T
<br />�_ tea.. ,,. ... �,, ..L..., — _._ "I -- .. -I lam- .• ;4ak,a 11 6 a
<br />r
<br />r
<br />t
<br />INDEX OF DRAWINGS
<br />SHEET DESCRIPTION
<br />SHEET
<br />No.
<br />CS COVER SHEET
<br />1.1 FIRST FLOOR PLAN —
<br />1.2 SECOND FLOOR PLAN —"
<br />2.1 EXTERIOR" ELEVATIONS _ �u'v 03
<br />2.2 EXTERIOR ELEVATIONS
<br />3 ELECTRICAL PLAN
<br />4 _ -- ROOF PLAN----�--- --
<br />5 FOUNDATION PLAN
<br />6.1 FIRST FRAMING PLAN -
<br />6.2 SECOND ROOF FRAMING PLAN
<br />7 LINTEL PLAN AND DETAILS
<br />SN STRUCTURAL NOTES
<br />ABBREVIATIONS SNP DETAILS_---- ---_ -
<br />AB or A.B. Anchor Bolt FIX or FXD Foxed PWDR or Pwd. Powder Room S3 DETAILS
<br />ABV or Abv. Above FLR or Fir. Floor RA or R/A or RA Return Air S4 DETAILS
<br />AC or A/C Air -Conditioner FLR SYS or Fir Sys Floor System RAD or Red. Radius -- -- - - -
<br />ADJ or ADJ. Adjustable FOM or F.O.M. Face Of Masonry RAG or Rag. Return Air Grill S5 DETAILS
<br />AFF or A.F.F. Above Finished Floor FP or F.P. Fireplace REC or Rec. Recessed S6 DETAILS
<br />AHU or A.H.U. Air Handler Unit FR DR French Door RECEPT Receptacle L-- -- - -- - -----
<br />ALT orALT. Alternate FRT Front REF or Ref. Refrigerator ST STAIR DETAILS
<br />BC Base Cabinet FT or R. Foot/ Feet REINF Reinforcing
<br />BF Bifold Door FTG or Ftg. Footing READ or Req'd. Required SS RETROFIT DETAILS
<br />BK SH or Bk Sh BookShelf FXD GL Fixed Glass RM or Rm. Room D1 SECTIONS & DETAILS
<br />BLK or BILK. Block GALV or Galy. Galvanized RND or Rnd. Round --
<br />BLW or BLW. Below GC or G.C. General Contractor RO or R.O. Rough Opening D2 _ SECTIONSS &DETAILS
<br />BM or Bm. Beam GFI or G.F.I. Ground Fault Interrupter RS, R/S, R/SH or R&S Rod and Shelf WP WATERPROOFING DETAILS
<br />BOT or Bot Bottom GT or G.T. Girder Truss SD or SO. Smoke Detector - --
<br />BP or B.P. Bypass (door) GYP BD or Gyp. Bd. Gypsum Board SGD Sliding Glass Door PA1.0 PRODUCT APPROVAL NUMBERS
<br />BRG or BRG. Bearing HB Hose Bibb SH or Sh. Shelves
<br />C Carpet HDR or Hdr. Header SHT Sheet — — — — — — — — — — — — — — — — — — — — — — PA1.1 PRODUCT APPROVAL NUMBERS
<br />---------------
<br />CAB Cabinet HGT or Hgt Height SHWR or Shwr. Shower PA1.2 PRODUCT APPROVAL NUMBERS
<br />CIR or Cir. Circle HH or H.H. Hand Held (plumbing faucet) SL or S.L. Side Lights SH1.0 HURRICANE SHUTTER PRODUCT APPROVAL
<br />CJ or C/J Control Joint HORIZ Horizontal SPECS or SPECS. Specifications
<br />CLG or Clg. Ceiling HS Hard Surface (flooring) SPF or S.P.F. Spruce Pine Fir SH1.1 HURRICANE SHUTTER PRODUCT APPROVAL
<br />CMU Concrete Masonry Unit ILO In Lieu Of SQ FT or SF or S.F. Square Foot (feet) - - -- --- - -- "" " "--- - - —
<br />COFF or Coff. Coffered or Tray Ceiling INSUL or Insul. Insulation SO or Sq. Square SH1_2 HURRICANE SHUTTER PRODUCT APPROVAL
<br />COL or Col. Column INTorInt. Interior STO Storage n SH1.3 HURRICANE SHUTTER PRODUCT APPROVAL
<br />COMP or Comm. Community KS or K . KMfall Kneewall SW o S.W. Shear Wall �[E— �1 I a a o a a a �� , - - - - - - ---
<br />COMP orCom . Compressor KS or K.S. Knee Space SYP or S.Y.P. Southern Yellow Pine SH1.4 HURRICANE SHUTTER PRODUCT APPROVAL
<br />CONN orCONN. Connection LAUN orlaun. Laundry TB Towel Bar v u SH1.5 HURRICANE SHUTTER PRODUCT APPROVAL
<br />CCont. Continuous LLLavatory TEMP or Temp. Tempered El El E] EJ a El
<br />El::�:]
<br />CTT or or C.. T. Ceramic Tile LF o or L.F.LLinear Ft THIKN or Thik'n. Thicken
<br />D or D. Dryer LL Lintel Length TOB or T.O.B. Top of Block 00
<br />- -- - --
<br />DB Door Bell LT Laundry Tub TOM or T.O.M. Top of Masonry El a E] El E E�] E] El-
<br />DBIL or Dbl. Double MAS or Mas. Masonry TOP or T.O.P. Top of Plate
<br />DDecorative Cementitious Finish MAX or Max Maximum TP Toilet Paper Holder- - -
<br />DEC00
<br />C or Dec. Decorative MC Medicine Cabinet TR Towel Ring
<br />DED or Ded. Dedicated (outlet) MFR or Mfr. Manufacturer TRANS WDW or Trans. Transom Window
<br />DIA or Dia. Diameter MGT Management (room) TYP or Typ. Typical - - - -- -
<br />DISP or Disp. Disposal MIN or Min Minimum UC or u.c. Under Counter
<br />DIST or Dist. Distance MIR or Mir. Mirror UCL Under Cabinet Lighting
<br />DMF Decorative Masonry Finish ML or M.L. Microlam LINO or U.N.O. Unless Noted Otherwise
<br />DS or D.S. Drawer Stack MONO or Mono Monolithic V or v. Valve (shower or tubishower)
<br />DTL Detail MW or MICRO or kcro. Microwave VB Vanity Base - - -- - -_- _- -
<br />DV or D.V. Dryer Vent NTS or N.T.S. Not to Scale VERT or Vert. Vertical
<br />DVP or D.V.P. Diverter Valve (plumbing) OE or O.E. Owner's Entry VL or V.L. Versalam MEAN ROOF 15 FT. HIGH TYPICAL
<br />DWorD.W. Dishwasher OPNGorOpn'g. Opening VTR orVTE Vent through Roof/Exterior FOR SINGLE STORY HOMES
<br />EA or Ea. Each OPT or Opt. Optional W or w Washer
<br />ELEC or Elec. Electrical PC Pull Chain W/ or w/ With
<br />ELEV or Elev. Elevation PED or Ped. Pedestal WA or W.A. Wedge Anchor MEAN ROOF 30 FT. HIGH TYPICAL
<br />EQ Equal PH Phone WC or W/C or W.C. Water Closet (toilet) FOR 2 STORY HOMES
<br />EW or E.W. Each Way PKT or Pkt. Pocket (Door) WD or Wd Wood
<br />EXPorExp. Expansion PorP.L. Parallam WDWHDRorWDW.HDR. Window Header THIS DRAWING AND DESIGN IS VALID
<br />L
<br />EXT or Ext. Exterior PLF Pounds per linear foot WH or W.H. Water Heater FOR 12 MONTHS AFTER THE DATE IT
<br />FBC Florida Building Code PLNT SHLF or Pit. Sh. Plant Shelf WIC or W.I.C. Walk-in Closet IS SIGNED AND SEALED OR WHILE
<br />FDN or Fdn. Foundation PLT HT or Pit. Ht. Plate Height WM or W.M. Wall Mounted (plumbing fixture) CURRENT CODE IS VALID
<br />FG Fiberglass (Shower Pan) PSF Pounds per square foot WP WaterProof(ing) CODE REFERENCES ARE SUMMARIES
<br />FIN Finished PT or P.T. Pressure Treated WS Water Softener OF CODE SECTIONS.
<br />FIN FLR orFForFin. Flr. Finished Floor PWorP.W. Pre -wire WWF Welded WireFabric (Mesh) SEE FBCR (CURRENT VERSION) FOR
<br />PLAN REVISIONS COMPLETE CODE INFORMATION.
<br />DATE VERSION DESCRIPTION Notice to Builder & All Subcontractors
<br />It is the intent of Designer/Engineer listed in the titleblock of these
<br />04/25/12 1.0 NEW BASE PLAN documents that these documents be accurate, providing Licensed
<br />Professionals clear information. Every attempt has been made to
<br />prevent error. The Builder and all subcontractors are required to
<br />review all the information contained in these documents, prior to
<br />06/25/ 12 2.0 GRADE BEAM FOUNDATION the commencement of any work. The Designer/Engineer are not
<br />responsible for any plan errors, omissions,or misinterpretations
<br />undetected and not reported to the Designer / Engineer prior to
<br />08/11 /15 3.0 2015 NEW CODE UPDATE construction. All construction MUST be in accordance to the
<br />information found in these documents. Any questions regarding
<br />FBC 2017 CODE UPDATES & MODEL the information found in these plans should be directed to our
<br />03/06/ 18 4.0 Office at (407) 880-2333 immediately. No backcharges will be
<br />UPDATES considered for reimbursement by the Designer/Engineer without
<br />advanced notification and approval by the Designer/Engineer.
<br />REVISED SGD, LANAI & WINDOWS Payments will be made in accordance to the terms of the
<br />06/01 / 18 4.1
<br />AT REAR agreement.
<br />06/07/ 18 4.2 REVISED DINING WINDOW TO 35-S H Control of Construction SiteThe Designer/Architect and engineer of record (EOR) have no
<br />control over the construction site and shall not be responsible in
<br />any manner for control of the construction site including, but not
<br />12/19/20 5.0 FBC 2020 CODE UPDATE limited to, scheduling and sequencing of work, jobsite safety, and
<br />ventilation of the building and thereby shall not be responsible for
<br />IL IF= 14 114 Aix 11the indoor air quality, or the effects thereof, for any reason
<br />whatsoever. The Designer/Architect and FOR has no duty to
<br />protect, without limitation, the residence, construction site,
<br />materials, or equipment, from moisture, mold, fungus, fire, theft,
<br />vandalism, trespass, or any other peril or condition, at any time,
<br />expressly including, but not limited to, the period of time before
<br />construction, during the construction of the project, or after
<br />construction and the Designer/Architect and FOR has no duty to
<br />take any action or preventive measures to protect such property
<br />against any such peril at any time for any reason.
<br />Care and Maintenance
<br />Yearly maintenance and inspections by the builder/homeowner
<br />are necessary for the future life of this home. Care must be taken
<br />to check windows and doors for caulking, remove leaves and
<br />debris off roofs, make sure that water flow is away from the
<br />house and have your home repainted every 3 - 5 years to protect
<br />1763 the coatings. The designer and engineer of record are not
<br />responsible for the upkeep of the home and will not be held
<br />liable for instances that may occur over the normal life of the
<br />home without proper maintenance.
<br />78 L A
<br />a
<br />N
<br />N
<br />'L
<br />GD
<br />N f
<br />La
<br />� t �
<br />U
<br />f?
<br />r' r
<br />,t�i�uurru�,,
<br />8R • WV
<br />_ Q
<br />e U �O5�
<br />4
<br />.
<br />i ••' F �. ®
<br />•�'•••........
<br />•'
<br />°r o
<br />RO�EsStol",
<br />NN
<br />To the best of the Engineers Mowledge, information and belief,
<br />the structural plans and specifications contained within these
<br />drawings comply with the 2020 Florida Building Code -
<br />Residential 7th Edition. Engineers signature and seal is only for
<br />the structural engineering portions of the drawing pages bearing
<br />Engineers signature and seal.
<br />ab Ln
<br />E
<br />o g8
<br />I N J
<br />0 C J LL
<br />0 � ai at " uJ
<br />a
<br />C J
<br />�u.ii
<br />LL o
<br />rn
<br />Z m O
<br />OC ' � rp O
<br />W a
<br />02O0LL
<br />MZ Jn
<br />Cd7
<br />O Na
<br />ZZ
<br />U
<br />W ❑00
<br />U
<br />z 9
<br />z
<br />z
<br />CC
<br />a.
<br />z
<br />v0�
<br />LL
<br />W W
<br />LU
<br />�
<br />U
<br />O
<br />8
<br />V) �_
<br />LU
<br />H
<br />L
<br />U co
<br />co
<br />•
<br />O
<br />w
<br />LL.
<br />w
<br />zp
<br />a
<br />O
<br />(D
<br />ccU
<br />U
<br />U
<br />w°
<br />O
<br />Nw�
<br />iao
<br />a�
<br />a�
<br />ru
<br />N C
<br />C
<br />z
<br />Y
<br />�8
<br />mON
<br />o
<br />ZZ
<br />>Z
<br />Z
<br />J
<br />cab
<br />�
<br />wZZ
<br />wLL
<br />51;
<br />�W
<br />Waz
<br />o
<br />w
<br />w
<br />`
<br />a
<br />8
<br />.0O
<br />=
<br />LO
<br />N
<br />�
<br />�
<br />Co
<br />�
<br />r
<br />�..\
<br />T
<br />0'^ U
<br />m
<br />O
<br />�
<br />CMO
<br />04
<br />C)
<br />L0
<br />r
<br />Q N
<br />V2-
<br />m
<br />Z
<br />CV
<br />3 CV
<br />o
<br />Z
<br />a
<br />E r L
<br />c°�0 a o
<br />JOB
<br />NO: 22-02364
<br />SCALE : AS NOTED
<br />SHEET NO.
<br />-%
<br />(s
<br />is, ik
<br />
|