Laserfiche WebLink
NOTE: <br />I. VALVE5 TO BE ROTATED DOWN <br />MINIMUM OF 10 DEGREES. <br />2. SUPPLY BOX TO BE 5UPPL I ED 51 <br />DAVITA "FULLY LOADED". SEE <br />ELEVATION BELOW FOR CONTRA <br />SUPPLIED FITTINGS. ALL OTHER <br />FITTIN65 5HALL BE SUPPLIED BY <br />DAVITA. CONTRACTOR TO MAKI <br />FINAL GONNEGTION5 FROM BOX' <br />LOOP. <br />3. BIGARB AND CONCENTRATE TUBI <br />BE SUPPLIED BY DAVITA BETWE:I <br />MAIN LOOP TEE AND BOX <br />CONNECTION. CONTRACTOR 5HAI <br />SUPPLY NYLON HOSE CLAMP TO <br />5EGURE BOTH END5 OF THE HOST <br />COORDINATE WITH OWNER FOR E <br />RE62UIREMENT5. <br />R.0 <br />GONGENTRATI <br />GONCENTRAT <br />BIGARE <br />(2) FLOW6UARD GOLD <br />CONCENTRATE LOOPS <br />TEE FITTING5. DAVITA TO <br />PROVIDE 1/4" BALL VALVE <br />AND ALL OTHER FITTINC75 <br />DOWN5TREAM OF TEE WITH <br />EACH BOX. BALL VALVE TO <br />BE INSTALLED BY <br />CONTRACTOR. <br />FIN. FLOOR <br />SUPPLY <br />BOX i <br />CONNECTION <br />WITH AIR GAP <br />I" PEX TUBING W/ I" <br />IN5ULATION R.O. LOOP. PEX <br />TUBING LOOP 5HALL <br />CONNECT DIRECTLY TO <br />5TAINLE-55 STEEL TEE WHIGH <br />15 DIRECTLY ATTACHED TO <br />BOX PROVIDED BY DAVITA. <br />ALL FITTINGS DOWNSTREAM <br />OF TEE SHALL BE PROVIDED <br />WITH EACH BOX. <br />FLOWGUARD GOLD <br />BIGARB LOOP WITH TEE <br />FITTING. DAVITA TO <br />PROVIDE 1/4" BALL BALVE <br />AND ALL OTHER FITTING5 <br />DOW145TREAM OF TEE WITH <br />EACH BOX. BALL VALVE <br />TO BE INSTALLED BY <br />CONTRACTOR. <br />ALL PEX TUBING, INSULATION <br />AND FITTINGS ARE <br />FURN15HED BY DAVITA AND <br />INSTALLED BY CONTRACTOR. <br />TEE TO BE INSTALLED BY <br />CONTRACTOR. <br />COORDINATE'. <br />D15TANGE5 WITH <br />BOX OUTLET <br />HEIGHTS. <br />PROCESS P I P I NCB ELEVATION DETA 1 1 <br />SGALE : NONE <br />PRINKLER W X1 <br />RISER <br />S.W. D. GONFERENGE LOUNGE ° :O-BIGARB <br />22 <br />STORAGE 2 5 4 6 7 q <br />PD-HHD STORAGE Q z 1 ❑ <br />❑ 1 <br />I; <br />K <br />1 <br />3 <br />CORRIDOR <br />.: I <br />0 25 0 <br />23 ® <br />0 1 <br />PD-HHD OFF, Q RRI N. 2 3 4 5 <br />r- - <br />o ° _ BIOMED T ME T. <br />`---J JANITOR 0 D <br />T.T. -I T.T.-2 - 1 <br />r P.D.-H.H.D. EXAM(( 1 ® ® — — �, <br />-- - -- oa -_ 2 5 <br />La-- ❑ ❑ <br />I R <br />e <br />1 <br />K G o K <br />P.D.-H.H.D. EXAM 1 <br />FOE]TREATMENT <br />❑ --___ 2 <br />❑1 ° 1 <br />❑ LL <br />a -- - <br />❑ OL __ <br />-+- 11 LAB ° <br />L- P.T.-3 FAG. ADMIN. <br />2� 26 WORK 21 22 ❑ 24 <br />P.D.-H.H.D. EXAM ---- <br />o� ---- 2 3 <br />- i ❑ R K a� 2 3 � 1 <br />K i) Q <br />11 ---- <br />LLI <br />AT FILE AT FILE AT FILE ----------- -------- ----- ------- ------------- ---------------- - 8 <br />_ �❑� ---- <br />' i ,�i i i G ART CHART <br />V V CART CART <br />I.T. <br />`______-__ -G-RAR Tyr Res <br />AID 1 GHO4T5 20 1 q 18 <br />P.D.-H.N.D. EXAM ° <br />O6 BUSINESS OFFICE <br />2 5 <br />'I <br />it � I i ; <br />—� —� — -- K li % T-1--1--i--il COPIER �i K K O <br />e L_JL_J---L---L---L----- --_ L-------L------- <br />--------,__ IL-------r-___--- <br />PAT. K D❑ I ❑ 0 <br />PREP. 10 <br />WAITING <br />OI <br />P.T.-I <br />02 <br />®T 2 16 15 14 13 12 11 <br />1 Law <br />❑ ❑ <br />FLOOR PLAN - PLUMB I NCB R.O. P I P I NCB <br />SGALE: 1/8" = I'-O" <br />GENERAL NOTES: 11 <br />I. %1EEP SUPPORT BRACKET 514ALL BE USED FOR <br />R.O. PIPING CHANGE OF DIRECTION. LONG <br />5VtffEP5 (TRUE 5I^IIEEP5) TO BE USED FOR <br />BIGARB AND CONCENTRATE PIPING GHAN6E5 OF <br />DIRECTION. <br />2. ALL FINAL CONNECTIONS TO ALL DIALY515 <br />BOXES SHALL BE EXECUTED BY THE PLUMBING <br />CONTRACTOR- <br />5. ALL BOXES AND BOX FITTINGS SHALL <br />BE PROVIDED BY OWNER <br />4. WATER VENDOR TO INSTALL ALL WATER <br />BOXE5. G.G. TO COORDINATE AND <br />CHECK ALL DRAINS. <br />5. DAVITA TO APPROVE ALL CONNECTIONS. <br />6. ALL THREADED PVC JOINTS SHALL BE MADE <br />WITH TEFLON TAPE. PIPE DOPE 15 NOT AN <br />ACCEPTABLE MATERIAL. <br />1. ALL CUTS IN PVG PIPING TO BE MADE WITH TOOL <br />INTENDED FOR THAT USE AND ANY BURRED OR <br />ROUGH EDGES TO BE SANDED SMOOTH AND <br />PRIMED BEFORE JOINING PIPE. <br />8. ENDS OF INSULATION SHALL BE TAPED AT ALL <br />FITTIN65. INSULATION SHALL BE CONTINUOU5 <br />EXCEPT WHERE PENETRATING A <br />FIRE BARRIER. <br />a. PRE55L RE TEST ALL PROGE55 PIPING. <br />COORDINATE TESTING PRESSURES REQUIRED <br />WITH BIOMED TECHNICIAN PRIOR TO TESTING. <br />SUBMIT TEST RESULTS TO GENERAL <br />CONTRACTOR. <br />10. INSTALL ALL PLUMBING LINES BELOW <br />ELECTRICAL EQUIPMENT IN HORIZONTAL R.O. <br />CHASES. COORDINATE INSTALLATION IN FIELD <br />WITH ELECTRICAL CONTRACTOR. <br />KEYED NOTES: 11 <br />Q R.O. PIPING DOWN WALL OR IN CHASE. <br />Q INDICATES I" MEDICAL GRADE "GLEANPEX" <br />TUBIN6 W/ I" INSULATION FOR RD. CIRCULATION <br />AND TWO (2) 3/4" FLOWGUARD GOLD 5DR II <br />ASTM 02846 CONCENTRATE LINES AND ONE (1) <br />3/4" FLOWGUARD GOLD 5DR II ASTM D2846 <br />BIGARB LINE (TOTAL 4 PIPE-5). ALL <br />R.OADROGE55 LINES SHALL BE INSTALLED IN <br />STRIGT ACCORDANCE WITH MANUFACTURER'S <br />RECOMMENDATIONS. ALL PIPING SHALL BE <br />COORDINATED WITH EQUIPMENT LOCATIONS. ALL <br />BALL VALVES, UNLESS NOTED OTHERWI5E, 5HALL <br />BE A5AHI DUO -SLOG 21 WITH EPDM 5EAL5. <br />3Q R.O. PIPING ROUTED IN GASEVd . <br />® WATER HEATER NOT REQUIRED FOR R.O. <br />SYSTEM. <br />5Q R.O. PIPING ABOVE CEILING. <br />© CONFIRM ALL PLUMBING, MECHANICAL AND <br />ELECTRICAL CONNECTIONS TO R.O. EQUIPMENT <br />WITH OWNER PRIOR TO INSTALLATION. <br />7Q ALL EQUIPMENT TO BE PROVIDED AND <br />INSTALLED BY OWNER EXCEPT DOMESTIC WATER <br />HEATER, RECIRCULATION PUMP AND BACKFLOW <br />PREVENTER. <br />® PROVIDE BALL VALVE FOR R.O. WATER. <br />COORDINATE REQUIREMENTS WITH BIOMED <br />TECHNICIAN. BALL VALVE FOR BIGARB <br />ROOM SINK SHALL BE 8" ABOVE RIM OF <br />SINK. <br />Q R.O. PIPING TO BE SURFACE MOUNTED IN <br />RE-U5E, BIGARB, It R.O. ROOMS. <br />® DROP R.O. LINE, BIGARB LINE, AND I <br />GONCENTRATF LINE DOWN IN THE BIOMED ROOM. <br />ALL OTHER LINES SHALL CONTINUE THE RUN <br />OVERHEAD. <br />Shepherd, Harvey & Associates, Inc. <br />4855 River Green Parkway, Suite 400 <br />Duluth, Georgia 30096-2569 Fla. Cert. of Auth. No. 28961 <br />770-495-4007 FAX 770-495-7112 Project Number: 13-017 <br />m <br />Cn <br />-lc <br />C <br />L <br />>+ <br />O <br />O <br />4- <br />3 <br />r1 <br />+� <br />L <br />•r1 <br />>� <br />N <br />O <br />C <br />z <br />> <br />C <br />O <br />ca <br />O <br />+•� <br />U <br />C <br />UI <br />O <br />C <br />rl <br />+j <br />U <br />L. <br />N <br />O <br />O <br />C <br />X <br />^ <br />U <br />O <br />N <br />asC <br />N <br />L <br />L <br />+J <br />N <br />O <br />C <br />E <br />4 <br />O <br />-11 <br />N <br />U <br />'O <br />Q <br />In aodu In sMW h" m add as ffr <br />mfyad , ,h... =" m wft <br />dbeana. of ffr mfyid diaabq <br />ft dnnbq Is ffr F .0 ?a of AIM MUM W- I <br />and la w* fa be a�aapbd%r or r ood Ina MN <br />ba or adw projW Ydio be <br />U <br />U <br />CM <br />U <br />L <br />0 <br />C) <br />Q <br />Q <br />� <br />z <br />� <br />J <br />cc <br />O <br />O <br />r, <br />N <br />oC <br />O <br />Lu <br />00 <br />O <br />O <br />LU <br />r <br />0 <br />� <br />0) <br />ZH�X <br />U <br />�-1 <br />c <br />c <br />OZ—CM <br />o <br />N <br />� <br />I— <br />Q <br />NM <br />Q <br />`. <br />LL <br />Z <br />O <br />U <br />O <br />J <br />W <br />T- <br />It <br />LO <br />� <br />U <br />o <br />z <br />J <br />LL <br />m <br />J <br />0 <br />Z <br />-j <br />'J <br />Q <br />W <br />J <br />J <br />N <br />-17 <br />Lij <br />N <br />DRAWN BY: <br />JSM <br />DATE: 03/ 12/ 13 <br />PROJECT NO.1230 <br />REVISIONS <br />REV. <br />REV. <br />REV. <br />Sheet No. <br />P-4 <br />