Laserfiche WebLink
DIVISION S FINISHES <br />DIVISION S FINISHES (CONT.) <br />DIVISION S FINISHES (CONT.) <br />DIVISION lO SPECIALTIES <br />SECTION 09110 METAL SYSTEMS <br />SECTION 09511 ACOUSTIC PANEL CEILINGS <br />SECTION 10522 FIRE EXTINGUISHERS <br />METAL STUDS <br />PART I GENERAL <br />SECTION OSS60 STUCCO FINISH <br />PARti GENERAL <br />A. AT INTERIOR METAL STUD PARTITIONS, UNLESS OTHERWISE SHOWN ON THE DRAWINGS, PROVIDE <br />1,01 GENERAL <br />PART i GENERAL <br />1.01 SUBMITTALS <br />STANDARD PUNCH STEEL STUDS OF THE SIZES SHOWN ON THE DRAWINGS, EITHER HOT -DIP <br />q, COORDINATE LAYOUT AND INSTALLATION OF AGOUSTICAL CEILING UNITS AND SUSPENSION SYSTEM <br />A. PRODUCT DATA: REQUIRED <br />GALVANIZED OR FACTORY PRE -PAINT: 25 GA. UNLE55 SHOWN OTHERWISE ON THE DRAWINGS, 20 <br />COMPPONENTS WITH OTHER CONSTRUCTION THAT PENETRATES CEILINGS OR IS SUPPORTED BY THEM, <br />1.01 SUMMARY <br />B. SHOP DRAWINGS: NOT REQUIRED <br />GA. AT ALL DOOR OPENINGS. <br />INCLUDING LIGHT FIXTURES AND HVAC EQUIPMENT. <br />A. MATERIALS AND INSTALLATION OF CEMENT STUCCO ON HOLLOW MASONRY, EXTERIOR GRADE PLYWOOD AND <br />C. SAMPLES: NOT REQUIRED <br />B. ACCESSORIES: PROVIDE ALL ACCESSORIES INCLUDING, BUT NOT NECESSARILY LIMITED T0, <br />METAL LATH ALSO FURNI5W AND INSTALL METAL, LATH, STUCCO WRAP AND ACCESSORIES. <br />TRACKS, CLIPS, ANCHORS, FASTENING DEVICES, SOUND ATTENUATION PENCIL RODS AND <br />122 MINERAL -FIBER ACOUSTICAL PANELS <br />PART 2 PRODUCTS <br />RESILIENT CLIPS, AND OTHER ACCESSORIES REQUIRED FOR A COMPLETE AND PROPER <br />A. PROVIDE ACOUSTICAL PANELS AS MANUFACTURED BY ARMSTRONG CIRRUS ANGLED TEGULAR <br />1.02 DELIVERY, STORAGE AND HANDLING <br />INSTALLATION, AND AS RECOMMENDED BY THE MANUFACTURER OF THE STEEL 5TUD5 USED, <br />24 INCHES BY 24 INCHES 3/4 INCHES THICK WHITE, REFER TO DRAWINGS FOR- LIMITS OF TILE <br />A. DELIVER ALL CEMENT MATERIALS IN ORIGINAL CONTAINERS BEARING MANUFACTURERS NAME AND <br />2.01 MANUFACTURERS/PRODUCTS <br />C. MEET OR EXCEED MINIMUM REQUIREMENTS OF FEDERAL SPEC. QQ-S-698 AND FEDERAL SPEC. <br />INSTALLATION. <br />IDENTIFICATION. <br />A. COORDINATE WITH LOCAL MUNICIPALITIES AND PROVIDE FIRE EXTINGUISHERS. <br />QQ-S 115D, CLASS D. <br />B, INSTALL IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS. ARRANGE <br />B. DELIVER NEW, FLAT STRUCTURAL METAL LATH IN ORGINAL PACKAGING. <br />B. FIRE EXTINGUISHERS: SEE DRAWINGS FOR SPECIFICATIONS. <br />METAL TRIM <br />ACOUSTICAL UNITS AND ORIENT DIRECTIONAL PATTERN OF TILES FOR A UNIFORM APPEARANCE. REST <br />C. PROTECT PRODUCTS FROM MOISTURE AND HUMIDITY. STORE UNDER COVER OFF GROUND IN A DRY <br />A. FORM FROM GALVANIZED STEEL NOT LIGHTER THAN 26 GAUGE, COMPLYING WITH FEDERAL SPEC <br />PANELS ON FLANGES OR INVERTED TEES WITH TILE UNITS FITTING NEATLY AGAINST BUTTING SURFACE <br />LOCATION. <br />PART 3 EXECUTION <br />00-6-115, CLASS D. <br />AND SUPPORT BY WALL ANGLES. <br />B, CASING BEADS: U.S.G. "200-5. <br />1.03 SUBMITTALS <br />3.01 SCHEDULES <br />1.03 METAL SUSPENSION SYSTEM <br />A. MANUFACTURERS SPECIFICATION AND PRODUCT DATA FOR STUCCO APPLICATIONS. <br />A. INSTALL AS REQUIRED. <br />END OF SECTION 09110 <br />A, PROVIDE SYSTEM AS MANUFACTURED BY ARMSTRONG SUSPENSION SYSTEM SHALL BE EXPOSED <br />B. STUCCO WRAP STRUCTURAL METAL LATH AND ACCESSORIES, SUCH AS CORNER BEAD, CONTROL JOINTS, ETC. <br />TEE -GRID, DOUBLE -WEB, INTERMEDIATE DUTY (ASTM C635), ELECTROGALVANIZED, COLD -ROLLED STEEL, <br />END OF SECTION 10522 <br />15/16 INCHES WIDE, CAPPED BOTTOM FLANGE. WHITE IN COLOR SYSTEM TO INCLUDE ALL CRO55 TEES, <br />SECTION OB250 GYPSUM WALLBOARD <br />BRIDGING TREES, INTERSECTION CLIPS, SPLICES, COMPLETE EXPOSED GRID SYSTEM. <br />SECTION 10800 TOILET ACCESSORIES <br />B, LAY OUT PATTERN IN ACCORDANCE WITH THE DRAWINGS, LEVEL, TRUE TO PLANE, AND AT THE REQUIRED <br />PART 2 PRODUCTS <br />PART I GENERAL <br />ELEVATION, FRAME AROUND ALL OPENINGS IN CEILING LIGHTS AND GRILLES WITH MAIN RUNNERS. HANGERS <br />PARt 1 GENERAL <br />ARE TO BE SPACED AT 4'-0" ON CENTER MAXIMUM. PROVIDE ADDITIONAL HANGERS AS REQUIRED TO <br />2.01 JOB MIXED INGREDIENTS <br />1.01 GENERAL <br />SUPPORT LIGHT FIXTURES AND HVAC REGISTERS AND GRILLES AND INTERFERENCES OF DUCT WORK. <br />A. PORTLAND CEMENT, ASTMC 150 TYPE I, MIXED IN ACCORD WITH MANUFACTURERS INSTRUCTIONS. <br />1.01 SUBMITTALS <br />A. GYPSUM WALLBOARD WOW SHALL CONFORM TO THE GYPSUM ASSOCIATION "RECOMMENDED <br />B. WATER: CLEAN AND POTABLE. <br />A. PRODUCT DATA: NON -REQUIRED <br />SPECIFICATIONS FOR THE APPLICATION AND FINISHING OF GYPSUM WALLBOARD." <br />C. SECURES WIRES BY LOOPING AND WIRE -TYING, EITHER DIRECTLY TO STRUCTURES OR TO INSERTS, EYE <br />C. METAL LATH <br />B. SHOP DRAWINGS: NON -REQUIRED <br />B. EXAMINE SUBSTRATES TO WHICH DRY WALL CONSTRUCTION ATTACHES OR ABUTTS, PRESET HOLLOW METAL <br />SCREWS, OR OTHER DEVICES APPROPRIATE FOR SUBSTRATE. SCREW ATTACH EDGE MOLDINGS TO <br />1, STRUCTURAL METAL LATH SHALL BE 3.4 POUND EXPANDED METAL SHEET WITH SOLID PARALLEL RIBS. <br />C. SAMPLES: NON -REQUIRED <br />FRAMES, CAST-IN-ANCORS, AND STRUCTURAL FRAMING FOR COMPLIANCE WITH REQUIREMENTS FOR <br />SUBSTRATE AT INTERVALS NOT OVER 16 INCHES ON CENTER AND NOT MORE THAN 3 INCHES FROM ENDS. <br />2,. METAL LATH SHALL BE 3.4 POUND DIAMOND MESH METAL LATH. <br />INSTALLATION TOLERANCE AND OTHER CONDITIONS AFFECTING PERFORMANCE OF DRY WALL <br />LEVEL GRID TO A TOLERANCE OF 1/8" IN 12 FEET. <br />3. ACCESSORIES FURNISHED BY SAME MANUFACTURER FOR STUCCO APPLICATION. <br />PART 2 PRODUCTS <br />CONSTRUCTION. DO NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN <br />D. MECHANICAL FASTENERS <br />CORRECTED. <br />END OF SECTION 095ll <br />I. NAILS, 8d RING SHANK, HOT DIP GALVANIZED OF SUFFICIENT LENGHTH TO PENETRATE PLYWOOD BACKING <br />2.01 MANUFACTURERS/PRODUCTS <br />C. DO NOT TAPE AND FINISH GYPSUM BOARD WHEN THE TEMPERATURE 15 BELOW 60 DEGREES FAHRENHEIT, <br />I INCH, <br />A. ACCESSORIES SHALL BE AS MANUFACTURED BY "BRADLEY" OR EQUAL BY "BOBRICK." SEE DRAWINGS <br />THE TEMPERATURE OF THE ROOMS SHALL BE HELD AT 60 DEGREES FAHRENHEIT FOR 48 HOURS BEFORE <br />SECTION 0%50 VINYL COMPOSITION TILE <br />2, WHERE LIGHT METAL FRAMING OCCURS: MINIMUM NOlo SELF DRILLING CORROSION RESISTANT SCREWS OF <br />FOR SPECIFICATIONS. <br />TAPING AND FINISHING IS TO BEGIN, MAINTAIN 60 DEGREES FAHRENHEIT DURING AND AFTER INSTALLATION, <br />SUFFICIENT LENGTH TO PENTRATE METAL 3/8 INCH, <br />VENTILATES AS REQUIRED TO REMOVE EXCESS HUMIDITY. <br />PART I GENERAL <br />E. STUCCO WRAP <br />PART 3 EXECUTION <br />1. BY "TYVEK" FOR USE OVER PLYWOOD AND/OR DENSGLASS FACINGS/SHEATHINGS. <br />122 GYPSUM WALLBOARD <br />1.01 SUMMARY <br />F. STUCCO ACCESSORY TRIM, BEADS, AND CONTROL JOINTS SHALL BE VINYL. <br />3.01 SCHEDULES <br />A. GYPSUM WALLBOARD SHALL BE MANUFACTURED BY U.S. GYPSUM. WALLBOARD fS TO MEET. ASTM C36-84A <br />A. PROVIDE TYPE AND STYLE AS SCHEDULED IN THE FINISH MATERIAL SCHEDULE. <br />A. COORDINATE WITH DRAWINGS. <br />AND 55-L-30d 1/2 INCHES THICK, 48 INCHES WIDE WITH TAPERED EDGES. <br />B. ADHESIVES, <br />PART 3 EXECUTION <br />B. AT FIRE RATED PARTITIONS INSTALL WALLBOARD TO MEET SEPARATE REQUIREMENTS, USE TYPE III, GRADE <br />I. PROVIDE WHITE LATEX CARPET ADHESIVE SUCH AS W.W. HENRY COMPANY NO 356, ROBERTS <br />END OF SECTION 10000 <br />X CLASS I, 5/8 INCHES THICK FIRE RETARDANT WALLBOARD. <br />COMPANY NO, 41-0504, OR AN EQUAL APPROVED BY THE ARCHITECT AND RECOMMENDED <br />3,01 INSTALLATION <br />SECTION IOWO MISCELLANEOUS SPECIALTIES <br />C. INSTALL GYPSUM BOARD WITH TRUE, EVEN SURFACES AND STRAIGHT, SHARP CORNERS, USE !FULL LENGTH <br />FOR THE PURPOSE BY THE MANUFACTURER OF THE SELECTED CARPET, <br />A. INSTALL MECHANICAL FASTENERS ON 6 INCH CENTERS ALONG SEAMS AND 12 INCH CENTERS ALONG <br />BOARDS WHERE POSSIBLE. END JOINTS ON THE SAME SIDE OF A WALL SHALL BE STAGGERED AND JOINTS <br />2. PROVIDE SEAM ADHESIVE SUCH AS W.W. HENRY COMPANY NO, 246, ROBERTS COMPANY NO. <br />INTERIORS. <br />PART I GENERAL <br />ON OPPOSITE SIDE SHALL NOT OCCUR OVER THE SAME SUPPORT. DO NOT LOCATE NORMAL END JOINTS AT <br />41-0502, OR AN EQUAL APPROVED BY THE ARCHITECT AND RECOMMENDED FOR THE PURPOSE <br />B. STUCCO INSTALLATION SHALL BE TWO COAT APPLfCATION. APPLY BASE COAT WITH FIRM PRESSURE TO <br />EDGE OF OPENINGS. FORM JOINTS NEATLY. BUTT BOARDS TOGETHER BUT DO NOT FORCE INTO PLACE. DO <br />BY THE MANUFACTURER OF THE SELECTED CARPET. <br />FORM GOOD BOND THEN DOUBLE BACK TO PROVIDE THICKNESS. LEAVE ROUGH ENOUGH TO PROVIDE BOND <br />1.01 RELATED DOCUMENTS <br />NOT BUTT EDGES AGAINST TAPERED EDGES. NO JOINT SHALL HAVE A GAP GREATER THAN 1/4 INCH. <br />C. AT INTERSECTION OF CARPET AND FLOOR TILE, PROVIDE ROPPE COMPANY, INC. VINYL TILE CARPET JOINER <br />FOR FINISH COAT. FINISH COAT SHALL BE OF TEXTURE AS CALLED FOR ON THE BUILDING ELEVATION <br />A. REQUIREMENTS OF DIVISION I APPLY TO ALL WORK HEREUNDER. <br />D. IN GENERAL, INSTALL GYPSUM BOARD ON CEILING BEFORE WALLS. CONSTRUCT CEILINGS WITH LONG <br />"I88 OR EQUIVALENT. <br />DRAWINGS, <br />DIMENSION OF GYPSUM BOARD APPLIED AT RIGHT ANGLES TO SUPPORT. <br />D. PROVIDE OTHER MATERIALS, NOT SPECIFICALLY DESCRIBED BUT REQUIRED FOR A COMPLETE AND <br />C. CURING: CURE STUCCO BY USE OF POLYETHYLENE FILM, OR BY USE OF FINE SPRAY. <br />1.02 SCOPE <br />E. SCREW GYPSUM BOARD TO FRAMING WITH SCREWS NOT OVER 6 INCHES ON CENTER FASTEN GYPSUM <br />PROPER INSTALLATION, AS SELECTED BY THE CONTRACTOR, SUBJECT TO THE APPROVAL OF THE <br />A. PROVIDE MISCELLANEOUS SPECIALTIES AND RELATED ITEMS AS REQUIRED TO COMPLETE WORK <br />BOARD BEGINNING AT THE CENTER AND WORK TOWARDS OUTER EDGES. HOLD BOARD FIRMLY AGAINST <br />ARCHITECT. <br />3,02 PROTECTION <br />INDICATED ON DRAWINGS AND SPECIFIED HEREIN. <br />WOOD FRAMING WHILE FASTENING. FASTENERS AT EDGES OF BOARDS SHALL BE 1/2 INCH FROM THE EDGE, <br />E. ALLOW THE OWNER TO INSPECT AND SELECT FROM SCRAP CARPET REMAINING AFTER THE INSTALLATION. <br />A. PROTECT STUCCO DURING AND UPON COMPLETION FROM WATER INFILTRATION, DUST, [DIRT, PRECIPITATION, <br />F. OPENINGS FOR ELECTRICAL DEVICES, PIPING, GRILLS, AND REGISTERS SHALL BE ACCURATELY LOCATED <br />BUNDLE, WRAP IN BURLAP, AND DELIVER TO THE OWNER THE CARPET SCRAPS 50 SELECTED. <br />EXCESSIVE DRYING UNTIL STUCCO HAS SET. <br />1.03 QUALITY ASSURANCE <br />AND NEATLY MADE TO CLOSELY FIT THE DEVICES AND BE COMPLETELY COVERED BY PLATES AND <br />A. FIELD MEASUREMENTS: TAKE FIELD MEASUREMENTS PRIOR TO PREPARATION OF SHOP DRAWINGS <br />ESCUTCHEONS. <br />END OF SECTION 09960 <br />AND FABRICATION WHERE NECESSARY TO ENSURE PROPER FITTING OF WORK, <br />SECTION 09680 CARPETING <br />B. B. INSERTS AND ANCHORAGE'S: FURNISH INSERTS AND ANCHORING DEVICES WHICH MUST BE SET IN <br />123 TRIM PIECES <br />CONCRETE OR MASONRY FOR INSTALLATION OF UNIT. PROVIDE SETTING DRAWINGS, TEMPLATES, <br />A. PROVIDE TRIM ACCESSORIES OF THE SIZES REQUIRED FOR THE WALLBOARD APPLICATION AS <br />PART i GENERAL <br />INSTRUCTIONS AND DIRECTIONS FOR INSTALLATION OF ANCHORAGE DEVICES. COORDINATE <br />MANUFACTURED BY U.S. GYPSUM. PROVIDE DUR-A-BEAD CORNER BEAD AT EXTERNAL CORNERS AND NO, <br />DELIVERY WITH OTHER WORK TO AVOID DELAY. <br />200-A METAL CASING BEAD WHERE WALLBOARD ABUTTS OTHER MATERIALS. <br />IDI CARPETING <br />PART 2 PRODUCTS <br />A. PROVIDE TYPE AND STYLE AS SCHEDULE[) IN THE FINISH MATERIAL SCHEDULE, <br />124 FASTENERS <br />B. ADHESIVES. <br />2.01 MANUFACTURERS/PRODUCTS <br />A. PROVIDE SCREWS, NAILS, CLIPS, TIES, AND OTHER FASTENERS AS RECOMMENDED BY THE GYPSUM <br />1. PROVIDE WHITE LATEX CARPET ADHESIVE SUCH AS W.W. HENRY COMPANY NO 356, ROBERTS <br />A. MFRS' NAMES AND PRODUCT NUMBERS LISTED IN SPECIALTIES SCHEDULE ARE FOR DESCRIPTIVE <br />MANUFACTURER <br />COMPANY NO.41-0504, OR AN EQUAL APPROVED BY THE ARCHITECT AND RECOMMENDED <br />PURP05E AND ALL, UNLESS SPECIFICALLY PROHIBITED THEREIN, SHALL BE SUBJECT <br />FOR THE PURPOSE BY THE MANUFACTURER OF THE SELECTED CARPET. <br />TO REQUESTS FOR APPROVAL FOR EQUAL PRODUCTS IN CONFORMANCE WITH SECTION 01600. <br />1.05 JOINT TREATMENT SYSTEMS <br />2. PROVIDE SEAM ADHESIVE SUCH AS W.W. HENRY COMPANY NO. 246, ROBERTS COMPANY NO, <br />A. SYSTEM SHALL BE PERFORATED TAPE AND CEMENT RECOMMENDED THE GYPSUM MANUFACTURER <br />41-0502, OR AN EQUAL APPROVED BY THE ARCHITECT AND RECOMMENDED FOR THE PURPOSE <br />PART 3 EXECUTION <br />B. APPLY MATERIALS IN STRICT ACCORDANCE TO MANUFACTURER'S RECOMMENDATIONS. FILL JOINTS WITH <br />BY THE MANUFACTURER OF THE SELECTED CARPET. <br />JOINT COMPOUND, EMBED PERFORATED TAPE AND APPLY A SKIM COAT OF JOINT COMPOUND OVER TAPE. <br />C. AT INTERSECTION OF CARPET AND FLOOR TILE, PROVIDE ROPPE COMPANY, INC. VINYL TILE CARPET JOINER <br />3.01 INSTALLATION <br />APPLY TWO ADDITIONAL COATS OF JOINT COMPOUND ALLOWING AT LEAST 24 HOURS BETWEEN EACH COAT. <br />188 OR EQUIVALENT. <br />A. INSTALLATION OF MISCELLANEOUS ITEMS SHALL BE IN COMPLIANCE WITH MFR'S CURRENT PRINTED <br />SAND EACH COAT. FINISH SURFACES SHALL BE UNIFORMLY SMOOTH, TRUE AND IN SATISFACTORY CONDITION <br />D. PROVIDE OTHER MATERIALS, NOT SPECIFICALLY DESCRIBED BUT REQUIRED FOR A COMPLETE AND <br />RECOMMENDATIONS AND AS MAY BE SHOWN ON DRAWINGS AND SPECIFIED HEREINAFTER. <br />TO RECEIVE PAINT, <br />PROPER INSTALLATION, A$ SELECTED BY THE CONTRACTOR, SUBJECT TO THE APPROVAL OF THE <br />END OF SECTION 09250 <br />ARCHITECT. <br />PART 4 SPECIALTIES <br />E. ALLOW THE OWNER TO INSPECT AND SELECT FROM SCRAP CARPET REMAINING AFTER THE INSTALLATION, <br />BUNDLE, WRAP IN BURLAP, AND DELIVER TO THE OWNER THE CARPET SCRAPS SO SELECTED. <br />4.01 MISCELLANEOUS SPECIALTIES SCHEDULE <br />SECTION OWOO CERAMIC TILE <br />A. PROVIDE FOLLOWING ITEMS: <br />I. RESIDENTIAL KITCHEN EQUIPMENT <br />PART I GENERAL <br />END OF SECTION 09560 <br />a. REFRIGERATOR <br />(UKENMORE MODEL NO. 46-19842, 18 CU. FT. REFRIGERATOR/FREEZER WITH AUTOMATIC ICE MAKER - <br />COLOR - WHITE ON WHITE, <br />1.01 GENERAL <br />SECTION 09900 PAINTING <br />B. MICROWAVE <br />A. CERAMIC AND TYPES ARE INDICATED ON THE DRAWINGS AND ARE FROM A SINGLE MANUFACTURER. OTHER <br />I. KENMORE MODEL NO. 20-69301. <br />MANUFACTURERS WILL NOT BE CONSIDERED. <br />PART I GENERAL <br />C. COUNTERTOP ICEMAKER <br />B. DELIVER MATERIALS IN ORIGINAL CONTAINERS WITH SEALS UNBROKEN AND LABELS INTACT UNTIL TIME OF <br />I. DCM - 210 BAN, 16 9/16" x 24 3/16" x 31 1/8" BY HOSHIZAKI AMERICA INC. (800) 345-1325 <br />USES. ENGAGE AN EXPERIENCED INSTALLER WHO HAS SUCCE56FULLY COMPLETED TILE INSTALLATIONS <br />I.01 GENERAL <br />SIMILAR IN MATERIAL, DESIGN, AND EXTENT TO THAT INDICATED FOR THE PROJECT. <br />A. IT IS THE INTENT OF THIS SPECIFICATION TO PRODUCE A PREMIUM JOB, WHICH WILL PROVIDE THE MAXIMUM <br />END OF SECTION 10950 <br />C. COMPLY WITH PARTS OF ANSI 108 SERIES OF FINE INSTALLATION STANDARDS INCLUDED UNDER "AMERICAN <br />DURABILITY, WHICH CAN REASONABLY BE EXPECTED FROM A PAINTED SURFACE, <br />NATIONAL STANDARD SPECIFICATIONS FOR THE INSTALLER OF CERAMIC TILE" THAT APPLY TO TYPE OF <br />B, "PAINT" INCLUDES COATING SYSTEMS MATERIALS, PRIMERS, EMULSIONS, ENAMELS, STAINS, SEALERS, AND <br />SETTING AND GROUT MATERIALS AND METHODS INDICATED. TILE MAY BE THIN -SET. <br />FILLERS, AND OTHER APPLIED MATERIALS WHETHER USED AS PRIME, INTERMEDIATE, OR FINISH COAT. <br />1.02 MORTAR AND GROUT <br />C. SPECIFIED PRODUCTS BELOW ARE MANUFACTURED BY SHERWIN WILLIAMS, EXCEPT WHERE OTHER <br />A. MORTAR SHALL BE PORTLAND CEMENT ASTM C150, TYPE I. GROUT SHALL BE ACID RESISTANT UPCO <br />MANUFACTURERS ARE INDICATED, AND ESTABLISH A STANDARD OF QUALITY. EQUIVALENT PRODUCTS OF <br />HYDROMENT, TYPE AS RECOMMENDED BY THE MANUFACTURER FOR THE SPECIFIC TYPE OF TILE AND <br />OTHER ACCEPTABLE MANUFACTURERS MAY NOT BE USED UNLESS APPROVED BY ARCHITECT. <br />METHOD OF INSTALLATION, COLR FOR FLOOR TILE IS SPECIFIED ON THE DRAWINGS. <br />D. PROVIDE BEST GRADE AND QUALITY MATERIALS AND PRODUCTS MANUFACTURED BY SHERWIN WILLIAMS. <br />B. DO NOT GROUT TILE UNTIL TILE IS FIRMLY SET, SOAK OR DAMPEN JOINTS OF THE TILE TO BE GROUTED WITH <br />MATCH COLORS AS INDICATED ON THE DRAWINGS. USE PREMIXED PAINTS INSOFAR AS POSSIBLE. THIN ONLY <br />PORTLAND CEMENT GROUT. SOAK OR DAMPEN OTHER JOINTS AS RECOMMENDED BY THE GROUT <br />AS PERMITTED ANY MANUFACTURER'S LABEL INSTRUCTIONS, AND AVOID UNNECESSARY THINNING, <br />MANUFACTURER FORCE GROAT INTO JOINT LINES COMPLETELY IDILING JOINTS WITH COMPACTED GROUT AND <br />E. PROTECT FINISHED SURFACES, WORK OF OTHER TRADES, AND PROPERTY OF THE OWNER FROM DAMAGE AND <br />COVERING MORTAR FINISH JOINTS OF SQUARE EDGED TILE FLUSH WITH SURFACE, STRIKE OFF TOOL JOINTS <br />DEFACEMENT, COVER FLOORS AND FIXED EQUIPMENT WITH DROP CLOTHS. <br />OF CUSHION EDGED TILE TO DEPTH OF CUSHION. FILL GAPS AND SKIPS, AND RETOOL. <br />F. PREPARE SURFACES ACCORDING TO PAINT MANUFACTURER'S INSTRUCTIONS, EXAMINE FACTORY FINISHED <br />AND PRIMED SURFACES TO BE PAINTED, AND VERIFY COMPATIBILITY OF EXISTING MATERIAL WITH PAINT TO <br />BE APPLIED, APPLY PAINT IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS <br />1.03 CLEANING <br />ONLY TO SURFACES WHICH ARE THOROUGHLY DRY, SMOOTH, EVEN, GLEAN, FREE OF DUST AND PROPERLY <br />A. UPON COMPLETION OF THE PLACEMENT AND GROUTING, GLEAN TILE SURFACE SD THAT THEY ARE FREE OF <br />PREPARED 70 RECEIVE THE INTENDED FINISH, <br />FOREIGN MATTER. REMOVE LATEX-PORTLAND CEMENT GROUT RESIDUE FROM TILE AS SOON AS POSSIBLE <br />UNGLAZED TILE MAY BE CLEANED WITH ACID SOLUTIONS ONLY WHEN PERMITTED BY TILE AND GROUT <br />MANUFACTURER'S PRINTED INSTRUCTIONS, BUT SOONER THAN 14 DAYS AFTER INSTALLATION. FLUSH SURFACE <br />1.02 PAINTING <br />WITH CLEAN WATER BEFORE AND AFTER CLEANING. <br />A. ACCEPTABLE MATERIALS <br />I. ALL PAINTING TO BE SCHEDULED IN THE FINISH SCHEDULE. <br />END OF SECTION 09300 <br />2. EQUIVALENT PRODUCTS OF THE FOLLOWING ARE ALSO ACCEPTABLE: <br />PRATT 4 LANBERTT <br />GLIDDEN <br />PORTER <br />BENJAMINE MOORE <br />B. UNDERCOATS AND THINNERS <br />I. PROVIDE UNDERCOAT PAINT PRODUCED BY THE SAME MANUFACTURER <br />OF FINISH COAT, <br />2. USE ONLY THINNERS RECOMMENDED BY THE PAINT MANUFACTURER AND USE ONLY <br />THE RECOMMENDED LIMITS. <br />C. COLOR SCHEDULES <br />1. PROVIDE PAINTING AS SCHEDULED IN THE FINISH MATERIALS SCHEDULE, <br />`, Q t <br />DIVISION �1 �/y SIN 1 <br />VIA �.f U <br />a. ON GYPSUM DRYWALL, USE: <br />I. FIRST COAT - PIGMENTED PRIMER/SEALER <br />NONE SPECIFIED <br />2. SECOND COAT - ACRYLIC LATEX ENAMEL <br />3. THIRD COAT - ACRYLIC LATEX ENAMEL <br />b. ON FERROUS METAL, USE: <br />I. FIRST COAT - RUST INHIBITIVE ALKYD METAL PRIMER <br />Q <br />1� Vl�t I2 FURNISHINGS <br />DIVISION <br />2. SECOND COAT -SEMI-GLOSS ALKYD ENAMEL <br />3. THIRD COAT - SEMI -GLOSS ALKYD ENAMEL <br />NONE SPECIFIED <br />c. ON WOOD DOORS, USE: <br />I. FIRST COAT - STAIN (SEE FINISH SCHEDULE) <br />2. SECOND COAT - STAIN (SEE FINISH SCHEDULE) <br />3. THIRD COAT - VARNISH LOW SHEEN "RUBBED EFFECT" <br />I <br />DIVISION 13 SPECIAL CONSTRUCTION <br />SPECIAL <br />END OF SECTION 09900 <br />NONE SPECIFIED <br />DIVISION 14 CONVEI'INC SYSTEMS <br />NONE SPECIFIED <br />DIVISION 15 MECHANICAL <br />SEE MECHANICAL <br />DIVISION I& ELECTRICAL <br />SEE ELECTRICAL <br />REVISIONS <br />BY <br />fl <br />u <br /><r <br />4 00 <br />M <br />v m N <br />.-a co <br />Q� <br />o <br />mot` U <br />U <br />C (i, <br />1 <br />/ c U <br />1�� U N <br />. LO <br />t- > . <br />�I E <br />Q o - o <br />00 3 <br />75 " >.� 3 <br />3ti 3 <br />.n G <br />N <br />�w co <br />Wrl <br />C0 <br />N <br />� � O <br />o # <br />`a <br />U U <br />Z <br />Z 0 <br />J <br />U � � <br />O m �L J <br />t <br />} Q Lt_ <br />C <br />W :3o V0 0 <br />� <br />=U <br />>j W i3 O <br />c U <br />C `0 N d 0 <br />0 (0 (D <br />Q J �IZ N <br />0 Q CO <br />FX U_ <br />0 0 <br />L" cW <br />Date: 12. 23. 14 <br />Scale: AS NOTED <br />Project Mgr: DSH <br />Drawn: AZP <br />Job: 14-137 <br />Sheet <br />N2 <br />H:\Projects\Projects 2014\14137 - FMC Z Hills Diagnostics\04-CD\01-CDA\04-Architectura]\N-SPECS.dwg, 12/23/2014 4:03:09 PM, sharrison, Xerox 6604 PS.pc3 <br />