My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36763 Eiland Blvd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
36763 Eiland Blvd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 9:44:38 AM
Creation date
2/18/2025 3:22:20 PM
Metadata
Fields
Template:
Building Plans
Street #
36763
Location
Eiland Blvd
Contractor
Wallace Associates
Building Plans - Permit #
19892
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ill 1 ! —A"MI I ' 1 <br />1 FF <br />;I I <br />I QQ <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />--1 L <br />i <br />I I <br />I <br />Ili; 1 <br />'I i 1 <br />=L='�fATOR <br />i <br />200 <br />I <br />I <br />f <br />21 LA-46 <br />` <br />IT IE <br />;..:.;.. _.. <br />I <br />I <br />I <br />I <br />J <br />I <br />I <br />2ro4- <br />i <br />I <br />(-- - VAV-D821-NB- <br />— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br />KEYED NOTES <br />DRAWING NOTES FOR SHEETS Ela THRU Etc: O <br />L MOUNT THIS RECEPTACLE BELOW SINK FOR CONNECTION <br />OF MOT ION ACTIVATE WATER VALVE ASSEMBLY. <br />2, PROVIDE A 2-GANG DEVICE BOX FOR INSTALLATION OF <br />LOW VOLTAGE TRANSFORMER AND A SINGLE GANG <br />DEVICE BOX WITH TOGGLE SWITCH FOR MAINTENANCE <br />DISCONNECTING: OF POWER TO TRANSFORMER. MOUNT <br />BOXES ABOVE ACCESSIBLE CEILING AND ABOVE FLUSH <br />5EN50R MOUNTING BOX IN WALL. MAKE ALL LOW <br />VOLTAGE CONNECTION BETWEEN TRANSFORMER AND <br />WALL SENSOR. <br />3. PROVIDE ONE (1)- 4" SQUARE X 2-1/2 DEEP DEVICE BOX <br />MOUNTED FLUSH WITH WALL FOR CONNECTION OF <br />INFRARED SENSOR AND FLUSH SOLENOID. REFER TO <br />MANUFACTURE INFORMATION FOR ADDITIONAL <br />INSTALLATION REQUIREMENTS. <br />4. PROVIDE FINAL CONNECTION TO AUTOMATIC DOOR <br />SYSTEM CONTROLLER. COORDINATE CONTROLLER <br />LOCATION AND CONNECTION REQUIREMENTS WITH SYSTEM <br />INSTALLER, <br />5. AREA OF RESCUE A5516TANCE POWER SUPPLY. <br />ro. AREA OF RESCUE ASSISTANCE MASTER STATION. MOUNT <br />CENTER OF STATION 60" AFF. WIRE BACK TO SYSTEM <br />CONTROLLER/POWER SUPPLY. COORDINATE EXACT <br />REQUIREMENTS WITH SYSTEM INSTALLER AND OWNER. <br />-1. PROVIDE FINAL CONNECTION TO THE ELECTRIC WATER <br />COOLER. PROVIDE A RECEPTACLE CORD AND CAP AS <br />REQUIRED, <br />8. LOCATE A MICROWAVE OUTLET IN UPPER CABINET <br />MILLWORK AS DIRECTED BY ARCHITECT AS REQUIRED <br />FOR THE BUILT-IN MICROWAVE. COORDINATE WITH <br />MILLWORK INSTALLER. <br />9. PROVIDE FINAL CONNECTION TO GARBAGE DISPOSAL. <br />LOCATE SWITCH ABOVE COUNTER ADJACENT TO SINK. <br />10, PROVIDE 8' X LENGTH AS SHOWN X 3/4" THICK PHONE <br />BOARD FOR COMMUNICATION SYSTEM REQUIREMENTS. <br />PAINT WITH 2 GOATS OF FIRE RETARDANT PAINT, EXTEND <br />A 03/0 CU IN PC TO THE TO BUILDING GROUND SYSTEM. <br />11, PROVIDE A SWITCHED RECEPTACLE. BOTTOM <br />RECEPTACLE SHALL BE SWITCHED BY POWER PACK OF <br />THE CEILING MOUNTED OCCUPANCY SENSOR. PROVIDE <br />UNSWITCHED CONDUCTOR FOR UPPER RECEPTACLE. <br />12. FIRE ALARM ANNUNCIATION PANEL (FAAP). COORDINATE <br />EXACT LOCATION WITH AUTHORITY HAVING JURISDICTION <br />(AHJ) AND OWNER. <br />13. FIRE ALARM CONTROL PANEL (FRCP). <br />14, PROVIDE AND INSTALL JUNCTION BOX FOR TENANT <br />PYLON SIGNAGE. PROVIDE DISCONNECT TO 51GNAGE <br />PER ARTICLE 600-2 OF THE N.E.G. ROUTE VIA NEW <br />CONTROL PANEL LCP. FIELD VERIFY AND COORDINATE <br />EXACT LOCATION WITH G.G. AND OWNER. <br />15, PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC ROOF TOP UNIT. COORDINATE EXACT LOCATION <br />AND REQUIREMENTS WITH MECHANICAL CONTRACTOR. <br />FUSE PER NAMEPLATE. REFER TO ELECTRICAL HVAC <br />SCHEDULE ON SHEET Eld. <br />16. PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC VAV UNIT. COORDINATE EXACT LOCATION AND <br />REQUIREMENTS WITH MECHANICAL CONTRACTOR. FUSE <br />PER NAMEPLATE. REFER TO ELECTRICAL HVAC <br />SCHEDULE ON SHEET Eld. <br />11, PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC AIR HANDLING OR CONDENSING UNIT. COORDINATE <br />EXACT LOCATION AND REQUIREMENTS WITH MECHANICAL <br />CONTRACTOR. FUSE PER NAMEPLATE. REFER TO <br />ELECTRICAL HVAC SCHEDULE ON SHEET Eld. <br />18. PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />ELECTRICAL WATER HEATER COORDINATE EXACT <br />LOCATION AND REQUIREMENTS WITH PLUMBING <br />CONTRACTOR AND DRAWINGS. <br />19. PROVIDE 1)15CONNECTS AND FINAL CONNECTION TO <br />ELEVATOR CAB LIGHT AND CONTROLLER. FIELD VERIFY <br />r�CdCT LOCATION AND REQUIREMENTS WITH ELEVATOR <br />INSTALLER AND G.G. <br />20, PROVIDE A RECEPTACLE AND TV/DATA OUTLETS FOR <br />TV. COORDINATE EXACT LOCATION AND HEIGHTS WITH <br />G-C. AND OWNER PRIOR TO ROUGH -IN. <br />21, PROVIDE FINAL CONNECTION TO HOOD. FIELD VERIFY <br />EXACT LOCATION AND REQUIREMENTS WITH HOOD <br />INSTALLER AND OWNER. <br />( 22. DATA OUTLET AT WORKSTATION IN EXAM ROOM TO <br />P MOUNTED BELOW COUNTER. (TYPICAL FOR ALL EXAM <br />ROOMS) <br />1 <br />23. ALL RECEPTACLES AT THE EXAM SINK AND 1 <br />WORKSTATION TO BE MOUNTED ABOVE COUNTER. <br />(TYPICAL FOR ALL EXAM ROOMS). <br />KEY PLAN <br />0 2N% FLOOR PARTIAL ELECTRICAL FLAN (NORTH) a 13 <br />SCALE. 3/16" ■ 1'-0" <br />REVISIONS <br />BY <br />QI 04, 02. 18 <br />WR <br />v <br />WWI J L <br />0 rJ <br />/ <br />�x <br />v: <br />wSc4 <br />x <br />z <br />Q <br />i4a 0g$s. <br />gg�„ <br />%J <br />04-27-18 ° CC5 <br />° STATE ay C 27 <br />fas* u q�.y� n <br />FaD <br />■�� <br />€�3l5��QIr <br />+' M <br />3M O <br />Q H d Z <br />� D 4� <br />L L'i L u <br />0 , O o <br />EL Wl' C) N O <br />�aLZ�w� <br />c <br />ads N <br />w N <br />L3 �5 <br />o <br />o, Zw�o,^s <br />L <br />al C) My¢a a <br />L x ai L)O <br />'U U <br />U <br />W <br />0) z <br />c C-4 <br />m <br />.� Z M <br />M <br />m <br />U Q U? <br />4- _Id•o <br />UO <br />O ta... <br />W 0 <br />> <br />o >r <br />CL <br />z O d <br />LA - <br />Date: 02. 13. 18 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: IT/WR <br />Job: 15-025 <br />Sheet <br />E2c <br />
The URL can be used to link to this page
Your browser does not support the video tag.