Laserfiche WebLink
THIS DETAIL ONLY REFERS TO THE DIAMOND -MESH <br />EXPANDED METAL LATH ATTACHMENT. <br />METAL LATH - <br />WALL SHEATHING <br />16GAO-1i2" LONG (3/4"-1" CROWN) -- _ MAk <br />STAPLES @ 6" O.C. VERT BETWEEN 1 16GAx1-1/2" LONG t3f4"-1" <br />STUDS (NOTED THUS:-) - OFFSET I I I I I CROWN) STAPLES id 6" <br />STAPLES BETWEEN STUDS AS SHOWN -_I .. .-.-... -. O.C. VERT INTO STUDS <br />(NOTED THUS:-) <br />METAL LATH ATTACHMENT DETAIL <br />REV. 09.24.21 SCALE: 3/4" = V-0" <br />*DETAIL EXCEEDS THE REQUIREMENTS FOR FBCR 703.7.1 LATH* <br />"`ONLY APPLIES TO LENNAR TPAIJAX** <br />LATHING ACCESSORIES: <br />ATTACHMENTS SHALL BE OF CORROSION -RESISTANT MATERIALS. <br />WOOD APPLICATION: 16 GA. x 1-1/2" LONG (3/4"-1" CROWN) STAPLES @ 6" O.C. <br />VERTICALLY/HORIZONTALLY INTO FRAMING MEMBERS. <br />MASONRY APPLICATION: CONCRETE STUB NAIL, 3/8" (10 MM) HEAD DIA. MIN. @ <br />6" O.C. VERTICALLY/HORIZONTALLY OR COMPATIBLE ADHESIVES, EXTERIOR <br />GUN -GRADE, CONSTRUCTION ADHESIVE WITH 1" DABS @ 6" O.C. OR IN A <br />SEMI -CONTINUOUS BEAD BETWEEN THE SOLID PLASTER BASE AND THE SOLID <br />PORTION OF THE KEY ATTACHMENT FLANGE. <br />CONTROL JOINTS: INSTALL CONTROL JOINT LATHING ACCESSORIES IN <br />CONFORMANCE WITH C1063. LATH SHALL NOT BE CONTINUOUS THROUGH <br />CONTROL JOINTS, BUT SHALL BE STOPPED AND TIED AT EACH SIDE. <br />ALL ACCESSORIES SHALL BE IN ACCORDANCE WITH THE LATEST ASTM C1063 & <br />ASTM C1861. <br />CORNER OF <br />HOME <br />GARAGE SIDE <br />10'-0" <br />TANK -LESS W/H <br />,7211i <br />STUB -OUT FOR -' <br />GAS METER O <br />0 <br />CV <br />H C G <br />000 <br />�o <br />0 9 ' <br />o LO <br />x <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />w <br />15/32" CDX <br />PLYWOOD OR <br />7/16" OSB <br />RIDGE LINE <br />140 MPH <br />(ult)3 SECOND GUST EXPOSURE "C" WIND ZONE 140 MPH (ult) 3 SECOND GUST EXPOSURE "C" <br />WIND ZONE <br />8d RING SHANK NAILS @ 6" O.C. & 8d RING SHANK NAILS @ 6" O.C. EDGES & <br />+ + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS 8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />+ + 0.113 INCH NOMINAL SHANK DIAMETER 0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH 16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER 0.280 INCH FULL ROUND HEAD DIAMETER <br />2-3/8 INCH NAIL LENGTH 2-3/8 INCH NAIL LENGTH <br />NOTE: * FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAYBE USED <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ + <br />+ <br />+ + <br />+ + <br />+ + + + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ + <br />+ + <br />+ + <br />+ + + + + <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />9�F <br />+ <br />+ <br />+ + <br />+ + <br />+++ <br />+++ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ + + + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ + <br />+ + <br />+ + + + <br />+ <br />+ <br />Backer and Filler Block Dimensions <br />BCI®Joist <br />Backer Block <br />Thickness <br />Filler Block Thickness <br />Series <br />5000s 1.8/1.7 <br />3/4" or 7/8" <br />wood panels <br />Two 3/4" wood panels or 2 x _ <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />60 2.0 <br />wood panels <br />2x _ + 5/8" or 3/4" wood panel <br />902.0 <br />2 x _ lumber <br />Double 2 x _ lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking ° <br />1/8" gap r <br />r <br />FILL CELL <br />STD, 90° HOOK BOND BEAM <br />U) <br />w <br />...... ........... ..... <br />`z <br />STD. 90° <br />CONT. #5 <br />CONT. #5 HOOK <br />BAR <br />BAR <br />#5 CONT. <br />.... .... . <br />.. ..... <br />......... <br />.................. <br />.......... <br />. <br />............ <br />.. <br />FROM <br />FOUNDATION <br />TO HIGHEST <br />BOND BEAM <br />BEAM STEP <br />BOND <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />PLYWOOD FLOOR <br />SEE PLAN FOR REQ'D <br />SHEATHING PER PLAN <br />COLUMN AND <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION <br />@ INT. BRG. WALL <br />N.T.S. <br />1/8" min. } Small gap ?" min. <br />2," <br />max. � 4 max. <br />Clinch nails <br />when <br />possible <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />2x4/Plywood/OSB web stiffener 2" min. <br />4) Place joists together and nail from each side with 2 rows of 10d nails required when indicated or 4" max. <br />2x_; CONTIACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVING Ya" GAP @ TOP sides by 6". - Hangers with sides not containing WEB STIFFENER <br />top flange of joist. <br />DOUBLE JOIST CONNECTION - Birdsmouthcuts. N.T.S. <br />- Under 2nd floor column w/ loads <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />"Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />Check <br />wall or beam below,"'consideration. <br />local building <br />1116" <br />code for appropriate <br />IL <br />details in <br />One 10d box <br />areas=20 of high <br />or-20 sinker <br />lateral load. <br />nail each side <br />at bearing. <br />Squash block <br />(2x4 minimum) <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam <br />Boise Joist Blocking <br />Use 3" (10d) nails at 6" o.c. <br />�� Provide adequate bearing <br />for each lapped joist. <br />Odnails SECTION @ INT. BRG. WALL <br />N.T.S. <br />`-Z ' MINIMUM SPACING = 2x GREATEST <br />KNOCKOUTS) ALLOWED DIMENSION OF LARGEST HOLE <br />IN BEARING ZONES D (KNOCKOUT EXEMPTS) <br />(see table below) D <br />(see table below) <br />DO NOT cut, notch <br />or drill flanges <br />CO "' CO <br />A 1Y2" ROUND HOLE MAY 6"16" DO NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN 1Yz" <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1Y" <br />higher than 15001b. <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : - for vertical load transfer <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Joist <br />When joists meet over wall, provide <br />r1 3/4" minimum bearing for each. 1-Joist can be offset <br />�" <br />Use 10dx3" nails at 6"o.c. for all joist <br />blocking panel "Non -stacking walls <br />require additional consideration.— <br />r1d Hole Diameter in <br />2 <br />3 <br />4 <br />6 <br />7 <br />8 <br />8.875 <br />10 <br />11 <br />12 <br />13 <br />en ular Hole Side In <br />g�. (') <br />2 <br />3 <br />5 <br />6 <br />8 <br />9 <br />10 <br />Any 16" joist <br />Span rt) <br />8 <br />1°-0"' <br />V-1 "' <br />V-2" <br />r-2 <br />V-3" <br />V-3" <br />V-7" <br />V-11" <br />2'-4" <br />2'-9•" <br />3%2" <br />3' 7" <br />12 <br />V-0" <br />V-1" <br />V-2" <br />V-3" <br />1'-9" <br />2'-4" <br />2'-11" <br />3 7" <br />4'_2" <br />4'-9" <br />5'-4" <br />16 <br />1'-0" <br />1'-1" <br />V-2" <br />V-7" <br />2'-5" <br />3'-2" <br />3'-10" <br />1 4'-9" <br />1 5'-7" <br />1 6'-4" <br />1 7' -2" <br />20 <br />V-0" <br />V-1" <br />V-2" <br />1'-2" <br />2'-0" <br />3'-0" <br />24 <br />V-0" <br />V-1" <br />V-2" <br />1'-3'" <br />2'-5" <br />S-7" <br />4'-9" <br />5'-10" <br />1 7'-2" <br />1 8'-4" <br />1 9'-6" <br />1 10'-9" <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. %" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE 1Y" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION, USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />up to 3 to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />Backer block (12" wide min.) <br />Nail with 10-'I^d nails. <br />_-,Install tight to top flange. <br />Joist <br />\ Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />1/4"-2" gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4%2" gap at top of bottom 1/4"-2" gap at bottom of top <br />flange. flange. <br />eb stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger, doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />p depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />Web Stiffener Fastener Schedule <br />Joist BearingLocation <br />Series Depth <br />End <br />Intermediate <br />® <br />BC15000S <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />BCI 6000so <br />BCI6500s® <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI60so <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BC190s® <br />" <br />3-16d <br />3-16d <br />14" <br />5-1 d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />SIMPSC <br />wl (22) <br />NAILS 1 <br />5/8"0 <br />THRU <br />BOLT <br />SIMPSC <br />wl (22) <br />NAILS 1 <br />R TRUSS <br />'OP PLATE <br />I.0 <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />MIN. EMBEDMENT <br />SCHEDULEFOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20/ <br />Plumbing HETAL20 INSTALLATION <br />�L <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />' <br />_ <br />��IIIIF�IIE�II�III�IIC� <br />SLEEVE THRU STEMS <br />° <br />SEE PLAN FOR--'•• a . • • a <br />FOUNDATION INFO ^ d <br />STEM FOUNDATION <br />GRADE <br />_ a <br />r- REINF. SEE PLAN <br />A/C CHASE �PVC (2) #5 REBAR <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />LOCATION OF <br />SECOND H10A <br />SIMPSON H10A (WHEN <br />w/ (18) 10d x 1 1/2" ° REQUIRED) <br />NAILS <br />UPLIFT = 1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ FITS INSTALLATION <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE <br />PENETRATION <br />12" BELOW <br />GRADE <br />PLUMBING LINE <br />PVC OR SCH40 SLEEVE <br />a <br />7 a <br />I I� III <br />1= a I I a. d °d <br />1I ll_ •..i i lli <br />JUL 4 <br />r <br />SEE FND. PLN. <br />SIZE & REINF. VR/ <br />rtual Review Assist. In <br />PIPE VERTICAL THRUPFIiview completed and a <br />for compliance with the 2020 FB( <br />by Debra Anne Klahr PX2 <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE PLUMBING LINE <br />PENETRATION <br />� d a <br />------- <br />- p d <br />• a'a : d <br />--------------- <br />d <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />--------\ . --.— -- ° / av G <br />a a_ <br />414 <br />i <br />'-a------� . T <br />t. <br />SEE FND. PLN. <br />SIZE & REINF. <br />r <br />� <br />f0 <br />o <br />N <br />Ado <br />00 <br />u7 <br />LO <br />J , co � <br />• <br />d <br />N �- E 9 <br />Qi > O o <br />V -r- �O <br />V/ U <br />0 M <br />i, N M M <br />��o°� U <br />E O U <br />cy <br />IL O C <br />Udo <br />.Ns <br />V) U LU 0- � c <br />VJ L E �2 m <br />a <br />W <br />W (D W <br />C) <br />w <br />wwa L Lu7Q"0 <br />a!Og�Q0� �U. 000 <br />QQ <br />�Oo zu-u--ZM���4Q <br />ar��gozox0ocozm <br />L) <br />(� <br />0 Z <br />�0aOZyOZZ�OWO <br />a�wo���:-FLU <br />a <br />v0� <br />0X � a� <br />LL <br />!t <br />O <br />Z N <br />OF- <br />5 <br />CD <br />0 cM O <br />M <br />Z <br />Q � <br />U- <br />F-XaM <br />�o-2r-- <br />O <br />Z <br />V <br />Z <br />W <br />UJo <br />W <br />1 2023 <br />N <br />M <br />M <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />P4. <br />CV <br />mot' <br />r <br />! d' <br />pr <br />�- <br />o <br />N;N <br />010 <br />Ir <br />th Edition <br />0 <br />o0 <br />00 <br />0 <br />to <br />•- <br />0010 <br />P <br />N <br />C) <br />N <br />CD <br />N <br />CV <br />N <br />O <br />N <br />O'.O <br />N <br />N <br />O <br />CV <br />O <br />N <br />O <br />CV <br />O <br />N <br />& <br />N <br />o0 <br />OO <br />u7 <br />o0 <br />O <br />A <br />r <br />-, <br />CV <br />O <br />M <br />D�,CA <br />N <br />-it <br />000r- <br />O` <br />O <br />moo <br />CU <br />N L '^ <br />0 <br />0 <br />'1 0 <br />i <br />0 <br />0 <br />0 <br />0 <br />♦ <br />Lo <br />>CU <br />N <br />C'+M <br />d' <br />u7 <br />Cfl <br />rl- <br />CO�^ <br />VJ <br />Z Z <br />O <br />4-0W <br />0-6-a <br />W(r>- <br />W 0) <br />O <br />vo>¢ <br />-0 <br />Oa= <br />ZX <br />Q <br />X <br />�— <br />Q <br />=m=Z <br />00 <br />3: <br />NM <br />W <br />0 <br />M <br />-ZzLL <br />Cfl <br />w N <br />0 <br />F— <br />>—N <br />a <br />V�zz <br />. <br />Z <br />YQO <br />z <br />� <br />DC� <br />o <br />W <br />� <br />d <br />Z <br />SN1 <br />Z <br />z <br />J <br />W <br />9 <br />T— <br />LAST PLOT DATE <br />May. 9, 23 <br />Z O <br />STRUCTURAL <br />— J <br />DETAILS <br />