Laserfiche WebLink
EXISTING 30 KW GENERATOR <br />EXISTING EMERGENCY <br />POWER <br />DEMOLTION <br />DINING $ <br />ACTIVITIES ROOM <br />I <br />ELECT. <br />ROOM <br />PRIVATE_, <br />7 <br />CORRIDOR <br />SEMI-pRIV SEMI -PRIVATE SEW -PRIVATE EQUIP. <br />TOIL TOIL �X7 <br />TOIL <br />TDw <br />ATE SEW -PRIVATE -PRIVATE SEMF PRIVATE - SEMhPRNA -S_TE_L <br />310 308 306304 302 300 BATH <br />0 <br />0 <br />PORCH <br />0 <br />SMALL DINING <br />ROOM <br />TOIL TOIL TOIL NUTRITION <br />MECH <br />ROOM <br />CORRIDOR CENTRAL <br />CORRIDOR PHASE(D <br />JAW - NURSING SOILED <br />TOIL T <br />-TOIL - - STATION �� <br />PRIVATE SEMI-PRfV SEMI- SEMI3PRNATE _-_307SEMI�PRNATE TOIL <br />ATE SEMI-PRIVSEMI-PRIVATE OFFICE MED313TOIL3D9 PREP 11TILTIY <br />TOIL TOIL TOIL <br />CLEAN <br />-' SEMI -PRIVATE TOILET <br />400 <br />- PRIVATE <br />SPECIAL NOTES <br />A THE CONTRACTOR SHALL HAVE ALL CONSTRUCTION PERSONNEL TAKE PART IN A TRAINING SESSION <br />FOR CONDUCTING OPERATIONS WITHIN THE FACILITY. ALL CONSTRUCTION WORKERS SHALL BE <br />PROPERLY DRESSED IN COMPANY LOGO ATTIRE, BADGED WITH PICTURED IDENTIFICATION AND SHALL <br />CONDUCT OPERATIONS WITHIN THE CODES AND REGULATIONS REQUIRED BY THE HEALTH CARE <br />FACILITY AS WELL AS STATE REQUIREMENTS. <br />B REFER TO SPECIFICATION REQUIREMENTS FOR ALL REQUIRED INSURANCE AND FORMAL <br />DOCUMENTATION REQUIRED BY THE OWNER. <br />C ALL LIFE SAFETY AND EMERGENCY REQUIREMENTS SHALL BE ACTIVE AT ALL TIMES. TRANSFER OF <br />LOADS SHALL BE DONE IMMEDIATELY. LIFE SAFETY SHUT -DOWN OF MAIN SHALL BE DONE WITHIN <br />8 HOURS A COORDINATED FORMAL FIRE WATCH SHALL BE DONE. <br />D PHASE PLANNING <br />1 PHASES MAY BE COMBINED BASED UPON PROPER PROTECTION, VENTILATION AND COORDINATION <br />WITH THE ADMINISTRATOR AND PROJECT MANAGER REGARDING BUILDING FUNC110NS AND <br />OPERATION, HOWEVER MCA INSPECTION IS REQUIRED AS NOTED. <br />2 THE INTENT OF THE PHASING INDICATED IS TO PROVIDE RENOVATION WHICH ALLOWS THE CURRENT <br />FUNCTIONS TO EXIST OR TO BE RELOCATED AT THE DESIGNATED AREA NOTED. COORDINATE WITH <br />ARCHITECTURAL PLANS <br />3 PROVIDE TEMPORARY POWER TO MAINTAIN NEGATIVE PRESSURIZATION WHERE CONSTRUCTION <br />DUST OR AIR BORNE DEBRIS OCCURS. POWER SHALL CONSIST OF A GFI RECEPTACLE AND A <br />120 VOLT SUPPLY. COORDINATE LOCATIONS WITH THE MECHANICAL PLANS <br />E ALL PHASING SHALL BE COORDINATED WITH THE ICRA PLAN AND ALL RELATED PROCEDURES <br />ANISTING FEEDER, CIRCUITS <br />D ANNUNCIATOR WIRING <br />® R <br />O • U6 <br />E DEMOLITION PLAN <br />E6 <br />1� REMOVE THE EXISTING GENERATOR AND THE CONCRETE BASE. SPECIFIC CIRCUITS <br />AND CABLES MAY BE UTILIZED FOR THE NEW GENERATOR AS NOTED. <br />0 REMOVE THE EXISTING LIFE SAFETY LIGHT. THE EXISTING CIRCUIT SHALL BE <br />UTILIZED FOR THE NEW LIFE SAFELY LIGHT <br />O3 REMOVE THE EXISTING BATTERY LIGHT. THE EXISTING CIRCUIT SHALL BE UTILIZED <br />FOR THE NEW BATTERY LIGHT <br />® REMOVE THE EXISTING POWER DISCONNECT SWITCHES AND JUNCTION BOXES. THE <br />EXISTING LOCATION INCLUDING THE FEEDER CONDUIT AND THE 120 VOLT CIRCUITS <br />SHALL BE UTILIZED FOR THE NEW GENERATOR. COORDINATE WITH THE NEW <br />GENERATOR LOCATION AND THE NEW CAST GRADE JUNCTION BOX LOCATIONS <br />A TEMPORARY GENERATOR WILL BE PROVIDED. THE GENERATOR SHALL BE <br />SUPERVISED BY USING THE EXISTING ANNUNCIATOR. THE TEMPORARY GENERATOR <br />SHALL BE REMOVED UPON MCA 100% INSPEC110N APPROVAL OF THE NEW <br />GENERATOR <br />© REMOVE THE EXISTING GROUND ROD AND CONDUCTOR. <br />401 <br />SEMI -PRIVATE SEMI -PRIVATE <br />402 403 <br />TOILET <br />TOILET LET <br />TOILET <br />SEMI -PRIVATE <br />405 <br />SEMIPRIVATE <br />SEMI -PRIVATE SEMI -PRIVATE <br />406 - - 407 <br />TOILET TOILET <br />TOILET TOILET <br />SEMI -PRIVATE <br />408 - <br />SEW -MATE <br />;409 <br />,II <br />SEMI -PRIVATE SEMI -PRIVATE <br />410 - 411 <br />TOILET TOILET <br />TOILET TOILET <br />' SEMI -PRIVATE SEMI -PRIVATE <br />412 413 <br />JAN MECH <br />Roots r—� <br />414 415 <br />PHASING NOTES <br />1D PROVIDE TEMPORARY GENERATOR AND CONNECTIONS. <br />Efl DEMOLISH THE GENERATOR AND ITEMS INDICATED ON THE <br />GENERATOR DEMOLITION PLAN. <br />PROVIDE A NEW PAD AND WIRING EXTENSIONS. <br />® INSTALL THE NEW GENERATOR. <br />Q INSTALL LIGHTING, RECEPTACLE, EMERGENCY STOP, <br />GROUNDING AND LIGHTNING PROTECTION. <br />© PROVIDE A MCA 80% INSPECTION. <br />PROVIDE FINAL CONNECTIONS AND A MCA 100% <br />INSPECTION. <br />IF ❑ ❑ ❑ ❑ <br />PORCH <br />LOUNGE <br />VISORS <br />RECEPTION <br />ADMISSIONS jj CORRIDOR <br />OFFICE II <br />HUMAN <br />RESOURCES <br />0 <br />DINING KITCHEN <br />VENDING <br />0 «i <br />OFFICE <br />WsMEN' - WOMEN'S <br />TOIL <br />T <br />�� — — ROOM <br />MECHANICAL. <br />ELEC <br />TRICAL <br />ROOM <br />PHASE O <br />0 <br />NEW GENERATOR---\ <br />PHASE (j) <br />CORRIDOR <br />FOOD <br />STORAGE <br />SUPPLY <br />CENT. <br />PHASE <br />P <br />0 PORCH <br />TOIL <br />THERAPY <br />SPEECH do <br />OCCUPATIONAL <br />OFFICE <br />LINEN <br />SOILED <br />L'l <br />J <br />HtPIiRCRON <br />LAUNDRY <br />RRI <br />JA ITOR <br />GE <br />CENTRAL <br />ELEC <br />IYASASHINNGG <br />HEATER <br />WATER <br />MECH. <br />LAUNDRY <br />DRYING <br />-UTILITY <br />PRIVATE ROOM I I <br />100 —U TOIL <br />SEMI -PRIVATE <br />102 <br />TOIL <br />TOIL <br />SEMI -PRIVATE <br />104 �. <br />THERAPY <br />ROOM <br />" WATER <br />ED. <br />SPEECH <br />ROOM <br />mlL <br />PRIVATE <br />99 <br />GENERAL NOTES <br />1 ICRA REQUIREMENTS SHALL BE AS REQUIRED BY THE OWNER'S ICRA REPORT <br />INCLUDING CONTRACTOR DIRECTIVES. <br />2 THE ICRA NEGATIVE EXHAUST MACHINES. SEALED NEGATIVE EXHAUST <br />ENCLOSURES SHALL NOT BE REQUIRED. NO MAJOR CUTTING WORK WILL <br />OCCUR. <br />3 PROVIDE A HEPA FILTER AT THE MAKE-UP AIR INTAKE LOCATED NEAR THE <br />NEW GENERATOR AND WALL INSTALLATION. <br />CORRIDOR TOIL _� TOIL TOIL / TOIL <br />CENTRAL -- SE%PRNATE SEMI -PRIVATE SEMI -PRIVATE SEMI -PRIVATE SEMI -PRIVATE SEMI -PRIVATE <br />BATH 201 203 205 _ 207 209 _ 211 SEMI -PRIVATE <br />• ��..,, � j�ORAGE SmwATOIL � /� Toll ' '�To� MECH <br />(�13 <br />ODOR - —� <br />CORRIDOR <br />NURSES - �� _ JAN <br />STATION TOIL TOIL - TOIL <br />SEMI -PRIVATE <br />PREP TOI1 11FFICE SEMI -PRIVATE SEW -PRIVATE SEMI -PRIVATE SEMI -PRIVATE SEMI-PRIVATEW-PRIVATE 212 <br />MED TOIL 204 TOIL 208 TOI 210 TOIL <br />202 206 <br />` TOIL _; L _ <br />:L_ <br />SEMI -PRIVATE <br />101 <br />SEMI -PRIVATE <br />�1 103 <br />TOIL <br />===1 4=r7olL <br />SEMI -PRIVATE <br />105 - <br />SEMI' ATE CORRIDOR SEMI -PRIVATE <br />107 <br />TOIL TOIL - <br />TOIL - TOIL <br />-' SEMI -PRIVATE ` <br />108 <br />SEMI -PRIVATE <br />109 <br />SEMI -PRIVATE LL SEW -PRIVATE <br />TOIL " TOIL <br />TOIL TOIL <br />SEMI -PRIVATE SEW -PRIVATE <br />112 113 <br />MECH <br />ToLL. ^' JANr- ROOMr� TOIL <br />114 115 <br />.-CRA, PHASING AND DEMOLITION PLAN <br />PHASING NOTES <br />1 PROVIDE TEMPORARY MEANS TO EXHAUST ALL AIRBORNE DEBRIS WHERE REQUIRED. A <br />HEPA VACUUM SHALL BE USED TO CUT NEW BOX OPENINGS AT EXISTING WALLS WHERE <br />THE AREA IS OCCUPIED. WORK WITHIN THE DESIGNATED PHASE. ALL CONSTRUCTION <br />SHALL BE PROPERLY SEALED AND SECURED FOR NON AUTHORIZED ACCESS WHERE <br />NECESSARY. <br />2 PROVIDE NECESSARY DUST CONTROL PER ICRA REQUIREMENTS. ALL CONSTRUCTION <br />AREAS SHALL HAVE NEGATIVE EXHAUST PRESSURIZATION CONSTANT VOLUME WHERE <br />CUTTING, PATCHING OR DEBRIS WILL OCCUR. THIS SHALL BE ACCOMPLISHED UTILIZING <br />HEPA VACUUM DEVICES FOR DUST COLLECTION. <br />3 PROVIDE ALL WORK WITHIN THE DESIGNATED PHASE WHICH IS REQUIRED BY ADJACENT <br />PHASES. PLAN WORK TO ALLOW WORK IN PROTECTED AREAS ONLY. <br />4 COMPLY WITH ALL ICRA REQUIREMENTS FOR DUST MITIGATION AND MATERIAL HANDLING <br />5 CABLING WORK ABOVE CEILING WHERE NOTED SHALL NOT EXCEED 10 FEET OF OPEN <br />CEILING. PROVIDE TEMPORARY BARRIER FOR EACH 10' SECTION AS DETAILED. PROVIDE <br />A PERSON TO DIRECT CORRIDOR PASSAGE FOR NON AUTHORIZED PERSONNEL <br />6 NO RESIDENT SHALL BE PRESENT BELOW OR AROUND CONSTRUCTION WORK. PLAN ALL <br />WORK IN ACCORDANCE WITH THE ON GOING BUILDING OPERATION AND FUNCTIONS. <br />ICRA NOTES <br />Q ALL CONSTRUCTION AREAS SHALL HAVE NEGATIVE EXHAUST <br />PRESSURIZATION CONSTANT VOLUME. THE INTENT IS THAT <br />NO CONSTRUCTION DEBRIS SHALL BE EXHAUSTED INTO <br />THE EXISTING EXHAUST DUCT OR INDUCED INTO ANY <br />RETURN OR SUPPLY DUCTS. CUTTING OF THE OPENINGS <br />AND DEMOLITION SHALL UTILIZE LISTED HEPA FILTER <br />VACUUM DEVICES TO CONTAIN ALL DEBRIS WHEN CUTTING. <br />0 CORRIDOR WORK AREA SHALL ONLY HAVE 10' OF TILES <br />REMOVED AT A TIME. <br />3� THE NEW ANNUNCIATOR AT THE NURSE STATION SHALL BE <br />COORDINATED WITH THE OWNER'S DIRECTIONS AND THE <br />ENGINEER'S PLANS <br />® PROTECT ALL EXISTING ELECTRICAL TO REMAIN IN THE <br />CORRIDOR AND ALL OTHER AREAS WHERE DUST AND <br />DEBRIS OCCURS. <br />5 PROVIDE BARRIERS IN CORRIDORS FOR ALL WORK ABOVE THE <br />CEILING. REFER TO DETAILS ON E301 AND SPECIFICATIONS. <br />© REFER TO THE ICRA REPORT FOR ALL REQUIRED CLEANING, <br />TESTING, DOCUMENTATION AND ALL AHCA REQUIRED <br />INFORMATION. <br />PHASES <br />PHASE <br />INSTALL A 30 DAY RECORDING AMMETER ON THE EXISTING MDP. <br />RECORD READINGS AT 10 MINUTE INTERVALS. FOR THE FIRST <br />28 DAYS. THEN INCREASE TO 5 MINUTE INTERNALS FOR THE <br />LAST TWO DAYS -THE LAST TWO DAYS MUST OCCUR ON A WEEK <br />DAY <br />PHASED <br />PROVIDE A TEMPORARY GENERATOR AND FUEL FOR THE POWER <br />SUPPLY TO THE ESSENTIAL EMERGENCY ELECTRICAL SYSTEM. <br />LOCATE THE GENERATOR AS REQUIRED SO THAT IT WILL NOT <br />INTERFERE WITH THE PROPOSED NEW ELECTRICAL WORK AND <br />ANY EXISTING BUILDING FUNCTIONS. THE TEMPORARY <br />GENERATOR IS ONLY FOR POWER SHUTDOWN TRANSITION. <br />REMOVE THE EXISTING GENERATOR AFTER MCA APPROVAL <br />PHASE(j) <br />PREPARE SITE FOR NEW CONDUITS AND GENERATOR. PROVIDE <br />NEW CONDUITS. PROVIDE NEW CONDUIT STUBBED INTO THE <br />EXISTING BUILDING AND STUBBED UP AT THE PAD AND NEW <br />SERVICE EQUIPMENT <br />PHASE(a) <br />INSTALL THE NEW GENERATOR AND SERVICE EQUIPMENT <br />INCLUDING ALL WORK AT THE GENERATOR AREA. CONNECTIONS <br />TO THE EXISTING CANNOT BE DONE UNTIL AN MCA 80% <br />INSPECTION AND ACCEPTANCE. <br />PEE® <br />STUB FEEDERS INTO THE EXISTING BUILDING AT THE POINTS OF <br />CONNECTION IN ORDER TO EXPEDITE THE TRANSFER AND <br />PERMANENT CONNECTIONS AFTER THE MCA 80% INSPEC110N <br />APPROVAL. <br />PHASE® <br />NSTALL REMOTE ANNUNCIATOR AND CABLES. <br />PHASED <br />THE CONTRACTOR SHALL PROVIDE AN INSPECTION OF THE <br />GENERATOR, EQUIPMENT AND CONNECTIONS. PROVIDE A CHECK <br />OUT MEMO TO THE GENERATOR MANUFACTURERS REP AS <br />REQUIRED. SCHEDULE AND ATTEND A MCA 80% INSPECTION. <br />THE GENERATOR MANUFACTURER MUST DEMONSTRATE ALL <br />ALARMS <br />PHASE® <br />UPON MCA APPROVAL AND PERMISSION TO CONNECT TO THE <br />BUILDING, THE CONTRACTOR SHALL PROVIDE ALL PERMANENT <br />CONNECTIONS. PROVIDE A FACTORY SUPERVISED 2 HOUR <br />CERTIFIED LOAD TEST USING THE ACTUAL BUILDING LOAD. <br />RECORD ALL DATA AT 5 MINUTE INTERVALS. REFER TO <br />SPECIFICATION TESTING SECTION <br />PHASED <br />THE CONTRACTOR SHALL SECURE A LOCAL PERMIT FINAL <br />APPROVAL, FIRE MARSHAL ASSIGNED INSPECTION AND SCHEDULE <br />A AHCA 100% INSPECTION. OBTAIN A MCA 100% INSPECTION <br />APPROVAL <br />PHASE 10 <br />THE CONTRACTOR SHALL PROVIDE ALL CLOSE OUT DOCUMENTS <br />AND FINAL APPROVALS, AS -BUILT DOCUMENTS ETC. <br />DEMOLITION NOTES <br />1� THE EXISTING GENERATOR SHALL BE REMOVED. <br />COORDINATE WITH THE OWNER'S REP PRIOR TO <br />REMOVAL. <br />OREMOVE THE EXISTING ANNUNCIATOR AFTER THE <br />PROJECT IS 100% ACCEPTED BY MCA. <br />REMOVE THE FEEDERS TO ATS-LS AND ATS-CR. SEE <br />ONE -LINE DIAGRAM. <br />OREMOVE SECTION OF SECONDARY SERVICE. THIS <br />SHALL BE DONE BY THE UTILITY COMPANY AND <br />COORDINATED BY THE CONTRACTOR. <br />O REMOVE THE X/O GROUNDED NEUTRAL AT MDP <br />AFTER COMPLETION OF NEW X/O AT THE NEW MDP1. <br />$m4 <br />O <br />ct <br />W <br />C7 <br />Z Q <br />IN U O <br />�� U o WE <br />0 N as <br />Q O N <br />Z LLJ <br />m� <br />Wcr) W m oa <br />�LLOz <br />L] � J Lu <br />LL Z� Z Nwz <br />J Z8 z�W <br />I � W W <br />O F- z <br />Q O Z <br />0W <br />Lo <br />r- W 3J <br />_I Z NWZ <br />� Z <br />WW L�1 C r) CL <br />Z <br />W � W O Z Z OFz- <br />uj <br />c� <br />z <br />W <br />Z �cx o� <br />W W <br />�� <br />Z = LLJ N <br />o <br />0M0 o z <br />QD o a <br />I- W w �- <br />I w CL LJ <br />U F�d <br />'o <br />O�.•� <br />�• �ii% <br />v Lu <br />U <br />LtJ <br />CL <br />J : uJ <br />��% <br />%T Q • Z = <br />p <br />F- <br />w <br />cs' <br />�.• <br />z <br />m <br />• <br />O <br />REV <br />REV <br />REV 1& GENERAL REV. 02/13/18 <br />AHCA STAGE III MAIL -IN <br />REVIEW 12/26/17 <br />DATE 12/26/17 <br />DRAWN LF/BMA <br />CHKD BY BOB DONNELLY <br />E600 <br />