Laserfiche WebLink
A I B I C <br />I <br />D I E <br />F <br />C <br />H <br />J <br />z <br />zF_: <br />o Iz <br />wuj <br />o w <br />wit <br />0 Q <br />Wa <br />a= <br />_CC <br />~m <br />w2 <br />ow <br />z� <br />z <br />oY) <br />a <br />za <br />L� <br />x w <br />w0 <br />= 0 <br />0 <br />Of <br />zz <br />-z <br />Ix¢ <br />o0 <br />ww <br />U <br />oM <br />in <br />z o- <br />ww <br />c/)m <br />0Z <br />w� <br />wz <br />J O <br />m� <br />�w <br />cn o <br />wcf) <br />in Y <br />00 <br />o� <br />ww <br />�-M <br />wo <br />w~ <br />d J <br />w- <br />O J <br />o� <br />wO <br />o= <br />z <br />z� <br />zo <br />r- z <br />o¢ <br />Z Y <br />U) N <br />-w <br />� J <br />UO <br />wm <br />0w <br />aw <br />o� <br />w0 <br />z <br />U-w <br />w= <br />o� <br />¢Q <br />om <br />U 2 <br />Rto <br />w "' <br />m= <br />U <br />wfn <br />¢z <br />aQ <br />w <br />a-w <br />w N <br />U � <br />N O <br />00 <br />Z z <br />co <br />= Y <br />�o <br />U� <br />z� <br />zw <br />No <br />�z <br />0 <br />�0 <br />Lu~ <br />z <br />= J <br />0 <br />U � <br />00 <br />Ir 0 <br />w <br />J ¢ <br />wV <br />=o <br />0� <br />>_w <br />z U' <br />¢_ <br />oui <br />z� <br />¢ U <br />0 <br />zUJ <br />3 <br />5;o <br />ocr- <br />�w <br />F_ 0 <br />1 <br />2 <br />3 <br />2 <br />5 <br />0 <br />7 <br />0 <br />0 <br />10 <br />CODES, STANDARDS, AND SPECIFICATIONS <br />1. THIS SPECIFICATION IS FORMED IN PART BY THE FOLLOWING REFERENCES TO THE CURRENT EDITIONS OF CODES, <br />STANDARDS AND PUBLICATIONS. <br />ACI AMERICAN CONCRETE INSTITUTE <br />ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY <br />ACI SP-66 ACI DETAILING MANUAL 2004 W/ REF TO ACI 315-99 & 315R-04 <br />ACI 117-10 (2015) SPECIFICATIONS FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS <br />ACI 301-10 SPECIFICATIONS FOR STRUCTURAL CONCRETE <br />ACI 211.1-91(2009) STANDARD PRACTICE FOR SELECTING PROPORTIONS FOR NORMAL, HEAVYWEIGHT AND MASS <br />CONCRETE <br />ACI 309R-05 GUIDE FOR CONSOLIDATION OF CONCRETE <br />ASTM A615-16 STANDARD SPECIFICATION FOR DEFORMED AND PLAIN CARBON -STEEL BARS FOR CONCRETE <br />REINFORCEMENT <br />CRSI CRSI MANUAL OF STANDARD PRACTICE, 28TH EDITION, 2009 (CONCRETE REINFORCING STEEL INSTITUTE) <br />OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION TITLE 29, PART 1910 AND PART 1926 <br />NEC NATIONAL ELECTRICAL CODE, ARTICLE 250 GROUNDING <br />CONCRETE MATERIALS AND REINFORCING SHALL BE DESIGNED, DETAILED AND PLACED IN ACCORDANCE WITH THESE <br />SPECIFICATIONS AND THE NOTED REFERENCES. <br />2. SHOULD A CONFLICT BE FOUND TO EXIST BETWEEN ANY APPLICABLE PORTION OF THE ABOVE REFERENCED CODES, <br />STANDARDS AND REGULATIONS AND THIS SPECIFICATION, THE CONFLICT SHALL BE SUBMITTED TO THE ENGINEER <br />FOR RESOLUTION BEFORE PROCEEDING WITH THE AFFECTED WORK <br />DESIGN CRITERIA <br />1. RISK CATEGORY, PER ASCE 7-16, TABLE 1.5-1:RC-II <br />2. MINIMUM DESIGN LOADS IN ACCORDANCE WITH ASCE-7 <br />a. LIVE LOAD (LL) <br />1.) FLOOR LIVE LOAD: 100 psf <br />b. EQUIPMENT LOAD (ABSENCE OF VENDOR EQUIPMENT LOAD): <br />1.) 7" THICK SLAB: 250 psf <br />2.) 12" THICK SLAB: 400 psf <br />c. FORKLIFT LOAD: 23.5 kip VEHICLE PLUS LIFT WEIGHT, (8.125 kip FRONT AXLE LOAD) <br />d. EARTHQUAKE LOAD PARAMETERS <br />1.) ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE <br />2.) IMPORTANCE FACTOR: 1.0 (RC -II) <br />3.) SEISMIC SITE CLASS: D (DEFAULT) <br />4.) MINIMUM DESIGN SPECTRAL RESPONSE COEFFICIENTS <br />I. SpS = 0.062g <br />ii. Sp, = 0.051 g <br />iii. TL = 8s <br />5.) SEISMIC DESIGN CATEGORY: A <br />e. WIND LOAD PARAMETERS <br />1.) ANALYSIS PROCEDURE: MWFRS: DIRE ZONAL PROCEDURE <br />2.) WIND LOAD PARAMETERS <br />i. BASIC WIND SPEED - 137 MPH <br />ii. EXPOSURE CATEGORY = C <br />iii. TOPOGRAPHIC FACTOR -1.0 <br />iv. ENCLOSURE = PARTIALLY ENCLOSED <br />f. SNOW LOAD PARAMETERS <br />1.) GROUND SNOW LOAD = 0 psf <br />g. ICE LOADS: NA <br />h. FLOOD LOADS: NA <br />i. SPECIAL LOADS: NA <br />j. FUTURE LOADS: UNLESS SPECIFICALLY NOTED, THERE ARE NO PROVISIONS MADE FOR FUTURE FLOOR, ROOF OR <br />OTHER LOADS <br />15. THE SUBCONTRACTOR SHALL BECOME FAMILIAR WITH THE SURVEY AND SUB -SURFACE SOILS INVESTIGATION <br />REPORT BEFORE BEGINNING CONSTRUCTION. <br />16. NOTIFY THE ENGINEER AS SOON AS POSSIBLE OF ANY UNUSUAL SOIL CONDITIONS IN VARIANCE WITH TEST BORINGS, <br />SUCH AS UNEXPECTED SPRING OR SEEPAGE WATER, MATERIAL PUMPING UNDER EXCAVATION EQUIPMENT, <br />MATERIAL BECOMING FLUID DUE TO VIBRATION CAUSED BY EXCAVATION EQUIPMENT, MATERIAL DIFFERING FROM <br />TEST BORINGS, OR SOIL OF QUESTIONABLE BEARING CAPACITY. <br />17. THE SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ALL SHORING, BRACING, NEEDLING, UNDERPINNING, AND OTHER <br />MEANS REQUIRED TO PROTECT THE SAFETY, INTEGRITY, AND STABILITY OF ALL CONSTRUCTION, INCLUDING <br />EXCAVATIONS ADJACENT TO EXISTING STRUCTURES, SLABS, OR FOUNDATIONS. THE SUBCONTRACTOR SHALL BE <br />RESPONSIBLE FOR THE DESIGN, MEANS, METHODS, TECHNIQUES, SEQUENCES, PROCEDURES OF CONSTRUCTION, <br />AND FOR CONSTRUCTION SAFETY. EXISTING STRUCTURES, SLABS, OR FOUNDATIONS SHALL NOT MOVE OR BE <br />UNDERMINED DUE TO SUBCONTRACTOR'S EXCAVATION. <br />18. EXCAVATION: <br />a. CARE SHALL BE TAKEN TO NOT DISTURB THE BOTTOM OF THE FINAL EXCAVATION. FINAL FOUNDATION GRADE <br />EXCAVATION SHALL NOT BE MADE UNTIL JUST PRIOR TO PLACING REINFORCING AND CONCRETE. <br />b. ALL EXCESS EXCAVATED MATERIAL SHALL BE REMOVED FROM THE SITE OR AS DIRECTED BY MERRICK. <br />19, DEWATERING OF EXCAVATIONS AS REQUIRED. METHODS FOR DEWATERING AND THE NEED TO DO SO IS AT THE <br />SUBCONTRACTOR'S DISCRETION AND THE GEOTECHNICAL REPORTS LISTED IN SECTION VIII. <br />20. SET FOUNDATIONS AT ELEVATIONS SHOWN, OR ON FIRM UNDISTURBED MATERIAL OF DESIGN BEARING CAPACITY, <br />WHICHEVER IS LOWER. THE SUBCONTRACTOR SHALL VERIFY THAT EACH FOOTING PLACED IS BEARING ON SUITABLE <br />DESIGN MATERIAL. PER GEOTECHNICAL REPORT. <br />a. ALL SOIL SURROUNDING AND UNDER ALL FOOTINGS SHALL BE PROTECTED FROM FREEZING AND FROST ACTION <br />DURING CONSTRUCTION. <br />b. WHERE FOOTINGS ARE IN CLOSE PROXIMITY OF SEWERS, DRAINS, CONDUITS, UNDERGROUND PIPES, ETC., <br />BOTTOM OF FOOTINGS SHALL BE BELOW INVERT ELEVATION OR BOTTOM OF NOTED ELEMENTS. <br />c. KEEP FOUNDATION EXCAVATIONS FREE OF WATER AT ALL TIMES. REPLACE WEAKENED SOIL WITH LEAN <br />CONCRETE (1500 PSI). <br />21. BACKFILL AND FILL MATERIALS: PROVIDE SATISFACTORY SOIL MATERIALS FOR BACKFILL AND FILL FREE OF CLAY, <br />DEBRIS, WASTE, FROZEN MATERIALS, VEGETABLE AND OTHER DELETERIOUS MATTER, ROCK OR GRAVEL MATERIAL <br />SHALL NOT BE LARGER THAN 3 INCH IN ANY DIMENSION. BACKFILL AND FILL SHALL BE PER GEOTECHNICAL SOILS <br />REPORT RECOMMENDATIONS. <br />22. POROUS FILL SHALL BE A NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF CRUSHED LIMESTONE OR GRAVEL, <br />COMPACTED, (MINIMUM 6 IN. THICK UNDER FLOOR SLABS, UNLESS NOTED OTHERWISE ON DRAWINGS). THE <br />GRADATION SHALL CONFORM TO ASTM C33 SIZE 57. <br />23. COMPACTION: <br />a. BACKFILL SHALL BE BROUGHT UP TO FINISHED GRADE IN COMPACTED LIFTS PER THE RECOMMENDATIONS OF <br />THE GEOTECHNICAL REPORT. <br />b. THE BACKFILL OR FILL MATERIALS SHALL HAVE AN OPTIMUM MOISTURE CONTENT PER PROJECT GEOTECHNICAL <br />REPORT WHEN TESTED. TEST ACCORDING TO MODIFIED PROCTOR ASTM D1557. THE MINIMUM COMPACTION <br />DENSITIES UNDER FOUNDATIONS, SLABS ON GRADE, SEWERS, MANHOLES, PAVEMENTS, NOT LESS THAN 95%. <br />c. SETTLEMENT OR WASHING THAT OCCURS IN GRADED OR BACKFILLED AREAS PRIOR TO ACCEPTANCE OF THE <br />WORK SHALL BE REPAIRED AND GRADES REESTABLISHED TO THE REQUIRED ELEVATIONS AND SLOPES. <br />d. COMPACTION TESTS SHALL BE CONDUCTED ON THE SUBGRADE AND FOR EACH LAYER OF BACKFILL AT THE RATE <br />OF ONE TEST FOR EVERY 5000 SQUARE FEET. <br />II. SUBGRADE: <br />1. ALL BUILDING FOOTINGS, EQUIPMENT FOUNDATIONS, PIPE RACK FOUNDATIONS AND GROUND FLOOR SLABS SHALL <br />BE PLACED IN ACCORDANCE WITH PROJECT GEOTECHNICAL REPORTS. <br />2. CONCRETE FOR FOUNDATIONS SHALL BE PLACED ON UNDISTURBED SOIL, ROCK, OR ON COMPACTED STRUCTURAL <br />FILL OR SEAL SLAB (MUD MATS), SURFACES TO RECEIVE CONCRETE SHALL BE FREE OF LOOSE MATERIAL. <br />PLACEMENT AND COMPACTION OF SUBGRADE MATERIALS SHALL COMPLY WITH THE PROJECT GEOTECHNICAL <br />SPECIFICATIONS. <br />3. GROUND FLOOR SLABS SHALL BE CAST OVER A CAPILLARY WATER BARRIER CONSISTING OF 4" OF WELL COMPACTED <br />MATERIAL. THE MATERIAL SHALL BE FREE DRAINING, SAND (SP) AND NOT MORE THAN 5% PASSING THE NO. 200 SIEVE. <br />VAPOR RETARDERS SHALL BE PROVIDED UNDER SLABS PER FBC 1907.1. <br />4. ELECTRICAL GROUNDING SHALL BE PROVIDED IN ACCORDANCE WITH THE NEC ARTICLE 250, GROUNDING, AND AS <br />PROVIDED, PER ELECTRICAL DRAWINGS FOR THIS CONTRACT. <br />a. REINFORCING STEEL PRIOR TO FABRICATION OR SHIPMENT OF REINFORCING STEEL AND ACCESSORIES, THE <br />SUBCONTRACTOR SHALL SUBMIT THE SHOP DRAWINGS FOR FOR APPROVAL. SHOP DRAWINGS SHALL INDICATE <br />BENDING DIAGRAMS, ASSEMBLY DIAGRAMS, SPLICING AND LAPPING OF REBARS, SHAPES, DIMENSIONS AND <br />DETAILS OF REBAR AND ACCESSORIES. DRAWINGS SHALL SHOW ALL OPENINGS AND PENETRATIONS THAT PASS <br />THROUGH CONCRETE CONSTRUCTION. THE APPROVAL OF DRAWINGS WILL BE FOR CONFORMANCE TO THE <br />DESIGN INTENT AND WILL NOT RELIEVE THE VENDOR OF RESPONSIBILITY FOR ERRORS, OMISSIONS OR THE <br />• • • • • • • • N • N N N • • N •• • • • •• • • ••• • • • N • • N • • N • • • •• • •• • • • • •• • • • • • • N • N • N• • • •• • • •• • •N • ••••N••N••N•NNNNNN•NNNN••NNNNNN••••••••••N••NN•N•N•H••N•N•NN•N <br />b. EMBEDDED ITEMS PRIOR TO FABRICATION OR SHIPMENT OF EMBEDDED ITEMS, THE SUBCONTRACTOR SHALL <br />SUBMIT THE SHOP DRAWINGS FOR FOR APPROVAL. THE DRAWINGS WILL SHOW ALL MATERIAL SPECIFICATIONS, <br />CUTS, ANCHOR DEVICES, WELDS AND FINISH IN ACCORDANCE WITH THE DESIGN DRAWINGS AND THE AMERICAN <br />INSTITUTE OF STEEL CONSTRUCTION CODE OF STANDARD PRACTICE. THE DRAWING APPROVAL WILL BE FOR <br />CONFORMANCE TO THE DESIGN INTENT AND WILL NOT RELIEVE THE SUBCONTRACTOR OF RESPONSIBILITY FOR <br />ERRORS, OMISSIONS, OR THE ACCURACY OF DIMENSIONS. <br />c. THE SHOP DRAWINGS SHALL INDICATE THE MERRICK DESIGN DRAWING REFERENCE AND THE REVISION NUMBER <br />AND DATE USED TO CREATE THE SHOP DRAWINGS. <br />V. EXPANSION CONSTRUCTION AND CONTROL JOINTS: <br />1. EXPANSION, CONSTRUCTION AND CONTRACTION JOINTS SHALL BE PROVIDED IN ACCORDANCE WITH STANDARD <br />DETAILS AND AS LOCATED OR DETAILED ON THE DRAWINGS. ANY OTHERS DEEMED NECESSARY SHALL BE APPROVED <br />BY THE MERRICK REPRESENTATIVE. <br />VI. GROUT: <br />1. GROUT FOR COLUMN BASE PLATES AND EQUIPMENT FOUNDATIONS SHALL BE MINIMUM 1 1/2" THICK CONSTRUCTION <br />GRADE NON -SHRINK UNLESS NOTED OTHERWISE ON DESIGN DRAWINGS, MASTERFLOW 713, MASTER BUILDERS OR <br />APPROVED EQUAL. GROUT PLACEMENT WITHIN TIGHT CLEARANCES OF LESS THAN 1", USE FIVE STAR FLUID GROUT <br />100 OR APPROVED EQUAL. <br />2. CONCRETE FOUNDATIONS SHALL BE CURED FOR AT LEAST SEVEN DAYS PRIOR TO GROUT PREPARATION. <br />3. NON -SHRINK GROUT SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 5000 PSI. EPDXY GROUT SHALL HAVE A <br />MINIMUM COMPRESSIVE STRENGTH OF 8000 PSI. <br />4. BEFORE GROUTING COLUMN BASE PLATES, REMOVE LAITANCE FROM THE HARDENED CONCRETE SURFACE AND <br />ROUGHEN BY CHIPPING TO COARSE AGGREGATE WITH 1/4" DEEP INDENTATION. THOROUGHLY CLEAN THE SURFACE <br />AFTERWARD. <br />5. THE FOUNDATION MUST BE KEPT FREE OF CONTAMINATION BY OIL, DIRT, WATER, AND SO FORTH AFTER IT HAS BEEN <br />PREPARED FOR GROUTING. PROTECTIVE SHEETING (SUCH AS SHEETS OF CLEAN POLYETHYLENE) SHALL BE USED TO <br />COVER THE PREPARED SURFACES WHEN WORK IS NOT IN PROGRESS. <br />6. WHEN THE SURFACE CHIPPING IS COMPLETE, THE FOUNDATION SHALL BE THOROUGHLY BROOMED AND AIR -BLOWN <br />FREE OF ALL DUST WITH CLEAN, DRY, OIL -FREE AIR. <br />7. WATER SATURATE THE GROUT CONTACT SURFACE FOR 12 HOURS PRIOR TO GROUTING. REMOVE ALL FREE WATER <br />IMMEDIATELY BEFORE GROUTING. <br />8. ANCHOR BOLT SLEEVES AND GROUT POCKETS KEYS SHALL BE TEMPORARILY PLUGGED, CAPPED OR OTHERWISE <br />SECURELY CLOSED TO PREVENT ENTRY OF CONCRETE, DIRT, DEBRIS OR WATER, <br />9. AFTER COLUMN IS SET AND ALIGNED ON THE FOUNDATION, GROUT POCKET VOIDS SHALL BE FILLED. CHAMFER <br />• • • • • N ••• • • •N • • • •• • • • • •• • • •• N • • • •• • • •• • •N • • N••••NN•••••NN•••N•N••••NN•NNNNNN• <br />10. ANCHOR BOLT THREADS SHALL BE COVERED WITH DUCT TAPE, FOAM PIPE, INSULATION, OR OTHER SUITABLE MEANS <br />TO KEEP THEM CLEAN AND PREVENT ANY DAMAGE THAT MIGHT OCCUR DURING CHIPPING AND GROUTING <br />OPERATION. <br />11. AFTER GROUT HAS THOROUGHLY HARDENED, REMOVE ALL LEVELING WEDGES OR SCREWS AND PATCH HOLES WITH <br />SIMILAR GROUT. <br />12. ALL COLUMN BASE PLATES WITH SHEAR LUGS SHALL BE GROUTED WITH FLOWABLE NONSHRINK CEMENT BASED <br />GROUT. <br />13. EPDXY ADHESIVE SHALL BE USED FOR ANCHORING RODS, DOWELS, AND REINFORCING BARS INTO EXISTING <br />CONCRETE, UNLESS NOTED OTHERWISE. FOR DETAILS, SEE STANDARD ANCHOR RODS, SHEET 6004-SG-00-004. <br />14. EPDXY BONDING ADHESIVE SHALL BE USED AT JOINTS FOR BONDING ANDIOR MORTARING WITH EXISTING CONCRETE, <br />AS NOTED ON DESIGN DRAWINGS. ADHESIVE SHALL BE COMPLIANT WITH ASTM C881. RECOMMENDED PRODUCT IS <br />BASF MASTEREMACO ADH 326, LIQUID EPDXY CONCRETE BONDING ADHESIVE, OR APPROVED EQUAL. <br />15. ALL COLUMN PENETRATIONS THROUGH FLOOR SLAB SHALL BE BACKFILLED WITH PLAIN CONCRETE. BOND BREAKER <br />MATERIAL SHALL BE WRAPPED AROUND COLUMN PRIOR TO CONCRETE PLACEMENT. <br />III. CAST -IN -PLACE CONCRETE: VII TESTING: <br />1. <br />CALCIUM CHLORIDE SHALL NOT BE PERMITTED NOR SHALL ANY ADMIXTURE CONTAINING CALCIUM CHLORIDE BE <br />1. A QUALIFIED AND INDEPENDENT TESTING AND INSPECTION AGENCY SHALL WORK TO PERFORM TESTS, AND PREPARE <br />CONCRETE GENERAL NOTES <br />PERMITTED. <br />TEST REPORTS. <br />2. <br />BOND BREAKER MATERIAL SHALL BE 30 POUND FELT PAPER. <br />a. WORK SHALL FOLLOW AGENCY PROCEDURES, AS APPROVED BY MERRICK, AND SHALL PROVIDE INDEPENDENT <br />3. <br />CONCRETE SHALL BE DISCHARGED AT THE PROJECT SITE WITHIN 1-1/2 HOURS AFTER WATER HAS BEEN ADDED TO <br />AND VERIFIABLE RESULTS FOR QUALITY ASSURANCE AND QUALITY CONTROL (QA/QC). THE SUBCONTRACTOR <br />I. <br />GENERAL SITEWORK/CONSTRUCTION NOTES: <br />THE CEMENT AND AGGREGATES. ADDITION OF WATER TO THE MIX AT THE PROJECT SITE WILL NOT BE ALLOWED. ALL <br />SHALL REMAIN SOLELY RESPONSIBLE FOR ALL WORK PERFORMED, REGARDLESS OF THE DEGREE OF <br />1. <br />REINFORCING STEEL SHALL BE ASTM A615, GRADE 60 AND SHALL BE FREE FROM LOOSE FLAKY RUST, MUD, OIL OR <br />WATER MUST BE ADDED AT THE BATCH PLANT. HIGH -RANGE WATER -REDUCING ADMIXTURE MAY BE ADDED AT THE <br />INSPECTION PROVIDED BY MERRICK. <br />OTHER COATINGS THAT WILL DESTROY OR REDUCE THE BOND. ALL BARS SHALL BE DEFORMED UNLESS NOTED. <br />PROJECT SITE TO INCREASE THE SLUMP. <br />b. THE TESTING AGENCY SHALL CONDUCT AND INTERPRET THE TESTS, STATE IN EACH REPORT WHETHER THE <br />2. <br />MINIMUM DISTANCE FROM EDGE OF BAR TO FACE OF CONCRETE SHALL BE 3" WHERE PLACED AGAINST EARTH AND 2" <br />4. <br />PROPER SUPPORT OF PRINCIPAL REINFORCING SHALL BE DETAILED AND SUPPLIED BY THE SUBCONTRACTOR <br />TEST SPECIMENS COMPLY WITH CONTRACT DOCUMENTS, OR NOT, AND SPECIFICALLY STATE ANY DEVIATIONS IN <br />WHERE EXPOSED TO EARTH OR WEATHER AND PLACED AGAINST FORMS. FOR CLEARANCE NOT LISTED, SEE ACI 318, <br />WHETHER OR NOT THEY ARE INDICATED ON THE DRAWINGS. <br />CONSTRUCTION FROM THE CONTRACT DOCUMENTS. <br />CHAPTER 7. <br />5. <br />TOP LAYER OF REINFORCING STEEL IN BEAMS, AND FOOTINGS SHALL BE CONSIDERED TOP BARS REGARDLESS OF <br />. cTHE CONCRETE TEST REPORTS SHALL CONTAIN THE FOLLOWING INFORMATION: CONCRETE SUPPLIER, <br />3. <br />CONCRETE SHALL BE MIXED AS FOLLOWS USING ASTM C150, TYPE II CEMENT, UNLESS OTHERWISE NOTED. <br />THICKNESS OF CONCRETE BELOW THE BARS. <br />QUANTITY OF CONCRETE REPRESENTED, LOCATION OF SAMPLES TAKEN, STRENGTH REQUIREMENT AT 28 DAYS, <br />CONCRETE SHALL HAVE A WORKABLE MIX WITH THE FOLLOWING MAXIMUM WATER CEMENT (W/C) RATIOS: <br />LIST OF MATERIALS IN MIX AS SHOWN ON TALLY TICKET (WEIGHTS, BRAND OR SOURCE). ACTUAL SLUMP, ACTUAL <br />W/C 0.45 NON AIR -ENTRAINED <br />6. <br />CONCRETE MIX DESIGN: <br />AIR CONTENT, AIR TEMPERATURE, CONCRETE TEMPERATURE, WEATHER CONDITIONS, CYLINDER WEIGHT AS <br />0.40 AIR -ENTRAINED <br />a. NO CONCRETE SHALL BE PLACED UNTIL THE PROPOSED CONCRETE MIX AND RESPECTIVE TESTS (FIELD TEST <br />• • • • • • • N • N • •• • •• M N• • • • N • • • N • • • •• • • • •• • • • • N • N • N • • • N • N ••• • • • • • • • N •• • • • • • ••• • •• • N• • • • • • • • • • • <br />RECEIVED, DATE MOLDED, NUMBER OF DAYS ON PROJECT SITE, DATE TESTED, TEST RESULTS FOR 7 AND 28 <br />• • • • • • • • • •�•�{ afll•I .p • • • • • • • • <br />'N�EE'3 <br />THESE W/C RATIOS SHALL PRODUCE TWENTY-EIGHT (28) DAY COMPRESSIVE STRENGTHS IN ACCORDANCE WITH ACI <br />• • • • • • • <br />�✓1f]�r 3 s�ld7 INFORMATION A i f7 E V1 �LV �� J.• <br />UAT <br />17.1 <br />.......N ................... N ...................... • ............ N ... N ....... • .................... • <br />'cr. <br />211.1-91/2009, AND PER THE RELATIONSHIPS SHOWN IN TABLE 6.3.4(A). <br />ACKNOWLEDGMENT. <br />.. <br />' TWO 1✓bP1ES OF TNEIC-UNC*RrM-M-STWEVURTS'SNALL 13E'S'E1Vf`UIRECTCYTO MERRICK. <br />2. CONCRETE TESTING: <br />CONCRETE SHALL BE AS FOLLOWS: <br />E <br />b. WATER/CEMENT RATIO SHALL NOT EXCEED SPECIFIED AMOUNT. THE CONCRETE MIX SHALL ONLY HAVE ENOUGH <br />a. SAMPLE TESTS FOR EACH CLASS OF CONCRETE SHALL BE TAKEN NOT LESS THAN ONCE A DAY. SAMPLES SHALL <br />CEMENT DEVELOP THE REQUIRED STRENGTH. CEMENT SHALL NOT BE ADDED TO THE MIX TO ACHIEVE THE <br />a. ' N N ' ' N " ' ' N ' • ' ' ' ' ' N ' ' ' ' ' N ' N ' N ' »" • N ' ' " ' "" "« ' ' ' " ' ' • ' ' ' ' " ' ' ' ' ' " ' •' ' •' ' •» ' • N • • • • • <br />• • • • • • • <br />• • • WA-�TUCEMENT RATIO' TIME WATEWSI-FALL BE'f1-IE'VA"ABL•F NOTgT-ITCEMENT. WA'TER'REDUCE'RSAND NrGH ' ' ' • • <br />BE TAKEN AT LEAST ONCE FOR EVERY CONSECUTIVE 100 CUBIC YARDS OR 5000 SQUARE FEET OF CONCRETE <br />' ' .N " "' " « ' • ' ' " • ' " ' • ' • ' ' ' '• • ' " " ' " ' ' ' N ' ' '• ' ' " ' ' ' ' ' ' ' " • ' ' ' ' ' " ' "' ' ' ' " ' « ' ' '• ' ' ' •` '""«""N"""""'«""..."���5'R11}��'Y°BE'RL7DED'TO <br />OBTAIN THE DESIRED WORKABILITY, AS APPROVED. <br />PLACED, OR AT LEAST ONCE FOR EVERY NONCONSECUTIVE 50 CUBIC YARDS OF CONCRETE PLACED. <br />b. USE ADMIXTURES ONLY WITH APPROVAL. <br />c. THE REQUIRED AVERAGE COMPRESSIVE STRENGTH FOR EACH MIX DESIGN MUST EXCEED THE SPECIFIED 28 DAY <br />b. COMPRESSIVE STRENGTH TESTS SHALL INCLUDE 4 CYLINDERS FOR TESTING: ONE (1) AT DAY 7; TWO (2) AT DAY <br />C. CONCRETE MIX SHALL BE TESTED TO SHOW COMPLIANCE WITH CONTRACT REQUIREMENTS. <br />• • • • • • • • •• • • • • •• • • • N N • •• • N • • • • N • • •• • • • • • •• • • • N .. • ..... . ...................... • ••N••••N•••••NN••N•••••••••••N•••••• <br />AND ONE (1) TO HOLD. <br />d. AS APPROVED BY THE ENGINEER OF RECORD AND AS NEEDED FOR STRENGTH GAIN OR SULFATE RESISTANCE, <br />c. SLUMP TEST SHALL BE MADE AT EACH SAMPLING, OR WHEN VISUAL INSPECTION INDICATES THAT A CHANGE HAS <br />5. <br />COARSE AGGREGATE SHALL BE A MAXIMUM OF 1 1/2" IN SIZE FORMAT FOUNDATIONS, MAXIMUM 3/4" FOR PAD <br />CEMENT SHALL BE TYPE II OR TYPE III. BLENDED CEMENTS SHALL NOT BE USED. <br />OCCURRED IN THE CONSISTENCY OF THE CONCRETE MIX. <br />FOOTING, AND A MAXIMUM OF 3/4" IN SIZE FOR ALL OTHER STRUCTURES. <br />e. THE MAXIMUM SLUMP WITHOUT HIGH -RANGE WATER-REDUING ADMIXTURE: <br />d. TESTS FOR AIR CONTENT SHALL BE MADE BY THE PRESSURE METHOD ASTM C231. NO CONCRETE SHALL BE <br />i. WALLS, PIERS, AND COLUMNS = 5" <br />PLACED THAT DOES NOT MEET AIR CONTENT REQUIREMENTS. <br />6. <br />FOR DESIGN CRITERIA, THE COMPRESSIVE STRENGTH OF CONCRETE SHALL BE TAKEN AS SHOWN IN THE FOLLOWING <br />ii. ALL OTHER CONCRETE = 411 <br />3. SLUMP SHALL BE SHOWN AS EXCESSIVE WHEN EXCEEDING THE SPECIFIED MAXIMUM AND OCCURRING IN 2 <br />TABLE: <br />iii. ALL NORMAL WEIGHT CONCRETE WITH HIGH -RANGE WATER -REDUCING ADMIXTURE = 9" <br />CONSECUTIVE TESTS ON DIFFERENT PORTIONS OF THE SAME SAMPLE. EXCESSIVE SLUMP SHALL BE CAUSE FOR <br />FOUNDATIONS AND FLOOR SLABS <br />F8. <br />fc = 4500 PSI1 <br />7. <br />BROOM FINISH REQUIRED ON ALL SLOPED SURFACES. <br />REJECTION OF THAT TRUCK LOAD AND SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. <br />INTERNAL SLAB ON GRADE SHALL HAVE AN OVERALL FLATNESS OF FF:35/FL25. LOCAL FLATNESS SHALL BE FF20/FL10. <br />4. THE REPLACEMENT OF REJECTED CONCRETE, WITH SPECIFIED CONCRETE, SHALL BE DONE AT NO ADDITIONAL <br />EXPENSE TO OWNER (OWNER'S REPRESENTATIVE). <br />7. <br />ALL EXPOSED EDGES SHALL HAVE A 3/4" CHAMFER, UNLESS NOTED OTHERWISE ON DESIGN DRAWINGS OR <br />9. <br />INTERNAL SLAB ON GRADE SHALL BE SURFACE HARDENED USING ASHFORD FORMULA CONCRETE HARDENER BY <br />SPECIFICATIONS ABOVE. <br />CURECRETE, OR APPROVED EQUAL. <br />VIII. GEOTECHNICAL REPORTS: <br />8. <br />ALL FOUNDATION ANCHOR RODS, UNLESS SPECIFICALLY DETAILED, SHALL CONFORM TO DRAWING 6004-SG-00-004. <br />IV. <br />CONCRETE AND REINFORCING STEEL: <br />1. GEOTECHNICAL REPORT PREPARED BY ECS FLORIDA, LLC FOR BLUE TRITON ZEPHYRHILLS EXPANSION DATED <br />9. <br />ALL DAMAGED CONCRETE SHALL BE REPLACED AS PER THE DIRECTIONS OF THE ENGINEER. <br />06/15/2022. <br />10. <br />PRIOR TO IMPLEMENTATION OF FIELD MODIFICATIONS FOR CONSTRUCTION OR PLACEMENT ERRORS. THE ENGINEER <br />1. <br />ALL ANCHOR ROD GROUPS SHALL BE SUPPORTED AND SET BY USING A TEMPLATE WITH THE EMBEDDED ENDS <br />2• ALLOWABLE SOIL BEARING CAPACITY FOR SITE IS 2,500 PSF. <br />SECURELY TIED TO PREVENT DISPLACEMENT DURING PLACEMENT OF THE CONCRETE. FIELD TACK WELDING OF <br />OF RECORD SHALL BE NOTIFIED IN WRITING FOR APPROVAL OF ALL FIELD DESIGN CHANGES. <br />REINFORCING, PIPE SLEEVES, ETC., TO ANCHOR RODS IS PROHIBITED. <br />11. <br />THE SUBCONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATIONS, ELEVATIONS AND DETAILS OF ALL EXISTING <br />2. <br />BEFORE PLACING ANY CONCRETE, ALL DRAWINGS SHALL BE CHECKED TO DETERMINE THAT ANCHOR RODS, <br />CONDITIONS THAT MAY AFFECT THE WORK. <br />EMBEDDED STEEL, GROUNDING CONNECTIONS, PIPING, CONDUIT, DRAINS, BOXES, ETC. ARE PROPERLY INSTALLED. <br />12. <br />SHOULD EXISTING CONDITIONS OTHER THAN THOSE INDICATED ON THE DRAWINGS BE ENCOUNTERED, THE MERRICK <br />SEE ELECTRICAL DRAWINGS FOR GROUNDING AND CONDUITS. <br />REPRESENTATIVE SHALL BE NOTIFIED IMMEDIATELY SO THAT CORRECTIVE MEASURES MAYBE RECOMMENDED. <br />3. <br />REPOSITIONING OF REINFORCING TO AVOID INTERFERENCE WITH EMBEDDED ITEMS SHALL BE APPROVED BY THE <br />13. <br />ALL EXISTING SITE DATA INCLUDING GRADES, LOCATIONS, PIPING, ETC. ARE BASED ON OWNER'S RECORD DRAWINGS <br />FIELD ENGINEER PRIOR TO PLACING CONCRETE. <br />AND MUST BE FIELD VERIFIED. <br />4. <br />WELDING OR TACK -WELDING OF REINFORCING IS PROHIBITED UNLESS NOTED ON THE DRAWINGS. <br />14. <br />IT IS THE SUBCONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL GOVERNING CODES AND REGULATIONS DURING ALL <br />PHASES OF CONSTRUCTION <br />5. <br />FABRICATED ITEM SHOP DETAILS: <br />1 <br />ISSUED FOR CONSTRUCTION <br />07/15/22 <br />CSO <br />WLK <br />BES <br />LEF <br />AJD <br />0 <br />ISSUE FOR PERMIT <br />06/24/22 <br />CSO <br />WLK <br />BES <br />LEF <br />AJD <br />REV <br />REVISION DESCRIPTION <br />DATE <br />DRWN <br />DSGN <br />CHKDJ <br />QC <br />APPD <br />REF. DWG. NO <br />REFERENCE DRAWING TITLE <br />G� <br />•' No, 712412 <br />• <br />• i <br />• 8TM OF • <br />• • <br />vool <br />VVT❑❑❑ <br />r.. <br />o MERRICK* <br />000 <br />TI -TURN <br />CLIENT PROJECT NO.: <br />MERRICK PROJECT NO.: 30216004911 <br />SCALE: <br />TITLE: <br />BLUE TRITON ZEPHYRHILLS <br />STRUCTURAL <br />CONCRETE GENERAL NOTES <br />REVISION: DRAWING NO.: SHEET NO.: <br />1 6004-SG-00-001 1 OF 1 <br />1 <br />2 <br />3 <br />4 <br />5 <br />A <br />7 <br />0 <br />E <br />10 <br />A I B ' C <br />E <br />G <br />I <br />I ' J <br />