Laserfiche WebLink
CONDENSATE <br />DISCHARG <br />GRADE <br />REFRIGERANT PIPING UP TO ROOF TO <br />CU-6 (TYP AHU-1 TO AHU-6) <br />--- ----------------- <br />T <br />AHU-2 li AHU-3 T AHU-4 T ANU-5 T AHU-6 <br />T <br />— — — — — — J ANU-3 REFRIGERANT PIPING FROM EACH AHU-4 AHU-5 AHU-6 <br />DOWN TO AHU-2 it AHU UP TO CONDENSING UNITS ON <br />FIRST FLOOR FRESH AIR DUCT 84 UP ROOF (SEE ARCH DWGS FOR RACK 2" CONDENSATE DRAIN LINE 12' ABV <br />TO ROOF CAP LOCTION) PIPING FOR AHU 1,2, 43 ON FLOOR -SLOPE TOWARDS AHU-2. PROVIDE <br />(TYP-AHU-2 AND AHU-6) RACK I AND AHU-4, AHU-5, AND PIPE SUPPORTS AS REQUIRED AND <br />AHU-6 ON RACK 2 TWO-WAY CLEANOUT @ EVERY 20'-0" <br />MEZZ. ABOVE <br />SCALE: 1/8" = P-O" <br />CONDENSATE DRAIN <br />GD(IM MC77AMIAIC <br />FLOOR PLAN <br />SCALE: 1/8" = P-0" <br />FRESCH AIR DUCT FRESCH AIR DUCT <br />ROOF CAP - DUCT 10'-0" 10'-0" ROOF CAP - DUCT <br />TO AHU-2 min min TO AHU-6 <br />CU-1,2,43 \_(I) CONDENSERS EACH END ON CU-4,5,V6 <br />ROOFTOP RACKS. PROVIDE <br />ANCHORS TO MEET CURRENT <br />BUILDING AND MECHANICAL CODE. <br />A/C g ROOF LEVEL <br />SCALE: 1/32" = 1'-O" <br />OVERALL PLAN <br />SCALE: 1/128" = P-0" <br />J <br />O <br />I I <br />� o � 1 <br />I I <br />I <br />�00�� <br />I I <br />I �I <br />RV ON ROOF <br />RSF-I <br />BRD IN CEILING AND <br />ON ROOF 1-0) <br />CONNECTED TO RV WITH GALV. <br />1 <br />DUCT. (SET @ 0.05" WG TO <br />O <br />OPEN AND RELIEVE THE <br />PRESSURE) <br />18x18 <br />I <br />1 <br />I <br />DUCT. <br />I <br />I <br />I <br />I <br />I(Ox16 SUPPLY <br />GRILLE ( TYP 3 <br />SIDES) <br />II <br />O <br />I_ <br />FLOOR PLAN @ <br />STORAGE ROOM <br />SCALE: 3/16" = 1'-O" <br />SPLIT SYSTEM A/C SCHEDULE <br />AIR HANDLING UNIT DATA <br />MARK <br />- <br />AHU 1-6 <br />COOLING CAPACITY <br />BTUH <br />55000 <br />SENSIBLE CAPACITY <br />BTUH <br />39000 <br />SUPPLY .AIR <br />CFM <br />1970 <br />OUTSIDE AIR(FOR AHU-2 & 6 ONLY) <br />CFM <br />200 <br />ENTERING AIR TEMP. DB/WB <br />'F/'F <br />80/67 <br />EYT. STATIC PRESSURE <br />IN, H2O <br />0,5" <br />_ <br />�I <br />ELECTRIC HEATER <br />KN✓!STAGES <br />7.5/1 <br />MOTOR <br />HP <br />1.0 HP/7.6 AMPS <br />ELECTRICAL <br />V/PH/HZ <br />203/1/60 <br />FILTER TYPE <br />- <br />I" THROW AWAY <br />BASIS OF DESIGN (1) <br />- <br />YORK <br />MODEL <br />- <br />F5FP060H06T2C <br />NOTES <br />- <br />2,3,4,6 <br />E.E.R. <br />- <br />13.0 <br />CONDENSING UNIT DATA <br />MARK <br />- <br />CU-1 TO 6 <br />OUTDOOR TEMPERATURE <br />'F <br />95 <br />ELECTRICAL <br />V/PH/HZ <br />205-230/3/60 <br />COMPRESSOR <br />RLA/LRA <br />17.3/123 <br />MCA/MOCP <br />- <br />25/40 <br />BASIS OF DESIGN ("1) <br />- <br />YORK <br />MODEL <br />- <br />HIRD060525 <br />NOTES <br />- <br />4, 5, 7 <br />(1) OR APPROVED EQUAL. <br />(2) VERTICAL UNIT. WITH HORIZONAL DISCHARGE. PROVIDE ANGLE IRON FRAME WITH NEOPRENE PADDING BETWEEN UNIT AND FRAME_ <br />(3) PROVIDE WITH DISCHARGE GRILLE AND ON/OFF/AUTO DUAL BAND T'STAT <br />(4) VERIFY THE SIZE OF REFRIGERANT PIPING BASED ON THE LAYOUT AND LENGTH BETWEEN EACH AHU AND ITS RESPECTIVE CU. <br />(5) PROVIDE ANCHORS FOP. CONDENSING UNIT TO WITHSTAND WIND LOAD PER BUILDING/MECHANICAL CODE. <br />(6) PROVIDE SINGLE POINT POWER CONNECTION n <br />(7) FURNISH WITH CONVINIENCE OUTLET. HyA, ( H 0 TE <br />FAN AIND D;���MPEP S-CHED!_iEE <br />MARI, <br />RSF-1 <br />RV 1 <br />BRD-1 <br />CFM <br />2500 <br />2500 <br />1- - <br />-- <br />EXTERNAL S.P. <br />DRIVE TYPE <br />C 25 <br />DIRECT <br />0_D94 <br />- <br />MOTOR H.P. <br />1 0 <br />- <br />- <br />R.P.M- <br />994 <br />- <br />- <br />ELECTRICAL <br />120/1/60 <br />- <br />- <br />BASIS OF DESIGN (3) <br />GREENHECK <br />GREENHECK <br />GREENHECK <br />MODEL <br />SAF-110-10 <br />FGP <br />BR-10 <br />ACCESSORIES <br />DS,RC,BD,F,BS <br />RC,BS,BD <br />- <br />NOTES <br />1,2,3 <br />4 <br />(1) FURNISH WITH WEATHER PROOF OUTSIDE AIR INTAKE HOOD <br />(2) FURNISH WITH DUCT COLLAR <br />(3) APPROVED OR EOUAL <br />(4) FURNISH WITH Iv1GDEL WD-100-PB GRAVIT'r' OPERATE DAMPER <br />(5) DAMPER START TO OPEN @ 0.05 IN IWG. <br />VELOC.TY NUT TO EXCEED 2000 FT/I•AINI <br />ABBREVATIONS- <br />RSF - ROOF SUPPLY FAN <br />Rv - RELIEF VENT <br />BRD - BAROMETRIC RELIEF DAMPER <br />PIPE FLASHING MUST NOT BE SUBJECTED TO <br />TEMPERATURES ABOVE 300'F. EXPOSURE TO <br />TEMPERATURES ABOVE 300' WILL RESULT IN <br />FAILURE OF FLASHING MATERIAL. <br />PIPE FLASHING <br />TR FASTENERS @ <br />2' O.C. MAXIMUM <br />' RV-1 (SHOWN FOR <br />CONTINUOUS BEAD CLARITY. SEE FLOOR <br />OF TUBE CAULKING /j PLAN FOR LOCATION) <br />CURB BY <br />VENTILATION <br />CONTRACTOR <br />Z <br />BOTTOM VIEW OF <br />PIPE FLASHING I� <br />PROVIDE SUPPORTS AT <br />REVERY 5'-0" TO PREVENT <br />I <br />VIBRATIONS <br />TO RSF-I <br />SET @ 80'F <br />ROOF PANEL----% PROVIDE FULL SIZE <br />FIELD CUTj DUCT BETWEEN BRD <br />\ HOLE \ AND RV <br />ERECTION PROCEDURES <br />1) OPENINGS IN THE ROOF FOR SMALL DIAMETER PIPING SUCH AS VENTS MAY BE LOCATED ONLY IN <br />THE FLAT OF THE PANEL. DO NOT CUT PANEL RIBS FOR ROOF PENETRATIONS. <br />2) CUT A NEAT HOLE IN ROOF PANEL WITH I' CLEARANCE FOR PIPE AND INSTALL PIPE. <br />3) RUBBER SLEEVE SHOULD BE A WATERTIGHT FIT ON PIPE. IF RUBBER HAS TO BE CUT TO SUIT <br />PIPE SIZE, USE A SHARP PAIR OF SCISSORS AND AVOID NICKS. <br />4) APPLY TUBE CAULKING TO THE UNDERSIDE OF BASE AND USING WATER AS A LUBRICANT, SLIDE <br />FLASHING ALING PIPE UNTIL IT MEETS ROOF PANEL. <br />5) PRESS BASE OF PIPE FLASHING FIRMLY AGAINST PANEL. <br />6) DRILL TWO HOLES OPPOSITE EACH OTHER AND FASTEN. PROGRESSIVELY COMPLETE THE <br />FASTENING BY PRESSING BASE FIRMLY AGAINST PANEL TO AVOID GAPS. <br />CXP ROOF PANEL DETAILS <br />PIPE FLASHING INSTALLATION <br />SCALE: N.T.S. <br />8'0 DUCT TO ROOF <br />T-CAP (FOR AHU-2 FULL SIZE GRILLE ON <br />AIR <br />AND AHU-6 ONLY) DISCOF AHU <br />OPENING <br />AN- <br />LOCATE LOCATE ROOF CAP MIN 10'-0' AHU <br />AWAY FROM CONDENSING UNITS FIRE STAT <br />�- REFRIGERANT PIPING <br />AIR HANDLING FILTER <br />(FRONT ACCESS) UP CU ON ROOF <br />I UNIT PO <br />SCH. 40 <br />PVC <br />1' CONDENSTATE DRAIN. <br />1' CONDENSDATE DRAIN LINE <br />WITH P-TRAP. DISCHARGE INTO <br />NEOPRENE PAD BETWEEN CONDENSATE PIPE ALONG THE <br />UNIT AND ANGLE IRON WALL (SEE PLAN FOR PIPE <br />FRAME. LOCATION) <br />I <br />`J <br />DISCHARGE TO CONDENSATE VJ—F-i—Ir <br />DRAIN PIPE. SEE PLAN FOR <br />� <br />ISOLATORS. TYP. OF 4 ON GALVANIZED STEEL STAND. <br />ANGLE BRACING WfFEE PROVIDE ANGLE BRACING AS <br />PIPE LOCATION <br />REQUIRED TO SUPPORT AHU <br />AHU DETAIL (TYP) <br />r <br />F PAPDETAIL <br />NO 'r ALE <br />NO SCALE <br />1. ALL 'dVORK SHALL BE ACCOPDAN"E WITH HFPA C?O—A & B, <br />HR�L '.;UIDE "�IgAI_:J'Jti' DIH T C:OfJ�-PU1,TI 'Il <br />Aid'FDS, NrPA. I0I, EL 1PIDA _TATE EivEF' L)DE <br />rLUPID A BUILDING � C)DE AND ALL D-.CAL CODE HA VIr• G JURISDICTl' P_) <br />_. %/IDE A TF'.Ar' AT C'_1iJDEF1S'-TE ERA.IrI L'I<JE �IaNsrJECT'Gr,l <br />AT ALL AIR HANDLIII(_l UNITS DRAIF1 LIME, ,HALL RE r:H. AC) P r, <br />_L'_P__ TO PAINT Or DlSiCHARGE AT MIIJIfIUIU ' PER FurT_ <br />3 :ALL __ IIIpIv1EFJ1 SHALL BE U.L. D_;TED AND A P ERTIFIED <br />A,-L V ED H,ANI AL EJI III^.4ENd 1 RE01 (Pill ELECTPl- AL /JER <br />r E L 1 L- H �I C� i11 'EC.T Ti E T E, ,CH <br />0 n <br />I � �F rI,IPP EI T CO RU IJFTE TWITCH PtIIFEN1ENTs <br />H HE ELF Tk,��L rT�IT� ACT P. IT <br />H ",!,i l T� <br />HE .P_I'1SIE'1-ITi 'D '_ _C'CILj4TE LL ELE-T,EI PE_ IIPEMEP.T'7. <br />LI'STE' FIPE _ ... T 1[ 1 ='JFPL IP <br />F AL ^I J THE G .TE.IP INDICATED Ji'd THE DPANIIJC HALL <br />BF Vn✓IGFL�TOF lFt AHU rANI PC ETE ,IG,,-jU"E <br />J HE jH_ h,!;_ RIPE 'I APIvl STE" PLI 4ri E <br />F 7H F l ILI�IIJS H O FIPt ALARM �TENs THE t'EC'(-,F,'HALL <br />v U H_F L PJ A UDIBLE ]D VISUAL ALARI I It -I A I JKNIti Lt CI I IP,E_ <br />PEA IIJSTALL Ilk E \vI.H THE -FIFE MAP'SHA.LL. <br />5 L L,T CIMLNSIONS _HC NF! APE C LEAP•. HI_IDE DIIvIE',ISII rJS <br />6. I-Et_)VIDE A FLEXIBLE '01`,II`JECIICI�`J BETWEEN P�F 1, DU(_-7 C"Rk <br />LIJD 4:HU FFE H AIP DUCT- <br />-' PPL C U T FROP.4 P`�F—1 `.HALL BE FABRICATELD I IF <br />ACCESSOPIES GALVAi'JIZED SHEETIv1ETAL, WITH ALL SEAMS AND JOII"JTS SEALED <br />US — DGCONNE^T '��dTCH — LIEM3 ti FTI ;HT PROVIDE-,LIPP0RTS AND.'-`,PJCHOP TO ADJ''�ETJT 'J;A,LL A� <br />FULLi INEATZ PROOF H Jwhvi'l n EVER( 5 <br />BG - B A,KDRAFT DAMPER <br />RC — PJOFCHRB H qL'� "1O I[TTED THERM✓ STATS SHALL BE FC)CATEU A. MiNlIC1LIV, LLF —0­ <br />F - I" WASHABLE ALUMINUM FILiFRS ABO'✓E FINISHED FLCIOR_ <br />BS - BIRD SCBEErJ <br />�J A.LL MFC-HAi'",JICAL ErULIIPNIEJT AND SYSTEMS SHALL BE GUARANTEED <br />FOR A PERIOD OF OPJE TEAR AFTER WPITTEN 'CCEP IANCE BY CA"I'lER. <br />HVAC COMPRESCPS SHALL HAVE AN A,DDIT10'vJAL FOUR—lE'P 'V_`PPa,NT'( <br />'I CD L L PFRiGEPAN'JT FIPIN� _ SHALL BE IN`LILATED WITH THICK APMAFLE? <br />E000 GE EC_UAL. pP00IDE ALUM JACKET OF,J THE PIPIILG 0C, RCnF <br />11- PRE=WIDE T'STAT FOP RSF-1 WIPE TO STAPT/'STOP_ SET i�) 80`F <br />6 <br />FRAME TO BE ANCHORED TO <br />THE WALL USING 3/8' DROPS <br />114 ANCHORS'-' ° <br />I <br />a <br />\" <br />°< <br />FRAME°CONSTRUCTION <br />2 xl/4' ANGLE. ALL <br />WELDED CONST. <br />°< <br />ACU WALL RACK <br />SCALE: 1/4" = V-0" <br />4 <br />BRD-1 SET <br />@ 0.05'WG <br />18XIB DUCT DC <br />FROM RSF-I <br />SUPPLY GRILLE I(PA6 ON <br />THREE SIDES AS SHOWN <br />ON PLAN ANGLE VENTS <br />DOWN <br />I <br />t <br />s <br />f <br />SETION A -A <br />SCALE: 1/2" = 1'-O" <br />f BY <br />I ER <br />HARISH SHAH, P.E. <br />HVAC, PLUMBING, FIRE PROTECTION <br />CONSULTING ENGINEER <br />P.E. NO. 19880 <br />LAKELAND, FL. 33813 <br />PHONE/FAX: 863-619-8258 <br />EMAIL — HHSHAHI®YAHOO.COM <br />SIGNATURE <br />PLANS NOT VALID UNLESS <br />RAISED SEAL AFFIXED. <br />REVISIONS: <br />DATE: 9-25-08 <br />PER BLDG DEPT <br />DATE: <br />mot- <br />C C <br />N <br />O N <br />c <br />y <br />C14 <br />O � <br />c <br /># <br />Lac <br />00.0 C <br />� <br />Q- <br />r <br />W 050 <br />LLI <br />C J <br />LL- <br />ra"4) <br />3 <br />rn <br />� <br />j c 4 <br />o a� <br />b V c O <br />c <br />Y W CL O <br />L <br />=cE' <br />-U uw <br />LY <br />�04 <br />� <br />N <br />I <br />00 <br />cfl <br />L4 <br />o <br />0000 a`0o <br />`9 <br />ML2 <br />00 <br />0 a <br />N�00� <br />z <br />4 Q L O <br />Q <br />L • <br />,\ <br />a EL <br />w �m <br />Q <br />0 (LI <br />a. <br />N <br />S <br />co <br />�m <br />O� <br />J <br />F- <br />00 <br />ao <br />� <br />_c <br />O <br />Z <br />Q <br />0 <br />U <br />W <br />�- <br />Q <br />L0 <br />w Q <br />�o <br />V)o <br />L J <br />.4� ILL- <br />WO <br />N (/j <br />J <br />O -� <br />r7 = <br />0 <br />Ld <br />N <br />N <br />m <br />a) <br />J_ <br />O <br />LL <br />J <br />LLJ <br />_ <br />O <br />a. <br />:�E <br />W <br />w <br />N <br />U <br />Z <br />LL' <br />O <br />Z <br />cD "0 <br />N <br />M co <br />WI <br />I <br />W`' <br />z <br />O <br />C) <br />Ne <br />i <br />.0 00 <br />lal l <br />Plan <br />ZEPHYRHILLS <br />ob <br />Job <br />2924 <br />Date <br />8-20-08 <br />Sheet <br />M-100 <br />