Laserfiche WebLink
DOORJAMB (REFER-\ F_1x4 1/2" DRYWALL <br />F <br />DOOR JAMB (REFER <br />1x4 <br />1/2" DRYWALL <br />TO PRODUCT <br />P.T. <br />TO PRODUCT <br />APPROVAL FOR CONN. <br />APPROVAL FOR CONN. <br />x4 <br />MFURRING <br />1 x4 P.T. <br />3/16"0 X 3" LONG <br />F URRING <br />3-1/4" LONG X3/16110 <br />TAPCONS <br />TAPCON. INTO <br />STAGGERED @ 16" <br />1x8 P.T. <br />BLOCK@ SPACING <br />1" <br />DETAIL <br />O.C. 2-ROWS INTO <br />PER MANUFACTURE <br />MASONRYTHROUGH <br />1-1/211 DETAIL <br />1 x4 P.T. & 1 x8 P.T. <br />3/16" x 3 -1/2" <br />TADrr)r,l nn 1r11 <br />1x4 P.T. <br />DOOR JAMB (REFER-\ <br />TO PRODUCT <br />APPROVAL FOR CONN. <br />O.C. & 4" FROM <br />DOOR JAMB (REFER <br />EACH END W1 MIN. <br />TO PRODUCT <br />2" EDGE DIST. <br />APPROVAL FOR CON*N. <br />(2) ROWS 3/16" x 3-1/2" <br />WPTZ4 <br />TAPCON @ 16" O.C. & <br />4" FROM EACH END w/ <br />)"st 0 T <br />2x8 P.T. <br />9 , <br />2x P.T. AS REQ'D <br />MIN. 2" EDGE DIST. <br />2x DETAIL <br />2 1/4" DETAIL <br />BUILDOUT @ OVER SIZE DOOR -WINDOW ROUGH OPENINGS <br />SCALE: N.T.S. <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />W/ 1/4" x 3 1/47'TAPCON ( 1 1/4" MIN. <br />EMBEDMENT INTO BLK.) <br />1 X 4 FURRING <br />BLOCK HEADER <br />1/2" DRYWALL <br />8d NAILS AT 8" O.C. AT BUCK <br />2 x 8 45 A DIAGONAL (4) 10d NAILS INTO <br />BRACE(S) 7/16" OSB 2 x 8 BRACE/ BLKG. <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />I <br />SCRIBE (NOTCH) POLY -CELL IN THIS ARE7A <br />Q <br />BACKSIDE TO FIT ARCH (4) 1 Od NAILS INTO 2 x 8 <br />CONNECT W/ 8d NAILS 6d BRACE/BLKG. <br />\_2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />ARCH FACES W (4) 10d NAILS THRU OSB INTO 2 x 8 <br />A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />ARCH DETAIL <br />SCALE: N.T.S. �s <br />INSTALL WDW. SCREW ANCHOR­� <br />INTO ARCH BLKG. PER <br />INSTALLATION DETAILS <br />1/4" MAX <br />ir Z-13" <br />SOLID BLKG. AT TOP BTWN. <br />ARCH BLKG. & BUCK <br />SECTION <br />A -A <br />1/4" x 3 1/4" TAPCONS <br />DOOR JAMB (REFER <br />1x4 <br />1/2" DRYWALL <br />F <br />TO PRODUCT <br />APPROVAL FOR CONN. <br />*4"! <br />1 X 4 <br />(2) ROWS 3/16" x 3-1/2"' <br />FURRING <br />TAPCON @ 16" O.C. & <br />2X8 <br />FROM EACH END w/ MIN. <br />1X8 <br />2" EDGE DIST. ATTACH <br />1 x8 w/ (2) ROWS 8d NALS <br />3" DETAIL <br />S I AGGERED @ 12" O.C. <br />DOOR JAMB (REFER <br />TO PRODUCT <br />APPROVAL FOR CONN. <br />1 X�41 <br />/2" D I <br />1/2" DRYWALL <br />2x8 P.T. w/ (2) ROWS 3/�l 6" <br />x 3-1/2" TAPCON @ 16" <br />1x4 <br />I <br />O.C. & 4" FROM EACH <br />FURRIN <br />IST. <br />END w/ MIN. 2" EDGE DIST. <br />ATTACH SECOND PLY w/ <br />(2) ROWS 10dx3" <br />2x8 <br />STAGGERED@ 12"O.C. <br />1-11A11 ng:TA I I <br />,LEAVE A CUT OUT IN O.S.B. ON THE <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />2 x 8 45 DrAGONAL BRACE AT EA. <br />FACE OF ARCH W/ (3) 10d NAILS <br />AT EA. END <br />PROVIDE TAPCON WITHIN <br />4" MIN. OF BRACE <br />START OF ARC <br />4'MAX. RAD, <br />2 <br />x 8 BUCK - CONNECT TO BLOCK SECTION <br />WITH <br />1/4" x 3 1/4" TAPCON (11 1/4" MIN B-B <br />/4" MAX EMBEDMENT INTO 2'-0" <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />1 X 4 FURRING <br />BLKG. & BUCK <br />8d NAILS @ 8" O.C. AT BUCK <br />2 x 8 VERT. W/ (2) 1 Od <br />NAILS AT EA. END <br />PROVIDE 2 x 8 DIAG. BRACE BTWN"'. <br />VERT. BRACES WHEN HGT. OF <br />BRACE EXCEEDS 24" <br />LEAVE A CUT OUT IN O.S.B. ON T <br />2 x 8 VERT. BRACE(S) ------- <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />BUILT UP PLWD. BUCK- <br />SCRIBE (NOTCH) BACKSID <br />7/16" OSB ARCH PANEL <br />TO FIT ARCH CONNECT W/ <br />8d NAILS <br />x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />7""_'--2 <br />INSTALL WDW, SCREW_,__�F— <br />ANCHOR INTO ARCH BLKG. <br />BTWN. OSB ARCH FACES W/ (4) 10d NAILS EQUAL EQUAL <br />THRU OSB INTO 2 x 8 <br />PER INSTALLATION DETAILS <br />13-13 <br />ARCH DETAIL rK <br />SCALE: N.T.S. SS <br />PROVID 2x <br />PROVIDE (2) MIN. CONT. I / (3) <br />TAPCON AT EA. SIDE 12d NAILS <br />BUCK - (1) WITHIN 4" <br />MIN. OF START OF <br />ARCH <br />START OF ARC <br />4'MAX. RAD. <br />PROPER INSTALLATION MAX. 8" <br />FILL SOLID <br />BOTH CELLS <br />#5 REB, <br />(TYP,) <br />STD. 90' <br />HOOK <br />> <br />JLU <br />7L]Ir4l <br />ru,7 <br />±5A <br />NOTCH WEB AT <br />FIRST 2 COURSI <br />,APACITY = 805 # FOR 1 S I RAP <br />= 1610 # FOR 2 STRAPS <br />1 PLY PRE-ENGINEERED TRUSS <br />SIMPSON HM9KT w/ (4) 1/4"xl 1/2" SDS <br />SCREWS & (5) 1/4" x 2 1/4" TITEN (IF TRUSS <br />IS 2 PLY INSTALL SIMPSON LGT2 wl (16) 16d <br />SINKERS AND (7) 1/4"x2 1/4" TITEN = 2150 <br />BOND BEAM OR CAST IN PLACE BEAM <br />RETROFIT TRUSS DETAIL <br />N.T.S. <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />IF TRUSSES USED) W/ (3) #6 X 4Y," WOOD <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />12 <br />JACK TRUSS PROVIDED BY SEE <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24" O.C. <br />ROOF SHEATHING ATTACHED <br />PER NAILING SCHEDULE LL <br />(5) 12d NAILS IMPSON <br />2X6 TO 2X4 H2.5A w/ (10) <br />8d NAILS <br />7V <br />___T_V <br />NOTE: <br />SHED ROOF ENDS TO BE <br />GABLE ONLY, CORNERS <br />SHALL NOT BE FRAMED AS <br />HIP. <br />DESIGNED ONLY FOR THE <br />INSTALLATION OF SHINGLE <br />AND METAL ROOF FINISH <br />GLASS BLOCK INSTALLATION NOTES <br />A) <br />COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) <br />ADHERE EXPANSION STRIPS TO JAMBS AND HEAD, MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL. <br />C) <br />SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />D) <br />SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. <br />4" EXPANSION BOLT (2 <br />E) <br />INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />9 ga. PANEL <br />55,5:5�1P/E R A N C H 0 R) <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING <br />REINFORCING <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE) <br />EXPANSION STRIP <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />REINFORCING AS FOLLOWS: <br />PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />SEALANT <br />PRESS PANEL REINFORCING INTO PLACE. <br />6" MIN. LAP SPLICE W/ <br />COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />.14: <br />REINFORCING PANEL <br />SMOOTH. DO NO FURROW. <br />F) <br />PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />A. <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />6" MIN. LAP <br />G) <br />SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE <br />NOTE: <br />REMAIN FREE OF MORTAR. <br />H) <br />STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />SEE GLASS BLOCK INSTALLATION NOTES. <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) <br />GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />1) <br />AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />J) <br />APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />K) <br />A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />INSTALLATION OF GLASS BLOCK. <br />JACK TRUSS PROVIDED BY--/ <br />TRUSS COMPANY OR 2x4 <br />#2 SYP @ 24" O.C. <br />4'-0" MAX SEE PLAN <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />IF TRUSSES USED) W/ (2) #6 X 4Y2" WOOD <br />SCREWS @ 16" O.C. MAX, OR IF MASONRY <br />WALL USE (2) 1/4" X 3 112" TAPCONS AT 16" <br />O.C. <br />SECTION @ ENTRY <br />SCALE: 3/4" = V-0" <br />MASONRY WALL. SEE PLAN FOR <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />W * W , M , AT PERIMETER <br />WHERE THIS CONDITION <br />(1) #5 BARS CONT. OCCURS <br />TOP WITH MIN. 3" <br />COVER 6'-0" F.F. <br />I L <br />A <br />GR DE <br />C14 <br />M <br />(2) #5 REBAR. MIN. 3" <br />16" MIN. Of COVER EA. WAY <br />SECTION AT DEEP MONO FOUNDATION <br />SCALE: 3/4" = V-0" <br />FILLED CELL PER <br />FOUNDATION PLAN <br />kR <br />YP.) <br />THE <br />:S <br />I IKIAnt%r_0TADI C IKICTAI I TInKI <br />FILLED CELL INSTALLATION rH <br />SCALE: N.T.S. <br />c-,E-= ARCH FLAN AND <br />PRE ENG TRLSS; IDE, <br />SEE NOTE I BELCV,' <br />2x SUE <br />L I <br />BRG WALL TYPE ALUM, <br />PERPLAN <br />1-314" F <br />55 NAIL <br />DIA (a <br />�-A,-jFf�FD PER g <br />N(,1TF,`P,FI0V1 CONT VENTED CR E <br />CrDNT 2vA NAILED TI: L 2x BLOCKING NA I LE 0 TOf <br />�'L A_',KIW_i wi 2-12d NAIL4, CHORD EVERY Q�HI:k HUS'­ <br />vd 3-12d NAILS, -YP <br />1. G.C..'DJ1LZ)--F?. TO VERIFYIPROVIDE&OFFIT MATERIAL SPAN CAPACIT _­1 E <br />ON I H= DI-1,03N PRFSSURES FOR ODMPONEN I,, AND CXV_1',I� <br />LISTED IN THIF DESIGN CRITERJA ON SHEET SIN. <br />2 FOR SOFFITAi TACHMENTATWAI I �-FR ALPHA Al 11P.1 ft; FL#IK-i4-' <br />PRODUCT "PPROVAL) F CHANNEL FASTENED TD: <br />CLIL! V,,, T NAIL.097" DIA <br />il,'?.1"O.C. W1 SOO" I`XN. EMBEDMENT <br />VV(DI".0 lh�(13) 16 GA. 3,A`x1,4'1_'R0WN STAPLES 24"MAX. 0 C,. IN <br />PATTERN <br />IA W 16 GA 1-4 y C;ROWN STAPI EACH GRO( <br />STRUCTURAL SOFFIT <br />SF01 E;CALE� 34'- I'-D* FC)R A_UMIINUM SOFFITS WIT— <br />T-j?3 2021 VA' INFiTAJ I MID SPAN Bt0r:P 7�:_P <br />THF �­_)FFIT F; PA INSTALLATIC*,,�, I I <br />'REFER TO THE PRODUCT APPROVAL FOA INSTALLATION DETAJILS.- <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />TRUSS AS SHOWN FOR O.H. UP TO Z-13" <br />DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />0 (2) 10d NAILS @ 8" O.C. <br />TO TRUSS TOP CHORD <br />+ + 7/y PLYWOOD SHEATHING <br />+ BLOCKING AS <br />+ REQUIRED <br />TO SUPPORT <br />TRUSS + <br />+ SOFFIT <br />2X4 SYP <br />EACH TRUSS <br />CONNECTOR <br />SEE LINTEL <br />SCHED. <br />PRECAST LINTEL CENTER SOFFIT <br />SEE ELEVATION <br />2X2 #2 P.T. MIN. FOR OVER HANG <br />W/J-CHANNEL SECURED (MAX. 4'-0") <br />@24" O.C. FASTENED TO <br />CMU W/ 3" LONG T-NAILS @ <br />24" O.C. <br />SECTION @ ROOF EXTENSION <br />SCALE: 3/4" = V-0" <br />SIMPSON HTT4 wl (18) 1 Od x 1 <br />1/2" NAILS TO STUDS & (1) - <br />5/8" DIA. ALL THREAD ROD <br />EPDXIED w/ SIMPSON "SET" <br />EPDXY MIN. 6" EMBEDMENT 8 <br />3" MIN. EDGE DISTANCE <br />RETROFIT FOR WE <br />MSTAM STRAP <br />RrA I P-1/4 <br />OCC OUCCT M AKIn <br />z <br />0 <br />U) <br />LL <br />0 <br />LU <br />0 <br />U) <br />2"x BOT, PLATE M (2) 1 Od @ 6" O.C. <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />AND NAILED W/ 8d COMMON @ <br />2X BOTTOM PLATE W/ 8d @ 4" <br />6" O.C. EDGES AND 12" O.C. FIELD <br />O.C., 2 ROWS STAGGERED <br />2x BAND JOIST W/ FACE NAIL 1 Od <br />TOP & BTTM CHORD, AND (8) <br />FACE NAILS 10d @ TRUSS VERT. <br />WEB <br />E - <br />NOTE: <br />t[BOT@ <br />LAP SHEATHING TO <br />C TOM OF BAND <br />JO <br />JOIST TYPICAL <br />Sil <br />—SIMPSON HGAM10KTA @ 12" O.C. <br />w/ (4) 1/4xl 1/2" SDS SCREWS <br />INTO BAND JOIST & (4) 1/4"x2 3/4" <br />TITEN INTO K.O. BLOCK <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />FILL 1 st 4 COURSES <br />SOLID W/GROUT <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. <br />4: <br />OVERHAN <br />RETROFIT WALL OVERHANG DETAIL (NTS <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR RECI'D. <br />11-011 51-01' <br />A <br />Ii. 1 1.01, A 6 <br />.1 a, 0 <br />A:�INISH FLO( <br />11-F <br />#5 BAR <br />CENTERED W1 <br />IN TOP <br />KNOCKOUT/ <br />CHAIR BLOCK <br />% <br />MONO FOOTING <br />SIZE AND REINF. PER PL . AN <br />AND SECTION DETAILS <br />CLEAN FILL <br />DIRT <br />NDARD 9 <br />�STA <br />90r HOOK <br />#5 BAR IN <br />FILLED CELL," <br />STEMWALL FOOTING SIZE AND <br />REINF. PERLAN AND STEMWALL <br />MONO TO STEMWALL FOOTING SECTION DETAILS <br />SCALE: 3/4" = V-0" <br />OTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJEC, <br />ONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />EXISTING BOND BEAM. <br />DRILL 3/4"x5" MIN. HOLE SET BAR IN <br />EPDXY CAP TO PREVENT LEAKAGE <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY ± 211) <br />#5x6'EMBEDDED INTO EXISTING BOND BEAM <br />FILL CELL FULL HEIGHT W/ <br />NON SHRINK GROUT. <br />#5x6'EMBEDDED INTO <br />EXISTING FOOTING <br />DRILL 3/4"x5" MIN. HOLE <br />SET BAR IN EPDXY <br />r"Iw-f��Fvw� <br />SAW CUT <br />EXISTING FOOTING rA _'� SECTION <br />11_�ji SCALE: N.T.S. <br />RETROFIT FILLED CELL DETAIL <br />SCALE: N.T.S. <br />CV) <br />Lo <br />LO <br />< <br />LU <br />0 <br />z <br />0 Q) LO E <br />> 0 <br />U <br />en CO <br />V), C6 <br />Z) M M <br />En U -0 -of i ,,, <br />E C <br />0 <br />U <br />Ln U w <br />C,1 <br />00 E <br />co <br />CL <br />LU LIJ <br />C6 W 0 <br />W LU _j LLJ 2 �_ 0 <br />W8< �20 z <br />(D W <br /><,gyz, <br />X=)�_j 03-MOLL000-0 <br />< CY X Cl) <br />W 0 z 2 0 �L_L <br />0 0 <br />Z, 0 0 M, z <br />LL) Ly V5 <br />q IL =0) <br />> Z LU CL <br />U) 0 z <br />LL <br />-, <br />J< CLU 92:Lzcuj( <br />� . Lj Z ) 0 � <br />< —20 <br />0 W <br />W <br />0 <br />LL < 0 F- LL <br />C:) <br />C:) <br />z CN <br />Uj <br />0 I-_ <br />(—/) 5 <br />> U) <br />CD 0 <br />CV) C:) <br />cf) r,-- <br />LO <br />_j <br />IT <br />LL <br />U) I r-� <br />z <br />< LLI LO <br />00-0 cyi <br />a- mv— <br />00 <br />< >- < <br />z <br />z <br />W <br />LU <br />JUL. <br />21 <br />H24', <br />Virtual <br />Revi <br />Assist <br />Inc <br />Plans Review <br />-am <br />I te <br />J <br />qp <br />rovf <br />d <br />for compliance <br />w th t <br />T <br />e..21.2 <br />in <br />F.-d <br />7 <br />h Ec <br />itioll <br />Loby Debra <br />A111 <br />Rid <br />r r <br />MCI <br />0 <br />0 <br />04 <br />0 <br />N <br />0 <br />C14 <br />— <br />04 <br />CD <br />1-- <br />0 <br />(14 <br />00 <br />0 <br />z <br />0 <br />N LO <br />V5 <br />" � <br />UU <br />C4, <br />U'-) 'II- <br />> <br />-0: <br />co� <br />(C�i, <br />Cr <br />CO <br />Z I-- <br />< Z <br />LU <br />4_0 <br />0 <br />LLI <br />9 U) <br />z z <br />000 <br />cy) 0 <br />LU <br />0 IL) V5 <br />-0 <br />Z)Z5 <br />LO -0 <br />0 <br />0111- <br />Ora <br />z <br />X-< <br />(L X <br />Lli <br />LU , <br />co �-_ LU <br />11744 <br />0 <br />r*4 <br />01f <br />0--,0 <br />Z6= <br />W <br />>_ <br />a- <br />>_ = cp <br /><�—=) <br />CD <br />0zWO <br />C-q <br />< <br />0:51.1im <br />Z LL <br />Z <br />Ln � <br />< <br />0 0 <br />z <br />z <br />z <br />LU <br />W <br />Lo <br />> C-) <br />LAST PLOT DATE <br />4-a <br />z 0 <br />STRUCTURAL <br />-J <br />DETAILS - RETRO FIT <br />