Laserfiche WebLink
12 <br />I <br />INSULATION — <br />BAFFLE <br />INSULATION PER - <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS <br />1/2" GYP WB <br />DOUBLE 2x S.P.F. TOP PLATE <br />(2) LAYER TYPE 1(#15) UNDERLAYMENT FOR ROOF PITCH > 4:12 <br />(2) LAYERS TYPE I OR TYPE II (#15 OR #30) UNDERLAYMENT FOR <br />ROOF PITCH 4:12 OR LESS. <br />PRE ENGINEERED HURRICANE ANCHOR @ EACH TRUSS <br />WOOD TRUSS @ 24" <br />O.C. MAX. SHINGLE ROOF <br />-SHINGLE ROOF <br />15/32" CDX PLYWOOD OR 7/16" <br />O.S.B. (SEE ROOF NAILING <br />SCHEDULE ON SHT SN1) <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />2x SUB FASCIA <br />SEE SOFFIT SHEET <br />ATTACHED WALL SHEATHING TO <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />1x2 NAILER <br />J w PLYWOOD SHEATHING <br />J <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />= <br />W <br />W <br />16" O.C. 2X S.P.F. STUDS <br />W/ (4) 16d TOENAILS TO TOP PLATE <br />O U) <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />J <br />=)w <br />LAYER 1/8"THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />LL = <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA 51000 <br />B R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALE <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />METAL SEAT <br />PER PLAN 0 <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />°.A <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN -� <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />v <br />c <br />E <br />CV <br />M I I9 <br />6x6 W1.4xW1.4� <br />WWF OR FIBERM <br />1x WD FURRING @ 24" 0.' <br />BASEBOARD <br />MIN. 2500 PSI CONC. SLAI <br />MIN. PSI MAY VARY PER <br />MUNICIPALITY <br />d <br />A ° <br />STD. 90 T1OOK (SEE DETAIL) <br />8"x8"X16" CONC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />M <br />LLLIJ <br />v 4"x4" INSPECTION PORT AT <br />0 EACH FILL CELL TYPICAL <br />w <br />%• <br />0- <br />a AT GARAGE CONTRACTOR <br />LO <br />ON <br />TO CUT BLOCK OR POUR <br />CURB DUE TO SLOPE <br />NOTE: EXTEND DECO FINISH <br />411to 6" BELOW GRADE <br />d a <br />. A ad A <br />FINISH GRADE 00 <br />o0 <br />—_— <br />° `'=I <br />°.A ° <br />_— . _ <br />I I —I � . _ <br />I I I I I I I I I <br />III 111� \—STD. 90`HOOK <br />(3) # 5 REBAR ON 3" CHAIR "—"' (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" 1'-8" <br />TYP 2-STORY WALL SECTION <br />SCALE:3/4"=V-0" S6 <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" NAILS TO <br />STUDi <br />2nd FLOOR W, <br />BEAM/GIRDER <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL_ / <br />BAND JOIST V\ <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL— <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1 ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />FLOOR TRUSS <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />ITE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 1 Od @ 6" O.C. <br />NOTES: USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAN D <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />'IT" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />PLAN INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8) 1Odx1 1/2" <br />O/C FOR THE 1 ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1 <br />2"x BOT. PLATE <br />(2) 10d @ 6" 0.0 <br />PRE-ENGINEE <br />FLOOR TRUS: <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />FLOOR CONNECTION B <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=1'-0" S6 <br />FOR ADDITIONAL INFORMATION. <br />RIBBONS <br />DETAIL FLOOR TRUSS o <br />SCALE: 1 1/2"=V-0" S6 <br />NOTE: SEE TYPICAL WALL <br />SECTION C/S3 FOR <br />ADDITIONAL INFORMATION <br />(1) ROW OF 2x BLOCKING @ MID <br />HGT. FOR WALL HGT.:5 8'-611. (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />PTS FOR WALL HGT. > 8'-6" <br />SIMPSON SP1 w/ (10) 10d <br />NAILS AT EA. STUD <br />2 x STUDS @ 16" O.C. <br />2X P.T. PLATE <br />SEE SHEATHING <br />SPECS ON FLOOR <br />•1/2" GYP. W.B. MIN. @ <br />GARAGE SIDE IF APPLICABLE <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ <br />2"DIA.X 3/16" PLATE WASHER <br />(MIN. SHEAR 3500#. MIN. <br />TYPICAL TENSION 2600#.) <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />A <br />l �. a '• v A. <br />a <br />°' <br />i iaA 10 <br />I I IiI I l I= <br />III=1=1 I I —I I 1-1 I I —III —I 11- (3) #5 CONT. ON 3" <br />III III —III —I � I —I � I <br />8" 1'-8" 8" CHAIR W/ 3" MIN. <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION rS <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" <br />ADDITIONAL SLAB INFORMATION. <br />B <br />15/32' OSB <br />EXPOSUREI <br />SHEATHING <br />x <br />x <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />j <br />o SECTION X-X IF <br />NOT FULL <br />F HEIGHT SHEET - <br />CIO <br />K <br />G <br />FLOOR <br />SYST M <br />(2)- 2x TOP PLATE <br />f BEYOND I <br />15/32" OSB <br />EXPOSUREI <br />F <br />SHEATHING w <br />SOLID 2x C0 <br />C <br />BLOCKING @ ALL <br />C <br />SHEATHING N <br />EDGES (SEE <br />OPENING <br />SECTION X-X <br />IL U <br />C <br />d <br />x <br />�W <br />I <br />I.- <br />_x <br />E <br />2x STUDS w <br />BEYOND. � <br />SEE PLAN o <br />O <br />V) <br />I \--2x4 P.T. BASE <br />2x RIBBON OR VERTICAL a HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM IAiAI I rI r%/A"^Kl r'%[A^r'tAAA <br />318" "S" = NAIL sits <br />SPACING <br />4 <br />3/4" S 1/2" <br />1 /2" <br />S 1f2" <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2)12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />VERTICAL BLOCKING <br />SECTION X-X <br />ram/ <br />sFF �ow <br />N <br />2x CRIPPLES @ - <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x — <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />oxTFR\ <br />�R <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM %" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />o <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />w <br />PENETRATE SURFACE MORE THAN Y". <br />V) <br />V) <br />? <br />OA NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />O <br />C NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />LL = <br />NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMMON NAIL. <br />O <br />OD NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />=n <br />OESTAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />w/ 8d COMMON NAIL <br />J <br />w LL ¢ O <br />O PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />> ¢ O iw <br />W/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />¢ 0U) <br />7)) F i LL <br />OG (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />U) w O O ~ <br />MEMBER IF GABLE END <br />W <br />c 0 LL <br />FOR WALL SHEATHING MUST BE MIN.131"X 21/2" <br />EINOTE:S <br />T OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />CE MORE THAN 1/8". <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />S4 <br />BOX HEADER <br />ONLY <br />SEE PLAN FOR REQUIRED--� <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />•• INTERIOR HEADER: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 10d x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS / <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />,C <br />E <br />. • a. ': •d a .. d . q <br />d . ° <br />•' <br />CV.a <br />.� • �' • '. <br />A A° n <br />JE <br />-I <br />—iTi <br />I —I <br />i A <br />n a'• •. <br />M <br />S6 <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />EA END <br />EA END <br />EA END <br />EA END <br />1'-4' <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />4'-9' <br />(2) <br />3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />(3) <br />(3) <br />(2) <br />(3) <br />1 (2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 118" THICK. <br />SIMPSON SP1 w/ (10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />00 <br />FINISH GRADE <br />00 <br />o z r <br />I —I I r <br />(3) # 5 REBAR ON 3" CHAIR — 14" V-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />@ WOOD 1ST FLR, SEE J/S6 FOR SCALE: 3/4"=V-0" <br />ADDITIONAL INFORMATION. <br />SAY 2 4 2022 <br />V <br />S6VIRTUAL REVIEW ASSIST <br />Virtual Review Assist, Inc. <br />Plans Review completed and ap v �d <br />for compliance With the 2020 FBC 7th <br />Edition by Debra Anne Klahr PX2000 <br />A' <br />s <br />04 <br />N <br />O <br />04 <br />� " <br />M <br />_ y <br />L0 <br />:X00 <br />. ' = <br />LO <br />fh �p A pp��}} <br />stLLI <br />z <br />° } w kwPAR" <br />O <br />Q <br />W <br />> <br />0 <br />z <br />Q <br />'L*o' E <br />/11 O M 0 <br />V/ Q M N 7 <br />`U a <br />c,° m <br />N V <br />. <br />/eft 'C t p <br />0 S o <br />T11 •� O L.o N Q <br />.N W Q H <br />7� 00 M 0) <br />'0 V <br />CL <br />LQL <br />W <br />W W W 2 0 O <br />¢U <br />2O�JO <br />V <br />JOQ��U <br /><a09-9OWO20i,ZCWWZ0W00Mzz <br />0Q�<M1zz <br />Z <br />zQO a- W W w <br />a0. <br />W Fn <br />Q <br />OW W6LL QOU_Q <br />O <br />O <br />O <br />N <br />z W <br />0� <br />O <br />cO <br />Q�co <br />J LO <br />z <br />QLLJQLC) <br />0- M <br />00 <br />< <br />Z U <br />W <br />LU <br />J0 <br />J <br />I <br />I <br />I <br />I <br />I <br />I <br />I: <br />I <br />I <br />I <br />I <br />O <br />o <br />0 <br />0 <br />N <br />0 <br />0 <br />0 <br />0 <br />M <br />f_ <br />M <br />M <br />00 <br />o <br />a <br />o <br />O <br />N <br />o <br />Z <br />O <br />W <br />o <br />0 <br />0 <br />0 <br />� <br />� <br />I <br />' <br />o <br />LU <br />N <br />CM <br />� <br />I <br />I <br />I <br />M <br /><Z <br />Z <br />w U) <br />Qz <br />C)W <br />z <br />_ <br />+� <br />MILLI <br />W <br />000 <br />_LO <br />^ <br />i.j <br />O <br />0 LU <br />Oro <br />Z <br />d a.�- <br />Q <br />T/�� <br />F� <br />� - Q <br />L J <br />= <br />m=W <br />N <br />� <br />ZLn <br />o° <br />W <br />^^ <br />CQ�0c <br />■ ■ <br />cy) <br />0 <br />ZWO <br />Z <br />U <br />aZE <br />�z <br />J <br />O� <br />O0 <br />F- 00 <br />z <br />z <br />z <br />z <br />W <br />W <br />J <br />o <br />Ln <br />C) <br />LAST PLOT DATE <br />.. <br />z 0 <br />STRUCTURAL <br />DETAILS - MONO <br />