My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6495 Beverly Hills Dr
Zephyrhills
>
Building Department
>
Building Plans
>
6495 Beverly Hills Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 9:45:24 AM
Creation date
2/18/2025 3:38:43 PM
Metadata
Fields
Template:
Building Plans
Street #
6495
Location
Beverly Hills Dr
Contractor
SFR Construct
Building Plans - Permit #
4149
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JV -V <br />6'-1 1 " 6'-0" <br />4 <br />(V <br />U <br />U <br />Gil, <br />CJ 1 <br />-I <br />E7 <br />141 <br />CJ3 <br />o <br />J ✓ <br />I <br />'A <br />0 <br />I <br />CJ5 <br />5 <br />I <br />I <br />A7G <br />8'-0" CEILING /A6 <br />j A5 <br />-Z <br />I <br />I <br />I <br />L---------------- ----A4--------------- <br />II I <br />I II II <br />I II II <br />I II II <br />I <br />I <br />I <br />II I <br />II II <br />II L--------------, <br />8'-0" CEILING <br />I <br />I <br />II <br />II <br />I <br />I <br />II __ ______ <br />I I rr -- -----� <br />I <br />L--- <br />--- <br />I I I <br />---------�IL-------------�`--------- <br />--------------------------------471 <br />I <br />I <br />II I <br />II <br />p <br />Z6 II <br />ty <br />I <br />II II <br />I I <br />II <br />O <br />I <br />II <br />I I <br />2. 12 VAULTED CLG. <br />I <br />i I ¢ <br />o <br />I <br />J I <br />I <br />I I 8'-0" CEILING <br />- - - <br />I <br />LO <br />II <br />11 <br />I <br />2.5/12 VAULTED CLG. <br />I <br />I <br />II 1 <br />I IiL <br />II II <br />II II <br />___TJ L J I <br />II II <br />u 8'-o"iCEILING <br />II 1-T <br />II <br />II II <br />I <br />II II <br />I II <br />� II <br />II II <br />II II <br />II II <br />Z <br />Q <br />�" tY <br />W ui <br />I II <br />I � 7 <br />-m: ays�xv L_________ <br />IF- r <br />II u <br />I I I I <br />____J L---- J L------------------------- <br />¢ m <br />I i A/C CHASE l i <br />I I <br />I A1C <br />Vim v <br />i <br />L-----J <br />; ;I <br />-m <br />2.5/12 CLG. <br />I <br />Ii 1i <br />A1B <br />I <br />8'-0" C ING <br />II AS <br />I <br />c <br />o <br />I <br />j� <br />A9 <br />11 <br />11 <br />8'-0" CEILING <br />m01 <br />A11 <br />C)CJ3 <br />�5�, CJ5A <br />CJ5 <br />C <br />� <br />h <br />1 ' <br />U <br />E <br />5 <br />w <br />CJ3A <br />CJ3 <br />r` <br />C1 <br />u7 <br />' U <br />U <br />EJ7 <br />LO y�� <br />0 cn C1 <br />0 = <br />O <br />CV <br />U <br />4'4" <br />6-0" <br />19'-4" <br />ROOF FRAMING PLAN (ELEV B.' <br />1 /411 = 1 '-011 <br />TRUSS NOTES: <br />THE FLOOR AND ROOF TRUSS LAYOUT ON THESE PLANS <br />ARE SCHEMATIC DESIGN ONLY. FINAL FLOOR AND ROOF <br />TRUSS LAYOUTS TO BE DEVELOPED BY TRUSS <br />MANUFACTURER. TRUSS LAYOUTS AND TRUSS SHOP <br />DRAWINGS MUST BE REVIEWED AND APPROVED BY <br />DESIGN STYLES, INC. AND/ OR THE ENGINEER OF RECORD <br />PRIOR TO CONSTRUCTION. <br />TRUSS MANUFACTURER TO VERIFY ADEQUACY OF ALL <br />SPECIFIED LVL BEAMS AND MAKE ANY ADJUSTMENTS <br />NECESSARY DUE TO FINAL TRUSS DESIGN OR <br />CALCULATED REACTIONS. ALL MODIFICATION TO BE <br />REPORTED TO DESIGN STYLES, INC. AND THE ENGINEER <br />OF RECORD PRIOR TO CONSTRUCTION. <br />ELECTRICAL & HVAC LAYOUTS ARE BASED ON THESE <br />FRAMING LAYOUTS. ANY DEVIATIONS ARE TO BE <br />APPROVED BY DESIGN STYLES, INC. PRIOR TO <br />CONSTRUCTION. <br />TYPICAL TRUSS CONNECTORS <br />1. ALL CONNECTORS ARE "SIMPSON, STRONG -TIE". U.N.O. <br />2. USE MTS20'S OR H10A'S FOR ROOF TRUSS TO FRAME <br />CONNECTIONS. <br />3. ATTACH ALL FRAMING ABOVE ROOF TRUSSES TO <br />TRUSSES W/ MTS16'S. <br />4. USE HETA20 FOR ROOF TRUSS TO MASONRY <br />CONNECTIONS. <br />5. USE (2) HETA20 FOR GIRDER TRUSS TO MASONRY <br />CONNECTIONS. <br />6. USE (2) HTS30 OR H10A FOR GIRDER TRUSS TO FRAME <br />CONNECTIONS. <br />7. THE PREVIOUS CONNECTORS APPLY UNLESS <br />OTHERWISE NOTED. <br />8. SEE FLOOR PLAN AND FOUNDATION SHEETS FOR <br />OTHER CONNECTIONS. <br />DESIGN STYLES, INC. AND THE ENGINEER RESERVE THE <br />RIGHT TO MAKE ANY CHANGES AFTER FINAL TRUSS <br />INFORMATION IS SUPPLIED FROM TRUSS MANUFACTURER. <br />NOTE: <br />ALL VALLEY KITS MARKED "VK" OR "MVK" ARE <br />CONVENTIONALLY FRAMED. PLEASE REFER TO <br />ENGINEERING PACK FOR DETAILS <br />NOTES: <br />• FLOOR TRUSSES ARE CUT BACK 3/4" FROM EXTERIOR BLOCK <br />WALLS. <br />• FLOOR TRUSSES ARE CUT BACK 1/2" FROM FRAME WALLS. <br />• SEE ENGINEERING FOR FLOOR TRUSS CHASE AND STRONG <br />BACK LOCATIONS. <br />• SECOND STORY TRUSSES ARE CUT BACK 3/4" FROM EXTERIOR <br />WALLS. <br />NOTE: <br />DO NOT CUT OR ALTER TRUSSES WITHOUT CONSENT OF THIS <br />OFFICE. BACK CHARGES WILL NOT BE ACCEPTED WITHOUT PRIOR <br />WRITTEN APPROVAL BY OUR SERVICE DEPARTMENT AT <br />CARPENTER CONTRACTORS OF AMERICA, INC. 877-293-9487 <br />NOTE: <br />MULTI -PLY GIRDER CONNECTION. <br />ALL PLIES SHALL BE FASTENED TOGETHER (BOLTS, NAILS, AND <br />OR SCREWS) PRIOR TO INSTALLATION AND BEFORE ANY LOADS <br />ARE APPLIED. PER THE SUPPLIED ENGINEERING SHEETS. <br />NOTE: <br />ALL BEARING WALLS MUST BE ADEQUATELY DESIGNED TO CARRY <br />THE LOADS IMPOSED BY THE TRUSS OR TRUSSES, AND MUST BE <br />IN PLACE AND IN SERVICE BEFORE THE TRUSSES ARE SET IN <br />ORDER TO AVOID REPAIRS. <br />COLUMN NOTE: <br />REFER TO FOUNDATION PLAN FOR COLUMN SIZES <br />\/V\ MAY 24 222 <br />VIRTUAL REVIFW ASSIST <br />Virtual Review Assist, Inc. <br />Plans Review completed and app ved <br />for compliance with the 2020 FBC 7th <br />Edition by Debra Anne Klahr PX2300 <br />0 <br />LO <br />SHINGLE ROOF <br />12 <br />51- <br />12 <br />HEEL= 4-1/16" Z�A01 <br />REFER TO ENG. _ — <br />PACK FOR f _ <br />PLUMB <br />CONNECTION —� CUT 2X4 <br />CJ3 <br />M <br />U <br />12" <br />U LABELED END MARK <br />1'-0 5/16, <br />TYPICAL F SETBACK CORNER -SET <br />LABELING AND SPACING <br />REFER TO ENG. <br />PACK FOR CONNECTION <br />CJ5 <br />4 CJ3LO <br />U <br />CJ1 v <br />V-0 5/16"'-[-,� I. 2'-0" 1. 2'-0" <br />TYPICAL 7' SETBACK CORNER -SET <br />LABELING AND SPACING <br />Total Truss Quantity = 79 <br />ATTENTION' <br />30' Soanlorless <br />DON'T LIFT SINGLE TRUSSES <br />VVITH SPANS LONGER THAN <br />30' BY THE PEAK <br />CONSULT BCSI -B1 <br />60 degrees <br />or less <br />30' to <br />2/3 to 1 /2 I <br />line i spanapP Ta line i span approx. <br />REFER TO BCSI -131 <br />Truss must be set this way if crane used. <br />Truss is an example, your truss may not match. <br />Insist crane operator sets truss this way. <br />General Notes <br />1. ALL PARALLEL CHORD TRUSSES, FLAT TRUSSES <br />AND FLAT GIRDERS HAVE THE TOP CHORD <br />PARTIALLY PAINTED GREEN TO BE INSTALLED <br />GREEN SIDE UP. <br />2. ALL HANGERS TO BE SIMPSON HUS26 UNLESS <br />OTHERWISE NOTED. <br />3. ALL TRUSS SPACING IS 24" O.C. UNLESS <br />OTHERWISE NOTED. <br />4. PER TRUSS PLATE INSTITUTE BCSI-131 <br />RECOMMENDATION PERMANENT X-BRACING <br />SHOULD BE PLACED AT A MAXIMUM SPACING 15' <br />O.C. ACROSS THE SPAN, TO BE REPEATED AT A <br />MAXIMUM OF 20' BETWEEN EACH X-BRACE <br />THROUGHOUT THE STRUCTURE. <br />" PLEASE REFER TO BCSI-B1 FOR ANY ADDITIONAL <br />BRACING DETAILS. <br />ROOF LOADING SCHEDULE <br />TCLL = 20 PSF <br />TCDL = 7 PSF <br />BCLL = * PSF <br />BCDL = 10 PSF <br />TOTAL = 37 PSF <br />DURATION = 1.25 % <br />WIND SPD/TYPE = 145 <br />ENCLOSED <br />BLDG EXPOSURE = C <br />USAGE = RESIDENTIAL CAT II <br />WIND IMPORTANCE FACTOR = 1 <br />UPLIFTS BASED ON = 9.2 PSF <br />DESIGN CRITERIA <br />FBC 2020 <br />TPI 2014 <br />Truss member design & connector plates <br />are designed for ASCE 7-16 and maximum <br />forces from both components and claddings <br />and main wind force resisting systems. <br />* These trusses have been reviewed to carry an <br />additional 10# psf non -concurrent bottom chord live <br />load. <br />FLOOR LOADING SCHEDULE <br />TCLL = 40 PSF <br />TCDL = 10 PSF <br />BCDL = 5 PSF <br />TOTAL = 55 PSF <br />ROOF DESIGNED FOR <br />SHINGLE <br />ALL REACTIONS <br />AND UPLIFTS <br />ARE SHOWN ON <br />ENGINEERING. <br />WALL KEY <br />LOAD DESCRIPTION INIT. DATE <br />R/01 <br />Created from BID 8312288A AS <br />8/8/2015 <br />RA01 <br />REV. ENTRY & ADD HIP (M REAR SHM <br />9/18/15 <br />R801 <br />Add Vaulted ceiling n Great rm, <br />Dining mi Kitchen Foyer & Entry AS <br />12/29/2015 <br />RB01 <br />LC 9 AND FBC2017 HAB <br />12/07/2017 <br />RC01 <br />RE-CALC A7G B.C. AS <br />7/23/2019 <br />RD01 <br />LCA JTH <br />114/21 <br />- <br />CARPENTER <br />—� <br />CONTRACTORS <br />OF AMERICA <br />- <br />3900 AVENUE <br />G. N, W, <br />WINTER <br />HAVEN FLORIDA 33880 <br />PHONE: <br />(800) 959-8806 <br />FAX: <br />(863) 294-2488 <br />BUILDER : LENNAR HOMES <br />PROJECT :TOUCHSTONE <br />MODEL : 1450 <br />CCA PROJ/MODEL/ALT <br />7A2 / 1450B <br />ALT DESC: <br />OTC <br />LOT BLOCK <br />DESIGNER PAGE <br />HAB <br />DATE <br />08 06 2015 <br />LAN# SCALE <br />N321594R <br />i <br />N <br />O <br />C)F-FL0 <br />N <br />co <br />to <br />` 'J�`, R00 JUS <br />t <br />w <br />O <br />w <br />0 <br />Z <br />Q <br />U <br />M CN <br />N �0Cc uc <br />�` <br />E Q <br />�•� O¢ <br />N W QV <br />N 00 E c. <br />^�0a �o <br />rWr^^ W <br />LU <br />� o <br />W � W z� <br />coLLUOpJO <br />V <br />Q V <br />IY�RJ(Q�of co <br />�v)O<ZLLO�00m <br />0 O <br />O Z <br />��a8zWOZzLLX<0X_ <br />Qom¢°W�—WZ_ U <br />LL <br />OO Q~ 0 ES Q Z¢ <br />¢ <br />LL I LL <br />i! <br />C:) <br />CN <br />Z LU <br />O �- <br />0 <br />E5 (V <br />.—:cv)o <br />Q U) M I*-- <br />n. U) <br />d- <br />U_z 2 (0 <br />< W Q In <br />1--WCLcei <br />Q>-<oo <br />~ <br />Z <br />W <br />W <br />0 <br />CD <br />M <br />I <br />III <br />I <br />I <br />Q <br />0 <br />N <br />CD <br />N <br />N <br />0 <br />� <br />N <br />0) <br />0 <br />o <br />I <br />I <br />I <br />I <br />Z <br />0 <br />��>QNMIIII <br />U <br />co <br />¢Z <br />C)ZW <br />0) O <br />W <br />woo <br />U <br />�Z> <br />p W — <br />0 <br />Iz <br />Q <br />O <br />Z <br />F_ <br />n�a <br />�Wa <br />L^ / <br />= <br />MHW <br />ZOM <br />rl <br />■ ■ <br />Z <br />0 <br />5WIX <br />(L Z <br />z <br />Uz <br />0C� <br />0CL <br />m <br />z <br />A3 <br />z <br />Z <br />W <br />W <br />M <br />N <br />N <br />O <br />Q <br />LAST PLOT DATE <br />O <br />• ■ <br />Z 4-0 <br />March 9, 2022 <br />J <br />ROOF FRAMING <br />PLANS B <br />
The URL can be used to link to this page
Your browser does not support the video tag.