<br />ABBREVIATIONS GENERAL NOTES BUILDING DATA
<br />A G Q
<br />1. The work shall conform to the applicable building code, and other ordinances, 15. The general contractor is responsible to coordinate work of all sub -contractors and delay is not acceptable to the client. BUILDING CODE: Florida Building Code, 2007 Edition (with 2009 Addendum)
<br />A/C AIR CONDITIONING GALV GALVANIZED QT QUARRY TILE codes and regulations listed in the specifications or on the drawings, and required shall perform such miscellaneous work as may be necessary for them to complete 40. Substitution of all equals shall be only as approved by the office of the Architect. Florida Existing Building Code, 2007 Edition (with 2009 Addendum)
<br />A/E ARCHITECT/ENGINEER GC GENERAL CONTRACTOR QTY QUANTITY b local builds authorities. The governing codes rules and regulations are their work. It Is expected that the general contractor shall also dose) coordinate Where the term "or
<br />A/V AUDIO VISUAL GEN GENERAL or GENERATOR Y n9 9 9 � e9 P� 9 Y equal" is used the Architect shall be the sole judge of equality Florida Mechanical Code, 2007 Edition (with 2009 Addendum)
<br />ACT ACOUSTICAL CEILING TILE GFI GROUND FAULT INTERRUPTER R collectively referred to as "the code". The contractor shall report any his work With that of all other vendors retained by the client to assure that all based upon the. Information furnished by the contractor. Substitutions must be Florida Fire Prevention Code, 2007 Edition
<br />A/C UNIT AIR CONDITIONING UNIT GL GLASS or GLAZING inconsistencies, conflicts or omissions he may discover to the architect for schedules are met and that work proceeds without delay. accepted In writing before they may be used. National Electric Code, 2008 Edition
<br />AW ADJACENT GRD GROUND R or RAD RADIUS
<br />AFF ABOVE FINISH FLOOR GWB GYPSUM WALL BOARD RB RUBBER BASE interpretation prior to performing the work. 16. Bidders, before submitting proposals, shall visit and carefully examine the area 41. The general contractor shall have received Architect's approval for each sample Life Safety Code
<br />AHU AIR HANDLING UNIT GYP GYPSUM RBR RUBBER 2. The general contractor shall contact building management to determine the rules affected by the work to familiarize themselves with the existing conditions and the submitted for all exposed materials, hardware and finishes required by this contract Florida Accessibility Code
<br />ALT ALTERNATE(ING) RCP REFLECTED CEILING PLAN of the building relative to construction; when and how deliveries can be made, difficulties that will affect the execution of the work. Submission of a proposal will prior to the order placement, or use.
<br />ALUM ALUMINUM H RECEPT RECEPTACLE BUILDING OCCUPANCY: Business
<br />ANOD ANODIZED RD ROAD or ROOF DRAIN what phases and types of construction may be done on regular or overtime basis, be construed as evidence that such an examination has been made, and later 42. If the general contractor, the owner, or the owners representative substitutes a
<br />APPROX APPROXIMATE H HIGH REBAR REINFORCING BAR and in general any special building requirements which will affect the cost of all claims Will not be recognized for extra labor, equipment, or materials, required material, method of attachment, revises a construction detail, or in any way alters
<br />ARCH ARCHITECT HB HOSE BIBB RECT RECTANGULAR work borne b the general contractor. All work shall conform to all base builds because of difficulties encountered which could have been reasons foreseen had the work such that it no longer conforms to these documents without the written NUMBER OF STORIES: 1
<br />AUTO AUTOMATIC HC HOLLOW CORE Y
<br />REF REFERENCE
<br />AVG AVERAGE HOW HARDWARE specifications standardand building regulations,which the contractor shall obtain such an examination been made. The general contractor shall verify all conditions acceptance of the office of the Architect; such action will relieve the Architect of
<br />HEXHEXAGONAL REINF REINFORCING /REINFORCEMENTg PROJECT SCOPE: ADA remediation of customer facing spaces.
<br />B HID HIGH INTENSITY DISCHARGE RE D REQUIRED prior to submission of bid. and dimensions on the job site and report any and all discrepancies and/or unusual any responsibility or liability including but not limited to aesthetic consequences,
<br />RET RETURN
<br />HM HOLLOW METAL 3. The general contractor shall be responsible for the sub -contractors receipt of conditions to the architect prior to finalizing bids or commencement of any subsequent fallure(s) and personal or property damage attributable to this change.
<br />REV REVISE/REVISION CLASSIFICATION OF WORK: Renovation (Existing Building) Level II
<br />BETW BETWEEN HORIZ HORIZONTAL RH RIGHT HAND complete sets of these documents, as well as all future addenda, field directives construction. 43. The Architects approval or review of separate Individual ltem(s) shall not constitute
<br />BEV BEVELED HR HOUR RHR RIGHT HAND REVERSE and change orders, etc. 17. The general contractor shall make known any and all limitations, exclusions, or the review of and assembly In which the item functions within.
<br />BIT BITUMINOUS HT HEIGHT CONSTRUCTION TYPE: II-B
<br />BLDG BUILDING HTG HEATING RO ROUGH OPENING 4. The AIA Standard Document "A201" titled "General Conditions of the Contract for modifications to the project during the bid selections period. Any and all 44. "Shop Drawings" that contain excessive errors or that are incomplete or Inadequate
<br />BLK BLOCK HTR HEATER Construction" shall be considered part of the general conditions of this work. limitations, exclusions, or modifications not itemized in the bid proposal documents may be returned "unchecked" and any costs Incurred for the resultant delays will BUILDING SQUARE FOOTAGE: 3,992
<br />ROW RIGHT OF WAY g
<br />BLKG BLOCKING HVAC HEATING VENTILATION &AIR COND. " i
<br />HW HOT WATER RPM REVOLUTIONS PER MINUTE 5. The contractor shall coordinate with the building management the storage of all are presumed "Included", In which case no additional monies will be allocated for be the responsibility of the contractor.
<br />BTM BOTTOM HWY HIGHWAY RB RUBBER BASE
<br />BSMT BASEMENT RSF RENTABLE SQUARE FOOTAGE materials and shall provide protection as necessary to prevent vandalism and lass this work. 45. Approved "Shop Drawings" shall not relieve the contractor of obligations or OCCUPANT LOAD: 40
<br />BTU BRITISHSHERMAL UNIT RT RUBBER TILE of materials by theft or damage sustained due to exposure to Inappropriate 18. All work costs submitted for this project are furnished without obligation; the client responsibilydes for deviations from the requirements of these contract documents,
<br />BUR BUILT UP ROOFING I RTU ROOF TOP UNIT environmental conditions and will make good any damage or losses at his own reserves the right to accept or reject any proposal or part of any cost submitted. unless the office of the Architect is notified of, and specifically approves of such NUMBER OF EXITS PROVIDED: 2
<br />IN INCHES RWC RAINWATER CONDUCTOR expense without charge to the owner. 19. Existing construction and dimensions shown are per existing drawings. All existing deviations at the time of the submission.
<br />C INCL INCANDESCENT 6. Where adjacent areas beyond the Immediate construction area will be occupied Information must be verified In the field. Neither the owner nor the architects are 46. Approved "Shop Drawings" shall not relieve the general contractors obligation for EMERGENCY LIGHTING PROVIDED: Yes
<br />INCL INCLUDE(ING) /INCLUSIVE S
<br />CTR CENTER INFO INFORMATION during the construction period, the contractor shall: responsible for accuracy of existing Information. Existing construction conditions coordination nor waive responsibility for errors and omissions In the submittals,
<br />CER CERAMIC INSUL INSULATION S SOUTH . Conform to owners and tenant requirements for hours of construction in areas where new work is not planned may not be completely shown. Including "fleld measure".
<br />CUBIC FEET INT INTERIOR SB STONE BASE
<br />CF CONTROL JOINT INV INVERT SAN SANITARY operations, access to tenant spaces and allowable noise level during 20. Within one (1) week, (5 business days) of the award of this contracts, prior to 47. Unless noted otherwise a minimum of 1" (one inch) clearance between property L-�
<br />Cl CENTERLINE SC SOLID CORE tenant business hours. mobilization for any work, the general contractor shall furnish a construction lines and any new construction like walls, footings, etc. shall be maintained.
<br />CLG CEILING J SCHED SCHEDULE Construction operations shall not block hallways or means of g the chronologicallythe hases of his wor and all related work 48. An changes in the j
<br />CLOS CLOSET SCHEM SCHEMATIC Pe ys egress for schedule showin p w y ng scope of worst, or in construction details, whether due to field
<br />CUR CLEAR ]AN CLOS JANITOR'S CLOSET SE SOUTHEAST tenants of building. for the completion of the project. This schedule shall Indicate all ordering lead conditions, or omissions, by the contractor, architect or owner, shall be
<br />CMU CONCRETE MASONRY UNIT JB JUNCTION BOX SECT SECTION Construction operations shall not cause interruptions of electrical services times, length of time for each phase, its start and completion, with a projected documented by the architect and approved, prior to execution. /� �j�� ,,%, �GC S'
<br />COL COLUMN JST JOIST SF SQUARE FOOTAGE to the tenants of the building without r notification and approvals. completion date. 49. Should the general contractor claim that an issue, directed revision or change to �! / / "%J
<br />CONC CONCRETE ]T JOINT SHWR SHOWER g P� g /v
<br />CONSTR CONSTRUCTION SIM SIMILAR . Properly protected all floors, mail chutes and stair doors In public areas 21. Contractor and subcontractors shall attend job meetings as required by this the original contract involves additional cost under his contract, he shall give
<br />CONT CONTINUOUS K SPEC SPECIFICATION (S) subject to construction traffic. Shoe wiping mats will be installed at all contract, written notice within a period of not more than three (3) weeks (15 business days), e P�ac� lo l 1 &q
<br />CONTR CONTRACTOR SQ SPEAKER openings between construction areas and all public aces. All active 22. The contractor shall obtain all permits for all site development all fees but shall not proceeding to execute the work until written approval for the change
<br />CORK CORRIDOR KD KNOCK DOWN SQ SQUAREP spaces. ��� pay P n9 PP
<br />CPT CARPET KIT KITCHEN SQ FT SQUARE FOOT areas shall be kept dean and free from debris. for permits, and check all governing authorities' specifications for but not Iirrdted request is received. No such claims shall be valid unless so made. Unless
<br />CERAMIC TILE SSTL STAINLESS STEEL . Erect and maintain temporary bracing, lights, dustproof partitions, to gutters, sidewalks, poles, and other structures, Including the removal or otherwise agreed, no payment for such claims will be made until final settlement.
<br />CO FT CUBIC FEET L ST STREET - - - --- ---
<br />STD STANDARD barricades, fences, and warning signs as necessary to prevent injury, relocation of existing utilities or other physical objects shown on plans or otherwise 50. All claims for additional work will be submitted in writing for the dienVs approval. DRAWING INDEX
<br />D L LOW STL STEEL noise, dust and Inconvenience to other tenants, the public, and to noted. The contractor shall Include a complete narrative description of the work to be
<br />LAM LAMINATED STOR STORAGE - - --
<br />() prevent damage to adjacent construction which Is to be left in place. 23. All required permits must be obtained from the fire department prior to start of performed as well as materials to be used the room number of the area or space I rn rn -
<br />D DEPTH LAV LAVATORY STRUCT STRUCTURE/STRUCTURAL
<br />SUSP SUSPENDED 7. All cutting, chasing, drilling or demolition of walls, slabs, etc. requiring the use of construction. being worked In and under whose authorization the work to be performed was Q Q
<br />DBL DOUBLE LF LINEAR FEET fn N
<br />DEG DEGREES LH LEFT HAND Sw SOUTH WEST jack hammers or other heavyhand or power tools shall be performed after regular 24. All costs for Inspections and/or tests shall be the responsibility ct the general ARCHITECTURAL
<br />SYMB SYMBOL 1-4
<br />P g Initiated. ,
<br />DEMO DEMOLITION / DEMOLISH LHR LEFT HAND REVERSE business hours on an overtime basis If necessary, unless the building management contractor, unless noted otherwise. 51. The presence of a representative of the Architect on the job site does not imply •-+
<br />DEPT DEPARTMENT LL LIVE LOAD SYS SYSTEM
<br />and an affected tenants provide a written waiver a permitting otherwise. 25. The general contractor shall the expenses for all transportation; hoisting and
<br />DTL DETAIL LONG LONGITUDINAL Y P expressly pe g 9 pay Pe Po , 9 concurrence with or the approval of any work. The general contractor shall call to AN-1 ABBREVIATIONS, GENERAL NOTES AND DRAWING INDEX
<br />DF DRINKING FOUNTAIN LVL LEVEL T 8. The contractor shall assume sole and complete responsibility for job site conditions elevator use charges on all his materials or equipment to the point of use, and shall the attention of the office of the Architect, in writing, any and all spedflc items for - - - -- - - - -
<br />DH DOUBLE HUNG r AN-2 ACCESSIBILITY DATA
<br />DIAG DIAGONAL M T TREAD (S) or TILE during the course of construction of this project including safety of all persons and be responsible for all unloading, checking and storage of the same in connection which acceptance Is required. l
<br />DIAM DIAMETER T & B TOP & BOTTOM property. This requirement shall apply continuously and not be limited to normal with this contract. 52. Upon substantial completion of the work the general contractor shall notify the AO-1 DEMOLITION PLAN
<br />DISP DISPENSER M HAL METAL HALIDE T & G TONGUE & GROOVE working hours. The contractor shall provide public protection as necessary and 26. The general contractor shall make all arrangements, maintain and pay all costs for office of the Architect to prepare a "Punchlist" of corrections and unsatisfactory --- - - --- - - - --f-- j - -
<br />DN DOWN ANT MAINTENANCE THRES THRESHOLD Al-1 CONSTRUCTION PLAN
<br />DR DOOR TSTAT THERMOSTAT required by governing agencies, having jurisdiction, until client acceptance of the temporary water, plumbing, power, lighting, heating or ventilation as he may and/or Incomplete work conditions. Final payment will be contingent on the
<br />MAS MASONRY - -- - - - - - - - -
<br />DS DOWN SPOUT MATL MATERIAL TB TILE BASE premises. require to properly conduct his work. completion of these Items under the terms of the Owner -Contractor Agreement. A2-1 ENLARGED PLANS, DETAILS AND SECTIONS
<br />DWG DRAWING MAX MAXIMUM TBD TO BE DETERMINED 9. The general contractor in solely responsible for the provision and maintenance of 27. Do not scale these drawings; written dimensions shall govern. Should any 53. The contractor shall maintain at the site, for the owner, one record copy of all
<br />DWR DRAWER MECH MECHANICAL TEL TELEPHONE -- - - - - - - a% a% -
<br />TEMP TEMPORARY or TEMPERATURE all bracing, shoring, enclosures, barriers or scaffolding required to provide a safe dimensional discrepancies be encountered, clarifications shall be obtained from the drawing, permits, approved shop drawings, submittals ansamples, on which to
<br />MED MEDIUM srbmittd l
<br />Q Q
<br />MEZZ MEZZANINE TERR TERRAZZO working environment as dictated by site conditions and the progress of work office of the Architect. record all changes during construction. Access to these shall be provided for the MECHANICAL & PLUMBING N
<br />E MFR MANUFACTURER
<br />THK THICK � �
<br />MIN MINIMUM THRU THROUGH 10. During the entire construction period, all exits, exit lighting, fire protection devises 28. Large scale details shall govern over smaller scale plans and elevations. use of all trades, client representatives and the architect, during all phases of
<br />E EAST MISC MISCELLANEOUS TOC TOP OF CONC. / CURB and alarms shall be continuously maintained, in conformance with local building 29. Install all equipment and materials as per manufacturers' recommendations. Any construction. -- - - - - -
<br />EA EACH Mo MASONRY OPENING TOS TOP OF STEEL M1-1 MECHANICAL/PLUMBING PLAN
<br />EF EXHAUST FAN TOW TOP OF WALL code and other governing entity requirements. Unless otherwise noted, all difficulties are to be reported to the architect immediately. 54. During the course of construction, actual locations shall be indicated to scale In red
<br />MTG MOUNTING -- { -
<br />EJ EXPANSION JOINT MTL METAL TRANSF TRANSFORMER existing, services and devices shall remain active. 30. The contractor and each subcontractor shall warrantee all work performed by him Ink on the owners record drawings for all runs of mechanical and electrical work
<br />ELEC ELECrRIC(CAL) TYP TYPICAL I Q Q
<br />ELEV ELEVATION or ELEVATOR 11. The general contractor shall at all times protect the property of the client and the directly for a minimum period of one (1) year. All defects occurring In the Including concealed work which deviates from the drawings. Upon completion of j ELECTRICAL rn N
<br />EMERG EMERGENCY N building owner. This includes but Is not limited to windows, floor and ceiling guaranteed period shall be corrected at no additional cost. the project, Including all punchlist Items, this Information shall be neatly transferred
<br />ENCL ENCLOSURE U
<br />ENGR ENGINEER N NORTH finishes, public toilets, elevators, doors & bucks, electrical and air-conditioning 31. The site and buildings shall be maintained accessible to and functional for the by the contractor to a set of drawings, which shall be marked "As Built Set" and aUB D pI *AVE EWE:yENTR ENTRANCE N/A NOT APPLICABLE / NOT AVAILABLE UC UNDERCUT equipment. The general contractor shall also properly protect any adjoining physically handicapped. All ramps shall be fitted with a non-sllp finish. copies shall be provided to both the owner and the Architect. Within three (3) E1-1
<br />EQ EQUAL NE NORTHEAST UL UNDERWRITER'S LABORATORY __ - . BY Z FICE
<br />EQUIP EQUIPMENT UNIXCAV UNEXCAVATED property, any damage to the same caused by the contractor's work or workmen 32. The client, Architect, consultants and all inspectors from perdnent agencies shall be weeks (15 business days) of the receipt of the "As Built Set" approval for final -
<br />NEC NATIONAL ELECTRIC CODE Date:
<br />EW EACH WAY NEG NEGATIVE UNO UNLESS NOTED OTHERWISE must be made good, in a timely fashion, without delay. Patching and replacement permitted access to the job site at all times during normal working hours. payment to the contractor shall be granted or reasonable cause shown why such
<br />EWC ELECTRIC WATER COOLER NIC NOT IN CONTRACT UPS URINAERRUPTABLE POWER SUPPLY of damaged work shall be done at the cost and expense of the contractor 33. The general contractor shall provide all labor, materials, and equipment as approval has been denied. Reviewer:
<br />EXH EXHAUST NO NUMBER UR URINAL
<br />EXIST EXISTING NOM NOMINAL USF USABLE SQUARE FOOTAGE responsible for the damage. The general contractor shall be fully responsible for all necessary to execute all work as shown on these drawings except where noted as 55. Prior to the completion of his work the general contractor shall assemble and
<br />EXP EXPANSION NRC NOISE REDUCTION COEFFICIENT urtL UTILITY of his sub -contractors. If the contractor fails to complete the repairs in a timely not In contract (N.I.C.). Unless otherwise noted on these drawings or in the furnish the client/ owner, In a loose leaf binder(s), a complete set of
<br />EXT EXTERNAL or EXTERIOR NTS NOT TO SCALE
<br />NW NORTHWEST fashion, said repairs will made by a contractor selected by the owner's specifications as being not In contract or existing, all items, materials, etc., and the manufacturers catalogues, operating Instructions, maintenance instructions and wj��l ALl
<br />V representative and back charged accordingly. Timely fashion includes, but is not Installation of same are a part of the contract defined by these drawings and similar data, as well as all guarantee(s) for all equipment and operable devices
<br />F
<br />O limited to an amount of time which will limit the disruption of the T ` .i ,t• �'� D��U
<br />v VOLT / VENT Y p operation of specifications. furnished or Installed by the general contractor under this contrail and shall orient E A i
<br />FC FOOT CANDLES VAP RET VAPOR RETARDER tenant's work places, the buildings operations, access and compromise safety or 34. Minor details not shown or specified, but necessary for proper construction of any and Instruct the personnel designated by the client/ owner in the operation of all , VpI� i C CAD c
<br />FCO FLOOR CLEAN OUT OC ON CENTER VAR VARIES i RE aL, : - �NCL,
<br />FD FLOOR DRAIN OCC OCCUPANCY / OCCUPIED VB VINYL BASE presents a health risk, etc. part of the work, shall be included as if they were indicated In the drawings, unless such equipment. .00 ' 0�0
<br />FDN FOUNDATION OFF OFFICE VCT VINYL COMPOSITION TILE �1oD� 1k�'�k
<br />12. The contractor shall indemnify and save harmless the landlord, the tenant, and otherwise agreed upon. Where the contract, construction notes or drawings call 56. The contractor shall immediately notify the owner in the event that mold or Y nF 'j,L•e
<br />FE FIRE EXTINGUISHER OH OVERHEAD VENT VENTILATION C1T
<br />FEC FIRE EXTINGUISHER CABINET OPG OPENING VERT VERTICAL architect against any and all claims and demands for the damage to the properly for any work of it id oa more stringent nature than that required by the building code, or asbestos Is Uncovered. The owner shall retain a qualified consultant who shall
<br />FIN FINISH OPP OPPOSITE VEST VESTIBULE of any person, firm or individual or for personal injuries (induding death) arising any other entity having jurisdiction over the work, the work of the more stringent arrange for the prompt Identification, testing, treatment, remedlation and storage
<br />FF FINISH FLOOR oz OUNCE(S) VIF VERIFY IN FIELD
<br />FHC FIRE HOSE CABINET VOL VOLUME out of, or suffered while engaged In, or caused, in whole or in part, by the nature called shall be furnished In all cases. of the mold Or asbestos as required by law and good construction practices. The
<br />FIG FIGURE VTR VENT THRU ROOF execution of the work; he shall well and truly defend the landlord, tenant and 35. Details are intended to show the Intent of the design. Minor modifications may be architect shall bear no responsibility for work related to these materials.
<br />FIN FINISH P VWC VINYL WALL COVERING architect and shall pay all monies awarded for such damages or injuries (including required to suit the field dimensions or conditions and such modifications shall be 57. The contractor Is advised that the premise has not been tested for lead paint or
<br />FIXT FIXTURE .J
<br />FLEX FLEXIBLE # lb POUND death), all costs including attorneys fees sustained, and shall obtain a full included as part of the work of the contract. other potentially hazardous materials. The contractor shall use all appropriate i�� •
<br />jv�
<br />FUR FLOOR % PERCENT ART PARTIAL W acquaintance and release in favor of the landlord, tenant and architect, unless such 36. All work shall be executed in a workmanlike manner b mechanics and tradesmen carrying operations g ��Vr� - t♦
<br />FLUOR FLUORESCENT Y precautions In the ca out of all construction o rations which might disturb Y
<br />FNDN FOUNDATION PTN PARTITION W WEST or WATT liability results solely from the negligence of the landlord, tenant, architect, its skilled in their respective trades and in accordance With the best practices of the such materials. Q� ZEpH
<br />FOM FACE OF MASONRY PASS PASSAGE w/ WITH
<br />s or employees.
<br />agenttrades Involved. 58. All contractors shall cant' property damage and public liability insurance as required
<br />PC PRECAST W/o WITHOUT �M1
<br />FOS FACE OF STUD adrisadPth�Ns
<br />PED PEDESTAL � WOOD BASE 13. The architect shall not be held responsible for the performance of an work, nor for 37. All work shall be plumb level and true. The contractor shall lay out all work and by any governing agencies having jurisdiction and complying with statutory 1S reVl@W Of
<br />FPL FABRIC PANEL Y � 9 j
<br />PERF PERFORATED WC WATER CLOSET (TOILET) plans suWyftd Ig a
<br />FP FIRE PROTECTION WD WOOD (SOFTWOOD) the means and methods of construction chosen by the general contractor or any of establish all prints, grades, lines and levels and assume full responsibility for the requirements for disability and workmen's compensation.
<br />FT FEET IN FOOT PERP PERPENDICULAR �Y blew to assist the contraGor in wo
<br />FTG FOOTING PL PLATE or PROPERTY LINE WH WATER HEATER his sub -contractors, nor shall he guarantee the performance of their contracts. same. OOrftlpoanoe
<br />PLAM PLASTIC LAMINATE WP WATERPROOF Icabte fire safe
<br />FRTWD FIRE RETARDENT TREATED WOOD 14. The contractor shall perform daily cleaning of the job site during the construction 38. All exterior wall dimensions are to face of concrete block Or to face of stud, unless � COdeS. �16R /evlew j= not jn��
<br />FURR FURRING PLAS PLASTIC WPT WORKING POINT otherwise to be a final approval of ttN submiad is ft
<br />FWC FABRIC WALLCOVERING PLYWD PLYWOOD WT WEIGHT period and shall protect finished work from damage. Immediately prior to tenant pleris. k ilia
<br />POS POSITIVE WWF WELDED WIRE FABRIC 39. The contractor shall confirm the availability and delivery times for all tied
<br />PR PAIR wF WIDE FLANGE occupancy, the contractor shall perform final cleaning of the work area including, tY �Y specified COn raCtOrS sole re�� b en3trMr .�1a...
<br />PREFAB PREFABRICATED but not limited to, wet wiping of furniture, casework, and wall covering, washing Items upon receipt of the contract documents. Should any of the specified Items complete COmplianCe willh M 1oda
<br />PROJ PROJECT or PROJECTED Y and waxing of VCT flooring, and the vacuuming of carpet. All cleaning shall be in availability pose a delay to the on time completion of the project, the contractor NFPA OOde3 811d
<br />PROP PROPERTY or PROPOSAL accordance with manufacturers' recommendations. shall notify the client Immediately and propose an equivalent substitution If such a local ordinances: in then evert Ihat utter examination or
<br />sinspection reveals areas of non compliance. k sw be
<br />PIPSF POUNDS PER SQUARE FOOT YD YARD or YARD DRAIN t, 1,ite rc COritraCt� $Q�
<br />POUNDS PER SQUARE INCH responlaw, � �� enww to
<br />bring those areas in
<br />COrlbUWS Mn Iin I* in ems.
<br />N,ELSdil
<br />Florida Certificate of Authorization Number: AA26001403
<br />1349 West Peachtree Street, NE, Ste. 1300
<br />Atlanta, GA 30309
<br />Phone: (404) 873-3697
<br />Fax: (678)904-1510
<br />Frederick Geheber
<br />ii.)MPLY` 1FIIA1,i.
<br />'REVAILING C01) F1 ORIDA BUILDi
<br />(:ODC. NATIONAL ELECTRIC CODEAN'r
<br />(."'TVOF ZEN iYRHILLS ORDINANCES
<br />REVIEW DATE G , to
<br />CITY OF ZEPHYRHILLS
<br />PLANS EXA4NER_
<br />Consultant:
<br />CBRE
<br />BANK OF AMERICA
<br />CEI RICHARD ELLIS
<br />Bank of America 6700 Lakeview Center
<br />rive
<br />Second Floor
<br />Client: Tampa, Florida 33619
<br />Permit Set SE R 11 25-2009
<br />Client Review Set SE R 11-13-2009
<br />Descri tion: No: BY: Date:
<br />BANK OF AMERICA ADA REMEDIATION
<br />Zephyrhills Location
<br />5632 Gall Boulevard
<br />Zephyrhills, Florida 33539
<br />Project Title & Address:
<br />Abbreviations -General Notes
<br />And Drawing Index
<br />Sheet Title:
<br />Proj. No.: - -
<br />09.00683.00
<br />Drawn By:
<br />Checked By:
<br />P.M..
<br />AN-1
<br />_ SARAH ROLAND _f
<br />ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED ON
<br />SITE BY THE CONTRACTOR AND SUB -CONTRACTORS. THE PROJECT
<br />MANAGER SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES PRIOR
<br />TO PROCEEDING WITH THE WORK.
<br />© NELSON - ALL RIGHTS RESERVED
<br />with All applicable NFPA Codes and kxW orAL-noes--
<br />.
<br />
|