Laserfiche WebLink
0A <br />Wa er SqRply Plan-Buildin 1 <br />P03 1 8 .1 -0 <br />1 <br />Water Supply -Plan Building Z <br />18 -170 <br />Plumbing <br />Legend <br />WASTE PIPING <br />VENT PIPING <br />— — -- — — -- -- <br />COLD WATER PIPING <br />- <br />NOT WATER PIPING <br />- - - - - - <br />GAS PIPING <br />G <br />STORM PIPING <br />S <br />WASTE <br />W <br />VENT <br />v <br />ROOF DRAIN <br />RD <br />RAIN LEADER <br />RL <br />VENT THRU ROOF , <br />vTR <br />COLD WATER <br />CW <br />HOT WATER <br />HW <br />NOT WATER RETURN <br />H" <br />WALL HYDRANT <br />WN <br />HOSE 8190 <br />H8 <br />o <br />Q <br />Plumbing Notes <br />1. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH STANDARD <br />�.,.� <br />n� <br />W <br />PLUMBING CODE AND LOCAL CODES. <br />4-a <br />2. DOMESTIC WATER PIPING SHALL BE TYPR `L• COPPER WITH 95-5 <br />(TIN-ANITIMONY) SOLDER JOINTS OR APPROVED EWAL, <br />CPVC 1S ACCEPTABLE AS ALTERNATE <br />3. WASTE AND VENT PIPING SHALL BE SCHEDULE 40 PVC WITH <br />O <br />SOLVENT JOINTS EXCEPT PIPING IN RETURN AIR PLENUMS SHALL <br />BE NO -HUB CAST IRON 1NTH NO -HUB SLEEVE AND CLAMP JOINTS. <br />4. INSULATE ALL HOT WATER PIPING WITH 1• THICK ARMAFLEX <br />INSULATION, <br />Date: 03/07/06 <br />5. IT IS NEEDED TO HAVE A CLEAN OUT (YCO) EVERY 75' AT THE <br />Scale: <br />AS NOTED <br />SANITARY MAIN LINE. <br />,IOU NO. <br />0407 <br />Drawn By: <br />rmovAES <br />Checked By: <br />� <br />CAD: PW.d" - Mor. 7. 2W 2: 49 p.m• Fobb AcW R 1&0 <br />' <br />Sheet <br />- <br />HARISH SHAH, P.E. 11',NA TTk <br />Of Sheets <br />FLORIDA REG, NO. 19880 .. <br />Drawing NO. <br />Rev. <br />MECHANICAL ENGINEER Tf ' t i <br />DA TE., <br />PLANS ;V(!T, VALID -UNLESS <br />P03 <br />A <br />