Laserfiche WebLink
U <br />IV <br />C <br />I <br />E <br />G <br />H <br />J <br />z <br />0z <br />0 2 <br />OW <br />F_ 11J <br />wW <br />"> O <br />CL _ <br />I=- w <br />w in <br />O <br />Uw <br />Z� <br />OFn a <br />w a <br />�Lu <br />w <br />w� <br />0= <br />Z) <br />Z 0 <br />Q <br />0 0 w <br />W U <br />J <br />OD <br />= O <br />w <br />z n- <br />u.r w <br />UJI <br />Oz <br />w UJI <br />wZ <br />J O <br />Q 0 <br />r_ w <br />�O <br />wN <br />m Y <br />OU <br />H W <br />0 <br />�w <br />wO <br />w~ <br />W <br />� m <br />OJ <br />0 ~ <br />W <br />0 O <br />z=_ <br />z � <br />Z 0 <br />O Q <br />Z `1 <br />u)SQ <br />cr <br />�= w <br />� J <br />U O <br />LLI U) <br />0 k <br />aw <br />Z <br />0 <br />wO <br />z <br />[L-w <br />wF- <br />0 <br />¢ Q <br />rY <br />Om <br />LL J <br />Y J <br />U¢ <br />07 <br />wW <br />2 D <br />m= <br />V <br />LUN <br />¢ 0 <br />n- Q <br />w <br />Wo <br />o- w <br />0 J= <br />wo <br />07 Q <br />O p <br />ZZ <br />UJI rn <br />Y <br />z�' <br />ZW <br />LnO <br />1­-Z <br />O <br />O_ <br />H Q~Q <br />Z N <br />0 <br />OO ~' <br />U <br />00 <br />O_ <br />w~ <br />J V <br />w- <br />w <br />wo <br />H <br />O <br />>_w <br />zN <br />0 LLJ <br />¢ 0 <br />O <br />Z � <br />O <br />W <br />GL <br />0 � <br />Nw <br />_x <br />I=- O <br />SECTION 07 54 23 - THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING <br />1 <br />1. Accelerated Weathering: Roof membrane shall withstand 2000 hours of <br />2. Compressive Strength: 25 psi (172 kPa). <br />b. Trim insulation neatly to fit around penetrations and projections, and to <br />PART <br />1 -GENERAL <br />exposure when tested according to ASTM G152, ASTM G154, or <br />fit tight to intersecting sloping roof decks. <br />ASTM G155. <br />3. Size: 48 by 96 inches (1219 by 2438 mm). <br />1.1 <br />RELATED DOCUMENTS <br />c. Make joints between adjacent insulation boards not more than 1/4 inch <br />1.2 <br />SUMMARY <br />2. Impact Resistance: Roof membrane shall resist impact damage when tested <br />4. Thickness: <br />(6 mm) in width. <br />A. <br />Section Includes: <br />according to ASTM D3746, ASTM D4272, or the "Resistance to Foot Traffic <br />Test" in FM Approvals 4470. <br />a. Base Layer: 1-1/2 inches 38 mm R-13 . <br />Y ( ) ( ) <br />d. At internal roof drains, slope insulation to create a square drain sump <br />with each side equal to the diameter of the drain bowl plus 24 inches <br />1. Mechanically fastened, thermoplastic polyolefin (TPO) roofing system. <br />B. <br />Material Compatibility: Roofing materials shall be compatible with one another <br />2.5 INSULATION ACCESSORIES <br />(610 mm). <br />and adjacent materials under conditions of service and application required, as <br />2. Roof insulation. <br />demonstrated by roof membrane manufacturer based on testing and field <br />A. General: Roof insulation accessories recommended by insulation manufacturer <br />1) Trim insulation so that water flow is unrestricted. <br />experience, <br />for intended use and compatibility with other roofing system components. <br />e. Fill gaps exceeding 1/4 inch (6 mm) with insulation. <br />1.3 <br />DEFINITIONS <br />C. <br />Wind Uplift Resistance: Design roofing system to resist the following wind uplift <br />B. Fasteners: Factory -coated steel fasteners with metal or plastic plates complying <br />A. <br />Roofing Terminology: Definitions in ASTM D1079 and glossary in NRCA's "The <br />pressures when tested according to FM Approvals 4474, UL 580, or UL 1897: <br />with corrosion -resistance provisions in FM Approvals 4470, designed for <br />f. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and <br />NRCA Roofing Manual: Membrane Roof Systems" apply to Work of this Section. <br />1. Zone 1 (Roof Area Field): As shown on Drawings. <br />fastening roof insulation to substrate, and acceptable to roofing system <br />penetrations. <br />2 <br />manufacturer. <br />1.4 <br />ACTION SUBMITTALS <br />2. Zone 2 (Roof Area Perimeter): As shown on Drawings. (kPa/sq. m) <br />3.5 <br />INSTALLATION OF MECHANICALLY FASTENED ROOF MEMBRANE <br />A. <br />Product Data: For each type of product. <br />3. Zone 3 (Roof Area Comers): As shown on Drawings. <br />PART 3 -EXECUTION <br />A. <br />Mechanically fasten roof membrane over area to receive roofing according to <br />Y 9 9 <br />roofing system manufacturer's written instructions. <br />1. For insulation and roof system component fasteners, include copy of FM <br />D. <br />FM Approvals' RoofNav Listing: Roof membrane, base flashings, and component <br />3.1 EXAMINATION <br />Approvals' RoofNav listing. <br />materials shall comply with requirements in FM Approvals 4450 or FM <br />B. <br />Unroll roof membrane and allow to relax before installing. <br />Approvals 4470 as part of a roofing system, and shall be listed in FM Approvals' <br />A. Examine substrates, areas, and conditions, with Installer present, for compliance <br />B. <br />Shop Drawings: Include roof plans, sections, details, and attachments to other <br />RoofNav for Class 1 or noncombustible construction, as applicable. Identify <br />with requirements and other conditions affecting performance of the Wont. <br />C. <br />For in -splice attachment, install roof membrane with long dimension <br />work, including the following: <br />materials with FM Approvals Certification markings. <br />1. Verify that roof openings and penetrations are in place, curbs are set and <br />perpendicular to steel roof deck flutes. <br />1. Layout and thickness of insulation. <br />1. Fire/Windstorm Classification: Class 1A-120. <br />braced, and roof -drain bodies are securely clamped in place. <br />D. <br />Start installation of roofing in presence of roofing system manufacturer's technical <br />personnel. <br />2. Base flashings and membrane termination details. <br />2. Hail -Resistance Rating: FM Global Property Loss Prevention Data <br />2. Verify that wood blocking, curbs, and nailers are securely anchored to roof <br />deck at penetrations and terminations and that nailers match thicknesses of <br />E. <br />Accurately align roof membrane, and maintain uniform side and end laps of <br />3. Flashing details at penetrations. <br />Sheet 1-34 MH. <br />insulation. <br />minimum dimensions required by manufacturer. Stagger end laps. <br />3 <br />4. Tapered insulation layout, thickness, and slopes. <br />E. <br />Solar Reflectance Index: Not less than 78 when calculated according to <br />ASTM E 1980, based on testing identical products by a qualified testing agency. <br />3. Verify that surface plane flatness and fastening of steel roof deck complies <br />F. <br />Mechanically fasten or adhere roof membrane secure) at terminations, <br />Y Y <br />with requirements in Section 05 31 00 "Steel Decking." <br />penetrations, and perimeter of roofing. <br />5. Roof plan showing orientation of steel roof deck and orientation of roof <br />F. <br />Energy Performance: Roofing system shall have an initial solar reflectance of not <br />membrane, fastening spacings, and patterns for mechanically fastened <br />less than 0.70 and an emissivity of not less than 0.75 when tested according to <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />G. <br />Apply roof membrane with side laps shingled with slope of roof deck where <br />roofing system. <br />CRRC-1. <br />possible. <br />6. Insulation fastening patterns for comer, perimeter, and field -of -roof locations. <br />G. <br />Exterior Fire -Test Exposure: ASTM E108 or UL 790, Class A; for application and <br />3.2 PREPARATION <br />H. <br />In -Seam Attachment: Secure one edge of TPO sheet using fastening plates or <br />roof slopes indicated; testing by a qualified testing agency. Identify products with <br />A. Clean substrate of dust, debris, moisture, and other substances detrimental to <br />metal battens centered within seam, and mechanically fasten TPO sheet to roof <br />deck. <br />1.5 <br />INFORMATIONAL SUBMITTALS <br />appropriate markings of applicable testing agency. <br />roofing system installation according to roofing system manufacturer's written <br />instructions. Remove sharp projections. <br />I. <br />Seams: Clean seam areas, overlap roof membrane, and hot-air weld side and <br />A. <br />Qualification Data: For Installer, manufacturer and testing agency. <br />2.2 <br />THERMOPLASTIC POLYOLEFIN (TPO) ROOFING <br />B. Prevent materials from entering and clogging roof drains and conductors and <br />watertight to ensure a flashings of roof membrane and sheet s ht seam <br />end laps 9 9 <br />B. <br />Manufacturer Certificates: <br />A. <br />TPO Sheet: ASTM 06878/D6878M, internally fabric -or scrim -reinforced, <br />from spilling or migrating onto surfaces of other construction. Remove roof -drain <br />installation. <br />1. Performance Requirement Certificate: Signed by roof membrane <br />fabric -backed TPO sheet, <br />plugs when no work is taking place or when rain is forecast. <br />1. Test lap edges with probe to verify seam weld continuity. Apply lap sealant to <br />manufacturer, certifying that roofing system complies with requirements <br />"Performance <br />1. Manufacturers: Subject to compliance with requirements, available <br />C. Perform fastener -pullout tests according to roof system manufacturer's written <br />seal cut edges of roof membrane and flashing sheet. <br />4 <br />specified in Requirements" Article. <br />manufacturers offering products that may be incorporated into the Work <br />instructions. <br />fy g y, and repair seam <br />2. Verify field strength of seams a minimum of twice daily, <br />a. Submit evidence of compliance with performance requirements. <br />include, but are not limited to, the following: <br />1. Submit test result within 24 hours after performing tests. <br />sample areas. <br />2. Special Warranty Certificate: Signed by roof membrane manufacturer, <br />a. Carlisle SynTec Incorporated. <br />a. Include manufacturer's requirements for any revision to previously <br />3. Repair tears, voids, and lapped seams in roof membrane that do not comply <br />certifying that all materials supplied under this Section are acceptable for <br />b. Firestone Building Products. <br />submitted fastener patterns required to achieve specified wind uplift <br />with requirements. <br />special warranty. <br />requirements. <br />J. <br />Spread sealant bed over deck -drain flange at roof drains, and securely seal roof <br />C. <br />Product Test Reports: For roof membrane and insulation, for tests performed by <br />c. GAF. <br />membrane in place with clamping ring. <br />a qualified testing agency, indicating compliance with specified requirements. <br />d. Johns Manville; a Berkshire Hathaway company. <br />3.3 INSTALLATION OF ROOFING, GENERAL <br />3.6 <br />INSTALLATION OF BASE FLASHING <br />D. <br />Evaluation Reports: For components of roofing system, from ICC-ES. <br />2. Source Limitations: Obtain components for roofing system from roof <br />A. Install roofing system according to roofing system manufacturer's written <br />E. <br />Field quality -control reports. <br />membrane manufacturer or manufacturers approved by roof membrane <br />instructions, FM Approvals' RoofNav listed roof assembly requirements, and FM <br />A. <br />Install sheet flashings and preformed flashing accessories, and adhere to <br />manufacturer. <br />Global Property Loss Prevention Data Sheet 1-29. <br />substrates according to roofing system manufacturer's written instructions. <br />1.6 <br />CLOSEOUT SUBMITTALS <br />3. Thickness: 60 mils (1.5 mm), nominal. <br />B. Complete terminations and base flashings and provide temporary seals to <br />B. <br />Apply bonding adhesive to substrate and underside of sheet flashing at required <br />prevent water from entering completed sections of roofing system at end of <br />rate, and allow to partially dry. Do not apply to seam area of flashing. <br />A. <br />Maintenance Data: For roofing system to include in maintenance manuals. <br />4. Exposed Face Color: White. <br />workday or when rain is forecast. Remove and discard temporary seals before <br />5 <br />beginning Work on adjoining roofing. <br />C. <br />Flash penetrations and field -formed inside and outside comers with cured or <br />B. <br />Certified statement from existing roof membrane manufacturer stating that <br />uncured sheet flashing. <br />existing roof warranty has not been affected by Work performed under this <br />2.3 <br />AUXILIARY ROOFING MATERIALS <br />C. Install roof membrane and auxiliary materials to be in to existing roofing to <br />Section. <br />A. <br />General: Auxiliary materials recommended by roofing system manufacturer for <br />maintain weathertightness of transition and to not void warranty for existing <br />D. <br />Clean seam areas, overlap, and firmly roll sheet flashings into the adhesive. <br />roofing system. <br />Hot-air weld side and end laps to ensure a watertight seam installation. <br />intended use and compatible with other roofing components. <br />1.7 <br />QUALITY ASSURANCE <br />E. <br />Terminate and seal top of sheet flashings and mechanically anchor to substrate <br />1. Adhesive and Sealants: Comply with VOC limits of authorities having <br />3.4 INSTALLATION OF INSULATION <br />through termination bars. <br />A. <br />Manufacturer Qualifications: A qualified manufacturer that is listed in FM <br />jurisdiction. <br />Approvals' RoofNav for roofing system identical to that used for this Project. <br />A. Coordinate installing roofing system components so insulation is not exposed to <br />B. <br />Sheet Flashing: Manufacturer's standard unreinforced TPO sheet flashing, 55 <br />precipitation or left exposed at end of workday. <br />3.7 <br />FIELD QUALITY CONTROL <br />B. <br />Installer Qualifications: A qualified firm that is approved, authorized, or licensed <br />mils (1.4 mm) thick, minimum, of same color as TPO sheet. <br />by roofing system manufacturer to install manufacturer's product and that is <br />B. Comply with roofing system and roof insulation manufacturer's written instructions A. <br />Testing Agency: Engage a qualified testing agency to perform tests and to <br />eligible to receive manufacturer's special warranty. <br />C. <br />Prefabricated Pipe Flashings: As recommended by roof membrane manufacturer. <br />for installing roof insulation. <br />inspect substrate conditions, surface preparation, roof membrane application, <br />sheet flashings, protection, and drainage components, and to furnish reports to <br />D. <br />Roof Vents: As recommended by roof membrane manufacturer. <br />C. Installation Over Metal Decking: <br />Architect. <br />1.8 <br />DELIVERY, STORAGE, AND HANDLING <br />6 <br />1. Size: Not less than 4-inch (100-mm) diameter. <br />1. Install base layer of insulation with end joints staggered not less than 12 <br />B. <br />Final Roof Inspection: Arrange for roofing system manufacturer's technical <br />A. <br />Deliver roofing materials to Project site in original containers with seals unbroken <br />inches (305 mm) in adjacent rows and with long joints continuous at right <br />personnel to inspect croofing installation on completion, in presence of Architect, <br />and labeled with manufacturer's name, product brand name and type, date of <br />E. <br />Bonding Adhesive: Manufacturer's standard. <br />angle to flutes of decking. <br />and to prepare inspection report. <br />manufacture, approval or listing agency markings, and directions for storing and <br />F. <br />Metal Termination Bars: Manufacturer's standard, predrilled stainless steel or <br />mixing with other components. <br />aluminum bars, approximately 1 by 1/8 inch (25 by 3 mm) thick; with anchors. <br />a. Locate end joints over crests of decking. <br />C. <br />Repair or remove and replace components of roofing system where inspections <br />indicate that they do not comply with specified requirements. <br />B. <br />Store liquid materials in their original undamaged containers in a clean, dry, <br />b. Trim insulation neatly to fit around penetrations and projections, and to <br />protected location and within the temperature range required by roofing system <br />G. <br />d tor ll i i l d d t ' t f M tt l B t MeaBattens: Manufacturer's standard, aluminum -zinc -alloy -coated <br />fit tight to intersecting sloping roof decks. <br />D. <br />Additional testing and inspecting, at Contractor's expense, will be performed to <br />manufacturer. Protect stored liquid material from direct sunlight. <br />zinc -coated steel sheet, approximately 1 inch wide by 0.05 inch thick (25 mm <br />determine if replaced or additional work complies with specified requirements. <br />wide by 1.3 mm thick), prepunched. <br />c. Make joints between adjacent insulation boards not more than 1/4 inch <br />1. Discard and legally dispose of liquid material that cannot be applied within its <br />(6 mm) in width. <br />stated shelf life. <br />H. <br />Fasteners: Factory -coated steel fasteners and metal or plastic plates complying <br />3.8 <br />PROTECTING AND CLEANING <br />with corrosion -resistance provisions in FM Approvals 4470, designed for <br />d. At internal roof drains, slope insulation to create a square drain sump <br />A. <br />Protect roofing system from damage and wear during remainder of construction <br />C. <br />Protect roof insulation materials from physical damage and from deterioration by <br />fastening roofing components to substrate, and acceptable to roofing system <br />with each side equal to the diameter of the drain bowl plus 24 inches <br />period. When remaining construction does not affect or endanger roofing system, <br />sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with <br />manufacturer. <br />(610 mm). <br />inspect roofing system for deterioration and damage, describing its nature and <br />insulation manufacturer's written instructions for handling, storing, and protecting <br />during installation. <br />I. <br />Miscellaneous Accessories: Provide pourable sealers, preformed cone and vent <br />1) Trim insulation so that water flow is unrestricted. <br />extent in a written report, with copies to Architect and Owner. <br />7 <br />D. <br />Handle and store roofing materials, and place equipment in a manner to avoid <br />sheet flashings, preformed inside and outside comer sheet flashings, T joint <br />covers, lap sealants, termination reglets, and other accessories. <br />e. Fill gaps exceeding 1/4 inch (6 mm) with insulation. <br />B. <br />Correct deficiencies in or remove roofing system that does not comply with <br />permanent deflection of deck. <br />requirements, repair substrates, and repair or reinstall roofing system to a <br />f. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and <br />condition free of damage and deterioration at time of Substantial Completion and <br />2.4 <br />ROOF INSULATION <br />penetrations. <br />according to warranty requirements. <br />1.9 <br />FIELD CONDITIONS <br />A. <br />General: Preformed roof insulation boards manufactured or approved by TPO <br />g. Mechanically attach base layer of insulation using mechanical fasteners <br />C. <br />Clean overspray and spillage from adjacent construction using cleaning agents <br />A. <br />Weather Limitations: Proceed with installation only when existing and forecasted <br />roof membrane manufacturer, approved for use in FM Approvals' RoofNav listed <br />specifically designed and sized for fastening specified board -type roof <br />procedures recommended b <br />and p y manufacturer of affected construction. <br />weather conditions permit roofing system to be installed according to <br />roof assemblies. <br />insulation to metal decks. <br />manufacturer's written instructions and warranty requirements. <br />B. <br />Polyisocyanurate Board Insulation: ASTM C1289, [Type II, Class 1, Grade 2] <br />1) Fasten insulation according to requirements in FM Approvals' <br />END OF SECTION 07 54 23 <br />1.10 <br />WARRANTY <br />[Type tl, Class 2, Grade 2], felt or glass -fiber mat facer on both major surfaces. <br />RoofNav for specified Windstorm Resistance Classification. <br />A. <br />Special Warranty: Manufacturer agrees to repair or replace components of <br />1. Manufacturers: Subject to compliance with requirements, available <br />2 Fasten insulation to resists specified uplift pressure at comers, <br />) p p <br />roofing system that fail in materials or workmanship within specified warranty <br />manufacturers offering products that may be incorporated into the Work <br />perimeter, and field of roof. <br />period. <br />include, but are not limited to, the following: <br />2. Install upper layers of insulation and tapered insulation with joints of each <br />$ <br />1. Special warranty includes roof membrane, base flashings, roof insulation, <br />a. Carlisle SynTec Incorporated. <br />layer offset not less than 12 inches (305 mm) from previous layer of <br />fasteners, and other components of roofing system. <br />b. Firestone Building Products. <br />insulation. <br />2. Warranty Period: 20 years from date of Substantial Completion. <br />c. GAF. <br />a. Install with long joints continuous and with end joints staggered not less <br />than 12 inches (305 mm) in adjacent rows. <br />PART 2 -PRODUCTS <br />d. Insulfoam - a division of Carlisle Construction Materials Inc. <br />e. Johns Manville; a Berkshire Hathaway company. <br />2.1 <br />PERFORMANCE REQUIREMENTS <br />f. Rmax, Inc. <br />0 <br />10 <br />A. General Performance: Installed roofing system and flashings shall withstand <br />specified uplift pressures, thermally induced movement, and exposure to weather <br />without failure due to defective manufacture, fabrication, installation, or other <br />defects in construction. Roof system and flashings shall remain watertight. <br />1 <br />ISSUE FOR CONSTRUCTION <br />07/15/22 <br />JWT <br />JWT <br />JWT <br />TC <br />TC <br />0 <br />ISSUE FOR PERMIT <br />06/24/22 <br />JWT <br />JWT <br />JWT <br />TC <br />TC <br />REV <br />REVISION DESCRIPTION <br />DATE <br />JDRWN <br />DSGN <br />CHKD <br />QC <br />APPD <br />REF. DWG. NO <br />REFERENCE DRAWING TITLE <br />NOT USED <br />07/15/2022 <br />CLIENT PROJECT NO.: <br />❑❑ <br />MERRICK000 <br />UP` <br />MERRICK PROJECT NO.: 3021600491 <br />SCALE: <br />AS NOTED <br />TITLE: <br />WT-BTB ZEPHYRHILLS EXPANSION <br />ARCHITECTURAL <br />SPECIFICATIONS <br />REVISION: DRAWING NO.: SHEET NO.: <br />1 A002 OF '- <br />1 <br />2 <br />i <br />E <br />5 <br />f <br />7 <br />10 <br />0 <br />C <br />0 <br />10 <br />F <br />C <br />W <br />I I J <br />