6.3 CoaM•Rae Vt,r3�, RNw VRrr3^-Y,SNow[:ou%Nr^. SRav[awTxy AovNww^aim ShowCMyw bvax®"-Y:
<br />• 6.3.1 MadooN ant m the slot opening as follows, ensuing that the eMs of the opening #op at Mast 6Arch from a, end
<br />.allsantl A ei,- Uinch from lep ari ridge inter n or derrey,
<br />� No Ndga Board: Cut a ]/8-mch opening on eachestle of the ridge )Figure A).
<br />,i Rwp FI,i Cuta 13/B-inch apeNne on each sided the ridge IRgwe gl.
<br />"klo fudge Board .With Ridge Board
<br />6.3.2 SealeM: Apptya beae MsRcone cadbrgW moi certrent[o tM underside pFeM Mrta baHtealpng DOM edges andat
<br />exposetl eME errwrirg the WtsNe edges where the vent meets the mkgks are zealee wrtn tie cauR W flashing
<br />cement.
<br />6.3.3 VNn NWCeneM: SurtrngM one eM oltM slo4 dace, Cenierarb conform the [obra•rigM vent over the slot with Me
<br />vent Portly agars# the roof surfxe, ewur'xg the vent—od, past the slot geedng by m Streit 6 rnce.
<br />63.4 Fa#eAerz: For Coba•Rrgrd vent 3`•,Cobra•Nigitl Vent 3^�Y, tuba• Slmw COMB Advanoi ant CMxa• Snow
<br />Country Advanced"-Y oNy, ee. her 3"ring Mark roils pMfuaed). Fit, Cobra•Sngw Coo" use Irk w kart l%-
<br />-h W brgM. Nails must always penettate Mrough piywooC decks Drat kaat %+rxh rho wood pinks. NOiE: GAF
<br />r ounends 3arrch ring Maid nark forircremed upRX resistance.
<br />6.35 Spaehg: AOach the vent s<Mbn through the We -molded oiling Ysdes bcM.etl a13, 12. 24, 36 and dSIMh {rum the
<br />start M eaA log-krtnwni piece
<br />6.3.6 )oMN: Apply Me obscurest Cob got M tuns wertM length F M Eg 'rig the edap/md¢rkp tabs.
<br />63.1 Ridge Shrei IMWI Idol sheiksdance with sh%W —olet WbltMed in#a1WtiWr: nsttucbor,.
<br />uvng nags deuried'n 6 3 a A —I I.e. k inscribed on top of the Cobo] to wM to serve M a For-
<br />-- wM -to'. —
<br />team Nrmsweraasw
<br />[minar<n Rrw,.e oases �asg9
<br />ReMamnGM/pa/N1t6
<br />F.e.sae
<br />]. 8,—. P.—
<br />. —tried by the B..eI& Of .1 or AUMerrN Having loohrtbn ie order to Woory evalua. the rnsulWtkn at Mh Croduct.
<br />8. MAeRR—M INANr3.
<br />Co.'- me mx110x1-1 or the.-0A ent4y for Wormazio on pWMs cooled . —I Rule 61G263 QA reW nerFeMs.
<br />A [IuAlarrA6TaNANt[E—
<br />UI.. LLC -Win% 5; (B4]) 664-3281
<br />-ENO OF EVAEUATION RERORT -
<br />honor Reread Nre Deien, LLC.
<br />r..yerr a.waer®e.,.ama
<br />esmuadon Rlpartet6p6,eids7 p
<br />FtAzs]a9
<br />uahor.9.w/9Lzots
<br />pageame
<br />6.4 f ORoee Romeea•
<br />6.4.1 Cut slot RM 6.3.1.
<br />RA2 a I -foot sxtbn W be used u a tempWu I. hermit the wet out (Fywe EG) er t cemer the template( IpcatW over
<br />the ridge cap sMngles at the k%imdng of tM vent slot. Note the Mcatbn of tho batik (Figure H). Make sure to do this
<br />at both enpds of the in#apavon.
<br />- Gr)
<br />r..
<br />6.A3 kAeawre tie drslance homthe edgedthe runt slot to the eamior baRle(OIEsubkiM1acha&line alongoo sideMMe
<br />ridge fFgure I). Unroll the vent end use the iivieded 13/4wh pneumatic roorrry —h, to Much the first the of the
<br />ridge vent with the e#Wlpr of the baffle aligned wXh the, chalk line (igure l). proceed with using Me 1' interval
<br />Easytex^ system to custom vac to! vent w the approp+Wte length. g the Exyiear^ system can - M euOred, use a
<br />:Ill ty IeR, to sun the .M. N0 gun targets are embossed on the Wrt as a guide For prynerty a —I- vent he tie
<br />.of. The— I— M Ixtercd an birch ceMPrt (Figure el
<br />f it ^3
<br />i H�Q
<br />V
<br />FAA NOTE: when tl—I, the wnt ant rap mingle:, he ore that the rnclueed 1 3/-1 Coil nark ranpleti Feeet-I
<br />plywood or e—e M least 3/4-rrch penerre ion into woad planks. In the case they eon not, you mu# use ahermte orh
<br />ttit Weed, the new Mperre#atlon. Pm ld wrtn anxhrrg Inc other side d the vent When brVereng torap down
<br />the sxod side, M NOT begs at the end; begin between the lost and second one font I— and teen rewrn to
<br />fasten the Irl# one -font se , This wrp alb. for proper M.
<br />FWbr Reslan'!r ant Darien. LLL
<br />[sNkma N 4„uarwtim x.Mrr3
<br />[gkMon Mart dl5R6Dl D6aD
<br />f Wg)#9
<br />Remson9: o4/w/tots
<br />Ipe6o16
<br />u t —
<br />iir- rmuli odge mingles rn cwtler.Ce with shergle nsamfethe- s Rebli—d III.lWtbn i-,eehons, uvng Ile .4 Wes
<br />on top of th, ridge vent for mper lapping.
<br />6.5 Ths6tAlf•Rwra V[NT:
<br />6.5.1 m NOT use W hips.
<br />6.S.2 imapTru56ate•Rklge Vent berme intalRng the lkid stales.
<br />6.5.3 After letwmlMrgtie oral length of TIAI.Ie• eidO, Vent reWlae i It. Woper venXW6on1. deurmine tM re .1
<br />slot opening M M-o f aeo m the slot opeorm enwn the esrds of the opening stop at kxt 64rch from arty ene
<br />wagsand Ml 2 h krom hioand ddge hee - or rhee-
<br />6.S,31 Roofs,,,ther[ I ridge bond. Cut a 7/8—h operwg aloIg the ridge oe oerh 51,W IFigare A).
<br />6.5.3 2 RwR wdh a ridge bond: Cut a 1 5/8 irch openng along lire r41ge o exh sitle.;Figure e).
<br />Nu fl d�N 8oartf
<br />6.5A In#ap an lg-kch wke sMion of pFTM OIB]p sepaeherkg leak bxrkr �hoMrrg Fbritla SiMewbe RoduM ApWoxal or
<br />ApWovPd o a lM:al pasrsl from the edge of tie ridge sW e#emMg down wwards the roof dtt4 o both skk of ine
<br />slot.
<br />6.5.5 place the TwSWte• Ridge Ven[ over the doge sbl, 'peaked' a d centered over the r.v got, ,II anatlr using
<br />' - um 3w,h Mng ring -drank nark though [he pe-nroldetl nail holes o tM vent, brazed 3-irrh hom tM.ends ark
<br />17h o.t. Fa#eren shalt peo[rale tborgh dywootl decks or endsed mrnrmum %Inch into wood piano decks.
<br />11.1.6 CoMrno river the ieogth of the ridge, uthring m the ak/lemale Correct mete unite. Figure the IInIMM ends
<br />include the p eeobttf eel caps Cover aid exposed sort heads W ne -th vkooecalk heuil a bead,f err,
<br />grade Nutt— seal nt . the keeI IIpe katirg edges M the red, sent, az IN- Immon of the ke fieg edge and the
<br />kak-0ankr below.
<br />6.5 ] In#a11 the lop course of I—' field slates, UMerBkrA" W & Mohtu Bar od Tru51Me• I— states in
<br />ore,,—.0 — Ieb4shed —11h tro irsgwctions IMag in6bte hire 0.1.MIh 16nch exposure -it,
<br />Ienterem 1 5/8 iKh long tieti,,news throgh pre duped hole, thre gh the Idr errtto el%W the, wood
<br />j
<br />' f
<br />j
<br />hwrkr geoearM aid Mrien, LLL
<br />P+dmrc N Mnea,warm la5oi
<br />let,
<br />fMrwalenMm e15h6.MA6R9
<br />N6a6]i9
<br />ekrNwnroAw/aoas
<br />Pye]Mp
<br />REVISIONS
<br />NO EAT El DESCRIPTION
<br />u e wen e
<br />V
<br />e
<br />d c �
<br />P
<br />C o
<br />E
<br />3A
<br />oY
<br />N Wy C
<br />W L O
<br />L h- —
<br />d
<br />A O K
<br />or
<br />E N
<br />" w
<br />O fO L
<br />N
<br />� el m0
<br />nU
<br />u t rn
<br />r�i U a
<br />N t -
<br />\J
<br />/ Z
<br />NO >
<br />LL E)J
<br />a �
<br />a o
<br />Q �
<br />U Q
<br />0 c�
<br />O
<br />w
<br />a
<br />Q EV
<br />LL
<br />O
<br />J
<br />LL
<br />JOB NO.
<br />DATE
<br />FBC Mill
<br />DRAWN BY
<br />MANUFACTURE
<br />SHEET NO.
<br />GAF - 2
<br />
|