Laserfiche WebLink
LIST OF <br />ABBREVIATIONS <br />= CONTROL JOINT <br />O.F. <br />C.J. <br />CL. <br />= CLEAR <br />REINF. <br />COL. <br />= COLUMN <br />SECT. <br />CONST. <br />JTCONSTRUCTION JOINT STL. <br />DET. <br />= DETAIL <br />TEMP. <br />DWG. <br />= DRAWING <br />U.O.N. <br />E.W. <br />= EACH WAY <br />WWF <br />EL. <br />= ELEVATION <br />qp <br />F.F. <br />= FINISHED FLOOR <br />!l <br />O.C. <br />=ON CENTER <br />B.O.B. <br />=OUTSIDE FACE <br />= REINFORCING <br />= SECTION <br />= STEEL <br />=TEMPERATURE <br />= UNLESS OTHERWISE NOTED <br />=WELDED WIRE FABRIC <br />=CENTERLINE OF SYMETRY <br />= BOTTOM OF BEAM <br />All Materials, Workmanship, Design and Construction Shall Conform to the Drawings, Specifications <br />FBC 2017, 6th Edition. <br />DESIGN LOAD CRITERIA <br />Roof Live Load_ 20psf <br />Floor Live Load 125psf <br />Roof Dead Load 15psf <br />Corridor Live Load 125 psf <br />Structural Drawings Shall be Used in Conjunction With Architectural Drawings For Bidding And Construction. <br />Contractor Shall Verify Dimensions and Conditions For Compatibility and Shall Notify Architect of Any <br />Discrepancies Prior to Construction <br />Contractor Shall Verify All Existing Conditions Prior to Commencing Any Work And Determine The Location <br />of All Adjacent Underground Utilities Prior to Commencing Excavation, and Notify Architect of Discrepancies <br />and Conflicts. <br />Contractor Shall Provide Temporary Bracing for the Structure and Structural Components Until All <br />Final Connections Have Been Completed in Accordance With the Plans. <br />Contractor Shall be Responsible for All Safety Precautions And The Methods, Techniques, Sequences or <br />Procedures Required to do The Work. <br />Shop Drawings For Structural Steel, Roof Structure And Floor Structure Shall Be <br />Submitted to The Architect And/or Structural Engineer <br />For Review Prior to Fabrication of Approval of These Items. <br />All Shop Drawings Shall Also be Submitted to The Building Department. <br />Shop Drawings Review: Dimensions and Quantities are Not Reviewed by The Engineer of Record, Therefore Must <br />be Verified by The Contractor. Contractor Shall Review and Stamp Drawings Prior to Review by Engineer of <br />Record. Submittals Shall Include a Reproducible And One Copy. Reproducible Will be Marked And Returned. <br />Shop Drawings Submittals Processed by The Engineer Are Not Change Orders. The Purpose of Submittal by The <br />Contractor is to Demonstrate Understanding of the Design Concept, The Materials Intended to be Furnished and <br />Installed, and to Detail The Intended Fabrication And Installation Methods. If Deviations, Discrepancies, or <br />Conflicts Between Shop Drawing Submittal And The Contract Drawings Are Discovered Either Prior to, or <br />After Shop Drawing Submittal Are Processed by The Engineer, The Design Drawings And Specifications Shall <br />Control And be Followed. <br />GEOTECHNICAL <br />Foundation Notes: The Structural Engineer And Architect Assume no Responsibility For Geotechnical. <br />Allowable Soil Pressure And Pile Capacity Listed Below Are Assumed Design Values. Verification by a <br />Qualified Soils Engineer is Strongly Recommended. <br />Allowable Soil Pressure _ <br />Pile Compression Capacity <br />Pile Lateral Capacity <br />2,000 psf <br />10 Tons <br />2 Tons <br />CONCRETE <br />Concrete Shall be Mixed, Proportioned, Conveyed and Place in Accordance With ACI 318-14 Chapter 19. Concrete Shall <br />Attain a 28 Day Strength of F'c = 3,000psi And Shall be Proportioned to Produce a Slump of 6" or Less <br />Reinforcing Steel Shall Conform To ASTM 1615, Grade 60, Fy = 60,000psi. <br />Welded Wire Fabric Shall Conform To ASTM A-185. <br />Reinforcing Steel Shall be Detailed (Including Hooks and Bends) in Accordance With ACI 315-80 and 318-83, Lap <br />All Continuous Reinforcement 48 Bar Diameters or 27" Minimum. Lop Adjacent Mats of Welded Wire Fabric A <br />Minimum of 8" at Sides And Ends. <br />Concrete Protection (Cover) For Reinforcing Steel Shall be as Follows: <br />Footings And Other Unformed Surfaces, Earth Face <br />All Other Surfaces — <br />3" <br />1— 1 /2" <br />Epoxy —Grouted Items Specified on The Drawings Shall be Grouted With HS-200 Bond Epoxy by Bond —It <br />Fastening Systems, Adhesives Technology Corporation or Equal. Install in Strict Accordance With Manufactures <br />Recommendations. <br />MASONRY <br />Masonry Shall be Constructed of Grade N, Type II Units, Laid up in Running Bond. Mortar Shall be Type M or S <br />And Shall Attain a Minimum Compressive Strength of 2,000psi at 28 Days. Strength Shall be Verified <br />by Prism Testing. Masonry and walls adjacent to cathedral or vaulted ceilings must extend to the ceiling. <br />Unless Otherwise Noted, Reinforce Walls With #5 Rebar at Each Corner And at 8 Feet Minimum Vertical Spacing. <br />Rebor Shall Extend From Footing to Lintel And Hooked at Each End. Horizontal Reinforcement, Such as DuroWoll, <br />Shall be Used at 16" Vertical Spacing. <br />Fill All Cells Containing Reinforcement or Embedded Items With Concrete Grout. Provide Clean <br />Out And Inspection Holes at Bottom of All Masonry Wall CMU Cells Containing Reinforcement. <br />Roofing <br />Roofing must be strong enough to stay intact in the estimated highest winds of the area by <br />the manufacture's installation instructions and test data that proves the strength of the shingle. <br />STEEL <br />Structural Steel Design, Fabrication And Erection Shall be Based on The Latest Editions of The AISC <br />Specifications and Codes: <br />1. Specifications For Structural Steel Buildings — Allowable Stress Design <br />2. Code of Standard Practice For Steel Buildings and Bridges, Amended. <br />3. Specification For Structural Joints Using ASTM A325 or A490 Bolts. <br />Structural Steel Including Plates And Rolled Shapes, Shall Conform to ASTM A50, Fy=50ksi. Steel Pipe <br />Shall Conform to ASTM A53, Type E or S Grade B, Fy-35ksi. Structural Tubing Shall Conform to ASTM A500, <br />Grade B, Fy=46ksi. Anchor Bolts and Connection Bolts Shall Conform to ASTM A307. <br />All Welding Shall be in Conformance With ASIC and AWS Standards And Shall be Performed by WABO <br />Certified Welders Using E70 Electrodes. Only Prequalified Welders (As Defined by AWS) Shall be Used. <br />WOOD <br />Dimensioned Lumber Shall be Dressed S4S And Shall Bear The Grade Stamp of the Suppliers Association. <br />All Lumber Shall be Sound And Free From Warp. <br />All Lumber Shall be Southern Pine Grade No. 2 or Better With The Following Minimum Properties (U.O.N.): <br />Fb= 850psi <br />Fv= 165psi <br />GENERAL STRUCTURAL NOTES: <br />WOOD CONTINUED <br />Plywood Sheathing Shall be DFPA CD With Exterior Glue. All Roof Sheathing Shall be Installed With PlyClips <br />Between Framing Members Spaced Greater Than 16"o.c. <br />Install Bridging in All Floor And Roof Joists ® 8'— 0" o.c. Maximum. Install Blocking in All Wall Studs at <br />Plywood Edges. <br />All Nailing And Bolting Shall Comply With American Institute of Timber Construction Requirements. <br />Provide a Single Plate at The Bottom And a Double Plate at The Top of All Bearing Stud Walls. <br />Studs Shall be Doubled at All Angles And Around All Openings. Studs Shall be Tripled at All Comers. <br />Install All Connectors And Ties as Per Manufacturer to Their Highest Capacity. <br />If Wood Shows Evidence of Cracking From Fasteners, Pre Drill For Fasteners or Use Self —Tapping Fasteners <br />PRE—ENGINEERED WOG, <br />Codes And Standards: <br />a. National Design Specification For Wood Construction Latest Edition. <br />b. Design Specifications For Metal Plate Connection Wood Trusses, TPI-85, Published by The Truss <br />Plate Institute. <br />c. HIB — 01, Published by The Truss Plate Institute. <br />d. All Requirements of Truss Plate Institute. <br />Maximum Deflection: <br />Live Load L/360 <br />Dead Load _ L/240 <br />Design Wood Trusses For The Loads Shall Meet Wind Loads Shown on The Drawings. <br />Truss Erector is Responsible For The Temporary Bracing of The Trusses. <br />Truss Manufacturer Shall Clearly Show The Size And Location of All Required Top And Bottom Chord Bracing. <br />Truss Manufacturer Shall Provide All Connections, Hangers, Header, Beams, etc. in Order to Complete <br />The Floor Framing as Shown on Drawings. <br />Submittal: Detailed Shop Drawings Showing Layout, Bridging, Connection Details, And All Accessory Materials to <br />to Safely Complete The Floor System. Provide Calculations and Drawings Signed And Sealed by a Licensed <br />Florida Engineer Registered in The State of Florida. <br />GLUE LAMINATED MEMBERS <br />Shall be Fabricated in Conformance With FBC Standards. Each Member Shall Bear an AITC Identification Mark <br />And Shall be Accompanied by an AITC Certificate of Conformance. All Simple Spans Beams Shall Be <br />Douglas Fir Combinations 24F—V4, Fb=2,400 psi, Fv=165 psi. <br />Laminated Veneer Lumber (LVL) Shall be Manufactured Under a Process Approved by The National <br />Research Board. Each Piece Shall Bear A Stamp or Stomps Noting The Name And Plant Number of The <br />Manufacturer, The Grade, The National Research Board Number, And The Quality Control Agency. All <br />Laminated Veneer Lumber Shall be Manufactured in Accordance With NER-126 Using Douglas Fir Veneer <br />Glued With a Waterproof Adhesive Meeting The Requirements of ASTM D2559 With All Grain Parallel <br />With The Length of The Member. <br />Fb=2,600 psi, E=1,800,000 psi Fv= 285 psi (For 1.8E Members) <br />Fb=2,985 psi, E-2,000,000 psi, Fv=285 psi (For 1-3/4" Wide 2.0E Members) <br />Fb-2,485 psi, E=2,000,000 psi, Fv=285 psi (For 3 1 /2" Wide 2.0E Members) <br />Design Shown on Plans is Based on Lumber Manufactured by the Trus—Joist Corporation. Alternative <br />Manufacturers May be Used Subject to Review And Approval by The Architect And/or Structural Engineer. <br />Alternate Joist Hangers And Other Hardware May be Substituted For Items Shown Provided They Have <br />I.C.B.O. Approval For Equal or Greater Load Capacities. All Joist Hangers And Other Hardware Shall <br />be Compatible in Size and Loads With Members Provided. <br />PARALLEL STRAND LUMBER (PSL) Shall be Manufactured Under a Process Approved by The National <br />Research Board. Each Piece Shall Bear a Stamp or Stamps Noting The Name And Plant Number of The <br />Manufacturer, The Grade, The National Research Board Number, And The Quality Control Agency. All <br />Laminated Veneer Lumber Shall be Manufactured in Accordance With NER-126 Using Douglas Fir Veneer <br />Glued With a Waterproof Adhesive Meeting The Requirements of ASTM D2559 With All Grain Parallel <br />With The Length of The Member, <br />Fb= 2,900 psi, E=2,000,000 psi, Fv=290 psi (For 2.0E Members <br />Fb= 3,100 psi, E=2,100,000 psi, Fv=290 psi (For 2.1E Members <br />Design Shown on Plans is Based on Lumber Manufactured by The Trus—Joist Corporation. Alternate <br />Manufacturers May be used Subject to Review And Approval by The Architect And/or Structural Engineer. <br />Alternate Joist Hangers And Other Hardware May be Substituted For Items Shown Provided They Have <br />I.C.B.O. Approval For Equal or Greater Load Capacities. All Joist Hangers And Other Hardware Shall <br />be Compatible in Size With Members Provided. <br />PRE—ENGINEERED TRUSSES <br />Pre —Fabricated Connector Plate Wood Roof Trusses Shall be Designed by the Manufacturer in Accordance <br />With the Design Specification For Metal Plate Connected Wood Trusses, TPI-78, by The Truss Plate <br />Institute for The Spans And Conditions Shown on The Plans. <br />Wood Trusses Shall Utilize Approved Connector Plates, Submit Shop Drawings to The <br />Architect And/or Structural Engineer For Review Prior to Fabrication, Submitted Documents Shall Bear The <br />Stamp And Signature of a Registered Professional Engineer Registered in The State of Florida. <br />Provide For Shapes, Bearing Points, Intersections, Hips, Volleys, etc. Shown on The Drawings. Exact Composition <br />of Special Hip, Valley, And Intersection Areas (Use of Girder Trusses, Jack Trusses, Step —Down Trusses, etc.) <br />Shall be Determined by The Manufacturer Unless Specifically Indicated on Plans. Provide All Truss to Truss <br />And Truss to Girder Truss Connection Details And Required Connection Materials, Provide For All <br />Temporary And Permanent Truss Bracing And Bridging. <br />Exterior Plywood Sheathing Shall be Grade C—D, Exterior Glue or Structural II. Exterior Glue. <br />Timber Connectors Indicated by Letters And Numbers Shall be Strong Tie by Simpson Company, as Specified <br />in Their Catalog. Equivalent Devices by Other Manufacturers May be Substituted, Provided They <br />Have I.C.B.O. Approval For Equal or Greater Load Capacities. Provide Number And Size of Fasteners as <br />Specified by Manufacturer. Connectors Shall be Installed in Accordance With The Manufacturer's Recommendations. <br />Bolts in Wood Members Shall Conform to ASTM A307. Provide Oversize Washers Under The Heads And Nuts of All <br />Bolts And Lag Screws Bearing on Wood. Unless Noted Otherwise, All Nails Shall be Common, All Shims Shall be <br />Seasoned And Dried And of The Some Grade (Minimum) as The Members Connected. All Joists Shall be Connected <br />To Flush Beams With Joist Hangers, Unless Otherwise Noted. <br />Wood Framing Notes: The Following Apply Unless Otherwise Noted on The Plans: <br />All Wood Framing Details Not Shown Otherwise Shall be Constructed to The Minimum Standards of The 2017 <br />Florida Building Code. Minimum Nailing, Unless Otherwise Noted, Shall be Common. Coordinate The Size And <br />Location of All Openings With Mechanical And Architectural Drawings. Provide Washers Under The Heads <br />And Nuts of All Bolts And Lag Screws Bearing on Wood. <br />Fc= 565 psi <br />FOUNDATION IN51'ECTION <br />E= 1,200,000 psi <br />FRAMING INSPECTION <br />A FOUNDATION 5URVEY SHALL BE PERFORMED AND <br />NOTE: <br />TO THE BEST OF 7HE ENGINEERS KNC)MEDGE s <br />11 `% Maximum Moisture Content <br />A COPY OF THE SURVEY 511ALL $E ON 171E 517E <br />BELIEF, I TIE 5TRLK TURAL FLANS ! 51"ECIFICAI IONS <br />All Wood in Contact With Concrete or Masonry Shall be Pressure Treated. <br />' <br />NOTE: <br />ALL PLUMBING, ELCCTRICAL ML) MECHANICAL ROUGH-IN5 <br />FOR THE BUILDING INSPECIOR'S USE OR ALL <br />COMPLY NTH THC PLORIDA BUILDING,, CODE, <br />J <br />Pressure Treated Lumber Shall be Impregnated With a CCA Salt Treatment in Accordance With F.S. TT—W-571 <br />ALL W'OR.K SHALL COMPLY WITH <br />PREVALING COOLS, LOCAL <br />ML✓.iT BE COMPLEI E, IN5PECTOD AND APPROVm tJC1'ORE <br />RCOUE511NG THE FRAMING IN5PEC7ION. FTX: 2017. LTH <br />PROPERTY MARKCRS SHALL BE EXPOSED AND A <br />5TRLTC,HCD FROM MARKER TO MARKER lO <br />FBC 2017, 6Th.LDITION, CATEGORY III <br />And Bear The American Wood Preserves Institute Quality Mark LP-2. <br />BUILDING t ALUMINUM. <br />ELATION, CHAPTERS. <br />5MING <br />CHAFTVIZ 5. ENFY URE'C' WIND ZONE <br />140 MPH WINDS. <br />Wood Framing Notes Continued <br />Wall Framing: All Studs Walls Shown And Not Otherwise Noted Shall be 2X4 Studs at 16"o.c. Two Studs <br />Minimum Shall be Provided at The End of All Walls And at Each Side of All Openings, Solid Blocking <br />For Wood Columns Shall be Provided Through Floors to Supports Below. Provide Solid Blocking Between <br />Studs at Mid —Height of All Stud Walls Over 8 ft in Height. <br />All Stud Walls Shall Have Their Lower Wood Plates Attached to Wood Framing Below With 16d Nails at <br />12"o.c. Staggered or Bolted to Concrete With 1/4"X 3-1/4" Top Cons at 16"o.c. Unless Otherwise Noted. <br />Members of Built —Up Posts Shall be Nailed to Each Other With 16d at 12"o.c. Staggered. <br />Refer to The Plans And Shear Wall Schedule For Required Sheathing And Nailing. When Not Otherwise Noted, <br />Provide Gypsum Wallboard on Interior Surfaces Nailed to Al Studs, Top And Bottom Plates, And Blocking <br />With Nails at 7"o.c. Use 5d Cooler Nails For 1/2" GWB And 6D Cooler Nails For 5/8" GWB. Provide 1/2" Plywd <br />Sheathing on Exterior Surfaces Nailed at All Panel Edges (Block Unsupported Edges), Top And Bottom Plates <br />With 8d at 4"o.c., And to All Intermediate Studs And Blocking With 8d at 8"o.c. Allow 1/8" Spacing at All <br />Panel Edges And Ends. <br />Floor And Roof Framing: Provide Double Joist Under And Around All Openings in Floors or Roofs Unless Noted <br />Otherwise. Provide Bridging a 8 ft o.c. And Solid Blocking at All Bearing Points. <br />Toenail Joist to Supports With Two 16d Nails. Attach Timber Joist to Flush Headers or Beams With <br />Metal Joist Hangers in Accordance with Schedule. Nail All Multi —Joist Beams Together With <br />16d at 12"o.c. Staggered. <br />Unless Noted Otherwise on The Plans, APA Rated Roof And Floor Sheathing Shall be Placed With <br />Strength Axis Perpendicular to Supports And Nailed With 8d Nails at 6"o.c. to Framed Panel Edges <br />And Over Stud Walls as Shown on Plans And at 12"o.c. to Intermediate Supports. Provide Approved <br />Plywood Edge Clips Centered Between Joist/Trusses at Unblocked Roof Sheathing Edges. All Floor <br />Sheathing Edges Shall Have Approved Tongue —And —Groove Joints or Shall be Supported With Solid <br />Blocking. Allow 1/8" Spacing at All Panel Edges And Ends of All Roof And Floor Sheathing. Toenail <br />Blocking to Supports With (2)-16d at Each End or at 12"o.c. Unless Otherwise Noted. <br />1816.1 TERMITE PROTECTION— Termite protection shall be provided by registered termiticides. Including soil <br />applied pesticides, baiting systems and pesticides applied to wook. or other approved methods of termite <br />protection labeled for use as a preventative treatment to new construction. See Section 202. Registered <br />termiticide. Upon completion of the application of the termite protective treatment, a Certificate of <br />Compliance shall be issued to the building department by the licensed pest control company that contains <br />the following statement: "The building has received a complete treatment for the preventin of subterranean <br />termites. Treatment is in accordance with rules and laws established by the Florida Department of <br />Agriculture and Consumer Services." <br />1816.1.1 If soil treatment is used for subterranean termite prevention, the initial chamical soil <br />treatment inside the foundation perimeter shall be done after all excavation, backfilling and <br />compaction is compolete. <br />1816.1.2 If soil treatment is used for subterranean termite prevention, soil area disturbed after initial <br />chemical soil treatment shall be retreated with a chemical soil treatment, including spaces boxed or <br />formed. <br />1816.1.3 If soil treatment is used for subterranean termite prevention, space in concrete floors boxed <br />out or formed for the subsequent installation of plumbing traps, drains or any other purpose shall be <br />created by using plastic or metal permanently placed forms of sufficient depth to eliminate any <br />planned soil disturbance after initial chemical soil treatment. <br />1816.1.4 If soil treatment is used for subterranean termite prevention, chemically treated soil shall be <br />protected with a miimum 6 mil vapor retarder to protect against rainfall dilution. If rainfall occurs <br />before vapor retarder placemennt, retretment is required. Any work, including placement of reinforcing <br />steel, done after chemical treatment until the concrete floor is poured shall be done in such manner <br />as to avoid penetrating or disturbing treated soil. <br />1816.1.5 If soil treatment is used for subterranean termite prevention, concrete overpour or mortar <br />accumulated along the exterior foundation perimeter shall be removed prior to exterior chemical soil <br />treatment, to enhance vertical penetration of the chemicals. <br />1816.1.6 If soil treatment is used for subterranean termite prevention, chemical soil treatments shall <br />also be applied under all exterior concrete or grade within 1 foot (305mm) of the primary structure <br />sidewalls. Also , a vertical chameical barrier shall be applied promptly after construction is completed, <br />including initial landscaping and irrigation/sprinkler installation. Any soil disturbed after the chemical <br />vertical barrier is applied shall be promptly retreated. <br />1816.1.7 If a registered termiticide formulated and registered as a bait system is used for <br />subterranean termite prevention. Sections R320.1.1 through R320.0.6 do not apply; however, a signed <br />contract assuring the installation, maintenance and monitoring of the baiting system for a minimum <br />of 5 years from the issue of the Certificate of Occupancy shall be provided to the building official <br />prior to the pouring of the slab, and the system must be installed prior to final building approval. If <br />the baiting system directions for use require a monitoring phase prior to installation of the pesticide <br />active ingredient, the installation of the monitoring phase components shall be deemed to constitute <br />installation of the system. <br />1816.1.8 If a registered termiticide formulated and registered as a wood treatment is used for <br />subterranean termite prevention, Sections R320.1.1 through R320.1.6 do not apply. Application of the <br />wood treatment termiticide shall be as required by label directions for use, and must be completed <br />prior to final building approval. <br />1816.2 PENETRATION: <br />1816.2.1 Protective sleeves around metallic piping penetrating concrete slab —on —grade floors shall <br />meet the following materials. <br />1816.2.2 If Soil Treatment is Used for Subterranean Termite Protection, the Protective Sleeve Shall <br />Meet the Following Minimum Requirements: <br />1. The Sleeve Shall Hove a Nominal Thickness of 0.025 inch. <br />2. The Sleeve Shall be Sized for the Pipe. <br />3. The Sleeve Shall be Sealed Within the Slab Using a Noncorrosive Mechanical Clamping Device <br />to Eliminate the Annular space Between the Pipe and Pipe Sleeve. <br />^EKINEMNG <br />_V11"'_W a2se <br />STRLC7tW l BY: <br />1+'ERI.ITA ENGINEERING <br />RUSSELL FERLITA <br />P.E./ 47075 <br />4221 N. Florida Ave. <br />TAMPA, FIARIDA 33603 <br />PHONE (813) 234-5004 <br />ENGINEERING <br />gner. o e: <br />SIVI-LP <br />)rawn By: <br />scde: <br />LP <br />See Plan <br />>ecked By. <br />Project No. <br />RAF <br />ki <br />My 18 <br />STRUCTURAL <br />NOTES <br />REVISION <br />