MIAM!•Clt4DE DADS comer
<br />PGT industries, Ine.
<br />PGT Industries, line.
<br />U
<br />a
<br />N O
<br />mm PaODUCTCO-- IROL SECTION
<br />C
<br />PGT Industries. Inv.
<br />Q 0
<br />11905 svit26 street Bo 5- 2
<br />NOTICE OF ACCEPT kNTCE: EN"IDENCE SUBMITTED
<br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
<br />iiEFAAT3dEKTOY x.E�LiTQRYAPt1tECoNLIkbIIC RE5Oi�7RGE.S j�R) M�, .3s1�r$ _474 7a
<br />BOATeD AND CODE AD�TJIATICO DIVISW.4r T (i86)313-2590 F t7W 335-2543t
<br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
<br />V � 4,3
<br />NOTICE OF ACCEPTANCE ('BOA) WWW.Xdamidade.eor:ticonoo v
<br />1. Evidence submitted under previous NOA
<br />A. DRAWINGS
<br />B. TESTS (continued)
<br />D. U ALiT'i ASS[TR ��NCE
<br />Q
<br />1. Miami Dade Department of Regulatory and Economic Rffxur ces (RER)_
<br />C � CD cu 'Cn
<br />N -0 UO "a �
<br />PGT 1x&tse ies, Inc.
<br />1070 Te+chmdoq Drh-c,
<br />1_ Manufacttuees die drawings and sections.
<br />5_ Test r�epoat ore 1) Air Infiltration Test, per FBC. TAS 202-94
<br />0 Q C �
<br />North Venice, Fig 3427S
<br />(Subat lied under AW.A No.11-0107. 04)
<br />2) Uniform Static Air Piesstue Test, per FBC, TAS 202-94
<br />E. MATERIAL CERTIFICATIONS
<br />C
<br />Scow:
<br />2_ Drawing No. MD-5570.0, titled' Vinyl Sliding Glass DoorNOA {ilbi) `, sheets 1
<br />3) Water R e Test, per FBC, TAS 202-94.
<br />1. Notice ofAeceptame No. IS-OS28.14 issued to Vision Extrusion Limited fortheir
<br />M 0 � o M
<br />ThisNOA ts.bemgmuedutsder the applicable rulesandregubtions governing the use of constn>eoonmaterisls. The
<br />through 21 of 21. prepared by manufacturer, dated 10,05/15, with revision A dated
<br />4) Large Missile Impact Test per FBC, TAS 201-94
<br />'U'hite Rigid PVC Exterior Extrusions for Windows and Doors-, dated 08.n 3/15.
<br />_tn � O
<br />�
<br />documentation subinu teed has beenre ed and accepted byMiami-DadeCopy RER -Product Contra. Sectionto
<br />04105/17, and sealed by A. Lynn MMer; P_E.
<br />5) Cyclic Wald Prue Loadingpet FBC, TAS 203-94
<br />expiring on 09i3W19.
<br />� (D a)Q
<br />be used in MiamiDade County and odwareaswhere altowedbythe AuetcuityHaving7wisdiction {AID
<br />if j Faced Erdty Test, pet FIIC, TAS 2Q2-94
<br />2. Notice of Acceptance No. Id-0920.08 issued to Vision Extrusion Limited fortheir "`tom
<br />1E W � Co Q
<br />This.NOAshallnotbevalid atlertheexpmaimdateestatedbelow_T'heMiami D&&CountyProdductCentral Secam
<br />B. TESTS
<br />along withmarked-up drawings and installation diagram of vinyl sliding glass door. prepaeed
<br />1000 Tan 202 and Ughter Shades {fort-i�Wte} Rigid PVC Exterior Extrusions for
<br />�-- � .� U) Q
<br />(In Miami Dade County) anNorthe AM (in areas other thanMiami DadeCounty)reserve the right to have this
<br />1_ Test report on 1) Uniform Static Air Pressure Test, per FBC, TAS 202-44
<br />by Fenestration Testing Lab, Inc., Test Report Na_ FTL SM9, dated 11 (15, stgnexl and
<br />Windows and Doors", dated 12/08116, expiring on 12 -9f21.
<br />product" material tested for quality apurposes_ If this product or material fails to perform in the accepted
<br />will
<br />2) Large Missile Impact Test per FBC: TAS 201-94
<br />sealed by Idalmis Ortega, P. E_ (Test report revised on 12/04115 and 02/11/16)
<br />3_ Notice of Acceptance No. IS-0528.15 issued to Vision Extrusion Limited fortheir
<br />moaner, themaaaifacturer incurthe expense ofsuch testing and the ART may immediately revoke, mo dify, or
<br />3) Cyclic Wind Prune Loading per FBC TAS 203-94
<br />b. Test report on 1) Air Infiltration Test, per FBC, TAS 202-94
<br />"Brown Coated (Painted or Laminated) ' ►itlite Rigid PVC £zwior Exhasions for
<br />suspend the use of such product or material within their junsdiction. RER reserves the right to revoke this
<br />along wifhma�ed�p oisawings and installatism diagram of vinyl sliding glass dotyr, prepared
<br />2} Uniform Static Air' Pressure Test, per FBC. TAS 202-94�
<br />Windows and Doors'", dated 081131i 5. expiring on 09130/19.
<br />accegtaflce, if it is de#erwi$ed byMiamai-Dade County Product Cool Scotian ttrat this pra&oct or material fa ils to
<br />meet the requirements of the applicable budding code.
<br />by Fenestration Testing Lab, Inc,.Test Report No. FTL 8717, dated 1107115, Signed and
<br />3 Water Resistance Test, FBC, TAS 202-94.
<br />)
<br />4_ Notice of Acceptance No.16-0712.02 issued to ENERGI FenestrationSohitioms USA,
<br />This product is approved as deedherein and has been designed to comply with the Florida Building Code,
<br />sealed by Idalmis Ortega, P_ E. (rest report revised on 02/15/16 and 02,24116)
<br />4) Large Missile Impact Test per FBC, TAS 201-94
<br />Inc_ for their "T Act 3040 and Lighter Shades (Non -White) Rigid PVC Exterior
<br />including the High VelocityHunicam Zone
<br />2., Test report am 1) Air Infiltration Test -per FBC, TAS 202-94
<br />5) Cyclic Wind Preis = Loadingper FBC, TAS 203.94
<br />ExtrBsio►ns for i�'urdt►ws and Doors" dated 0911511�6, + on 02'04r�?1.
<br />DESCRIPTION: Series ` _457M 770"Vinyl Slag Glass Door (Reinfarced) w/ wo 901 & I3,r0 earners-L3LI.
<br />2) Uniform Static Air P'ressrtte Test, per FBC, TAS 202-94
<br />along with marked -up dtswmgs and installation diagram of vinyl sliding glass door, prepared
<br />5. Notice of Acceptance No-16-0712.04 issued to ENERLGI Fenestration Solutions USA,
<br />_4XM0 AL DOCUAJE'.%T: Drawn No_ MD-5"70.0 Rev B, titled "V Glass I�rNOA
<br />8 s
<br />3) Water � Test, per FBC. T-AS 202-94-
<br />by Fenestration Testing Lab; Inc., Test Report No. FTL 8551 dated 12044115, d and
<br />Inc. for their "Bronze and Lighter Shades of Cap C vaned Rigid PVC Exterior
<br />1 t>rrough of 1, prepay dared 10105115 and last revised on O 1. signed and sealed by
<br />4) Large � Impact Test per FBC, TAS 20194
<br />sealed. by Idalmis. Ortega, P. E_ (Test report revised on 02l152016)
<br />Extrusions for Windows and Doors" dated 09n/1546; erring on 04/16I20.
<br />i ring th Miami -Dade
<br />A. Lyra Miller, P.E.- bearingthe M;ams-Dade Coua�rProdn� Control Revision stamp with the Notice of
<br />amp wit
<br />5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
<br />7. Test report on 1) Uniform Static Air Presmse Test per FBC, TAS 20294
<br />6. Notice of Acceptance No=16-0712.03 issued to ENERGI Fenestration Solutions USA,
<br />-White
<br />Acceptance rain and expiration date by the �Kami-Dade County Product Control Section.
<br />Forced Test, per FBC, TAS 202-94
<br />� Entry
<br />2) Large Missile Impact Test per FBC, TAS 201-94
<br />Inc, for their Rigid PVC Exterioi- Extrusions for Windows and Doors" dated
<br />NfiSSD.E IMPACT KkTING: Large and SauklINksdt Impact Rmismar
<br />along withmarked-up drawings and installation diagram ofvmyl sliding glass door prepared
<br />3) Cyclic Wind Preswre Loadingper FBC. TAS 203-94
<br />0&10117, a Viring on 0228118_
<br />byFenesxration Testing Lab, hkC., Test Report No_ FTL 8546- dated 11106115, signed and
<br />along with marked -up drawings and installation diagram. of vinyl shding door, pnq mod
<br />7_ Test reports No(s). 104002-792(A), 1&-0G&M0527, 535753-09. per ASTME-84,
<br />Limitations:
<br />1. See table i (sheets aryl table 2 (sheetD forapplicableSGD unit sizes, design pressures, winforcements types,
<br />sealed by Idalmis Ortega, P_ E. (Test report revised on 01104/16 and 02i112016)
<br />;glass
<br />by Fenestration Testing Lab- Inc., Test Deport No. FTL 6638 (samiplm A-1 tbru A-22), dated
<br />AS'INID 1929 and ASTUD-635. issued by EXOVA toVision Extrusion for cellulosic
<br />types, sill riser (see tables B-1 & B-2, sheets 7-9) and anchor layout sheets requirements in 1 I thru 16_
<br />?
<br />3. Test repeat on 1) Air Infiltration Test, get FBC, TAS �OZ94nder
<br />1 L�19i 10, and sealed JorgeTe A. Canso. P. E_ (Submitted 1'� Q4110�r Il-
<br />composite materialmaterialglass
<br />2. Rigid While PVC, Tan (E'iou-�wirite) Rigid FG°C and Brvwu coated (P$ir�ed or laruinmted) white Rigid P�v C to be
<br />2) LTnifcuut Static Alt• Pressure i'#'sIt, per FBC, TAS 2tI2-94
<br />01 0i (l�tl
<br />(S'uL milted ttudet' ��►rt?_4 !4ro.11-lTl trl7. t74)
<br />labeled per r�efeerem edNiOA's requirements.
<br />3 Water Test, per FBC, TAS 202-94
<br />)
<br />8 Test report on 1) Air hnfilttatiom Test, per FBC. TAS 20294
<br />8. Notice afAcceptance Nto.14-0916.11 issued to Kivaray America.. Inc. for their
<br />3. Egress operable doors must comply with min car width or height per-FBC requirement, as applicable
<br />4) Large Missile Impact Test per FBC, TAS 20194
<br />2) Uniform Static Air Pressure Test, per FBC. TAS 202-94
<br />"Sen.tn-Glast (Clear and NNIke) Interlayee, expiring on 07/04/18.
<br />4. Pocket walls under separate approval. to be reviewedby Building official
<br />5) Cyclic Ranch Presstne Loading per FBC. TAS 203-94
<br />3) Water Resistance Test- per FBC, TAS 202-94.
<br />9. Notice of Acceptance No.16-1117.01 issued to Kuraray America, Inc- for their
<br />L AXInM G: Eachunit shalt bear a penmanent label with thenanuftwwrer`sname or logo, city, statue and series and
<br />6) Forced Entry Test, per FBC, TAS 202-94
<br />4) Large Missile Impact Test per FBC, TAS 201-94
<br />"TrosrfelS, Ultraclear. Clear and Color PVB Interla*j ers", expiring on 07/0&19.
<br />n
<br />following statement: "Miami -Dade County Product Control Approved ,noted herein
<br />alb with marked -up drawings and mstW ho a diagram of vinyl sliding glass door, prepared
<br />5 Cyclic Wind Pnmsurae Load' FBC, TAS 203-94
<br />) C"y mg pet
<br />RE.'s'EN AL of dusNOA shall be considered after a renewal application has been filed and there has beery no
<br />by Fenestration Testing Lab, Inc., Test Report No- FTL 8547, dated 12I4/15, signed and
<br />6) Forced Entry Test, per FBC, TAS 202-94
<br />F. STATEMENTS
<br />char in the able codene We affec the a ofthis
<br />� aPP'� � b� � � � Fes-
<br />sealed by Idalmis Ortega, P_ E. (rest report mired on 02115/16)
<br />along with marked drawings and installation din of 1 slid' door,
<br />g -�� '�}' � P, �
<br />1- Statement letter ofconfomxtnce with IBC-5&Edhion 014 and FBC-6&Edi ion
<br />� )
<br />TERWN-MONi ofthisNOAwill occur after the expiratiotdateor if these hasbeen a revisions or change in ffie
<br />4. Test report on 1) Air Infiltration Test, per FBC, TAS 202-94
<br />by Fenestration Testing Lab, Inc" Test Report No-FTL 6337 (samples A-1 thru A-5), dated
<br />(2017), issued by manufacturer, dated 08114/17, signed & sealed by LynnMill, PE_
<br />materials., use, and+or maau�C.asrre of the product or process_ Misuse of Phis NOA as an endorsement of any prorlact,
<br />2) Uniform Static Air Pressure Test, per FBC, TAS 202-94
<br />12rY36t10 and sealed by Jorge_ Cam, P. E. Submmitted under IVO.A 1'Vo.11-
<br />t � �
<br />2- Statement letter of no financial interest, dater! 04/18i17, issued b manufactur r,
<br />y ��d
<br />for sales, adcertisurg or any othevpurposes ill automatically tesmitmte this NOA. Failures comply with any
<br />3 Water Resistance Test, FBC, TAS 20�-44
<br />) Per
<br />d107.119
<br />)
<br />& sealed by Lynn Miner, P.E.
<br />section oft his NOA sludbe cause fix on and removalofNOA.
<br />4) Large NsW a Impd Test pef FBC, TAS 201-94
<br />3. Letter of lab compliance, part of the above test reports.
<br />ADI'ERTIESE-�f -N-r: Ike NOA number preceded by fie words Miami -Dade County, Florida, and foIlimed by the
<br />5) Cyclic Wind Pressures Loading per FBC, TAS 203-94
<br />C. CALC LTLATIONS
<br />4. REK Test Proposal No.17-0397 dated 0905/17, Signed by Ishaq C"banda. RE -
<br />expiration date be m advertisin literature. If art ortiou ofthe NNOAis displayed, then it shall be
<br />�' ��� g yF displa}'
<br />6) Forced Enhy Test, per FBC', TAS 20294
<br />i _ Anchor verification calciilatioans and strtictttral analysis, complying with FBG-2014,
<br />done is its entirety.
<br />along with marked -up drawings m. and installation diagram of vinyl sliding glass door_ prepared
<br />prepared by PGT_ dated 12,W3 Sand last revised on 02115C16, signed and sealed by
<br />G. OTHER
<br />INSPEC 10N: A copyofthis entire NOA shallbeprovided to the userby*e m&w&ctuwr or its disui tonand
<br />by Fenestration Testing Lab, Inc:., Test Report No. FTL 8r*48_ dated 12104il5, signed. and
<br />AnthonyL Mailer, P E. (Submitted unde►ry'L'O.A r'1'p.151:210 (11),
<br />1. Notice of Acceptance No. I5-1210.01, issued to PGT Industries, for their Series
<br />shall be available for inspection at the job site at the request oftheBuMing Official.
<br />sealed by Idalmis Ortega, P_ E_ (Test report revised on OL04.16 and 0211136)_
<br />s. Gyvtg t with ASTM E-1300.09_
<br />"5570)2770" Vinyl Spa Glass Door (Reinforced) - L.�.L". g on 0444/21_
<br />This NOA revises & renews NO A 424d429.05 and consists, of duspage 1 and evidewepag�es E-1, E-2, E-3, E-4,
<br />r 1 � �_i�
<br />� �
<br />i !� • , �, t� q .>
<br />t(
<br />_c
<br />E-5 & E-G as well as approval document merotio dabave.
<br />The submitted documents ioan was rev'iewed by Ishaq b Cliands, Par.
<br />Idwq L C kmla, PX.
<br />Ishaq 1, C ands, P.E.
<br />� T+'. Ishaq_L t'haada Pam.
<br />N
<br />Product Control Unit. Supervisor
<br />Product Control fait Supervisor
<br />Product Control unit Supervisor
<br />NOA No. 21-0.10SA3
<br />NOA. No. 21-020.03
<br />NOA No. N-020.9.03
<br />NOA Na. 21-0205.03
<br />ore
<br />tWQ0WZM
<br />j EspirationDatet Apriil"1,2026
<br />A.pproral Datc:blarch 25, 2021
<br />Evpiralfonl#ate: Aprallt,2t128
<br />Approval Date: March 25, 2021
<br />EzpirationI?ate: _lpril14,.026
<br />Approval Date: 11Iarck 15, 2021
<br />E:piratian Date-: April 14, 2026
<br />Approra I Date: brarch 15, 2021
<br />o
<br />ti G
<br />CLD
<br />' Pare 1
<br />L
<br />L �
<br />i
<br /><
<br />Li
<br />PGT Industries, Inc.
<br />CGI Vimdows and Doors, Inc.
<br />PGTlndustries, lac.
<br />' 'D :?
<br />NOTICE OF ACCEPTANCE: EN71DENCE SUBMITTED
<br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
<br />NOTICE OF ACCEPTANCE: EVIDENCE St�B'3ril
<br />W
<br />2. Evidence Submi!W under previous submittal
<br />E. MATERIAL CERTIFICATIONS (continae)
<br />3. New Evidence Submitted
<br />5. Quanex Part Suw Stnacer Standard complying with ASIM C518 Thermal Conductivity
<br />4" DRA'"INGS
<br />0-881 BIU-W ter. -€tom °F, ASTM F 1249 WVTR Pass, ASIM D3985 Oxygen Pass, ASTM E
<br />A. DRAWINGS
<br />1. Drawing No. MD-5570.0 Rev B. tilled "Vinyl Skiing Glass Door NOA (I.M)" sheets
<br />2190 I.G- Durability -No Fog -Pass. (Submitted under presious '1'0_A .Ye.154409. 05)
<br />I. Drawing No. AID-M70.0 Rev B. titled -Vinyl Sliding Glass Door NOA (I.M j , sheets 1
<br />1 through 21 of 21, prepared by marn.factut er. dated 10,05il 5 and last revised an
<br />through prepared by facttuer. dated 10105115 and }art revised an O2/012I_
<br />0412Li20, signed and sealed by A_ Lynn Miller, P.E.
<br />6. � Part urase complymtg with ASTM C518 Thermal Conductivity 2.22 BTU-ini
<br />Signed sealed by A_ Cyan Miller, P.E.
<br />d e le Mille
<br />cn
<br />hr_ W R P -°F ASTM F 1249 WVTass, ASTM D 1434 Argon P Pass, ASTM E
<br />Niter Th revision consists. of same existing stalled oxn screw ve ith flat head_
<br />S�
<br />B. TESTS
<br />2189 I.G. Durability --No Fob, ASTM E 546 Dew Point Deve�lopmmt 20aF in 48 hconsists.replacement
<br />1. Test reports on: 1) Air Inf ltmioa Test, per FBC, TAS 202-94
<br />(Submfted under NOA No.15-Its#(.05).
<br />2) Uniform Static Air Pressure Test, Loading per FBC. TAS 202-94
<br />o
<br />7- Vision Exttrt sions, Ltd. Parts comply* with PVC-AAMA 303-13, Vottmtary SpecificationB.
<br />TESTS
<br />3) Water Resistance Test, per FBC. TAS 202-94
<br />for Rigid Polyvinyl Chloride (PVC) Exterior .Profiles for Vision Extrusions, Ltd= VEX-1 by
<br />I. None
<br />4) Large Missile Impact Test per FBC, TAS 201-94
<br />AAMA Fenestration F.xterior-Profile Certification Program (Snbmmed under NO -1 No. 15-
<br />CCALCULATIONS
<br />5) Cyclic Winch Prue Loadingper FBC, TAS 203-94
<br />0409 65)
<br />L Notre
<br />along with ma&eid.-sop drawings and installation diagram of all PGT Industries, Inc_
<br />8_ Vision Extrusions, Ltd. Parts complying with P VC-AAMA M3-13-
<br />},
<br />representative .nits listed below and tested to qualify Dowsil 791 and Dowsil 993 silicones,
<br />(SubmMed under NO 4 No.15-0409.05)
<br />D. ASSURANCE
<br />=:3
<br />�
<br />prepared by Fenestration Testing Laboratory, Inc., Test Reports No.:
<br />9_ PVC-AAMA. 303-13, Voluntary Specification for Rigid Pow nyl Chloride (PVC) Exterior
<br />QUALITY
<br />FTL-7897, PGT PRt5520 PVC Fixed Window (unit 6 in proposal), dated 09rO3r 14
<br />Profiles for Vision E"uucns, Ltd_ VEX-1 by AAMA Fenestration Exteriar Profile
<br />1. Miami -Dade Department of Regulatory and Economic Resources XM)_
<br />FIL-20-21071, PGT SGD780 Ahumram Sliding Glass Door (unit 7 in proposal) FTL-20-
<br />Certification Program
<br />2107.2, PGT CA740 Ahmi Outswing Casement Window (unit 8 in proposal) FYL-24-
<br />10- Notice of Acceptance No. 18-1217.14 issued to Energi Fenestration Solution, USA, Inc. for
<br />E, X4,TERI.AL CERTIFICATIONS.
<br />CU
<br />2107.3, PGT PW7620A Aluminum Fixed Window (unit 9 in proposal) and FTL-20-2107.4,
<br />their "`Tan 3040 & light shade (non white) 1i►W0 Rigid PVC Exterior Extrusions for
<br />1_ None: of Acceptance No.19-0305.02 issued toKuraray America, Inc. fortheir
<br />PGT PW7620A Ahmfmum Fixed Window (unit 10 in proposal) dated 07/13120, all signed
<br />Windows and Doom, expiring on 02r04,r2 t .
<br />"Trosifolt Uliradk%r, Clear, and Color PN B Glass Intetlaseze, exgriaiug on 07VSt24_
<br />and sealed by Idahmis Ortega. P.E.
<br />11_ Notice of Acceptance No. 18-0122.02 issued to Ene igi Fenestration SoMiou, USA, Inc, for
<br />2. Notice of Acceptance No.17-0808.02 issued toKar'arati America, Inc. for their
<br />their series '`%like Rigid PVC Exterior Extrusions for Windows and Doors", expiring on
<br />"SentrTGlast (Clear and ffl&e) Glass Interlayeri" e?i xrmg on 07/04123_
<br />>
<br />C. CALCULATIONS
<br />YBC 76
<br />0212823.
<br />3- Notice of Acceptance No_ 18-1106.10 issued to Vision Extrusions Limited for their `Brown
<br />O
<br />CL
<br />Q
<br />1. Anchor velifir iotl Moats and structural analysis, complying with
<br />12 _ Notice of Acceptance No. 2tl-0203.03 issued to Emetgi Fenestration Solution, USA, Inc_ fort
<br />Coated (Painted or Laminated) White Rigid PVC Exterior Exti' Wous for i'�'indoa^s
<br />Edition (2020), dated 040-220, wed by marru cture-r_ Signed and sealed by
<br />their "Bronze & hot shade cap coated White Rigid PVC Exterior Extrusions for
<br />and Doors", expiring on 09130124.
<br />�
<br />-t—o
<br />AnthotrtyLyn Miller, P_E_
<br />Tirindmvs and Doors". expiring on 04,i1625.
<br />4_ Notice ofAcceptance No.18-II06.11 issued to Vision Extrusions Limited for their series
<br />�
<br />0
<br />2. Glazing complies with ASTM E 1300-04, -09, -12 and -16.
<br />"VE 1000 Tan 202 and lighter shades (l on--�'hite) Rigid Cellular PVC Exterior
<br />�
<br />D. QUAL-111' ASSURANCE
<br />F. STATEMENTS
<br />Extrusions for Windows and Doors, expiring on 12129r11.
<br />O
<br />Miami -Dade Department of Regulatory and Economic Resources (RER).
<br />1. Statement letter of conformance to FBC 7o Edition (2020), dated 0422f20, issued by
<br />t�
<br />manufacturer, signed and sealed by Anthony Lynn Mtn P.E.
<br />F. ST AMIENTS
<br />E. MATERIAL CERTIFICATIONS
<br />2. Statement letter of no financial interest and of independent, issued bymanufacturer. dated
<br />1_ Statement letter of conformance to FBC 7a` Edition (2020), dated 020L21, issued by
<br />�
<br />1_ Notice of Acceptance No.19-0305.02 issued to Kuraray America, Inc. for their
<br />04/1 MO, signed and sealed by Anthony Lynn Miller, P.E_
<br />mannufacitm signed and sealed by Anthony Lyra Miller, PE.'
<br />Cn
<br />`cTrosifoW Ultraclear, Clear, and Color PVB Glass Interlayers , expiring on
<br />3. Private Labeling Agreement document between PGT_ dated 03f3045 and sages by all
<br />2_ Private Labeling Agreement dated 03,10&/21 between PGT Industries, Inc. and CGI
<br />07r08r24-
<br />involved patties
<br />Windows and Boors Inc_, signed by Dean M. Ruadc, P.E., V.P. Engineering, on behalf of
<br />U
<br />�
<br />2. Notice of Acceptance No.17-0803.02 issued to Kuraray America, Inc. for their
<br />"Sent
<br />both coopatt;es.
<br />Q
<br />gGla , (Clear and White) bass Interlay err". expiring on 07/04lt_3.
<br />G. OTHERS
<br />3- Notice of Acceptance No. 18-1106.10 issued to Vision Fusions Limited fox their
<br />`Brown
<br />L This NOA revises'_ OA# 17-0420.06 (PVT w/CGI) and updates to FBC2020 (76 Edition),
<br />G. OTHERS
<br />Coated (Painted or Laminated) , Rye Rigid PVC Exterior Extrusions
<br />expiring O4f21r21_
<br />1_ This NOA r'e *es & renews NO:4,# 20-0429.05 (PLA w/CGI), expiring OV142C
<br />for V'mdows and Doors', expiring on 09I30124.
<br />2- RER Test proposals #19LI155 dated 01r 100-0 approved by Ishaq 1. Chanda, P.E, expiring
<br />2. The cturent associated PL4 CGI file. #21-0205.01, expiring 04/14i26.
<br />O
<br />�
<br />A. Notice of Acceptance No.19-1106.11 issued to Vision Extrusions Limited for their
<br />0411421
<br />s"VE ITan 202 and fthter shades (Non-11�e) Rigid Cellular PVC
<br />ew 000
<br />_
<br />ts. �, , c'` /,n „.�..
<br />1. "
<br />L�
<br />W �
<br />U
<br />Exterior Extrusions for Vilmdows and Doors7, expiring on 12/2921.
<br />ru
<br />i
<br />+
<br />n-k
<br />f
<br />Ishaq L Cloada, P.E.
<br />Ishaq L Ganda, P.E.
<br />Z J
<br />Ishaq L [reach, Y.E.
<br />Product Control Unit Supervisor
<br />Product Contras Unit Supervisor
<br />Z
<br />Product Control Unit Supwriser
<br />NEI.& No. 21-0205.03
<br />Ni?A No. 21-020S.E13
<br />a
<br />NOA No. 21-020.03
<br />Expiration Date: .April 14,2016
<br />Expiration Date.: April 14,2016
<br />J
<br />ExpirationDate.- _Fri) 14,2026
<br />Approval Dte; March .'a, Nll
<br />Approval Date: h:reh +S, .+ 21
<br />[L
<br />Approval Darr. March 25, 2021
<br />E -5
<br />g -6
<br />E -t
<br />SHEET
<br />NO.
<br />May 27, 2022
<br />PA 1
<br />1
<br />
|