My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6439 Back Forty Lp
Zephyrhills
>
Building Department
>
Building Plans
>
6439 Back Forty Lp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 2:58:28 PM
Creation date
2/18/2025 3:35:52 PM
Metadata
Fields
Template:
Building Plans
Street #
6439
Location
Back Forty Lp
Contractor
Lennar
Building Plans - Permit #
Unknown
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCALE: <br />NOTE: <br />THESE DETAILS ARE NOT PLAN <br />SPECIFIC. THEY ARE PROVIDED TO <br />YOU AS A STANDARD TO CONSTRUCT <br />STAIRS. REFER TO PLAN DETAILS <br />FOR RISE AND RUN INFORMATION. <br />2x4 SPF NOSING GLUED AND <br />NAILED MATCH NOSING ON <br />OTHER TREADS <br />�s <br />3/4" RISER CUT TO FIT 2x4 SYP BLOCKING <br />MAINTAIN BETWEEN 1/4" FOR STRAP (SIMPSON <br />AND 1/2" GAP TOP AND MTS12 w/ (14)10d x 1 <br />BOTTOM, GLUED AND 1/2" NAILS) <br />NAILED TO STRINGER <br />2x12 TREAD <br />GLUED AND <br />NAILED <br />2x4 PT NOTCHED INTO <br />STRINGER AND TAPCONED 2x8 SYP DRYWALL STOP MUST <br />INTO FLOOR WITH GLU NOT TOUCH STRINGERS <br />STRINGER CONTACT 2x4 BLOCK IN KNEEWALL FOR 2x12 NAILING <br />POINTS x4 GLUYED AND NAILED TO STRINGER <br />E FOR DRYWALL SPACING <br />VVNLL <br />3YP CUT TO FIT <br />kRS IN WALL <br />----2x12 SYP <br />BEARS IN WALL <br />SYP <br />2x4 PT NOTCHED INTO STRINGER - <br />AND NAILED TO FLOOR WITH GLUE <br />AT STRINGER CONTACT POINTS <br />VIEW "A" <br />SCALE: 1" = V-0" <br />I PT NOTCHED INTO STRINGER <br />D NAILED TO FLOOR WITH GLU <br />STRINGER CONTACT POINTS <br />SECTION VIEW "D" <br />FILLER STRIPS ADDED <br />GLUED & SCREWED TO <br />PLYWOOD DECKING <br />SCALE: 1" = 1'-0" <br />PLYWOOD <br />x SYP CUT TO FIT <br />BEARS IN WALL <br />2x12 SYP <br />BEARS IN WALL <br />BULLNOSE DETAIL <br />SCALE: 1" = V-0" <br />LINGER <br />GLUED <br />D NAILED <br />SECTION D-D <br />SCALE: 1" = V-0" <br />3/4 PLYWOOD <br />ON DECK <br />--2x8 SYP GLUED <br />AND NAILED TO <br />FRAMING <br />2x4 DRAFT 2x12 <br />STOP TREAD <br />GLUED <br />AND <br />2x4 PT NOTCHED INTO <br />STRINGER AND TAPCONED <br />INTO FLOOR WITH GLUE -AT <br />STRINGER CONTACT <br />POINTS <br />J <br />2x4 SYP BLOCKING <br />FOR STRAP <br />(SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS) <br />`f 2x8 SYP DRYWALL STOP MUST <br />NOT TOUCH STRINGERS <br />iLUED AND NAILED TO STRINGER <br />DRYWALL SPACING <br />ALIGN THIS STUD WITH <br />FACE OF 2ND RISER <br />2x4 SYP BLOCKING <br />FOR STRAP <br />(SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS) <br />SECTION VIEW "B" <br />3/4" RISER CUT TO FIT <br />MAINTAIN BETWEEN" <br />AND GAP TOP AND <br />BOTTOM, GLUED AND <br />NAILED TO STRINGER <br />2x4 BEHIND RISER <br />BLOCKING FOR <br />1x4 GLUED AND NAILED TO STRINGER STRAP GLUED TO <br />2x4 DRAFT RISER AND TREAD <br />STOP <br />2x8 SYP DRYWALL STOP MUST <br />NOT TOUCH STRINGERS <br />BLOCKING FOR 2x12 <br />PT UNDER 2x12 c <br />ATTACH ALL COMPONENTS <br />OF STAIR TO CONC. W/ J" X <br />2" TAPCONS @ MAX. 32" O.C. <br />G-1 <br />SCALE: 1" = V-0" <br />ALIGN THIS STUD WITH FACE OF 2nd RISER <br />TOP OF <br />STRINGER <br />�4 <br />TREAD-�_ <br />2x4 SYP BLOCKING <br />FOR STRAP <br />(SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS) <br />SECTION VIEW "E" <br />SCALE: 1" = V-0" <br />H SECTION VIEW E SECTION VIEW <br />SCALE: ' = V-0" SCALE: }" = 1'-0" <br />3/4 PLYW <br />ON DECK <br />---2x8 SYF <br />AND Ni <br />FRAMI� <br />2x4 DRAF' <br />STOP <br />2X4 BLOCk <br />C <br />- 1x4 GLUED AND NAILED TO STRINGER <br />2x4 DRAFT <br />STOP Ac' <br />-2x8 SYP DRYWALL STOP <br />MUST NOT TOUCH <br />STRINGERS <br />2x4 BLOCKING FOR 2x12 <br />2x4 PT UNDER 2x12 <br />SIMPSON A35 <br />OR LSC EACH <br />STRINGER — <br />OPTION: 2X4 CUT ON <br />BEVEL GLUED AND <br />NAILED TO SUPPORT <br />W/ SIMPSON H3 — <br />2x12 SYP SCAB 2x4 GLUED AND NAILED (EACH <br />STRINGER [SIDE) TO BOTTOM EDGE OF 2x12 <br />1 STRINGER <br />/ PROVIDE MOISTURE <br />PROTECTION <br />ATTACH ALL COMPONENTS <br />OF STAIR TO CONC. W/i" X <br />2 Jq" TAPCONS @ MAX. 32" O.C. <br />—1x4 GLUED AND <br />NAILED TO STRINGER <br />SECTION VIEW "C" <br />SCALE: 1" = V-0" <br />FLOOR TRUSS OR CONN. TO BOTT, <br />GIRDER, FIELD VERIFY OF NEWEL POST <br />PER CONTRACT <br />(2) LAYER" EDGE GOLD <br />OSB OR PLYWOOD <br />OR 1 J"X16" LVL <br />ATTACHED W/ 12d NAILS <br />@ 6" O.C. TOP, BOTTOM <br />AND VERT. <br />SECTION VIEW "G" <br />SCALE: 1" = 1'-0" <br />PROVIDE SOLID BLOCKING <br />BELOW ALL NEWEL POST <br />FROM JOIST TO JOIST. USE <br />2 X 12 BLOCKS, GLUED AND <br />NAILED TO JOIST. <br />L POST LET INTO <br />LOCK <br />IDE <br /><ING <br />2X8 BLOCKING <br />FOR NEWEL POST <br />TO ANCHOR TO. <br />(GLUED AND NAILED) <br />LOOR <br />TRUSSES <br />NEWEL POST <br />BLOCKING <br />� 1 /'-'� I I" � l� V I V � I I'i V l.r I I V I V L.► C I /`� I L �7 <br />(IF 11X17 REDUCE SCALE .5) SCALE: AS NOTED <br />SCALE: 1" = 1'-0" <br />JOINT <br />-TO <br />)ISTS) <br />NAILED AND <br />> TOP PLATE <br />`sITO RIM BAND, <br />ID NAILED TO <br />WALL BELOW <br />JOINT <br />-TO <br />)ISTS) <br />2X <br />PSON MT <br />10dxl 1/ <br />ECTION VIEW "H" <br />SCALE: 1" = 1'-0" <br />'e <br />CM <br />N <br />O <br />N <br />t 0 <br />Ln <br />U. t <br />0 <br />41 <br />`^ }, <br />Q <br />N a) LOW >Or 0 <br />Z. C so <br />U <br />p c) ai <br />m <br />N <br />0 -a om <br />` = <br />2 V <br />0 i° 8 o Q <br />g <br />.s wo <br />N•■ QN C <br />n, Y 00 !✓ � Cj <br />W L O N <br />a ^ a <br />W <br />w <br />LU W � QQ��+ � 0 <br />O <br />J O <br />J O <br />LL <br />Q <br />Cn <br />UU) 0' z0E:0c <br />00o <br />z <br />QMO <br />On <br />0 Z <br />A W W_nxQ <br />LUW0Z:a <br />ow�gzwzOwUpa <br />OP 6z <br />y <br />W Z)OQ QLL <br />Q <br />QLL <br />tL0 <br />!1 <br />O <br />z W <br />OIll- <br />U J ti <br />pG <br />Q cM <br />Q � M Lo <br />z <br />U) U_ III, <br />G U <br />to <br />z <br />Lid <br />I— W d- cM <br />�°-�T- <br />< >_ <br />Z U ~ <br />z ?� <br />W <br />Wo <br />J <br />JCD <br />O <br />d' <br />2 <br />oz <br />Virtual <br />Ri <br />vie <br />�ss�si, <br />I <br />Plans Review <br />r compliance <br />c <br />mpl <br />led <br />nd <br />, <br />ppr <br />with <br />by Debra Anne <br />the <br />202 <br />I4hr <br />FB <br />P�2 <br />7th <br />dit <br />on <br />!— <br />o <br />0 <br />N <br />0 <br />LO <br />ti <br />M <br />M <br />1 <br />Q <br />0 <br />°'Q0 <br />0 <br />� <br />c <br />I <br />i <br />z <br />N 'n <br />Wq <br />, <br />� <br />N <br />�� <br />00 <br />Z <br />V, <br />aZ <br />CDW <br />W <br />00LU 0 <br />4_j <br />0 <br />00� <br />U") -� <br />O <br />Or< <br />z <br />IX <br />Ln <br />pF O <br />N <br />zoo <br />>- <br />a�:) <br />O <br />Q <br />gW� <br />. <br />ry <br />z <br />z <br />aZ <br />N <br />H <br />U <br />0 <br />_012 <br />W <br />z <br />ST <br />z <br />Z <br />W <br />W '^ <br />J <br />N <br />LAST PLOT DATE <br />0 <br />z 0 <br />J <br />STAIR DETAILS <br />
The URL can be used to link to this page
Your browser does not support the video tag.