Laserfiche WebLink
ABBREVIATIONS <br />AFF <br />ABOVE FINISHED FLOOR <br />AP <br />ACCESS PANEL <br />BFF <br />BELOW FINISHED FLOOR <br />CP <br />CHROME PLATED <br />CLG <br />CEILING <br />CO <br />CLEANOUT <br />CW <br />COLD WATER <br />DN <br />DOWN <br />D <br />DRAIN <br />ET <br />EXPANSION TANK <br />EL <br />ELEVATION <br />EQUIP <br />EQUIPMENT <br />EWH <br />ELECTRIC WATER HEATER <br />FCO <br />FLOOR CLEANOUT <br />FD <br />FLOOR DRAIN <br />FL <br />FLOOR <br />GCO <br />GRADE CLEANOUT <br />GPF <br />GALLONS PER FLUSH <br />GPM <br />GALLONS PER MINUTE <br />HB <br />HOSE BIBB <br />HW <br />HOT WATER <br />INV <br />INVERT (VERIFY IN FIELD) <br />MAX <br />MAXIMUM <br />MIN <br />MINIMUM <br />PRD <br />PRIMARY ROOF DRAIN <br />RHB <br />RECESSED HOSE BIBB <br />SRD <br />SECONDARY ROOF DRAIN <br />S <br />SANITARY <br />TYP <br />TYPICAL <br />UON <br />UNLESS OTHERWISE NOTED <br />V <br />VENT <br />VIF <br />VERIFY IN FIELD <br />VTR <br />VENT THRU ROOF <br />W <br />WASTE <br />WCo <br />WALL CLEANOUT <br />ISOMETRIC SYMBOLS <br />_t TWO-WAY GRADE CLEANOUT <br />JI <br />I� VENT THRU ROOF <br />I <br />I <br />/ yr WATER CLOSET <br />�I WALL CLEANOUT <br />I <br />LAVATORY AND/OR SINK <br />FLOOR CLEANOUT <br />I <br />WASHER DRAIN BOX <br />FLOOR DRAIN WITH TRAP PRIMER CONNECTION <br />-S2 <br />�W� <br />2------------2 <br />2-- PST--2 <br />2-- SST --� <br />A <br />®-PST--2 <br />@--SST-__2 <br />101 <br />PIPING <br />SANITARY PIPING <br />WASTE PIPING <br />VENT PIPING <br />COLD WATER PIPING <br />HOT WATER PIPING <br />PRIMARY STORM PIPING <br />SECONDARY STORM PIPING <br />HAMMER ARRESTOR (PDT SIZE INDICATED) <br />FLOOR CLEANOUT <br />TWO-WAY GRADE CLEANOUT <br />FLOOR DRAIN <br />PRIMARY ROOF DRAIN <br />SECONDARY ROOF DRAIN <br />WALL CLEANOUT <br />VALVE IN RISER <br />DIRECTION OF FLOW <br />SIDE CONNECTION <br />DROP IN PIPING <br />RISE IN PIPING <br />UNION <br />HOSE BIBB <br />BALL VALVE <br />POINT OF INTERFACE BETWEEN CONTRACTORS <br />NOTE: <br />THESE AM STANDARD SYMWLS AND GENERAL NOTES <br />AND MAY NOT ALL APPEAR ON THE PROJECT DRAWINGS, <br />HOWEVER WHEREVER THE SYMBOL APPEARS ON THE <br />PROJECT DiAVVIN138, THE ITEM SHALL BE PROVE <br />AND INSTALLED. <br />SPECIFICATIONS <br />1.0 BASIC MATERIAL AND METHODS <br />1.1 SCOPE OF WORK <br />PROVIDE LABOR AND MATERIALS AS REQUIRED TO PROVIDE A FULLY FUNCTIONING AND COMPLETE SYSTEM AS INDICATED <br />ON DRAWINGS. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATE THE GENERAL ARRANGEMENT OF <br />SYSTEMS AND EQUIPMENT. FINAL LOCATIONS OF EQUIPMENT SHALL BE FIELD DETERMINED. ALL DISCREPANCIES ON <br />DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT IN WRITING PRIOR TO SUBMISSION OF BIDS. <br />1.2 GENERAL AND SPECIAL CONDITIONS <br />ALL DIVISION 1 SPECIFICATIONS AND ARCHITECTURAL GENERAL AND SPECIAL CONDITIONS OUTLINED IN THE CONTRACT <br />DOCUMENTS APPLY TO MECHANICAL SYSTEMS. ADDITIONALLY, WORK SHALL COMPLY WITH THE CURRENT FLORIDA <br />BUILDING CODE, ORDINANCES AND REGULATIONS OF THE LOCAL AUTHORITY HAVING JURISDICTION, <br />NATIONAL FIRE PROTECTION ASSOCIATION AND NATIONAL ELECTRICAL CODE. ALL EQUIPMENT SHALL CARRY THE <br />UNDERWRITER'S LABORATORIES (UL) SEAL WHERE APPLICABLE. <br />1.3 QUALITY CONTROL <br />UNLESS OTHERWISE NOTED, PROVIDE NEW MATERIALS FREE OF DEFECTS, WHERE NO SPECIFIC WEIGHTS OR GRADES ARE <br />SPECIFIED PROVIDE MATERIALS OF AN ACCEPTED STANDARD WEIGHT AND GRADE ACCORDING TO CODE AND GOVERNING <br />STANDARDS BY ASHRAE, SMACK NFPA AND UL. INSTALL ALL EQUIPMENT, PIPING, DUCTWORK AND CONTROLS IN <br />ACCORDANCE WITH CODES, GOVERNING STANDARDS, AND MANUFACTURER'S RECOMMENDATIONS. <br />FIRE PERFORMANCE CHARACTERISTICS OF INSTALLED MATERIALS SHALL BE RATED IN ACCORDANCE WITH ASTM E84. <br />MAXIMUM SMOKE DEVELOPED RATING SHALL BE 50. <br />SUPPLIED EQUIPMENT, SHALL BE AS SCHEDULED OR OWNER APPROVED EQUAL IN QUALITY AND PERFORMANCE. <br />1.4 COORDINATION <br />COORDINATE ALL WORK FOR PROPER LOCATION, POWER, AND UTILITY REQUIREMENTS. SCHEDULE INSTALLATIONS TO <br />AVOID CONFLICT AMONG TRADES. ADDITIONS TO THE CONTRACT FOR COORDINATION AMONG TRADES WILL NOT BE <br />ALLOWED. <br />1.5 PENETRATIONS, CUTTING AND PATCHING <br />SEAL ALL PIPING PENETRATIONS OF WALLS IN ACCORDANCE WITH ARCHITECTURAL DRAWINGS AND SPECIFICATIONS. <br />PIPING PENETRATIONS OF RATED FLOORS AND WALLS SHALL BE SEALED WITH FIRE STOPPING MATERIAL. FLASH ALL <br />ROOF AND WALL PENETRATIONS IN ACCORDANCE WITH ARCHITECTURAL DRAWINGS. PROVIDE FIRE DAMPERS AT ALL <br />RATED PENETRATIONS. <br />2.0 PIPING <br />SANITARY, WASTE AND/OR VENT PIPING BELOW FLOOR SLAB: SCHEDULE 40 DWV PVC (SOLID CORE <br />SANITARY, WASTE AND/OR VENT PIPING ABOVE FLOOR SLAB: SCHEDULE 40 DWV PVC (SOLID CORE <br />WATER PIPING BELOW FLOOR SLAB: SCHEDULE 80 CPVC PIPE <br />WATER PIPING ABOVE FLOOR: SCHECULE 40 CPVC PIPE W/SCH 80 CPVC FITTINGS <br />STORM PIPING BELOW FLOOR SLAB: SCHEDULE 40 DWV PVC (SOLID CORE) <br />STORM PIPING ABOVE FLOOR SLAB: SCHEDULE 40 DWV PVC (SOLID CORE) <br />CONDENSATE PIPING ABOVE AND BELOW FLOOR SLAB: PVC <br />VALVES: NIBCO OR EQUAL FULL PORT <br />HOT WATER PIPE INSULATION: 1" FIBERGLASS OWENS CORNING SSL II, ASJ <br />INDIRECT WASTE PIPING: CPVC <br />PIPE HANGERS: 3/8" THREADED ROD, WITH ADJUSTABLE BAND HANGER <br />WATER HAMMER ARRESTORS: SIOUX CHIEF MANUFACTURING HYDRA -RESTER 600 SERIES OR EQUAL <br />3.0 WATER METER <br />REFER TO PLUMBING DRAWING P301 FOR METER INFORMATION AND LOCATIONS. <br />4.0 SUBMITTALS <br />SHOP DRAWINGS MUST BE SUBMITTED AND APPROVED PRIOR TO ORDERING EQUIPMENT. ENGINEER WILL REQUIRE <br />10 BUSINESS DAYS TO REVIEW SUBMITTED SHOP DRAWINGS. <br />PLUMBING GENERAL NOTES <br />1. CONTRACTOR SHALL PROVIDE COMPLETE PLUMBING SYSTEMS AS DETAILED ON THESE DRAWINGS. <br />WORK CONSISTS OF FURNISHING ALL MATERIALS, EQUIPMENT, AND SERVICES REQUIRED FOR <br />COMPLETE SYSTEMS. INCLUDE ANY INCIDENTAL APPARATUS, APPLIANCES, MATERIAL LABOR AND <br />SERVICES NECESSARY TO MAKE NEW WORK COMPLETE IN ALL RESPECTS AND FULLY READY FOR <br />OPERATION. <br />2. VERIFY THE EXACT LOCATION OF EXISTING SANITARY, WASTE, VENT, HOT AND COLD WATER PIPING <br />MAINS FROM THE ACTUAL JOB SITE PRIOR TO SUBMITTING BID. SUBMISSION OF YOUR PROPOSAL <br />SHALL BE CONSTRUED AS INDICATING SUCH KNOWLEDGE. NO ADDITIONAL PAYMENT WILL BE <br />MADE ON CLAIMS THAT ARISE FROM THE CONTRACTOR'S FAILURE TO COMPLY WITH THIS <br />REQUIREMENT. <br />3. ALL PLUMBING WORK SHALL BE DESIGNED, INSTALLED, TESTED, AND CLEANED IN ACCORDANCE <br />WITH THE CURRENT FBC-B-SEVENTH EDITION (2020) AND FBC-P-SEVENTH EDITION (2020) <br />4. MAKE SUCH OFFSETS AND DEVIATIONS FROM WORK SHOWN ON THE DRAWINGS, AS MAY BE <br />NECESSARY TO FIT THE ACTUAL SPACE CONDITIONS. <br />5. WHERE VALVES OCCUR ABOVE DRYWALL OR PLASTER OR ARE CONCEALED BEHIND WALLS, THIS <br />CONTRACTOR SHALL FURNISH AND INSTALL ACCESS PANELS. COORDINATE AND LOCATION COLOR <br />AND STYLE WITH ENGINEER/ARCHITECT. <br />6. INSTALLER SHALL NOT CUT ANY STRUCTURAL MEMBERS WITHOUT FIRST SECURING WRITTEN <br />APPROVAL FROM THE ARCHITECT. <br />7. PROVIDE DIELECTRIC UNIONS AT ALL CONNECTIONS BETWEEN DISSIMILAR PIPING METALS. <br />8. FIELD VERIFY ALL EXISTING PIPE SIZES PRIOR TO INSTALLATION. <br />9. NO VENT THROUGH ROOF SHALL TERMINATE CLOSER THAN 10 FT. TO ANY OUTSIDE AIR INTAKE OR <br />VENTILATION LOUVERS, DOORS, WINDOWS AND OTHER BUILDING OPENINGS. <br />10. ALL SANITARY AND WATER PIPING UNDERGROUND SHALL BE A MINIMUM OF 12" BELOW GRADE OR <br />FINISHED FLOOR UNLESS NOTED OTHERWISE. <br />11. PROVIDE ALL SINKS AND LAVATORIES WITH SUP JOINT TRAP FITTINGS FOR CLEANOUT. <br />12. CONTRACTOR IS RESPONSIBLE TO ALSO CHECKING FIELD CONDITIONS PRIOR TO BIDDING AND <br />REPORT ANY PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY. ANY <br />CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO THE <br />ENGINEER'S ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE <br />OWNER. <br />13. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE(1) <br />YEAR FROM DATE OF FINAL ACCEPTANCE. ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED <br />WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE <br />OWNER AT NO ADDITIONAL COST TO THE OWNER. <br />14. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT, THE CONTRACTOR SHALL REMOVE ALL <br />TOOLS, APPLIANCES, SURPLUS MATERIALS, AND SCRAP. ALL IDENTIFIED EXISTING EQUIPMENT TO <br />BE REMOVED SHALL BE TURNED OVER TO THE OWNER. <br />15. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. <br />PLUMBING FIXTURE SCHEDULE <br />MARK <br />ITEM <br />COLD <br />HOT <br />SANITARY/ <br />VENT <br />WATER <br />WATER <br />GRADE CLEANOUT: ZURN 1470-A CLEANOUT PLUG WITH ZURN 1474 ACCESS COVER AND <br />FERRULE SET FLUSH INTO A CLEANOUT CONCRETE PAD 16"x16'0". NOTE LOCATION OF THIS <br />- <br />SEE <br />- <br />- <br />CLEANOUT FOR TYPE OF DUTY REQUIRED FOR THE COVER. SEE SPECIFICATIONS <br />DRAWINGS <br />FOR PIPE SIZE. <br />WCO <br />WALL CLEANOUT: ZURN Z1469 ROUND STAINLESS STEEL ACCESS COVER WITH SECURING SCREW <br />_ <br />SEE <br />DRAWINGS <br />- <br />- <br />FCO <br />FLOOR CLEANOUT: ZURN ZN1400-BZ1 ADJUSTABLE, WITH POLISHED NICKEL BRONZE TOP <br />_ <br />SEE <br />DRAWINGS <br />- <br />- <br />FD <br />FLOOR DRAIN: ZURN Z415S-ZN 5" X 5' SQUARE TOP, WITH POLISHED NICKEL BRONZE TOP <br />- <br />SEE <br />- <br />- <br />DRAWINGS <br />RHB <br />RECESSED HOSE BIBB: WOODFORD MODEL B65 CHROME FINISH WITH VACUUM BREAKER <br />3/4" <br />SEE <br />DRAWINGS <br />HB <br />-I <br />HOSE BIBB: WOODFORD MODEL 24P CHROME FINISH WITH VACUUM BREAKER <br />3/4' <br />SEE <br />DRAWINGS <br />PRD <br />PRIMARY ROOF DRAIN: ZURN Z100-DP-ZC-VP LOW SILHOUETTE CAST IRON DOME, SECURED TOP <br />- <br />SEE <br />DRAWINGS <br />- <br />- <br />ORD <br />OVERFLOW ROOF DRAIN: ZURN Z100-DP-ZC-VP-W2 LOW SILHOUETTE CAST IRON DOME, <br />_ <br />SEE <br />SECURED TOP WITH 2" INTERNAL WATER DAM <br />DRAWINGS <br />DNZ <br />DOWNSPOUT NOZZLE: ZURN Z199-ZAB DECORATIVE FACE WITH WALL FLANGE AND OUTLET NOZZLE <br />_ <br />SEE <br />DRAWINGS <br />AAV <br />AIR ADMITTANCE VALVE: STUDOR IPS CORPORATION MINI VENT <br />- <br />- <br />- <br />- <br />WHA <br />WATER HAMMER ARRESTORS: SIOUX 650 SERIES SIZE AS REQUIRED <br />- <br />- <br />- <br />- <br />BUILDING CODES <br />THESE PLANS WERE PREPARED IN ACCORDANCE WITH THE FLORIDA BUILDING CODE 7th EDITION (2020) INCLUDING <br />ALL APPLICABLE SECTIONS OF FBC BUILDING, MECHANICAL, PLUMBING, FUEL GAS, RESIDENTIAL, ENERGY <br />CONSERVATION, TEST PROTOCOLS, ACCESSIBILITY, EXISTING BUILDING INCLUDING BUT NOT LIMITED TO THE <br />FOLLOWING REFERENCED STANDARDS. ALL MECHANICAL WORK PERFORMED SHALL MEET THE APPLICABLE <br />REQUIREMENTS OF THESE CODES AND REFERENCED STANDARDS: <br />• FLORIDA FIRE PREVENTION CODE, INCLUDING THE FLORIDA EDITIONS OF NFPA 1 (FIRE CODE) AND NFPA 101 <br />(LIFE SAFETY CODE) <br />• NFPA-70 (NATIONAL ELECTRIC CODE, 2014 ED.) <br />• NFPA 90A (STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATION, 2015 ED.) <br />• ASHRAE 62.1 (VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY, 2013 ED.) <br />• SMACNA/ANSI (HVAC DUCT CONSTRUCTION STANDARDS, METAL & FLEXIBLE, 2005 3RD ED.) <br />• SMACNA (FIBROUS GLASS DUCT CONSTRUCTION STANDARD, 2003 7TH ED,) <br />• NAIMA AH116 (FIBERGLASS DUCT CONSTRUCTION STANDARDS, 2009 ED.) <br />• MSS SP-58 (PIPE HANGERS AND SUPPORTS -MATERIALS DESIGN AND MANUFACTURE, SELECTION, APPLICATION <br />AND INSTALLATION, 2009 ED.) <br />DRAWING INDEX <br />PLUMBING <br />P000 ABBREVIATIONS, LEGENDS, GENERAL NOTES AND FIXTURE SCHEDULE <br />P101 PLUMBING SANITARY FIRST FLOOR PLAN <br />P102 PLUMBING SANITARY SECOND FLOOR PLAN <br />P103 PLUMBING SANITARY THIRD FLOOR PLAN <br />P104 PLUMBING ROOF PLAN <br />P105 PLUMBING DOMESTIC WATER FIRST FLOOR PLAN <br />P106 PLUMBING DOMESTIC WATER SECOND FLOOR PLAN <br />P107 PLUMBING DOMESTIC WATER THIRD FLOOR PLAN <br />P201 PLUMBING SANITARY AND VENT APARTMENT ENLARGED PLANS <br />P301 PLUMBING DOMESTIC WATER APARTMENT ENLARGED PLANS <br />P401 PLUMBING DETAILS <br />P402 PLUMBING DETAILS <br />P501 PLUMBING RISER DIAGRAMS <br />P601 PLUMBING RISER DIAGRAMS <br />PLUMBING FIXTURE SCHEDULE <br />MARK <br />ITEM <br />COLD <br />WATER <br />HOT <br />WATER <br />SANITARY/ <br />WASTE <br />VENT <br />WATER CLOSET: WESTERN POTTERY 832T8HET VITREOUS CHINA, 2 PIECE FLOOR MOUNTED <br />12" ROUGH ELONGATED BOWL 1.6 GPF <br />1/2" <br />- <br />3" <br />2" <br />SEAT: HEAVY DUTY SOLID PLASTIC SEAT CLOSED FRONT SEAT WITH COVER <br />BRASSCRAFT- 1/2" X 3/8" X 12' LEAD FREE LONG FLEXIBLE RISER WITH 1/4 TURN STOP <br />COLOR AND TRIM FINISH SELECTION BY ARCHITECT <br />WATER CLOSET: WESTERN POTTERY 872T8HET VITREOUS CHINA, 2 PIECE FLOOR MOUNTED <br />12" ROUGH ELONGATED BOWL 1.28 GPF <br />1/2' <br />- <br />3' <br />2" <br />wcH <br />SEAT: HEAVY DUTY SOLID PLASTIC SEAT CLOSED FRONT SEAT WITH COVER <br />BRASSCRAFT: 1/2" X 3/8" X 12" LEAD FREE LONG FLEXIBLE RISER WITH 1/4 TURN STOP <br />COLOR AND TRIM FINISH SELECTION BY ARCHITECT <br />LAVATORY: WESTERN POTTERY 196 VITREOUS CHINA, 4' CENTER HOLES, UNDERCOUNTER MOUNTED <br />FAUCET: DELTA 520LF-HDF SINGLE HANDLE 4" CENTERSET CHROME PLATED WITH POP-UP DRAIN <br />LAV <br />TRAP: PPRDFTLOO PFPTEB403 1-1/4" X 1-1/2" CHROME PLATED 'P' TRAP WITH CLEANOUT <br />SEE <br />1/2" <br />1/2" <br />DRASEE <br />WINGS <br />DRAWINGS <br />RAFT: 1 /2" X 3/8' X 12" LEAD FREE LONG FLEXIBLE RISER WITH <br />SUPPLIES: B�411S� <br />1URN STOP <br />COLOR AND FINISH SELECTION BY ARCHITECT <br />LAVATO : WESTERN POTTERY 188 VITREOUS CHINA, 20"X16' RETANGULAR, UNDERCOUNTER MOUNTED <br />FAUCET: DELTA 520LF-HDF SINGLE HANDLE 4' CENTERSET CHROME PLATED WITH POP-UP DRAIN <br />�� <br />TRAP: PROFLO PFPTB403 1-1/4' X 1-1/2' CHROME PLATED 'P" TRAP WITH CLEANOUT <br />SEE <br />SEE <br />AND TAILPIECE <br />1/2" <br />1/2' <br />DRAWINGS <br />DRAWINGS <br />SUPPLIES: BRASSCRAFT: 1 2' X 3/8" X 12' LEAD FREE LONG FLEXIBLE RISER WITH <br />1/4' TURN ST P <br />INSULATE WASTE AND WATER SUPPLIES WITH TRUBRO PIPE INSULATION OR EQUAL <br />COLOR AND TRIM FINISH SELECTION BY ARCHITECT <br />KITCHEN SINK: PROFLO PFSR332283 20 GAUGE STAINLESS STEEL DOUBLE COMPARTMENT, <br />UNDERCOUNTER MOUNTED <br />KS <br />FAUCET: DELTA 400-BH-DST SINGLE LEVER WITH SPRAY CHROME PLATED FAUCET 8' CENTERS <br />SEE <br />SEE <br />DRAIN: PROFLO PF1431SS STAINLESS STEEL BASKET STRAINER, TAILPIECE <br />1/2' <br />1 /2' <br />TRAP: PROFLO PFPTB403 1 1/2' X" 1-1/2' CHROME PLATED 'P" TRAP AND TAILPIECE <br />DRAWINGS <br />DRAWINGS <br />M <br />SUPPLIES: BSCRAFT: 112 X 3/8 X 12 LEAD FREE LONG FLEXIBLE RISER WITH <br />1 4 TURN STUOP <br />TRIM FINISH SELECTION BY ARCHITECT <br />KITCHEN SINK: PROFLO PFUC301A 20 GAUGE STAINLESS STEEL SINGLE COMPARTMENT, <br />UNDERCOUNTER MOUNTED <br />FAUCET- DELTA 400-BH-DST SINGLE LEVER WITH SPRAY CHROME PLATED FAUCET 8' CENTERS <br />KS1 <br />DRAIN: PROFLO PF1431SS STAINLESS STEEL BASKET STRAINER, TAILPIECE <br />1/2" <br />1/2" <br />SEE <br />SEE <br />TRAP: PROFLO PFPTB403 1 1/2" X1-1/2" CHROME PLATED "P' TRAP AND TAILPIECE <br />DRAWINGS <br />DRAWINGS <br />A <br />SUPPLIES: BfjAA$SCRR Ff fP X 3/8r X 12 LEAD FREE LONG FLEXIBLE RISER WITH <br />�S4E�LECTION <br />TRIM FINISH BY ARCHITECT <br />SINK: PROFLO PFSR252283A 20 GAUGE STAINLESS STEEL SINGLE COMPARTMENT DROP IN <br />FAUCET: DELTA 400-BH-DST SINGLE LEVER WITH SPRAY CHROME PLATED FAUCET 8' CENTERS <br />SK <br />DRAIN: PROFLO PF1431SS STAINLESS STEEL BASKET STRAINER, TAILPIECE <br />"P" <br />1/2" <br />1/2" <br />SEE <br />SEE <br />TRAP: PROFLO PFPTB403 1-1/2* X 1-1/2" CHROME PLATED TRAP AND TAILPIECE <br />DRAWINGS <br />DRAWINGS <br />SUPPLIES: B $SCRAFT: 1/2' X 3/8' X 12" LEAD FREE LONG FLEXIBLE RISER WITH <br />1� TURN STOP <br />TRIM FINISH SELECTION BY ARCHITECT <br />MOP SINK: MUSTEE MODEL 63M 24' X 24' X 10' <br />SK-1 <br />MUSTEE MODEL 63.00A ROUGH CHROME FAUCET <br />1/2" <br />1/2" <br />3• <br />2" <br />MUSTEE MODEL 65.700 HOSE AND HOSE HOLDER <br />MUSTEE MODEL 65.600 MOP HANGER <br />MUSTEE MODEL 67.2424 WALL GUARDS <br />SHOWER: AQUATIC 1363BFR 36' X 36' X 75-1/2" H, WITH FOLD UP SEAT AND L BARS <br />SHOWER VALVE: DELTA R1000 SERIES SHOWER ROUGH, PRESSURE BALANCING VALVE <br />SHE <br />SHOWER TRIM: DELTA T13020 TRIM <br />1/2' <br />1/2" <br />2" <br />2" <br />SHOWER HAND HELD KIT- DELTA 51900 ADA SHOWER KIT 24" LONG GRAB BAR, 9 SETTING HAND <br />SHOWER PUSH BUTTON, 2.0 GPM MAXIMUM FLOW <br />WASHER CONNECTION: IPS CORP 85701 WHITE HIGH IMPACT POLYSTRENE RECESSED MOUNTED WALL <br />1/2" <br />1/2" <br />2' <br />1-1/2' <br />WMB <br />BOX, 2" DRAIN OUTLET AND 1/2' HOT AND COLD WATER HOSE BIBBS WITH WATER HAMMER <br />ARRESTORS <br />ICE MAKER HOOK-UP: IPS CORP MI62HAAB WHITE HIGH IMPACT POLYSTRENE RECESSED MOUNTED <br />1/2" <br />- <br />- <br />- <br />WALL BOX WITH 1/2' WITH LEAD FREE WATER HAMMER ARRESTOR <br />BATHTUB: BOOTZ 011-2390/2391 SYNIRON 5'-0" - 30" WIDE SLIP RESISTANT <br />SHOWER TRIM: DELTA T13420-H2OT PRESSURE BALANCING CHROME PLATED BATH AND SHOWER TRIM <br />SHOWER VALVE: DELTA10000UNWS MULTICHOICE PRESSURE BALANCING VALVE BODY <br />SCREWDRIVERBT <br />1/2' <br />1-1/2" <br />1-1/2' <br />1-1/2" <br />AND <br />POP-UP WASTE WITH OVERFLOW: MCGUIRE 1221PU OR EQUAL <br />TRAP: PROFLO 1-1/2' X 1-1/2* PVC "P" TRAP AND TAILPIECE <br />COLOR AND TRIM FINISH SELECTION BY ARCHITECT <br />(REFER TO ARCHITECTURAL DRAWING FOR RIGHT/LEFT HAND INSTALLATIONS) <br />BATHTUB: BOOTZ 011-2390/2391 SYNIRON 5'-0" - 30" WIDE SUP RESISTANT <br />SHOWER TRIM: DELTA T13420-H2OT PRESSURE BALANCING CHROME PLATED BATH AND SHOWER TRIM <br />MULTICHOICE PRESSURE BALANCING VALVE BODYAND <br />SHOWER VALVE: DE TA R10000-UNWSREWDRIVER <br />1/2" <br />1-1/2' <br />PS <br />1-1/2' <br />1-1/2" <br />HAND HELD SHOWER: DELTA 51900 WITH 30" CHROME PLATED SLIDE BAR <br />BTH <br />- <br />POP-UP WASTE WITH OVERFLOW: MCGUIRE 1221PU OR EQUAL <br />TRAP: PROFLO 1-1/2' X 1-1/2' PVC "P' TRAP AND TAILPIECE <br />COLOR AND TRIM FINISH SELECTION BY ARCHITECT <br />(REFER TO ARCHITECTURAL DRAWING FOR RIGHT/LEFT HAND INSTALLATIONS) <br />FWD <br />FOOD WASTE DISPOSAL- BADGER 5, 1/2HP, 120 /1PH/60 CY, 3 YEAR WARRANTY, 6.9 AMPS <br />_ <br />- <br />- <br />EQUAL TO ISE IN-SINK-ERATOR OR EQUAL <br />ELECTRIC WATER HEATER: EQUAL TO A.O. SMITH PROUNE ENJ-40, .93 ENERGY FACTOR 2-4500/4500 <br />EWH <br />WATTS 208/1/60 NON SIMULTANEOUS ELEMENT OPERATION, 10 YEAR WARRANTY MOUNTED IN <br />3/4" <br />3/4" <br />DRAIN PAN ON FABRICATED STAND BELOW HVAC EQUIPMENT OPEN END 3/4' DRAIN TO <br />FLOOR DRAIN (SEE DETAIL FOR FURTHER INFORMATION) <br />Furr, <br />Wegman & <br />Banks <br />Architects, P.A. AR0006480 <br />625 EAST ORANGE ST. <br />LAKELAND, FL 33801 <br />E-MAIL: INFO@FW BARC HITECTS.COM <br />W W W.FW BARC HITECTS.COM <br />PH. 863.688.1211 <br />® COPYRIGHT 2021 <br />FURR, WEGMAN & BANKS ARCHITECTS, PA <br />THE DESIGN AND CONCEPTS DEPICTED HEREWITH ARE THE SOLE <br />PROPERTY OF FURR, WEGMAN & BANKS ARCHITECTS, PA. <br />NO REPRODUCTION, REVISION OR REUSE OF THIS DRAWING IS <br />E AUTHORD WITHOUT SPECIFIC WRITTEN PERMISSION. <br />ALL RIGHTS RESERVED. <br />•� E Ns NFL ''- <br />� C-5� f Ste; <br />* No. 86539 <br />�0, Ug 0 \' <br />FL. UC. ONTO. 02-28-2023 <br />� N <br />a o <br />_�� <br />aSri lam- = 4 <br />z <br />J <br />z <br />0 <br />w <br />LLI <br />U) <br />U) <br />x <br />z <br />0 <br />d <br />U) <br />Lu <br />0 <br />z <br />0 <br />U) <br />Lu <br />IY <br />w <br />0 <br />CV <br />m <br />d <br />0 <br />w <br />t` <br />N <br />0 <br />N <br />W <br />N <br />coCD <br />I` <br />0 <br />Li <br />Z <br />o <br />J <br />W <br />Z <br />W <br />0 <br />0 <br />Z <br />U) <br />Q <br />Z <br />W <br />w <br />Z <br />:D <br />O <br />o <br />F- <br />Z <br />Q <br />UD <br />o <br />> <br />_j <br />U <br />Jm <br />� <br />� <br />CIOH <br />00 <br />Z F_ <br />z <br />Q <br />�Z � <br />o <br />0W �L <br />Z <br />(6 <br />�J F- <br />Z J <br />o <br />T- <br />o� <br />w <br />W <br />�' C <br />_ <br />W a coN <br />PROJ MGR: <br />CKD BY: <br />RR/SJ <br />SN <br />JOB NUMBER: <br />21-19 <br />SHEET NUMBER: <br />POO0 <br />Z:\Furr Wegman & Banks Archkects\211036 - Healthier Stay Pasco Dormitory\Design\211036 POOO.dwg, August 27, 2021 4:13 PM, SHAWN JEFFREY, <br />