Laserfiche WebLink
I - I YI II _ <br />GENERAL NOTES & CONDITIONS <br />GENERAL NOTES (CONT.) <br />CONSTRUCTION PLAN NOTES(CONT.) <br />SPECIFICATIONS FOR GENERAL CONTRACTORS PERFORMING WORK <br />FOR BANK OF AMERICA <br />1.19 ANY ITEM OF WORK NECESSARY TO THE PROPER <br />2.9 ALL EXISTING HOLES/CRACKS IN SLAB AND THOSE <br />COMPLETION OF CONSTRUCTION WHICH IS NOT <br />RESULTING FROM THE CONSTRUCTION PROCESS <br />SHALL BE FILLED/REPAIRED AND THE SURFACE <br />1.0 TENANT- BANK OF AMERICA C/0 CBRE-RICHARD EWS <br />SPECIFICALLY COVERED IN THESE DOCUMENTS SHALL <br />BE PERFORMED IN A MATTERS DEEMED GOOD <br />PATCHED SMOOTH AND LEVEL WITH ADJACENT <br />LANDLORD -BUILDING OWNER/REPRESENTATIVE <br />GC -GENERAL CONTRACTOR. <br />PRACTICE <br />PRACTICE OF THE TRADE INVOLVED. <br />SURFACE, IN A MANNER ACCEPTABLE TO <br />TH ASCHITECT. CONTRACTOR SHALL MAINTAIN FIRE <br />RA N WHEN FILING HOLES, ETC. <br />1.1 UPON COMPLETION OF THE JOB, THE CONTRACTOR <br />1.20 USE AND INTERPRETATION OF THIS DRAWING <br />2.10 HARDWARE SHALL BE PROVIDED BY GC AS <br />PROVIDE THE OWNER AND ARCHITECT WITH: <br />A. GENERAL CONDITIONS OF THE CONTRACT FOR <br />SPECIFIED. SEE MILLWORK DETAILS AND NOTES <br />FOR SCOPE OF HARDWARE. <br />A. AS -BUILT PLANS. <br />CONSTRUCTION, AIA DOCUMENT A201, ARE A PART <br />B. RELEASE OF LIENS FOR ALL SUB -CONTRACTORS. <br />OF A CONTRACT DOCUMENT AS DESCRIBE USE AND <br />2.11 ALL SUBSTITUTIONS, I.E., "EQUALS" MUST BE <br />C. A FINAL RELEASE OF LENS FROM THE GENERAL <br />INTENT OF THE DRAWINGS. THE CONTRACT <br />SUBMITTED TO ARCHITECT PROJECT MANAGER FOR <br />CONTRACTOR. <br />DOCUMENTS INCLUDE NOT ONLY THE DRAWINGS, <br />WRITTEN APPROVAL PRIOR TO SUBSTITUTION BEING <br />MADE. <br />D. THE ORIGINAL BUILDING PERMIT PLANS WITH THE ORIGINAL <br />BUT ALSO THE OWNER -CONTRACTOR AGREEMENT, <br />FINISH NOTES <br />INSPECTOR'S SIGNATURES. <br />CONDITIONS OF THE CONTRACT, THE SPECIFICATIONS, <br />1.2 TENANT WILL NOT BE RESPONSIBLE FOR: <br />ADDENDA AND MODIFICATIONS ISSUED AFTER <br />EXECUTION OF THE CONTRACT. THESE CONTRACT <br />A. SECURITY OF MATERIALS OF WORK IN PLACE. <br />DOCUMENTS ARE COMPLEMENTARY, AND WHAT IS <br />B. AIR CONDITIONING WORK NOT BEING PROPERLY <br />REQUIRED BY ANYONE SHALL BE BINDING AS IF <br />PERFORMED TO ALLOW FOR PROPER COOUNG OF THE <br />REQUIRED BY ALL WORK NOT COMPLETELY <br />6.1 ALL FINISH MATERIAL INDICATED TO BE PROVIDED AND <br />LEASED PREMISES UNLESS ALL AIR CONDITIONING WORK <br />DELINEATED HEREON SHALL BE CONSTRUCTED OF <br />INSTALLED BY G.C. UNLESS OTHERWISE NOTED IN FINISH <br />SCHEDULES, ON FINISH PLAN. <br />IS DONE IN COORDINATION WITH THE BUILDING <br />THE SAME MATERIALS AND DETAILED SIMILARLY <br />ENGINEERING STAFF. <br />AS SHOWN MORE COMPLETELY ELSEWHERE IN <br />C. WARRANTY REPAIRS. <br />THE CONTRACT DOCUMENTS. <br />6.2 GC AND VENDORS SHALL DETERMINE AVAILABILITY OF <br />D. WINDOW BREAKAGE DURING CONSTRUCTION. <br />ALL FINISH MATERIALS. ANY DELIVERY SCHEDULE <br />E. WORK STOPPAGES DUE TO WORK INTERFERING WITH <br />B. BY USE OF THE DRAWINGS FOR CONSTRUCTION <br />THAT POTENTIALLY MAY CAUSE COORDINATION <br />OTHER TENANTS. <br />OF THE PROJECT THE TENANT AND LANDLORD <br />PROBLEMS DURING THE FINAL STAGES OF <br />F. DELAYS DUE TO CHANGE ORDERS <br />REPRESENTS THAT THEY HAVE REVIEWED AND <br />CONSTRUCTION/INSTALLATION SHALL BE BROUGHT <br />G. PAYMENT F ANY DRAW y�LL BE SUBJECT TO THE <br />ARCHITECTQS AND TENANTS <br />APPROVED THE DRAWINGS, AND THAT THE <br />TO ATTENTION OF ARCHITECT , EARLY ON, FOR POSSIBLE <br />REEVALUATION OF MATERIAL DESIGNATION. <br />REPRESENTATIVES <br />CONSTRUCTION DOCUMENT PHASE OF THE PROJECT <br />AGREEING <br />TO THE DEGREE OF COMPLETION. TEN PERCENT 10%) <br />IS COMPLETE. THE CONTRACTOR REPRESENTS <br />6.3 A MINIMUM QUANTITY OF TWO � 1'-0' X V-0" <br />FINISH SAMPLES <br />OF EACH DRAW WILL BE HELD AS A RETAINER UNTIL <br />THAT HE HAS VISITED THE SITE, FAMILIARIZED <br />OF ALL SPECIFIED FINISHES AND <br />THE JOB IS COMPLETED, INCLUDING PUNCH UST ITEMS, <br />HIMSELF WITH THE LOCAL CONDITIONS, VERIFIED <br />CURRIMIT STOCK CUTTINGS OF ALL SPECIFIED WALL - <br />RELEASES OF LIEN, AND ACCEPTANCE OF THE SPACE <br />FIELD DIMENSIONS AND CORRELATED HIS <br />COVERINGS SHALL BE PROVIDED FOR APPROVAL <br />BY BOTH THE TENANT AND ARCHITECT. <br />OBSERVATIONS WITH THE REQUIREMENTS OF THE <br />PRIOR TO ORDERING. <br />CONTRACT DOCUMENTS. <br />1.3 THE CONTRACTOR WILL: <br />6.4 GC, ALL VENDORS SUBCONTRACTORS ARE RESPONSIBLE <br />C. THE CONTRACT SUM AND THE CONTRACT TIME <br />FOR FIELD VERIFICATION OF ALL DIMENSIONS, QUANTITIES <br />SECURE THE NECESSARY BUILDING PERMITS AND INSPECTIONS. <br />MAY BE CHANGED ONLY BY CHANGE ORDER TO <br />ETC., OF THEIR RESPECTIVE WORK. <br />INDEMNIFY AND KEEP HARMLESS THE OWNER FROM ALL <br />LOSSES, DAMAGES, LIABILITIES, AND EXPENSES WHICH MAY <br />THE CONTRACTOR SIGNED BY THE TENANT AND THE <br />ARCHITECT. ANY WORK PERFORMED IN VARIANCE <br />GC SHALL BE RESPONSIBLE FOR SUPPLYANSTALLATION <br />ARISE OR BE CLAIMED AGAINST TENANT AND BE IN FAVOR <br />WITH THE CONTRACT DOCUMENTS AND NOT COVERED <br />OF WOOD BLOCKING/GROUNDS ABOVE CEILING AS <br />NECESSARY FOR VERTICAL BUNDS, DRAPERIES, ETC., <br />OF ANY PERSONS, FIRMS, OR CORPORATIONS FOR ANY <br />INJURIES OR DAMAGES TO THE PERSON OR PROPERTY OF <br />BY THE ARCHITECTS WRITTEN ORDER FOR A MINOR <br />(UNLESS OTHERWISE NOTED) <br />ANY PERSONS, FIRMS, OR CORPORATION CONSEQUENT UPON <br />CHANGE IN THE WORK OR A CHANGE ORDER, WILL <br />OR ARISING FROM THE CONSTRUCTION, USE, OR OCCUPANCY <br />NOT BE ACCEPTED. <br />CONTRACTOR <br />UPON OR ARISING FROM ANY OMI3 OMISSIONS, NEGLECT OR <br />D. AS INSTRUMENTS OF SERVICE, ALL DRAWINGS, <br />GENERAL DEMOLITION NOTES: <br />FAULT OF THE CONTRACTOR , HIS AGENTS, SERVANTS, <br />EMPLOYEES, LICENSEES, VISITORS, CUSTOMERS, PATRONS, <br />SPECIFICATIONS AND COPIES THEREOF FURNISHED BY <br />OR INVITEES, OR CONSEQUENT UPON OR ARISING FROM THE <br />THE ARCHITECT ARE HIS SPECIFICATIONS AND <br />PROPERTY. THEY ARE TO BE USED ONLY FOR THIS <br />CONTRACTOR'S FAILURE TO COMPLY WITH ANY LAWS <br />STATUTES, ORDINANCES, CODES, OR REGULATIONS; i-HAT THE <br />PROJECT AND ARE NOT TO BE USED ON ANY OTHER <br />.1 ALL DEMOLITION, RENOVATION, AND CONSTRUCTION TO COMPLY WITH <br />NFPA 241. <br />OWNERS SHALL NOT BE LIABLE TO THE CONTRACTOR FOR <br />PROJECT. CHANGES TO THE DRAWINGS NOT TO BE <br />DAMAGES, LOSSES OR INJURIES TO THE PERSONS, FIRMS <br />USED ON ANY OTHER PROJECT. CHANGES TO THE <br />419 DEBRIS SHALL BE REMOVED FROM THE SITE DAILY. <br />OR CORPORATIONS EXCEPT WHEN SUCH INJURY, LOSS, OR <br />DRAWINGS MAY ONLY BE MADE BY THE ARCHITECT. <br />DAMAGE RESULTS FROM NEGLIGENCE OF THE OWNER, HIS <br />ANY SUBMISSION OR DISTRIBUTION WITHOUT THE <br />AGENTS, OR EMPLOYEES, AND THAT THE CONTRACTOR WILL <br />EXPRESS WRITTEN CONSENT OF THE ARCHITECT <br />IDEMNIFY AND KEEP HARMLESS THE OWNERS AND BE IN <br />MAY BE CONSTRUED AS DEROGATION OF THE <br />FAVOR OF ANY PERSONS FIRMS OR CORPORATIONS FOR ANY <br />INJURIES OR DAMAGES Tb THE PERSON, OR THE PROPERTY <br />ARCHITECT COPYRIGHT OR OTHER RESERVED RIGHTS. <br />OF ANY PERSONS, FIRMS OR CORPORATIONS WHERE SAID <br />INJURIES OR DAMAGES AROSE ABOUT OR UPON THE LEASED <br />PREMISES AS A RESULT OF THE HE NEGLIGENCE OF THE <br />1.21 ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE <br />CONTRACTOR, HIS AGENTS, EMPLOYEES,SERVANTS, LICENSEES, <br />WITH ACCESSIBILITY GUIDELINES AS SET FORTH IN <br />VISITORS, CUSTOMERS, PATRONS, AND INVITEES. ALL <br />THE FLORIDA BUILDING CODE 2007. <br />PERSONAL PROPERTY PLACED OR MOVED INTO OR OUT OF <br />THE CONTRACTOR AND SUBCONTRACTORS <br />THE BUILDING SHALL BE AT THE RISK OF THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR THE IMPLEMENTATION <br />OR THE OWNER THEREFORE AND THE OWNERS SHALL NOT <br />OF SUCH. <br />BE LIABLE TO THE CONTRACTOR FOR ANY DAMAGE <br />TO ANY PERSONAL PROPERTY. <br />1.4 THE CONTRACTOR WILL CONFINE THE CONSTRUCTION DEBRIS <br />AND DUST TO THE CONSTRUCTION AREA, AWAY FROM <br />COMPLETED TENANT SPACE OR COMMON AREAS, ALL AREAS <br />OF THE BUILDING, ESPECIALLY ACCESS AREAS AND COMMON <br />AREAS, ARE TO BE MAINTAINED IN A CLEAN AND ORDERLY <br />FASHION. THE CONTRACTOR IS TO TURN THE IMPROVED <br />PREMISES OVER THE PROPERTY MANAGER IN A CLEAN <br />CONDITION, READY FOR OCCUPANCY BY THE TENANT. <br />1.5 THE CONTRACTOR WILL REMOVE ALL TRASH AND DEBRIS, <br />INCLUDING EXCESS MATERIALS FROM THE CONSTRUCTION SITE <br />AND THE BUILDING AND NO UNREASONABLE ACCUMULATION <br />BE ALLOWED. <br />1.6 THE CONTRACTOR WILL COORDINATE THE DELIVERY OF <br />MATERIALS AND THE USE OF THE FREIGHT ELEVATOR AND <br />REMOVAL OF DEBRIS WITH THE PROPERTY MANAGER <br />1.7 THE CONTRACTOR IS RESPONSIBLE FOR ALL PARKING <br />CHARGES OF HIS EMPLOYEES, SUB -CONTRACTORS, AND <br />VENDORS. <br />1.8 THE CONTRACTOR WILL SUBMIT ALL CHANGES ORDERS TO <br />THE ARCHITECT FOR APPROVAL AND THE BLUEPRINTS ARE <br />TO BE REVISED ACCORDINGLY. <br />1.9 THE CONTRACTOR WILL EXERCISE ALL DUE DILIGENCE IN <br />MAINTAINING IN A SAFE WORKING ENVIRONMENT AND TO <br />ABIDE BY ALL OSHA REGULATIONS. <br />1.10 UPON COMPLETION, THE CONTRACTOR WILL REMOVE ALL <br />FOREIGN MATERIALS FROM WINDOWS, FLOORS, GLASS, <br />HARDWARE AND RESTROOM FIXTURES. <br />CONSTRUCTION PLAN NOTES <br />1.11 THE CONTRACTOR WILL NOT UNDULY DISTURB THE PEACEFUL <br />ENJOYMENT OF ANY TENANTS IN THE BUILDING. <br />ALL DRILLING THROUGH THE CONCRETE FLOOR SLAB IS TO BE <br />2.1 PRIOR TO START OF CONSTRUCTION, GC SHALL <br />SCHEDULED WITH THE PROPERTY MANAGER. ALL PLUMBING <br />COORDINATE SCHEDULING OF MEETINGC� WITH HIS <br />INSTALLATIONS REQUIRING ACCESS TO OTHER AREAS OF THE <br />PROJECT PERSONNEL, THE Bt DINGJLANDLORD <br />BUILDING WET COLUMN WILL BE COORDINATED WITH THE <br />REP(S), ARCHITECT PROJECT MANAGGGGGGEEEEEER, OTHERS, FOR <br />PROPERTY MANAGER. <br />REVIEW OF PROJECT SCOPE DESIGN INTENT, <br />QUALITYAL <br />1.12 THE CONTRACTOR WILL INSTALL CONSTRUCTION AIR <br />DISCUSSION OF DRAWINGS/DETAILS/QUESTIONS. <br />CONDITIONING FILTERS IN ALL RETURN AIR DAMPERS IN <br />2.2 DIMENSIONS ON DRAWINGS ARE FINISH FACE TO <br />THE DEMISING WALLS IN ORDER TO PREVENT CONSTRUCTION <br />FINISH FACE OF PARTITIONS, COLUMNS, ETC., OR TO <br />DUST FROM ENTERING THE MAIN AIR CONDITIONING SYSTEM. <br />WHERE SHOWN, UNLESS OTHERWISE NOTED. <br />DO NOT SCALE DRAWINGS <br />1.13 THE CONTRACTOR IS TO PROVIDE TO ARCHITECT FIVE COPIES <br />WRITTEN DIMENSIONS TAKE PRECEDENCE OVER <br />OF ALL SHOP DRAWINGS, PRODUCT INFORMATION SUBMITTALS, <br />GRAPHIC REPRESENTATION. DETAIL DIMENSIONS <br />AND ALL OTHER SUBMITTALS REQUIRED FOR REVIEW, ETC. AT <br />TAKE PRECEDENCE OVER PLAN DIMENSION. <br />LEAST TWO (2) OF THE ABOVE COPIES SHALL BE ORIGINALS. <br />2.3 GC SHALL BE RESPONSIBLE FOR FIELD MEASURING <br />OF EXISTING CONDITIONS P-80 TO START OF WORK <br />AND DURING CONSTRUCTION, AS NECESSARY, TO <br />1.14 THE CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY <br />ASSURE CONSTRUCTION ADHERENCE TO <br />ALL CONDITIONS OF THE WORK PRIOR TO SUBMITTING A BID. <br />DRAWINGS. BY ENTERING INTO A CONSTRUCTION <br />1.15 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE <br />CONTRACT FOR THIS WORK, GC SHALL INDICATE HIS <br />FAMILIARITY WITH THE SITE/FIELD, CONDITIONS. <br />FIELD. DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT <br />PRIOR TO THE COMMENCING OF THE WORK IN THE AREA <br />A. ALL 'HOLD' OR CLEAR DIMENSIONS SHALL BE <br />IN QUESTION. <br />MONITORED TO ASSURE CORRECTNESS. <br />B. ALLY DIMENSION REVISIONS/MODIFICATIONS ARE <br />1.16 ALL WORK SHALL BE DONE IN ACCORDANCE TO THE LATEST <br />TO BE BROUGHT TO ATTENTION OF ARCHITECT <br />PROJECT MANAGER FOR REVIEW/APPROVAL <br />EDITION OF THE FLORIDA BUILDING CODE 2000 AND ANY <br />OTHER APUCABLE CODE. <br />2.4 ALL VERTICAL DIMENSIONS SHALL BE TAKEN FROM <br />"BENCH MARK" OR OTHER SIMILAR GUIDE ESTABLISHED <br />1.17 IMPACT FEES, WATER AND SEWER CONNECTION FEES AND <br />PRIOR TO START OF CONSTRUCTION. HIGH POINTS, <br />DEPOSITS FOR PERMANENT UTILITY SERVICES SHALL BE PAID <br />LOW POINTS, IRREGULARITIES IN FLOOR SLAB, <br />FOR THE BY OWNER. THE CONTRACTOR SHALL NOTIFY THE <br />PARTICULARLY, WHICH ANY WAY AFFECT <br />FABRICATION/�NSTALLA�K OF OTHER TRADES <br />ARCHITECT AND/OR THE OWNER WHEN THESE FEES APPLY <br />OR VENDORS (E.G., CABINET CONTRACTORS), SHALL <br />PRIOR TO THE START OF THE CONSTRUCTION OF THIS <br />BE BROUGHT TO ATTENTION OF ARCHITECT. <br />PROJECT. <br />A. VARIATIONS IN FLOOR LEVEL IN EXCESS OF 1/2' <br />FOR EVERY 10'-0" IN EVERY DIRECTION WILL <br />1.18 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL <br />REQUIRED LEVELING OF SLAB BY G.C. OR <br />PREFABRICATED ITEMS OF THE WORK INCLUDING BUT NOT <br />LANDLORD AS PREDICATED BY FINAL LEASE <br />AGREEMENT. LEVELING OF SLAB TO BE DONE <br />LIMITED TO THE FOLLOWING: <br />READY TO RECIEVE ARCHITECT FLOOR FINISHES, <br />ATM, STOREFRONT DOORS, CABINETS, AIR CONDITIONING <br />I.E. VYNIL TILE, CARPETING, ETC. GENERAL <br />ETC. THE CONTRACTOR SHALL OBTAIN THE ENGINEER'S <br />CONTRACTORS TO VERIFY SLAB CONDITION <br />ARCHITECTS WRITTEN APPROVAL OF SHOP DRAWINGS PRIOR <br />PRIOR TO BID SUBMISSION. <br />TO THEIR FABRICATION. SAMPLES SHALL BE SUBMITTED <br />BY CONTRACTOR UPON REQUEST. <br />2.5 GC SHALL DEMOLISH EXISTING PARTITION AND <br />VARIOUS OTHER ELEMENTS AS INDICATED ON PLAN <br />AND COORDINATE THE REMOVAL OF ALL RELATED <br />ELECTRICAL SERVICE, PLUMBING AND ALL OTHER <br />APPURTENANCES INCLUDED THEREIN, REFER TO <br />GENERAL DEMOUTION NOTES. <br />2.6 GC SHALL BE RESPONSIBLE FOR THE REMOVAL OF <br />ALL CONSTRUCTION DEBRIS AND FOR THE RETURN <br />OF ANY BUILDING STANDARD COMPONENTS IF <br />REQUESTED BY THE BUILDING MANAGEMENT <br />UNLESS OTHERWISE NOTED ON CD'S <br />T <br />945 N. PENNSYLVANIA AVENUE <br />WINTER PARK, FLORIDA 32789 <br />OFFICE: (407) 629-1188 <br />FAX: (407) 388-1220 <br />WWW. ADCINTERNATIONAL.NET <br />STATE OF FLORIDA AR-0094103 <br />MOHAMED SHALABY, R.A. AA-CO01315 <br />Architect • Seal/Signature <br />Construction Documents for: <br />BAT*& OF ANMUCA <br />at: <br />ZEPHYRHILLS DUMPSTER <br />PAD & ENCLOSURE <br />5632 GALL BOULEVARD <br />FT. LAUDERDALE, FLORIDA 33542 <br />Issue Date & Issue Description Drawn By Checked By <br />i <br />i <br />Date & Delta Description Drawn By Checked By <br />1 06/-2-3V11 _ DRL AS <br />PERMIT SET _ <br />_L <br />Z- - ---------- <br />Z <br />LU <br />H <br />W <br />Q <br />Client Information <br />C.B. RICHARD ELLIS <br />100 N. WESTSHORE, 2ND FLOOR <br />TAMPA, FL. 33609 <br />OFFICE: 813-384-3670 <br />CONTACT: NICOLE GLASS <br />Project Number <br />11158 <br />CAD File Name <br />BOA- ZEPHYRHILLS DUMSTER PAD & ENCLOSURE <br />Description <br />GENERAL NOTES <br />Scale <br />1 /81, =1'-0" <br />