Laserfiche WebLink
N <br />Z <br />D <br />0 <br />Ln <br />0-) <br />0 <br />N <br />GENERAL NOTES AND CONDITIONS OF THE__CONTRACT <br />A. STANDARD FORM OF AGREEMENT BETWEEN OWNER AND <br />CONTRACTOR - AIA DOCUMENT A101-2007. <br />EXCEPTION: STANDARD FORM OF AGREEMENT BETWEEN <br />OWNER AND CONTRACTOR FOR RESIDENTIAL AND SMALL <br />COMMERCIAL PROJECTS - AIA DOCUMENT A105-2007 <br />SHALL BE USED WITHOUT ITEM B BELOW WHEN THE CONTRACT <br />COST IS LESS THAN $200,000.00. <br />B. THE GENERAL CONDITIONS OF THE CONTRACT FOR <br />CONSTRUCTION, AIA DOCUMENT A201-2007. <br />C. THE CONTRACTOR SHALL PURCHASE AND SECURE ALL <br />PERMITS, LICENSES AND INSPECTIONS, PAY ALL FEES AND <br />OBTAIN ALL OCCUPANCY PERMITS. <br />D. THE CONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, <br />RULES, REGULATIONS AND LAWFUL ORDERS OF BUILDING <br />OFFICIALS BEARING ON PERFORMANCE OF THE WORK. <br />E. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, <br />USING THE CONTRACTOR'S BEST SKILLS AND ATTENTION. <br />THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE <br />WORK, HAVE CONTROL OVER CONSTRUCTION MEANS AND METHODS, <br />TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR <br />COORDINATING ALL PORTIONS OF THE WORK UNDER THE <br />CONTRACT. THE CONTRACTOR SHALL PROVIDE A MONTHLY JOB <br />STATUS REPORTS TO THE ARCHITECT <br />F. INSURANCE: <br />1. BUILDERS RISK: TO BE PROVIDED BY THE GENERAL CONTRACTOR. <br />2. WORKERS COMPENSATION - STATE STATUTORY LIMITS - $1,000,000 <br />3. GENERAL LIABILITY AGGREGATE - $2,000,000 <br />PRODUCTS/COMPLETED OPERATIONS - $2,000,000. <br />4. EXCESS COVERAGE AGGREGATE - $ 2,000,000. <br />5. AUTOMOBILE BODILY INJURY & PROPERTY DAMAGE - <br />$ 1,000,000 - COMBINED LIMIT FOR EACH ACCIDENT. <br />6. ENDORSEMENT AS ADDITIONAL INSURED - THE OWNER <br />AND THEIR EMPLOYEES. <br />2. SUMMARY OF WORK <br />A. CONTRACT DOCUMENTS INDICATE THE WORK OF THE <br />CONTRACT AND RELATED REQUIREMENTS AND CONDITIONS <br />THAT HAVE AN IMPACT ON THE PROJECT. <br />B. SUMMARY BY REFERENCE: WORK OF THE CONTRACT <br />CAN BE SUMMARIZED BY REFERENCES TO THE CONTRACT, <br />PROJECT MANUAL, GENERAL AND SUPPLEMENTAL & SPECIAL <br />CONDITIONS, GENERAL REQUIREMENTS, TECHNICAL SPECIFICATIONS, <br />DRAWINGS, ADDENDA AND MODIFICATIONS TO CONTRACT <br />DOCUMENTS. <br />C. THE CONTRACT PRICE FOR THE PROJECT SHALL REFLECT ALL <br />FEES, LICENSES, INSURANCES, CONSTRUCTION REQUIRED TO <br />ACCOMMODATE THE EQUIPMENT OF OTHER TRADES, TEMPORARY <br />FACILITIES AND UTILITIES, AND APPLICABLE TAXES. <br />D. WARRANTIES AND BONDS: <br />1. GENERAL CONTRACTOR'S WARRANTY - LABOR AND MATERIALS <br />FURNISHED AND WORK PERFORMED ARE IN ACCORD WITH THE <br />CONTRACT DOCUMENTS AND WILL BE FREE OF DEFECTIVE <br />MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE AND ONE HALF <br />(1-1/2) YEARS AFTER ACCEPTANCE AND/OR FROM DATE OF <br />SUBSTANTIAL COMPLETION. <br />2. SUB -CONTRACTOR'S WARRANTY - ON THEIR RESPECTIVE <br />TRADE(S) - LABOR AND MATERIALS AND WORK PERFORMED ARE <br />IN ACCORDANCE THE CONTRACT DOCUMENTS AND AUTHORIZED <br />MODIFICATIONS, AND WILL BE FREE FROM DEFECTS FOR A <br />PERIOD OF ONE AND ONE HALF (1-1/2) YEARS AFTER <br />ACCEPTANCE AND/OR FROM DATE OF SUBSTANTIAL COMPLETION. <br />3. STATUTORY AFFIDAVIT - THE CONTRACTOR CERTIFIES THAT <br />ALL WORK UNDER THE PROJECT HAS BEEN PERFORMED IN <br />ACCORDANCE WITH THE TERMS THEREOF, THAT ALL MATERIALMEN, <br />MECHANICS, AND LABORERS HAVE BEEN PAID AND SATISFIED <br />IN FULL, AND THAT THERE ARE NO OUTSTANDING CLAIMS, <br />DISPUTED CLAIMS OR ANY CLAIMS TO WHICH THE CONTRACTOR <br />HAS OR WILL ASSERT ANY DEFENSE ARISING OUT OF THE <br />PERFORMANCE OF THE CONTRACT WHICH HAVE NOT BEEN <br />PAID IN AND SATISFIED IN FULL. <br />E. CLEAN UP <br />1. KEEP PROJECT SITE FREE FROM ACCUMULATION OF WASTE <br />MATERIALS AND RUBBISH AT ALL TIMES DURING CONSTRUCTION. <br />2. REMOVE ALL WASTE MATERIALS AND RUBBISH FROM AND ABOUT <br />THE PROJECT, AS WELL AS TOOLS, CONSTRUCTION EQUIPMENT, <br />MACHINERY AND SURPLUS MATERIALS, EXCEPT THOSE SPECIFICALLY <br />REQUIRED FOR OWNER'S MAINTENANCE AND/OR FOR COMPLETION <br />OF WORK. <br />3. STORE VOLATILE AND TOXIC WASTE IN COVERED METAL CONTAINERS, <br />REMOVE FROM SITE ON A DAILY BASIS. PROVIDE ADEQUATE VENTILATION <br />CAD ALL TIMES. <br />4. PROHIBITED ACTIVITIES: <br />a. BURNING OR BURYING RUBBISH OR DEBRIS ON SITE. <br />b. DISPOSAL OF VOLATILE AND/OR TOXIC THROUGH THE SANITARY OR <br />STORM SYSTEMS OR OTHERWISE ON -SITE DISPOSAL (BURY, SPILL, <br />AIR OR RUN-OFF DISPOSAL). <br />DIVISION NO. 3 CONCRETE: <br />003110 CONCRETE FORMWORK <br />A. THE METHOD OF FORMING, DESIGN & PLACEMENT FORMWORK <br />AND SHORING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />B. FORMING MATERIALS: <br />1.' WOOD FORMS FOR UNEXPOSED CONCRETE: #2 COMMON <br />SOUTHERN YELLOW PINE, PLYFORM OR METAL. <br />2. PLYWOOD FORMS: %" OR GREATER, 5 PLY DOUGLAS FIR <br />STRUCTURAL GRADE, OILED AND EDGE SEALED W/ STANDARD <br />WEIGHT HIGH DENSITY OVERLAY CONFORMING TO US PRODUCT <br />STANDARD PS 1 66 FOR SOFTWOOD PLYWOOD FORMS (CLASS II). <br />3. FORM OIL: NON -STAINING OIL (ENVIRONMENTALLY ACCEPTABLE). <br />4.° EXPANSION JOINT FILLER: ASTM D01752-67, TYPE II, X2" THICK <br />x WIDTH OF SLAB AND EQUAL, TO 1" LESS THAN SLAB DEPTH. <br />5.° CONTROL JOINTS: 24 GAUGE 'GALVANIZED METAL, EQUAL TO <br />PRODUCTS BY CONCRETE SPECIALTIES, INC., KEYHOLD, INC. <br />OR HECKMAN BUILDING PRODUCTS. <br />C. FORMWORK: <br />FORMWORK SHALL COMPLY WITH ACI 301 AND 347. FORMS SHALL <br />CONFORM TI SAPE, LINES, GRADES AND DIMENSIONS INDICATED ON <br />THE CONTRACT DRAWINGS. FORMS SHALL PREVENT LEAKAGE OF LIQUID <br />CONCRETE MORTAR AND BE BRACED & TIED TOGETHER TO MAINTAIN <br />POSITION AND SHAPE. FORMS SHALL NOT DEFLECT FROM WEIGHT OF <br />DEAD LOAD WEIGHT OF LIQUID CONCRETE OR IMPOSED CONSTRUCTION <br />LOADS. VARIATION GREATER THAN %4" TO %" FROM PLUMB LINE OR LEVEL <br />SHALL NOT BE ACCEPTABLE. FORMS SHALL BE EASILY REMOVABLE WITHOUT <br />DAMAGING THE GREEN CONCRETE. <br />EARTH FORMS: FOOTING SIDES AND TRENCH WALL ARE ACCEPTABLE <br />IF SOIL PERMITS, OTHERWISE WOOD FORMS SHALL BE USED. INSTALL <br />PLASTIC MEMBRANE OVER THE EARTH SURFACES PRIOR TO CONCRETE <br />PLACEMENT. <br />ADJUST AND CHECK ALIGNMENT ON FORMWORK IMMEDIATELY AFTER PLACING <br />CONCRETE TO MAINTAIN GRADES, LEVELS AND CAMBER. <br />D. BUILT-IN ITEMS: <br />1. 6 MIL PLASTIC MEMBRANE VAPOR RETARDER TO BE PLACED <br />UNDER ALL SLABS. <br />2. FASTENINGS AND ANCHORAGE ITEMS, CHASES, REGLETS, SLEEVES, <br />ETC. SUCH PLACEMENT SHALL NOT INTERFERE WITH REINFORCEMENT. <br />E. FORM REMOVAL: CAREFULLY REMOVE ALL FORMWORK, FILL, RUB AND <br />DRESS ALL SURFACES AS MAY BE REQUIRED TO MAINTAIN HOMOGENOUS <br />EDGE SURFACES. <br />DIVISION NO. 3 CONCRETE: <br />003200 CONCRETE REINFORCEMENT <br />A. REINFORCEMENT: <br />1. BARS: DEFORMED REINFORCEMENT SHALL WITH ASTM A615-68. <br />REINFORCING BARS SHALL BE GRADE 60. <br />2. WELDED WIRE FABRIC SHALL COMPLY WITH ASTM A185-611. <br />3. ACCESSORIES: PREFABRICATED SHALL COMPLY WITH CRSI MANUAL <br />OF STANDARD PRACTICE (CLASS E ® EXPOSED SURFACES AND <br />CLASS A CAD UNEXPOSED SURFACES. <br />B. INSTALLATION: <br />1. FOOTINGS AND GRADE BEAMS: 3" CLEAR SIDES & BOTTOM, <br />2" CLEAR ® TOP. <br />2. SLABS -ON -GRADE: 1" CLEAR ® TOP, 2" CLEAR ® BOTTOM. <br />3. FABRIC: LAP TWO WIRE, NOT LESS THAN 6". <br />4. SPLICES OR LAPS - CLASS B TENSION LAP SPLICES UNLESS <br />NOTED OTHERWISE. <br />GENERAL NOTE: <br />TENANT IMPROVEMENTS WILL <br />REQUIRE A VARYING AMOUNT OF <br />IMPROVEMENTS UNDER THIS <br />PROJECT SCOPE OF WORK. <br />THEREFORE, SOME OF THESE <br />SPECIFICATIONS MAY ONLY RELATE <br />TO A SMALL PORTION OF THE <br />WORK, OR IN SOME CASES NONE <br />AT ALL. <br />DIVISION NO. 3 CONCRETE: <br />(THIS DIVISION AND INDIVIDUAL SECTIONS APPLIES ONLY WHERE SCHEDULED OR APPLICABLE <br />UNDER THE MBBI WORK REQUIREMENTS.) <br />003300 CAST -IN -PLACE CONCRETE <br />PART 1 GENERAL <br />A. RELATED DOCUMENTS <br />1. DRAWING AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL <br />AND SUPPLEMENTARY CONDITIONS AND DIVISION I - GENERAL REQUIREMENTS, <br />APPLY TO WORK IN THIS SECTION. <br />B. THIS SECTION INCLUDES ALL STRUCTURAL CONCRETE AND PAVING WITH ALL <br />FORMWORK, REINFORCING STEEL AND INCIDENTAL ITEMS REQUIRED TO COMPLETE <br />THE WORK INDICATED ON THE DRAWINGS AND SPECIFIED. <br />PART 2 STANDARD SPECIFICATIONS <br />A. DOCUMENTS <br />1. EXCEPT AS MODIFIED OR SUPPLEMENTED BY THESE SPECIFICATIONS, THE <br />"STANDARD SPECIFICATION FOR STRUCTURAL CONCRETE" (ACI 301-99) OF <br />THE AMERICAN CONCRETE INSTITUTE SHALL GOVERN ALL WORK IN THIS <br />SECTION AND THE CONTRACTOR MUST HAVE A COPY OF THESE <br />SPECIFICATIONS IN THE PROJECT'S FIELD OFFICE AT ALL TIMES. COPIES OF <br />THE ACI SPECIFICATION MAY BE OBTAINED BY WRITING AMERICAN CONCRETE <br />INSTITUTE, P.O. BOX 19150, REDFORD STATION, DETROIT, MICHIGAN 48210. <br />WHERE ACI 301 AND THIS SECTION OF THE SPECIFICATIONS DISAGREE, THESE <br />SPECIFICATIONS SHALL GOVERN. <br />B. SUPPLEMENTS AND MODIFICATIONS TO THE STANDARD SPECIFICATIONS <br />1. THE FOLLOWING SECTIONS OF THE STANDARD SPECIFICATIONS SHALL BE <br />MODIFIED AND/OR SUPPLEMENTED AS FOLLOWS: <br />a. SECTION 1.6 <br />INSPECTION AND TESTING SHALL BE PERFORMED BY A FIRM SELECTED <br />AND PAID FOR BY THE OWNER IN ACCORDANCE WITH THE QUALITY <br />CONTROL SECTION OF THIS SPECIFICATION AND SECTION 1.6 OF ACI <br />301-99 ADDITIONAL CONCRETE CYLINDERS REQUESTED BY THE <br />CONTRACTOR FOR HIS INFORMATION SHALL BE PAID FOR BY THE <br />CONTRACTOR. <br />b. SECTION 1.6.4.1 C <br />TESTING REPORTS FOR CONCRETE DELIVERED TO THE SITE SHALL <br />CONTAIN THE UNIQUE IDENTIFICATION OF THE SPECIFIC MIX FOR THE <br />CONCRETE BEING SUPPLIED FOR THE REPORTED POUR. <br />c. SECTION 1.6.5.2 <br />NONDESTRUCTIVE TESTING SHALL NOT BE USED TO ESTABLISH <br />CONCRETE STRENGTH OR SUITABILITY UNLESS SPECIFICALLY AUTHORIZED <br />BY THE STRUCTURAL ENGINEER. <br />d. SECTION 1.6.7.1 <br />FOR ANY CONCRETE POUR THE STRENGTH LEVEL OF THE CONCRETE <br />WILL BE CONSIDERED SATISFACTORY ONLY IF THE RESULTS OF EVERY <br />COMPRESSIVE CYLINDER BREAK FOR THAT <br />CONCRETE POUR EQUALS OR EXCEEDS THE SPECIFIED COMPRESSIVE <br />STRENGTH. <br />e. SECTION 1.6.7.3 <br />CONCRETE REPRESENTED BY CORE TESTING WILL BE CONSIDERED <br />ADEQUATE ONLY IF THE RESULTS OF EVERY CORE EQUALS OR EXCEEDS <br />THE SPECIFIED COMPRESSIVE STRENGTH. <br />f. SECTION 2.1.2.2, 2.3.3.1 <br />SUBMITTAL OF SHOP DRAWINGS OR PROCEDURES FOR FORMWORK, <br />SHORING, OR RESHORING WILL NOT BE REQUIRED OR REVIEWED BY THE <br />STRUCTURAL ENGINEER. <br />g. SECTION 2.2.2.3 <br />EARTH CUTS MAY BE USED AS FORMS FOR FOOTINGS OR GRADE BEAMS <br />PROVIDING DIMENSIONS ARE CONTROLLED. THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR PROVIDING ANY DEWATERING OR DRY BOTTOMS <br />NECESSARY TO PLACE CONCRETE TO THE DIMENSIONS AND ELEVATIONS <br />SHOWN ON THE DRAWINGS. <br />h. SECTION 2.2.2.5 <br />UNLESS SHOWN OTHERWISE ON THE DRAWINGS ALL REINFORCEMENT <br />SHALL BE CONTINUED THROUGH CONSTRUCTION JOINTS AND BONDED ON <br />BOTH SIDES OF THE JOINT. <br />REINFORCEMENT OR OTHER ITEMS BONDED TO THE CONCRETE (EXCEPT <br />DOWELS BONDED TO ONLY ONE SIDE OF JOINTS) SHALL NOT BE <br />PERMITTED TO EXTEND CONTINUOUSLY THROUGH ANY EXPANSION JOINTS. <br />MAXIMUM SPACING OF EXPANSION JOINTS IN NON -PILE SUPPORTED <br />SIDEWALKS SHALL BE 10 FEET. EXPANSION JOINT FILLER SHALL BE <br />ASTM D 1751 OR D 1752. <br />i. SECTION 2.3 <br />DESIGN, PLACEMENT, AND REMOVAL OF SHORING, RESHORING, AND <br />FORMWORK ARE THE RESPONSIBILITY OF THE CONTRACTOR. NO REVIEW, <br />COMMENTS, OR APPROVAL OF THE STRUCTURAL ADEQUACY OR TIME OF <br />REMOVAL OF SHORES, RESHORES, OR FORMS WILL BE MADE BY THE <br />STRUCTURAL ENGINEER. <br />j. SECTION 3.1.1.1 A. <br />REPLACE THIS PARAGRAPH WITH THE FOLLOWING: PLACING DRAWINGS <br />SHOWING ALL FABRICATION DIMENSIONS AND LOCATIONS FOR PLACING <br />REINFORCEMENT SHALL BE SUBMITTED FOR REVIEW. ALL SUBMITTALS <br />SHALL BE MADE ON SHEETS HAVING A MINIMUM SIZE OF 22" X 34". <br />THE PROCEDURE AND QUANTITY OF SUBMITTALS SHALL BE IN <br />ACCORDANCE WITH THE REQUIREMENTS GIVEN IN THE SUBMITTAL <br />SECTION OF THE PROJECT SPECIFICATIONS. <br />k. SECTION 3.2.1 <br />REINFORCEMENT SHALL COMPLY WITH ASTM A615, GRADE 60. WELDED <br />WIRE FABRIC SHALL COMPLY WITH ASTM A185. WIRE FOR WELDED WIRE <br />FABRIC SHALL CONFORM TO ASTM A82. <br />I. SECTION 3.3.2.8 <br />NO FIELD BENDING OR STRAIGHTENING OF REINFORCEMENT PARTIALLY <br />EMBEDDED IN CONCRETE (INCLUDING EXISTING REINFORCEMENT) WILL BE <br />ALLOWED. <br />m. SECTION 4.1 <br />CONCRETE, OR CONCRETE THAT IS PUMPED SHALL HAVE AT LEAST 0.5 <br />MORE SACKS OF CEMENTITIOUS MATERIAL PER CUBIC YARD THAN <br />CONCRETE OF THE SAME STRENGTH THAT IS NOT PUMPED. <br />THE CONTRACTOR SHALL SUBMIT THE CONCRETE MIX DESIGN TO THE <br />TESTING LABORATORY FOR REVIEW. EVERY MIX FOR THE PROJECT <br />SHALL HAVE A UNIQUE IDENTIFYING NAME OR NUMBER AND THIS <br />IDENTIFICATION SHALL APPEAR ON THE MIX DESIGN SUBMITTAL. THE <br />BACKUP DOCUMENTATION. AND ON ALL TICKETS FOR THE CONCRETE <br />ACTUALLY DELIVERED TO THE SITE. THE TESTING LABORATORY SHALL <br />SUBMIT A WRITTEN REVIEW OF THE DESIGN MIX TO THE ARCHITECT AND <br />ENGINEER PRIOR TO COMMENCEMENT OF CONCRETE WORK. THE <br />LABORATORY SHALL VERIFY THAT THE MIX SUBMITTED MEETS ALL <br />REQUIREMENTS OF THIS SPECIFICATION, INCLUDING THE IDENTIFICATION <br />CRITERIA LISTED ABOVE. <br />w <br />c <br />C <br />L <br />>, <br />O <br />O <br />4- <br />•H <br />3: <br />4- <br />d <br />� <br />C <br />z <br />> <br />c <br />O <br />cu <br />O <br />U <br />0) <br />}� <br />C <br />"a <br />-H <br />M <br />­1 <br />cC <br />3 <br />LL <br />U <br />cA <br />a) <br />OL. <br />O <br />C <br />X <br />^ <br />O <br />(1)5 <br />LL <br />U <br />co <br />c <br />L.L. <br />c <br />L. <br />n. SECTION 4.2.1.1 = +p a) 0 <br />CLASS C FLY ASH CONFORMING TO ASTM C618 MAY BE USED IN THE <br />MIX PROVIDING IT CONSTITUTES NO MORE THAN 20% OF THE TOTAL <br />WEIGHT OF THE CEMENTITIOUS MATERIAL. <br />BLAST FURNACE SLAG CONFORMING TO ASTM C989 MAY BE USED , -_ <br />PROVIDING IT CONSTITUTES NO MORE THAN 20% OF THE TOTAL WEIGHT a," <br />OF THE CEMENTITIOUS MATERIAL. <br />O. <br />SECTION 4.2.1.4 <br />ADMIXTURES MAY BE USED IN CONCRETE AT CONTRACTOR'S OPTION AND <br />WITH THE APPROVAL OF THE TESTING LABORATORY. <br />_ <br />p, <br />SECTION 4.2.2.2 <br />WHEN ADMIXTURES (PLASTICIZERS, WATER REDUCERS, ETC.) ARE <br />ran <br />UTILIZED TO INCREASE SLUMP THE ADMIXTURES SHALL BE ADDED AT <br />THE JOB SITE AND THE SLUMP SHALL BE MEASURED PRIOR TO <br />INTRODUCTION OF THE ADMIXTURE. <br />• <br />U <br />q. SECTION 4.2.2.4 <br />UNLESS INDICATED OTHERWISE ON THE DRAWINGS, AIR ENTRAINMENT <br />WILL NOT BE REQUIRED. <br />r. <br />SECTION 4.2.2.5 <br />ADMIXTURES CONTAINING CALCIUM CHLORIDE MAY BE USED ONLY WITH <br />WRITTEN CONSENT OF STRUCTURAL ENGINEER. <br />+� <br />S. <br />SECTION 4.2.2.8 <br />V <br />SEE DRAWINGS FOR STRENGTH OF CONCRETE. <br />(3) <br />t. <br />SECTION 5.1.2.2 B <br />PRIOR TO PLACING ANY CONCRETE NOTIFY ARCHITECT AND STRUCTURAL <br />>" <br />c <br />ENGINEER WHEN REINFORCING STEEL PLACEMENT AND ALL OTHER <br />V <br />co <br />NECESSARY PREPARATIONS WILL BE COMPLETE. GIVE A MINIMUM OF <br />o <br />TWENTY-FOUR (24) AND MAXIMUM OF FORTY-EIGHT (48) HOURS <br />Q <br />NOTICE. <br />CL <br />Q <br />U. <br />SECTION 5.3.2.5 <br />0 <br />i•-f <br />ALL CONCRETE SHALL BE CONSOLIDATED BY MECHANICAL VIBRATION AND <br />(n z <br />0 <br />SHALL HAVE A MAXIMUM SLUMP OF 4". <br />_j <br />o O N N <br />V. <br />SECTION 5.3.2.6 <br />m <br />T N <br />ALL CONTROL, CONSTRUCTION, OR EXPANSION JOINTS IN PAVING SHALL <br />EXTEND CONTINUOUSLY THROUGH ANY CURBS, SIDEWALKS, ETC. POURED <br />= <br />z Q � <br />WITH OR ON THE PAVING. <br />X V <br />co <br />co Z^ co <br />W. <br />SECTION 5.3.3 <br />"GROUT <br />o" CO <br />J <br />SURFACE EXPOSED TO PUBLIC VIEW SHALL BE GIVEN A <br />LO <br />H N X <br />CLEANED FINISH". <br />Q N <br />m Q ~ < <br />X. <br />SECTION 5.3.4 <br />CONCRETE HARDENER AND SEALER SHALL BE USED ON ALL INTERIOR, <br />EXPOSED CONCRETE FLOORS. <br />Y. <br />SECTION 5.3.4.2 D <br />ALL EXTERIOR PAVING SHALL RECEIVE A BROOM OR BELT FINISH <br />z <br />UNLESS OTHERWISE NOTED. <br />O <br />Z. <br />SECTION 5.3.4.3 C <br />UNLESS DIRECTED OTHERWISE, ALL FLOOR SLABS SHALL RECEIVE A <br />0 <br />TROWELED FINISH AND ALL SLABS IN EXCESS OF 10,000 SQUARE FEET <br />SHALL BE TESTED FOR FLATNESS IN ACCORDANCE WITH ACI 117 AND <br />SHALL HAVE MINIMUM F NUMBERS OF FF =25 AND FL=20. <br />U <br />O <br />Z.1. <br />MINIMUM FOUR TEST KITS TO BE UTILIZED TO DETERMINE MOISTURE VAPOR EMISSIONS <br />= <br />T <br />IN CONCRETE SLAB. MOISTURE VAPOR EMISSION TEST TO BE CONDUCTED IN GENERAL <br />ACCORDANCE WITH ASTM-F1869 <br />11J <br />LO <br />C. <br />SUBMITTALS: <br />M <br />d 0 <br />� <br />z J <br />1. <br />DESIGN MIX FOR EACH CLASS OF CONCRETE SHALL BE CONDUCTED BY AN <br />'^ <br />vJ <br />L. <br />INDEPENDENT LABORATORY, APPROVED BY THE ARCHITECT AND PAID FOR BY THE <br />OWNER. TESTS SHALL CONFORM TO ASTM C39-66, C31-69, C142-66, AND <br />J <br />Q co W <br />C172-68 (LATEST EDITIONS). TESTS SHALL E FOR COMPRESSIVE STRENGTH, <br />0 J <br />FLEXUAL STRENGTH AND SLUMP. <br />Q <br />z J <br />2. <br />SOURCE QUALITY CONTROL TESTS SHALL BE CONDUCTED BY AN INDEPENDENT <br />\- <br />/ _ <br />- <br />Q <br />Q <br />LABORATORY SELECTED BY THE ARCHITECT AND PAID FOR BY THE OWNER. THE <br />W <br />CONTRACTOR SHALL DELIVER SAMPLES OF THE CONCRETE MATERIALS TO BE <br />♦^ <br />>_ <br />Q <br />TESTED TO THE LABORATORY. <br />_ <br />a. <br />AGGREGATE TESTS SHALL CONFORM TO ASTM C33-67 FOR FINE & COARSE <br />J <br />W <br />AGGREGATES. TESTS TO BE MADE WITHIN 90 DAYS PRIOR TO USE OF <br />- <br />N <br />AGGREGATE. TESTS TO BE MADE FOR GRADATION, STRENGTH AND IMPURITIES. <br />b. <br />LABORATORY REPRESENTATIVE SHALL VISIT BATCHING PLANT TO OBSERVE AND REPORT <br />ON COMPLIANCE OF PROCEDURES WITH SPECIFICATIONS AND CITED ASTM <br />STANDARDS. <br />Z <br />D. <br />MATERIALS: <br />0- <br />1. <br />CONCRETE SHALL COMPLY WITH ASTM C94. <br />W <br />N <br />2. <br />CONCRETE SHALL DEVELOP 3,000 PSI COMPRESSIVE STRENGTH IN 28 DAYS AFTER <br />PLACEMENT. PERFORM ONE TEST FOR EVERY 40 TO 50 CUBIC YARDS OF <br />POURED CONCRETE. <br />3. <br />AGGREGATE: SHALL COMPLY WITH ASTM C33. <br />a. <br />FINE AGGREGATE SHALL BE SAND HAVING CLEAN, HARD, DURABLE, UNCOATED GRAINS <br />FREE FROM DELETERIOUS MATERIALS. GRADATION SHALL <br />COMPLY W/ASTM STANDARDS. <br />b. COURSE AGGREGATE SHALL BE CRUSHED STONE, GRAVEL, OR INERT MATERIAL <br />HAVING CLEAN, DURABLE, UNCOATED PARTICLES. MAXIMUM SIZES: #57 STONE <br />FOR NORMAL STRUCTURES AND #7 FOR RESTRICTED PLACING CONDITIONS. <br />4. <br />WATER SHALL BE CLEAN AND FREE FROM DELETERIOUS AMOUNTS OF ACIDS, ALKALIS <br />OR ORGANIC MATERIALS. <br />5. ADMIXTURES: <br />V-1-a" Qw-,x <br />a. WATER REDUCING ADMIXTURE SHALL BE USED IN ALL CONCRETE. ADMIXTURE <br />SHALL COMPLY WITH ASTM C494, TYPE A, D OR E AS RECOMMENDED BY <br />; AI , %s5 <br />THE MANUFACTURER. <br />b. <br />AIR -ENTRAINING ADMIXTURE SHALL BE USED IN ALL CONCRETE TO PROVIDE 1-3% AIR <br />ENTRAINMENT. ADMIXTURES SHALL COMPLY WITH ASTM C260. <br />DRAWN <br />BY: <br />6. JOINT SEALER SHALL BE A RUBBER ASPHALT COMPOSITION CONFORMING <br />TO ASTM D-1 190. <br />LJ/CH <br />C. TESTING: REPRESENTATIVE TEST SAMPLING SHALL BE MADE DURING CONCRETE <br />PLACEMENT PROCEDURES AT THE RATE NOT TO EXCEED ONE TEST FOR EVERY 40 TO <br />DATE: <br />03/ 12/ 13 <br />50 CUBIC YARDS OF POURED CONCRETE. <br />PROJECT N0.1230 <br />REV. <br />R_ <br />R_ <br />REVISIONS <br />Sheet No. <br />T-2 <br />