OF 1-HOUR FIRE -RESISTANCE RATING, BOXES SHALL BE <br />SEPARATED BY A MINIMUM HORIZONTAL DISTANCE OF 24 INCHES OR <br />PROTECTED NTH UL LISTED PUTTY PADS. <br />Q. ELECTRICAL CONTRACTOR SHALL REVIEW THE ARCHITECTURAL DRAWINGS <br />FOR DEVICES EXACT LOCATIONS, MOUNTING HEIGHTS AND QUANTITIES <br />PRIOR TO BID AND PRIOR TO ROUGH -IN. NOTIFY THE ENGINEER <br />IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND. <br />' <br />R. REVIEW AND COORDINATE WITH MECHANICAL CONTRACTOR DRAWNGS FOR <br />EQUIPMENT, CONDUIT, DEVICES, ETC. REQUIRED FOR A COMPLETE AND <br />OPERATING HVAC SYSTEM. LOW VOLTAGE CONTROL WRING FURNISHED AND <br />INSTALLED BY DIVISION 15. CHECK ALL MOTORS AND ROTATING EQUIPMENT <br />FOR PROPER ROTATION. <br />S. FINAL QUANTITY OF EXIT AND EMERGENCY LIGHTS TO BE DETERMINED BY <br />FIRE MARSHALL INCLUDE CONTINGENCY FOR 6 ADDITIONAL EXIT LIGHTS AND <br />6 ADDITIONAL EMERGENCY LIGHTS IN BASE BID. <br />T. PROVIDE BACK BOXES AND RACEWAY FOR DOOR ACCESS CARD READERS <br />AND ELECTRIC STRIKES AS PER SECURITY CONTRACTOR DIRECTIONS. <br />PROVIDE 120VAC TO EACH ELECTRIC STRIKE DOOR LOCATION AND TO <br />ACCESS CONTROL SYSTEM PANEL ACCESS CONTROL SYSTEM MUST <br />DEACTIVATE OR OPEN ANY DOOR LOCKING MECHANISM AND REMAIN IN <br />FAIL SAFE POSITION WHENEVER FIRE ALARM SYSTEM IS ACTIVATED OR <br />BUILDING POWER FAILS. PROVIDE *PUSH-TO-EXI'r PUSHBUTTON AND <br />MOTION DETECTOR AT EACH ACCESS DOOR LOCATION. INTERLOCK WTH <br />FIRE ALARM SYSTEM. ANY CARD READERS PREVENTING FREE EGRESS <br />SHALL BE IN ACCORDANCE WTH SECTION 1010.1.9.9 OF CHAPTER 10 OF <br />THE FLORIDA BUILDING CODE. <br />U. ELECTRICAL CONTRACTOR MAY COMBINE CIRCUITS IN A COMMON RACEWAY <br />C TABLE 310-15. <br />SHARED NEUTRAL SHALL NOT BE ALLOWED UNLESS OTHERWSE INDICATED. <br />CIRCUITS SHARING A COMMON NEUTRAL MUST HAVE COMMON TRIP CIRCUIT <br />BREAKERS TO ALLOW ALL TO BE TURNED OFF SIMULTANEOUSLY, AS PER <br />NEC 210.4�13). <br />V. ELECTRICAL CONTRACTOR SHALL INCLUDE CORE DRILLING, CUTTING AND <br />PATCHING FOR THE INSTALLATION OF HIS/HER WORK WITHIN BASE BID. <br />W. CLEAN ALL NEW AND EXISTING LIGHT FIXTURES, LAMPS AND LENSES AND <br />PANELBOARD INTERIORS PRIOR TO FINAL ACCEPTANCE. <br />X. PROVIDE DISK FILE ON CAD 2015 OR NEWER RELEASE WITH ACCURATE <br />ELECTRICAL RECORD DRAWINGS AT THE COMPLETION OF THE PROJECT. <br />Y. CONTRACTOR REPRESENTS THAT HIS BID IS BASED UPON THE <br />MANUFACTURER'S MATERIALS AND EQUIPMENT DESCRIBED IN THE <br />CONTRACT DOCUMENTS. <br />Z. ELECTRICAL CONTRACTOR SHALL FILL UTILITY SERVICE INFORMATION LOAD <br />FORMS AND BUILDING DEPARTMENT ELECTRICAL PERMIT FORMS. <br />AA. ELECTRICAL CONTRACTOR SHALL INSTRUCT OWNER REPRESENTATIVE <br />REGARDING EQUIPMENT OPERATION AND MAINTENANCE AT COMPLETION OF <br />WORK. PROVIDE OMER NTH ALL MANUALS PERTAINING TO THE PROJECT. <br />AB. LOW VOLTAGE CABLES FOR SECURITY SYSTEM, AV SYSTEM, TELEPHONE <br />SYSTEM AND DATA SYSTEM ARE NOT PART OF THIS ENGINEER'S SCOPE OF <br />WORK. ELECTRICAL CONTRACTOR SHALL COORDINATE NTH LOW VOLTAGE <br />VENDOR(S) FOR BOXES AND RACEWAYS LOCATIONS, SIZES AND ROUTING <br />PRIOR TO ROUGH -IN. <br />AC. MINIMUM EMERGENCY ILLUMINATION SHALL BE PROVIDED FOR A PERIOD OF <br />1 1/2 HOURS IN THE EVENT OF FAILURE OR NORMAL LIGHTING, WITHIN THE <br />Y LIGHTING FACILITIES SHALL BE ARRANGED TO <br />PROVIDE INITIAL ILLUMINATION THAT IS AT LEAST AN AVERAGE OF 1 <br />FOOTCANDLE (10 LUX) AND A MINIMUM AT ANY POINT OF 0.1 FOOTCANDLE <br />(1 LUX) MEASURED ALONG THE PATH OF EGRESS AT FLOOR LEVEL <br />FIRE ALARM: <br />1. PROVIDE A COMPLETE DESIGN -BUILT ADDRESSABLE FIRE ALARM <br />SYSTEM TO COMPLY NTH FLORIDA FIRE PREVENTION CODE 2020 <br />EDITION, NFPA 72 2013 EDITION, FLORIDA ACCESSIBILITY CODE FOR <br />BUILDING CONSTRUCTION 2020 EDITION, AND LOCAL JURISDICTION <br />REQUIREMENTS. DO NOT BID PER PLANS. DEVICES SHOWN FOR <br />ARM CONTRACTOR SHALL PROVIDE A FIRE <br />ALARM SYSTEM THAT PASSES ALL APPLICABLE CODES. <br />2. HORN/STROBE TO MEET DB AND CANDELA AS PER ADA AND <br />NFPA-72 REQUIREMENTS. REFER TO NFPA 72 TABLES 18.5.5.4.1(A), <br />18.5.5.4.1(B), AND A.18.4.3 AS A BASE POINT AND FIGURE <br />18.5.5.4.1. <br />3. ALL BE FURNISHED BY ELECTRICAL <br />CONTRACTOR, INSTALLED BY MECHANICAL CONTRACTOR AND WRED BY <br />ELECTRICAL CONTRACTOR. PROVIDE RELAY LOCATED (SUPERVISED) <br />WITHIN 3 FT OF DISCONNECT RELAY TO SHUT DOWN HVAC UNIT AIR <br />P WTH BATTERY BACKUP. DUCT SMOKE <br />DETECTORS SHALL BE CONNECTED TO THE PROTECTIVE SIGNALING <br />SYSTEM IN ACCORDANCE NTH NFPA 72 AND CAUSE AN AUDIBLE AND <br />VISIBLE SUPERVISORY SIGNAL TO BE INDICATED AT A CONSTANTLY <br />ATTENDED LOCATION UPON INITIATION. PROVIDE A REMOTE DUCT <br />SMOKE DETECTOR REMOTE TEST INDICATOR PER EACH DUCT SMOKE <br />DETECTOR, LOCATE AT A VISIBLE ATTENDED LOCATION NEAR DUCT IT <br />SUPERVISES. <br />4. TOR SHALL REVIEW MECHANICAL DRAWINGS FOR <br />DUCT SMOKE DETECTORS AND FIRE/SMOKE DAMPERS REQUIREMENTS. <br />INCLUDE CONNECTION COST WTHIN BASE BID. <br />5. ELECTRICAL CONTRACTOR SHALL OBTAIN THE SERVICES OF THE <br />LANDLORD FIRE ALARM CONTRACTOR FOR DESIGN, INSTALLATION AND <br />PERMITTING OF THE FIRE ALARM WORK. INCLUDE COST WTHIN BASE <br />BID. <br />6. PROVIDE SIGNED AND SEALED FIRE ALARM SHOP DRAWINGS PREPARED <br />IONAL ENGINEER IN THE EMPLOYMENT OF THIS <br />CONTRACTOR FOR BUILDING DEPARTMENT REVIEW AND PERMIT. <br />7. SMOKE DETECTORS SHALL NOT BE LOCATED LESS THAN 3'-Om FROM <br />HVAC GRILLES. (DRAWINGS SHOW GENERAL LOCATION ONLY.) <br />8. FIRE ALARM SYSTEM CABLES SHALL BE #14 COPPER MINIMUM <br />ENCLOSED IN 3/4- OR LARGER EMT CONDUIT FOR NOTIFICATION. <br />SIGNAL LINE CIRCUIT PER MANUFACTURER'S SPECIFICATIONS. BOXES <br />FOR DEVICES SHALL BE 2 1/8' DEEP. <br />9. PROVIDE M01ION DETECTOR, PUSHBUTTON TO EXIT AND RRE ALARM <br />INTERLOCK FOR EACH ELECTRICALLY HELD DOOR. <br />10. F1NAL QUANTITY OF STROBE/HORNS MAY BE INCREASED BY FIRE MARSHAL <br />INCLUDE CONTINGENCY FOR 6 ADDITIONAL STROBE/HORNS AND 6 SMOKE <br />DETECTORS IN BASE BID. FIRE ALARM CONTRACTOR SHALL REFER TO FIR <br />PROTECTION DRAWINGS AND PROVIDE TAMPER SWTCHES AND FLOW <br />SWITCHES AT EACH FIRE PROTECTION SHUT-OFF VALVE/RISER/BACKFLOW. <br />11. 61G15 FLORIDA ADMINISTRATIVE CODE COMPLIANCE: <br />a) PROVIDE 24 HOUR BATTERY BACK-UP WITH 15 MINUTES OF RUN TIME <br />AT END FOR ALL EQUIPMENT AND DEVICES. PROVIDE BATTERY <br />CALCULATIONS VOLTAGE DROP CALCULATIONS PER UL 864 9TH <br />EDITION NTH SHOP DRAWINGS AND SUBMITTALS. <br />b) SHOW REQUIRED INTER -TIES TO ALL EXISTING FIRE ALARM SYSTEM <br />COMPONENTS AND/OR EXISTING AND NEW SYSTEMS REQUIRED TO <br />MAKESYSTEMS OPERATE AS ONEPER NFPA. <br />c) PROVIDE AUDIBLE NOTIFICATION 15 DECIBEL ABOVE AMBIENT NOISE <br />LEVELS. SEE NFPA 72 APPENDIX A TABLE A.18.4.3 AS BASE PONT. <br />PROVIDE VISUAL NOTIFICATION PER NFPA 72 18.5 AND FLORIDA <br />BUILDING CODE. <br />d) STROBES WITHIN SAME VISUAL RANGE SHALL SYNCHRONIZE. IF THIS <br />REQUIREMENT CANNOT BE ACCOMPLISHED NTH THE EXISTING DEVICES, <br />FIRE ALARM CONTRACTOR SHALL INCLUDE COST OF REPLACEMENT IN <br />BASE BID. PROVIDE SYNCHRONIZING MODULES AS NECESSARY. <br />e) TWO GROUPS OF VISIBLE NOTIFICATION APPLIANCES, WHERE VISUAL <br />APPLIANCES OF EACH GROUP ARE SYNCHRONIZED, IN THE SAME ROOM <br />OR ADJACENT SPACE WITHIN THE FIELD OF VIEW SHALL SYNCHRONIZE. <br />THIS SHALL INCLUDE SYNCHRONIZATION OF STROBES OPERATED BY <br />SEPARATE SYSTEMS. <br />f) MORE THAN TWO VISIBLE NOTIFICATION APPLIANCES OR GROUPS OF <br />LICES IN THE SAME ROOM OR ADJACENT SPACE <br />WITHIN THE FIELD OF VIEW THAT FLASH IN SYNCHRONIZATION. <br />g) MEN AN EXISTING SPACE OPENS INTO AN ADJACENT SPACE DUE TO <br />WALLS BEING DEMOLISHED, NOTIFICATION DEVICES OF BOTH SIDES <br />WITHIN SAME FIELD OF VIEW SHALL SYNCHRONIZE. REFER TO <br />ARCHITECTURAL DRAWINGS. <br />h) CONDUCTORS SHALL BE U.L LISTED FPLR MANUFACTURED AND <br />INSTALLED PER NFPA 70 SECTION 760. PROVIDE POWER LIMITED <br />SYSTEM. EXPOSED CABLES IN PLENUMS SHALL BE RATED FOR THE <br />R THAN 7'-O* AFF SHALL BE SLEEVED. <br />12. 760.49 NPLFA CIRCUIT CONDUCTORS. <br />0. SIZES AND USE. ONLY COPPER CONDUCTORS SHALL BE <br />PERMITTED TO BE USED FOR FIRE ALARM SYSTEMS. SIZE 18 AWG <br />AND 16 AWG CONDUCTORS SHALL BE PERMITTED TO BE USED, <br />PROVIDED THEY SUPPLY LOADS THAT DO NOT EXCEED THE <br />AMPACITIES GIVEN IN TABLE 402.5 AND ARE INSTALLED IN A <br />RACEWAY, AN APPROVED ENCLOSURE, OR A LISTED CABLE. <br />CONDUCTORS LARGER THAN 16 AWG SHALL NOT SUPPLY LOADS <br />GREATER THAN THE AMPACITIES GIVEN IN 310.15, AS APPLICABLE. <br />b. INSULATION. INSULATION ON CONDUCTORS SHALL BE SUITABLE <br />FOR 600 VOLTS. CONDUCTORS LARGER THAN 16 AWG SHALL <br />COMPLY WITH ARTICLE 310. CONDUCTORS 18 AWG AND 16 AING <br />SHALL BE TYPE KF-2, KFF-2, PAFF, PTFF, PF, PFF, PGF, PGFF, <br />RFH-2, RFHH-2, RFHH-3, SF-2, SFF-2, TF, TFF, TFN, 18,16 <br />14/12 THHN OR THWN, ZF, OR ZFF. CONDUCTORS WTH OTHER <br />TYPES AND THICKNESS OF INSULATION SHALL BE PERMITTED IF <br />LISTED FOR NON -POWER -LIMITED FIRE ALARM CIRCUIT USE. <br />C. CONDUCTOR MATERIALS. CONDUCTORS SHALL BE SOLID OR <br />STRANDED COPPER FOR FPLR OR FPLP CONDUCTORS SHALL BE <br />SOLID. <br />d. CONDUCTORS UNDERGROUND OR UNDER THE SLAB SHALL BE WET <br />ENVIRONMENT OR DIRECT BURIAL RATED AND SURGE PROTECTED. <br />TERMINATE PER MANUFACTURER'S INSTRUCTIONS. <br />13. AUDIO/VISUAL DEVICES SHALL BE SET AS REQUIRED BY BUILDING USE <br />CONDITIONS, MINIMUM OF 0.25W IN COMMON AREA AND 0.125W IN <br />PRIVATE OFFICES. PROVIDE AMPLIFIER CALCS (WATTS USED/WATTS <br />SPARE) <br />14. PROVIDE FIRE ALARM MODULE AND INTERFACE FROM KITCHEN HOOD <br />F1RE SUPPRESSION CONTROL PANEL TO BUILDING FIRE ALARM SYSTEM. <br />ELECTRICAL OUTLETS AND BOXES NOTES <br />1. AN OUTLET BOX OF THE APPROPRIATE SIZE AND TYPE SHALL BE PROVIDED <br />FOR ALL LIGHTING FIXTURES, SWITCHES, RECEPTACLES, ETC. <br />2. ALL SWTCHES AND RECEPTACLES SHALL BE SPECIFICATION GRADE 20A <br />MINIMUM UNLESS OTHERWISE NOTED. COORDINATE COLOR NTH ARCHITECT <br />PRIOR TO ORDERING. <br />3. ALL RECEPTACLES LOCATED OUTDOOR SHALL BE WEATHER RESISTANT. <br />COVERS SHALL BE "WHILE -IN -USE* TYPE. COVER SHALL BE IDENTIFIED AND <br />LISTED AS nEXTRA-DUTY". <br />4. PROVIDE 4 11/16*x 4 11/16"x 2 1/8" SQUARE BOX AND 1n CONDUIT <br />STUB -UP TO ACCESSIBLE CEILING FOR TELEPHONE AND DATA OUTLETS. <br />TERMINATE CONDUITS 6* ABOVE CEILING IN ACCESSIBLE SPACE NTH 90' <br />BEND INSULATED BUSHINGS AND PULL STRING. COORDINATE WITH TENANTS <br />DATA/TELEPHONE CONTRACTOR FOR FURTHER ELECTRICAL AND RACEWAYS <br />REQUIREMENTS PRIOR TO ROUGH -IN. CABLING BY OTHERS. <br />5. ALL JUNCTION BOX COVERS SHALL BE MARKED WITH PANEL, CIRCUIT <br />N MANENT BLACK MARKER. <br />6. JUNCTION BOXES SHALL NOT BE MOUNTED TO THE PARTITION TOP PLATE. <br />7. PROVIDE ACOUSTICAL FOAM AND SEALANT AT ALL DEVICES ON DEMISING <br />PARTITIONS. IF PARTITION IS ARE RATED, PROVIDE FIREPROOF COMPOUND <br />ON BACK AND SIDES OF THE BOX. <br />8. MERE TELEPHONE AND ELECTRICAL OUTLETS APPEAR ON PLANS AS BACK <br />TO BACK, OUTLETS SHALL BE STAGGERED TO REDUCE NOISE TRANSMISSION. <br />WHERE WALLS AND PARTITIONS ARE REQUIRED TO HAVE A MINIMUM OF <br />1-HOUR FIRE -RESISTANCE RATING, BOXES SHALL BE SEPARATED BY A <br />MINIMUM HORIZONTAL DISTANCE OF 24' INCHES OR PROTECTED NTH UL <br />LISTED PUTTY PADS. <br />9. GROUNDING OF RECEPTACLES AND FIXED EQUIPMENT IN PATIENT CARE <br />AREAS SHALL COMPLY WITH NEC ARTICLE 517,13 (A) AND (B). <br />10. GFCl RECEPTACLES FOR ALL APPLIANCES MUST BE READILY ACCESSIBLE. IF <br />RECEPTACLE CANNOT BE MADE ACCESSIBLE, PROVIDE GFC1 CIRCUIT <br />BREAKER. <br />WIRE SIZE REOUIRED FOR <br />BRANCH CIRCUITS AT LESS <br />THAN 3% VOLTAGE DROP <br />- <br />1 FT <br />m <br />50 FT <br />51 FT <br />TO <br />75 FT <br />76 FT <br />TO <br />100 FT <br />101 FT <br />m <br />125 FT <br />126 FT <br />70 <br />150 FT <br />151 FT <br />m <br />200 FT <br />120V <br />1 <br />20A <br />#12 <br />fI0 <br />#8 <br />#B <br />#6 <br />06 <br />30A <br />#10 <br />JB <br />40A <br />#8 <br />. <br />#6 <br />1 #6 <br />#4 <br />1 J4 <br />#3 <br />50A <br />#B <br />#6 <br />208V <br />10 <br />20A <br />#1 2 <br />J12 <br />#12 <br />#10 <br />fIO <br />#B <br />30A <br />fI0 <br />fIO <br />#10 <br />#B <br />#8 <br />#6 <br />40A <br />#8 <br />. <br />. <br />50A <br />#B <br />f4 <br />60A <br />#5 <br />#6 <br />70A <br />#4 <br />14 <br />BOA <br />#3 <br />#3 <br />. #3 <br />#3 <br />. #2 <br />#1 <br />90A <br />#2 <br />12 <br />100A <br />#1 <br />30 <br />I <br />I <br />. <br />30A <br />#10 <br />#10 <br />. #10 <br />#8 <br />#B <br />#6 <br />40A <br />#0 <br />JB <br />#8 <br />#B <br />I <br />60A <br />#6 <br />#6 <br />70A <br />#4 <br />. <br />80A <br />#3 <br />#3 <br />90A . <br />#2 <br />12 <br />100A <br />I #1 <br />, #1 <br />, #I <br />#1 <br />#1/0 <br />�r NO <br />CALCULATED USING COPPER WIRE AT 750 C. <br />TABLE ABOVE FOR REFERENCE ASSUMING FULLY RATED <br />CIRCUIT AT 80% OF AMPACITY. <br />NO MORE THAN 2% VOLTAGE DROP MAXIMUM FOR <br />FEEDERS. AS PER FBC ENERGY CONSERVATION, CHAPTER <br />4 ARTICLE C405.7.3.1. <br />NO MORE THAN 3% VOLTAGE DROP MAXIMUM FOR BRANCH <br />FEEDERS. AS PER FBC ENERGY CONSERVATION, CHAPTER <br />4 ARTICLE C405.7.3.2. <br />WH NDUCTORS ARE INCREASED IN <br />SIZE, EQUIPMENT GROUNDING CONDUCTORS SHALL BE <br />INCREASED IN SIZE PROPORTIONATELY ACCORDING TO THE <br />CIRCULAR MILL AREA OF THE UNGROUNDED CONDUCTORS. <br />ENERGY CONSERVAIION <br />CODE COMPLIANCE <br />1. THIS DESIGN COMPLIES NTH F.B.C. ENERGY CONSERVATION SEVENTH EDITION <br />(2020) CHAPTER 4. SECTION C405 FOR ELECTRICAL POWER AND LIGHTING <br />SYSTEMS. <br />2. THIS DESIGN COMPLIES WITH 7TH EDITION (2020) OF F.B.C. ENERGY CONSERVATION <br />CHAPTER 4 ARTICLE C405.5.3 FOR FEEDER AND BRANCH CIRCUIT VOLTAGE DROP. <br />3. WITHIN 30 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF <br />THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER, INCLUDING: <br />a. A SINGLE DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM AND <br />b. FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR ALL DISTRIBUTION. <br />(REF. FBC-EC C405.5.4.1 - 7TH EDITION). <br />4. AN OPERATING MANUAL AND MAINTENANCE MANUAL BE PROVIDED TO THE BUILDING <br />OWNER. THE MANUALS SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING: <br />a. SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH <br />PIECE OF EQUIPMENT REQUIRING MAINTENANCE. <br />b. OPERATION MANUALS AND MAINTENANCE MANUALS FOR EACH PIECE OF <br />EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS <br />SHALL BE CLEARLY IDENTIFIED. <br />c. NAMES AND ADDRESSES OF AT LEAST ONE QUALIFIED SERVICE AGENCY. <br />(REF. FBC-EC 405.5.4.2 - 7TH EDITION). <br />LIGHTING SYSTEM FUNCTIONAL TESTING <br />CONTROLS FOR AUTOMATIC LIGHTING SYSTEMS SHALL COMPLY NTH SECTION C408.3. <br />TESTING SHALL ENSURE THAT CONTROL HARDWARE AND SOFTWARE ARE CALIBRATED, <br />ADJUSTED, PROGRAMMED AND IN PROPER WORKING CONDITION IN ACCORDANCE NTH <br />THE CONSTRUCTION DOCUMENTS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br />FUNCTIONAL TESTING SHALL BE PERFORMED BY CONTRACTOR AND MANUFACTURER'S <br />REPRESENTATIVE IN THE PRESENCE OF THE CLIENT REPRESENTATIVE AT THE <br />COMPLETION OF THE PROJECT. SCHEDULE A SECOND TESTING WITH OWNER <br />ACILITY HAS BEEN IN OPERATION FOR TWO OR THREE <br />MONTHS. WERE REQUIRED BY THE CODE OFFICIAL, AN APPROVED PARTY <br />INDEPENDENT FROM THE DESIGN OR CONSTRUCTION OF THE PROJECT SHALL BE <br />RESPONSIBLE FOR THE FUNCTIONAL TESTING AND SHALL PROVIDE DOCUMENTATION TO <br />THE CODE OFFICIAL CERTIFYING THAT THE INSTALLED LIGHTING CONTROLS MEET THE <br />PROVISIONS OF SECTION C405. <br />FOR OCCUPANT SENSORS, TIME SWITCHES, PROGRAMMABLE SCHEDULE CONTROL <br />PHOTOSENSORS OR DAY LIGHTING CONTROLS THE FOLLOWNG PROCEDURES SHALL BE <br />PERFORMED. <br />1. CONFIRM THAT THE PLACEMENT, SENSITIVITY AND TIME-OUT ADJUSTMENTS FOR <br />YILD ACCEPTABLE PERFORMANCE. <br />2. CONFIRM THAT THE TIME SWITCHES AND PROGRAMMABLE SCHEDULE CONTROLS <br />ARE PROGRAMMED TO TURN THE LIGHTS OFF. <br />3. CONFIRM THAT THE PLACEMENT AND SENSITIVITY ADJUSTMENTS FOR <br />PHOTOSENSOR CONTROLS REDUCE ELECTRIC LIGHT BASED ON THE AMOUNT OF <br />USABLE DAYUGHT IN THE SPACE AS SPECIFIED. <br />ELECTRICAL SYMBOL LEGEND <br />(NOT ALL <br />SYMBOLS USED ON THIS PROJECT) <br />= [:] <br />RECESSED LUMINAIRE <br />[;a <br />EMERGENCY RECESSED LUMINAIRE. CONNECT AS 24-HOUR <br />NIGHTLIGHT UNLESS OTHERNSE NOTED. <br />0 9 <br />LED, INCANDESCENT, COMPACT FLUORESCENT FIXTURE - CEILING <br />MOUNTED, WALL MOUNTED <br />0 1P <br />EXIT SIGN FIXTURE, SHADED QUADRANT INDICATES FACE, WITH <br />AN - CEILING MOUNTED, WALL MOUNTED <br />$ $2 $3 $4 <br />- <br />1-POLE, 2-POLE, .3-WAY, 4-WAY SWITCH <br />0 <br />DIMMER SWITCH, LUTRON, VERIFY LAMP TYPE <br />(LEDANCANDESCENT/FLUORESCENT) PRIOR TO ORDER <br />$m $mp $VP <br />MANUAL MOTOR STARTER TOGGLE SWTCH AS NOTED; *P" <br />INDICATES PILOT LIGHT, "WP* INDICATES WEATHERPROOF <br />PRI 92 <br />OCCUPANCY SENSORS <br />12 <br />POWERPACK <br />000 <br />DUPLEX RECEPTACLE AT 18% ABOVE COUNTER AT 42% ISOLATED <br />Ic <br />GROUND TYPE <br />G[F OG <br />TYPE SELF TESTING DUPLEX RECEPTACLE <br />LI LEX RECEPTACLE <br />* * <br />(2) DUPLEX RECEPTACLES IN SINGLE OUTLET BOX WITH <br />SINGLE COVER PLATE AT 18% ABOVE COUNTER AT 42- <br />V <br />TELEPHONE/DATA OUTLET, PROVIDE 4 11/16"x 4 11/16"x 2 1/8" <br />SQUARE BOX AND 1" CONDUIT TO ACCESSIBLE CEILING. <br />CONFIRM WITH VENDOR PRIOR TO ROUGH -IN <br />0 [j] [j <br />SPECIAL RECEPTACLE, PUSHBUTTON AS NOTED, <br />TELEPOWER POLE <br />gfl fo <br />FLOOR MOUNTED DUPLEX RECEPTACLE, FLOOR MOUNTED <br />TELEPHONE/DATA OUTLET <br />r___1_1 <br />FINAL CONNECTION TO EQUIPMENT <br />[00'a <br />JUNCTION BOXES, MOTOR CONNECTION <br />E:3J cEm [s3J <br />DISCONNECT SWITCH, STARTER OR CONTACTOR, <br />/DISCONNECT <br />� <br />� <br />277/480VPANELBOARD <br />TELEPHONE TERMINAL BOARD <br />m <br />ELECTRIC DOOR STRIKE/CARD READER <br />V <br />TV OUTLET, PROVIDE 4 11/16"x 4 11/16"x 2 1/8" <br />SQUARE BOX AND 1' CONDUIT TO ACCESSIBLE CEILING. <br />COORDINATE MOUNTING HEIGHT PRIOR TO ROUGH -IN. <br />10 <br />MANUAL PULL STATION <br />[D4 <br />HORN/STROBE, FLUSH MOUNTED ON WALL <br />"C* INDICATES CEILING MOUNTED <br />19 <br />STROBE ONLY, FLUSH MOUNT ON WALL <br />wC* INDICATES CEILING MOUNTED <br />JA <br />SMOKE DETECTOR <br />k4= <br />DUCT -SMOKE DETECTOR <br />BRANCH CIRCUIT CONDUIT CONCEALED ABOVE CEILING OR IN <br />WALL, SLASH MARKS INDICATE NUMBER OF CONDUCTORS, <br />14v`� LONGER SLASH IS NEUTRAL, (GROUND WIRE NOT SHOWN); <br />2 #12 - 1 #12 GROUND MINIMUM (UNLESS OTHERWISE NOTED <br />OR MARKED); LONGER SLASH NTH HATCH MARK INDICATES <br />ISOLATED GROUND. ISOLATED GROUND CONDUCTOR SHALL BE <br />GREEN NTH A YELLOW STRIPE. QUANTITY OF ARROWS <br />INDICATE QUANTITY OF HOMERUNS TO PANELBOARD. <br />PROVIDE EQUIPMENT GROUNDING CONDUCTOR IN ALL BRANCH <br />CIRCUITS. CIRCUITS SHARING A COMMON NEUTRAL MUST HAVE <br />A COMMON TIE HANDLE ON THE CIRCUIT BREAKERS TO <br />ALLOW ALL TO BE TURNED OFF SIMULTANEOUSLY. <br />"0,.,- -.;I <br />'."' BRANCH CIRCUIT CONDUIT CONCEALED BELOW SLAB OR <br />.4, UNDERGROUND. CIRCUITS SHARING A COMMON NEUTRAL MUST <br />HAVE A COMMON TIE HANDLE ON THE CIRCUIT BREAKERS TO <br />ALLOW ALL TO BE TURNED OFF SIMULTANEOUSLY. <br />SUBSCRIFT LEGEND: <br />E EXISTING DEVICE/LIGHT AND ASSOCIATED CIRCUIT WRING TO REMAIN. PROVIDE <br />ALL NECESSARY EXTENSION OF CONDUIT AND WRING AS REQUIRED, IN ORDER <br />TO MAINTAIN CIRCUIT CONTINUITY TO EXISTING EQUIPMENT TO REMAIN. <br />. <br />ERL EXISTING DEVICE/UGHT TO BE RELOCATED. JUNCTION AND EXTEND EXISTING <br />CONDUIT AND WRING TO NEW LOCATION AS REQUIRED. <br />RL NEW LOCATION OF EXISTING DEVICE/LIGHT. PROVIDE EXTENSION OF EXISTING <br />CONDUIT AND WRING AS REQUIRED. (PROVIDE NEW SWITCHING AS INDICATED) <br />R EXISTING DEVICE/LIGHT TO BE REMOVED. MERE EXISTING EQUIPMENT TO <br />REMAIN IS FED VIA EXISTING EQUIPMENT TO BE REMOVED, PROVIDE ALL <br />NECESSARY EXTENSION OF CONDUIT AND WRING AS REQUIRED IN ORDER TO <br />MAINTAIN CIRCUIT CONTINUITY TO EXISTING EQUIPMENT. <br />N DEVICE/LJGHT TO MATCH EXISTING BUILDING STANDARDS. <br />1�0�f �00"X 0 1 1 � 0 <br />BASE BID: <br />URE THE SERVICES OF A THIRD PARTY VENDOR <br />TO TEST THE PUBLIC SAFETY RF RADIO COVERAGE, WITHIN THE PROJECT <br />SCOPE OF WORK, AND DETERMINE WHETHER A NEW DAS SYSTEM IS <br />REQUIRED PER FLORIDA FIRE PREVENTION CODE 7TH EDITION CHAPTER 11 <br />SECTION 11.10.1 AND NFPA 72 2016 EDITION CHAPTER 24 SECTION 24.9. <br />CONTRACTOR SHALL SUBMIT TEST REPORTS AND RECOMMENDATIONS TO <br />THE FIRE MARSHALL AS REQUESTED BY BUILDING PERMIT COMMENTS. <br />BID ALTERNATE: <br />CONTRACTOR TO PROVIDE PRICING FOR A COMPLETE IN-BULDING RF RADIO <br />COVERAGE SYSTEM FOR THE PUBLIC SAFETY RADIO AS SET FORTH IN <br />FLORIDA FIRE PREVENTION CODE 7TH EDITION CHAPTER 11 SECTION 11.10.1 <br />AND NFPA 72 2016 EDITION CHAPTER 24 SECTION 24.9 AND SHALL BE <br />VERIFIED AS COMPLIANT PER THE CODES ABOVE AND THE AHJ. THE <br />SYSTEM SHALL BE INSTALLED BY A TURN -KEY FIRM SPECIALIZING IN THE <br />TRADE, TO INCLUDE NECESSARY SHOP DRAWINGS, FREQUENCY ENHANCING <br />EQUIPMENT, INSTALLATION, TESTING, AND MONITORING TO SATISFY CODE <br />AND AHJ REQUIREMENTS. CHANGE ORDERS FOR ADD111ONAL EQUIPMENT <br />SHALL NOT BE PERMITTED. CONTRACTOR PROVIDING THIS PRICING SHALL <br />BE INDEPENDENT OF THE THIRD PARTY VENDOR THAT PERFORMED THE <br />PUBLIC SAFETY RADIO TEST AS PART OF BASE BID. <br />MEP CONSULTING <br />ENGINEERS <br />SINCE 1977 <br />FL REG NO. 3089 <br />2016 ALDEN RD. <br />ORLANDO, FL <br />32803 <br />(407) 246-1688 <br />WWW.PEIFLA.COM <br />PEI PROJECT # <br />22121 <br />ILTA <br />I i <br />- <br />'; <br />I ; <br />, I : <br />I <br />� , i <br />I , I I <br />, - <br />I <br />-_ ___ - - <br />11111111 <br />CAMPBELL +VAN DUSEN <br />IA R C H I T E C T U R E INTERIOR DESIGNI <br />www.CVDstudio.com <br />CAMPBELL + VAN DUSEN Design Studio, LLC. <br />255 South Orange Avenue Suite # 1 240 <br />Orlando, Florida 32801 <br />Phone: 407.930.6016 <br />FL. Lic. No. AA26003339 <br />ARCHITECT OF RECORD <br />FRANK W. CAMPBELL AIA <br />FL LIC NO. AR001 6053 <br />COPY OF THIS PLAN IS NOT VALID UNLESS SIGNED, <br />SEALED AND DATED BY THE ARCHITECT OF RECORD <br />%% 11 <br />,%\ ' G, S PA /V, `�',, <br />�% I ** <br />_z1_ * N r,EN.S -- '1�25 '.', <br />.- ��'- -\1 '�' % -:. <br />, ca ... <br />z : No. 64601 1'. '- <br />r, * : * : * - <br />. <br />:j -a % ST)kTE OF .0' CC . <br />.. -P -. - -� <br />- �. I <br />'.. <br />10 0 --- PtOR\0�_ e.. -zo <br />" xs -. 6 <br />'0 ;:!�' "..*.*.** -�' <br />%,% <br />""6119/0 \\% <br />-0 N %\ (/ . <br />.'I/,,, 1111110 �42:� <br />Bryan G. Spangler, PE, <br />FL Reg. No. 64601 <br />COPY OF THIS PLAN IS NOT VALID UNLESS SIGNED, <br />SEALED AND DATED BY THE ENGINEER OF RECORD <br />_j <br />L1_ <br />c/i <br />_j <br />= <br />:i <br />Q:� <br />0 <br />>_ <br />= <br />11-- <br />a- <br />= <br />CL <br />LU <br />E <br />�­ <br />r_4 <br />U <br />1 <br />< <br />ci <br />C/) <br />C/1) <br />> <br />LU <br />LU <br />I <br />_j <br />0 <br />= <br />I <br />co <br />II-_ <br />F__ <br />+ <br />L0 <br />= <br />_j <br />i <br />U <br />:z <br />"o <br />ck� <br />< <br />LU <br />_-) <br />LU <br />I <br />>- <br />() <br />0 <br />> <br />I <br />= <br />� <br />._0 "IT <br />CL- <br />0 <br />LLJ <br />"o Lr) <br />Cie <br />CL <br />< <br />3:: <br />rL-U4 <br />or-2 (cyll)) <br />CONSTRUCTION DOCUMENTS <br />03.24.2023 <br />PRINCIPAL IN CHARGE <br />F. CAMPBELL <br />.................................................................... <br />PROJECT MANAGER <br />M. TORRES <br />...... I ............................................................. <br />ADVENT HEALTH <br />WELL 65+ <br />ZEPHYRHILLS <br />22-0328-01 <br />ELECTRICAL <br />SPECIFICATIONS <br />El .1 <br />