Laserfiche WebLink
The <br />GENERAL PROJECT NOTES <br />S even <br />,3pr <br />ings <br />Challenge <br />1. DO NOT SCALE DRAWINGS. CONTRACTOR SHALL R:::.Y ON WRITTEN DIMENSIONS AS GIVEN. DIMENSIONS SHOWN ARE TO CENTER OF STUD, FINISH FACE OF MASONRY/CONCRETE OR GRID LINES, UNLESS <br />NOTED OTHERWISE. ALL DIMENSIONS SHALL BE FIELD 'VERIFIED BY THE CONTRACTOR AND COORDINATED WITH ALL OF THE WORK OF ALL TRADES. IF DISCREPANCIES ARE FOUND, THE CONTRACTOR SHALL <br />NOTIFY THE ARCHITECT IN WRITING FOR CLARIFICATICJ BEFORE THE COMMENCEMENT OR RESUMPTION OF WORK. <br />2. ABBREVIATIONS THROUGHOUT THE PLANS ARE THOSE IN COMMON USE. NOTIFY THE ARCHITECT OF ANY ABBREVIATIONS IN QUESTION. <br />3. CONSULTANT DRAWINGS ARE SUPPLEMENTAL TO THE ARCHITECTURAL DRAWINGS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE ARCHITECTURAL DRAWINGS BEFORE THE <br />INSTALLATION OF ANY OF THE CONSULTANT'S WORK AND TO BRING ANY DISCREPANCIES OR CONFLICTS TO THE ARCHITECTS ATTENTION IN WRITING, FOR CLARIFICATION. <br />4. THE CONTRACTOR AND SUBCONTRACTORS SHALL PROVIDE ALL NECESSARY PERMITS AND INSPECTIONS. ANY FEES ASSOCIATED WITH, BUT NOT NORMALLY COVERED BY THESE ITEMS, WILL. BE THE <br />RESPONSIBILITY OF THE CONTRACTOR. <br />5. THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, EQUIPMENT, TRANSPORTATION AND SERVICES NECESSARY FOR THE SATISFACTORY COMPLETION OF WORK UNLESS DESIGNATED AS "NOT IN <br />CONTRACT" (N.1.C.) OR "OWNER FURNISHED, OWNER INSTALLED" (O.F.O.I). ALL EQUIPMENT, WORK AND MATERIALS SHALL COMPLY WITH ALL CURRENT AND LOCAL APPLICABLE CODES AND GOVERNING <br />REGULATIONS, AND THE CONTRACT DOCUMENTS. <br />6. THE CONTRACTOR SHALL PROTECT ALL FINISH WORK AND SURFACES FROM DAMAGE DURING THE COURSE OF CONSTRUCTION AND SHALL REPLACE AND/OR REPAIR ALL DAMAGED SURFACES CAUSED BY <br />CONTRACTOR OR SUBCONTRACTOR PERSONNEL TO THE SATISFACTION OF THE OWNER AND ARCHITECT. <br />7. UNLESS IT IS SPECIFIED, ACCESS PANELS SHALL BE PROVIDED AND INSTALLED WHEREVER REQUIRED BY BUILDING CODE OR FOR THE PROPER OPERATION OR MAINTENANCE OF MECHANICAL OR ELECTRICAL <br />EQUIPMENT. WHETHER OR NOT INDICATED ON THE DRAWINGS THE CONTRACTOR SHALL COORDINATE SIZE, LOCATION, AND TYPE OF ACCESS PANEL WITH OTHER CONTRACTORS' WORK. NO ACCESS PANEL <br />SHALL BE LOCATED, FRAMED OR INSTALLED WITHOUT THE EXPRESSED APPROVAL OF THE ARCHITECT. <br />8. ANY WORK IMPROPERLY INSTALLED OR INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS EXPENSE AND AT NO ADDITIONAL EXPENSE TO THE <br />OWNER, ARCHITECT, OR CONSULTANTS. <br />9. THE SIZE, TYPE, SHAPE AND LOCATION OF MECHANICAL EQUIPMENT, FIXTURES, EQUIPMENT PADS AND BASES CONTAINED WITHIN THE CONSTRUCTION DOCUMENTS ARE APPROXIMATE ONLY, UNLESS <br />SPECIFICALLY NOTED. THE CONTRACTOR SHALL VERIFY DIMENSIONS WITH OTHER TRADES AND/OR THE EQUIPMENT MANUFACTURER. <br />10. THE CONTRACTOR IS RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING A REASONABLE AND PRUDENT SAFETY PROGRAM FOR ALL THOSE TRADES PERFORMING WORK ON THE PREMISES. THIS <br />SHOULD INCLUDE BUT NOT BE LIMITED TO THE ISOLATION OF WORK AREAS AND THE PROMPT REMOVAL OF ANY DEBRIS OR TOOLS WHICH MIGHT ENDANGER VISITORS AND STAFF OF THE OWNER OR ARCHITECT. <br />11. THE CONTRACTOR SHALL COORDINATE WITH REPRESENTATIVES OF ANY AND ALL UTILITY COMPANIES TO VERIFY AVAILABLE FACILITIES AND, IF APPLICABLE, TO ESTABLISH TEMPORARY FACILITIES. <br />ADDITIONALLY, THE CONTRACTOR SHALL COORDINATE THE REMOVAL, ABANDONMENT, AND/OR RELOCATION OF EXISTING UTILITIES BOTH ABOVE AND BELOW GRADE WITH THE RESPECTIVE UTILITY COMPANIES. <br />12. SUBSTITUTIONS: REFERENCE TO MAKERS, BRAND, MODELS, ETC., IS TO ESTABLISH THE TYPE AND QUALITY DESIRED; SUBSTITUTION OF ACCEPTABLE EQUIVALENTS WILL BE PERMITTED IF APPROVED BY THE <br />ARCHITECT AND OWNER PRIOR TO BID (UNLESS NOTED OTHERWISE). <br />13. ONLY NEW MATERIALS AND EQUIPMENT OF RECENT MANUFACTURE, OF QUALITY SPECIFIED, FREE FROM DEFECTS, WILL BE PERMITTED ON THE WORK. <br />14. SHOP DRAWINGS: SHOP DRAWINGS SHALL BE SUBMITTED FOR ALL EQUIPMENT AND MATERIALS WHICH MUST INTERFACE AND COORDINATE WITH OTHERS, WHETHER DETAILED OR NOT. <br />15. FINAL CLEAN UP AND DISPOSAL: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF CONSTRUCTION DEBRIS, RUBBISH AND WASTE MATERIAL FROM THE OWNER'S PROPERTY TO A LAWFUL <br />DISPOSAL AREA AND PAY ALL HAULING AND DUMPING COSTS. SECONDLY, THE CONTRACTOR WILL OBSERVE ALL TO PERTAINATE FEDERAL STATE AND LOCAL LAWS, REGULATIONS AND ORDERS REGARDING <br />COMPLETION OF WORK CLEAN-UP. FINALLY, ALL CONSTRUCTION AREAS SHALL BE LEFT VACUUM -CLEAN AND FREE FROM DEBRIS, INCLUDING, BUT NOT LIMITED TO: CLEAN ALL DUST, DIRT, STAINS, HAND MARKS, <br />PAINT SPOTS, DRIPPINGS, AND OTHER BLEMISHES. <br />ARCHITECT <br />DESIGN2907 State Road 590 <br />STYLES Suite 7 <br />Clearwater, FL 33759 <br />ARCHITECTURE p 727.797.4420 <br />f 727.797.9218 <br />designstylesinc.com <br />OAA0003393 <br />DEVELOPER <br />PASCO COUNTY <br />004U MAIN J 1 Ktt I, OUI I t LUU <br />NEW PORT RICHEY, FL 34652 <br />P# (727) 834-3445 <br />F# (727) 834-3450 <br />I eyst(:) n e <br />Fund <br />TABLE OF CONTENTS <br />PAGE # <br />DESCRIPTION <br />SCALE <br />CS <br />COVER SHEET <br />N/A <br />Al <br />SITE PLAN <br />1/8" = 1'-O" <br />A2 <br />FOUNDATION PLAN <br />1/4" = 1'-0" <br />A3 <br />FLOOR PLAN <br />1/4" = 1'-0" <br />A4 <br />ROOF FRAMING AND ROOF PLAN <br />1/4" = 1'-0" <br />A5 <br />EXTERIOR ELEVATIONS <br />1/4" = 1'-0" <br />A6 <br />ELECTRICAL PLAN <br />1/4" = V-O" <br />A7 <br />INTERIOR ELEVATIONS <br />1/2" = 1'-0" <br />S1 <br />STRUCTURAL DETAILS <br />SEE SHEET <br />S2 <br />STRUCTURAL DETAILS <br />SEE SHEET <br />S3 <br />STRUCTURAL DETAILS <br />SEE SHEET <br />S4 <br />STRUCTURAL DETAILS <br />SEE SHEET <br />PA <br />PRODUCT APPROVAL SHEET 01 <br />N/A <br />PA <br />PRODUCT APPROVAL SHEET 02 <br />N/A <br />PA <br />PRODUCT APPROVAL SHEET 03 <br />N/A <br />PA <br />PRODUCT APPROVAL SHEET 04 <br />N/A <br />AFFORDABLE HOUSING <br />3 BEDROOM / 2 BATH <br />1254 LIVING SQUARE FEET <br />PROJECT REVISIONS <br />DESCRIPTION <br />SHEETS <br />NO. <br />AFFECTED <br />REV. <br />CODE UPL A ES <br />ALL <br />01 <br />SHEETS <br />UPDATE SLAB NOTE, ADDED SLOPE FOR LANAI, UPDATED <br />A2 <br />FOOTING SIZE FOR LANAI OPT., UPDATED FOUNDATION B W/ <br />CMU BASE. <br />CHANGED LANAI DOOR FROM INSWING TO OUTSWING, <br />ADDED NOTE FOR EXTERIOR CEILINGS, CHANGES PC <br />A3 <br />LINTELS ON TWO WINDOWS TO BE PC-3, ADDED NOTE FOR <br />AC TO BE SEER 14, ADDED DRYER VENT NOTE <br />UPDA1 ED :R1IJSS NOTE, ADDED SCHEMATIC NOTE, UPDATED <br />DTL 3 <br />A4 <br />UPDATED FLASHING NOTE, UPDATED SOFFIT DETAIL <br />A5 <br />REMOVED ALL DIMMER FROM FANS, ADDED NOTE FOR <br />RANGE OUTLET <br />A6 <br />UPDATED ALL STRUCTURAL NOTES <br />S1 <br />REMOVED DTL 3, ADDED DTL 7.1 <br />S2 <br />UPDATED NOTE ON 1, ADDED DTL 9.1 <br />S3 <br />REV. <br />UPDATED SITE PLAN INDICATING SPOT ELEVATION HEIGHTS <br />Al <br />02 <br />& SWALE LOCATIONS. <br />3bi�V JOG <br />�� - <br />l <br />w <br />0LLrn <br />o <br />- W <br />Q <br />to <br />w <br />owZ <br />w <br />N U <br />W <br />LL <br />W H Z <br />< <br />W = Q <br />H <br />w?�W <br />0 <br />W V(n <br />N <br />0 <br />= Q <br />zi Ix <br />w <br />0 <br />p <br />rL <br />w <br />Q2� <br />=00 <br />p <br />Q <br />FUU <br />>W <br />W <br />u_ZZC, <br />_ <br />m o <br />wpz; <br />?p <br />p <br />QQ - <br />}�mw <br />wp<W <br />\ <br />w <br />wz _j <br />0w <br />�z <br />w�0(L <br />2LLLLW <br />.E] <br />Q` <br />• <br />U) <br />• <br />C <br />C <br />L.L <br />0cn <br />•> <br />C <br />0 <br />CUW <br />nC <br />E <br />_c <br />LO <br />U <br />M <br />�- <br />^♦ <br />W <br />J <br />LL <br />0 <br />uj <br />_o <br />cn <br />L <br />0 <br />ti <br />Q <br />W <br />it <br />Na) <br />Q <br />C: <br />j <br />a <br />W <br />:3 <br />O <br />a. <br />cn <br />Q <br />E <br />CD <br />ram•+ <br />O <br />CD <br />N <br />CD <br />M <br />0 <br />� <br />U <br />W <br />O <br />V , <br />cn <br />W <br />L.L <br />9-M <br />ISSUE DATE: 05/06/10 <br />JOB CAPTAIN: JMG <br />SCALE: AS NOTED <br />CHECKED BY: JMG/PF <br />PROJECT NUMBER: 0737 <br />COVER SHEET <br />(A) - COLONIAL <br />cs <br />