Laserfiche WebLink
REVISIONS <br />NO I DATE I DESCRIPTION <br />Approx. proposed roof pitch: 4 / 12 "MUST" be field verified by truss manufacture <br />before production of roof trusses. <br />Proposed finish ceiling height: 8' - 0" (min.) Contractor "MUST" field verify and <br />match existing ceiling height on SFR. <br />All door and window header heights to start at: 6'- 8" Contractor "MUST" verify <br />"ALL" lintel height locations with owner before construction begins. <br />Truss company "MUST" field verify all existing roof conditions, roof slope, overhang <br />bearing points, tie-in, etc. before engineering and manufacturing of roof trusses. <br />Daniel M. Ossman Drafting Service and Architect who signed / sealed the plans <br />assumes no responsibility for errors in production of roof trusses due to negligence <br />to conduct proper and accurate field inspection by truss manufacture and <br />dimensioning. <br />EXTERIOR FINISH: <br />Match existing vinyl siding, over a water resistive <br />"Tyvek" vapor barrier, over 1/2" cd-x plywood <br />sheathing that is nailed with 10d x 1 1/2" nails @ 6" <br />o.c. edges and 12" field, over 2 x 4 exterior wood <br />studs @ 16" o.c. with R - 13 insulation between and <br />finished with 1/2" drywall on the inside. Water <br />resistive barrier in accordance with Section R703.6.3, <br />of the FBC 5th Edition 2014 Residential. <br />All elevations drawn are for "illustration" purposes <br />only. For "actual" elevation construction, consult <br />construction drawings and structural details for <br />additional information. <br />API;�1 SFQ <br />LEFT SIDE ELEVATION <br />Fiberglass shingles over 30 Ibs felt over 1/2" plywood <br />sheathing or "opt" 7/16" OSB sheathing with roof <br />structure spaced no more than @ 24" o.c.. See roof <br />framing layout and connection schedule for additional <br />information.. <br />H: <br />Match existing vinyl siding, over a water resistive <br />"Tyvek" vapor barrier, over 1/2" cd-x plywood <br />sheathing that is nailed with 10d x 1 1/2" nails @ 6" <br />o.c. edges and 12" field, over 2 x 4 exterior wood <br />studs @ 16" o.c. with R - 13 insulation between and <br />finished with 1/2" drywall on the inside. Water <br />resistive barrier in accordance with Section R703.6.3, <br />of the FBC 5th Edition 2014 Residential. <br />Contractor MUST field verify and match all existing <br />conditions including roofing material, exterior finish / <br />paint colors, and soffit / fascia board. Truss company <br />is responsible for verifying and matching existing roof <br />pitch and overhang. <br />r &.%. 1 N I L-4..- W— V <br />REAR ELEVATION <br />iig" <br />SCALE: 1/4" = 1'- 0" <br />r71rvC % Xa !T <br />5 FQ ADD PNJ EL Cr-(R,) <br />RIGHT SIDE ELEVATION <br />W= W <br />z <br />ONQ <br />W O0 W <br />z <br />ixva. <br />i <br />a <br />w <br />o <br />CL O N ao <br />o.C�Wo0) <br />c Mcv o <br />0 0: M V N Q cM <br />— a <br />0 v) o -0> .� M � 0 <br />'C L uj J LL <br />0 OCL <br />3 M U U <br />Ect 0 .. 2 E <br />V <br />O V ~ 0M <br />-e p Q ` co <br />o M �.S Epp <br />E a. 0 0 rn <br />�WE� <br />>` N 0 m a) � <br />�O" M cow <br />0 >j- <br />�C'E(v 0 <br />fJ <br />W <br />qq <br />LO <br />v <br />t'M <br />f'7 <br />z <br />+�a <br />to <br />�_ <br />0 <br />nJ <br />CL <br />I <br />0 <br />00 <br />Z <br />NQ <br />L0 <br />N <br />J <br />Z) <br />m <br />1 <br />JOB NO. <br />5238 4TH STREET <br />A:L <br />SEPTEMBER 5, <br />DRAWN I3Y <br />Daniel M. Ossman <br />SCALE: 1 /4" = 1'- 0" <br />SCALE: 1 /4" = 1'- 0" <br />SHFFF N(A <br />A - 1 <br />