My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6931 Oak Crest Way
Zephyrhills
>
Building Department
>
Building Plans
>
6931 Oak Crest Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 3:32:17 PM
Creation date
2/18/2025 3:46:32 PM
Metadata
Fields
Template:
Building Plans
Street #
6931
Location
Oak Crest Way
Contractor
Jeff Dixon Construction
Building Plans - Permit #
16862
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MATEKIAL L15T <br />i a DESCRIPTION `j p Gp �` /'► G <br />FLOOR FRAMING GENE"L OI ECIFIVATION5 <br />1/4 cu. yd. - Gravel Note: These plans have been prepared to meet professional building standards. However, due to varying con- <br />3 pcs. 0012'treated Floor Runners struction codes and local building practices, these drawings may not be suitable for use in all locations. <br />2 pcs. 2x4x12' treated Band Boards Consequently, these drawings are not to be used as a guide for construction unless the builder has <br />13 pcs. 2x4x8' treated FloorJoists nut <br />lips confirmed suitability or until the drawings have been adjusted to meet local requirements. Results may <br />3 shts. fx8'x5/8' SA plywd. Floor Decking vary according to quality of material purchased and the skill of the builder. <br />WALL FRAMING M 1 1. DIMENSIONS <br />36 pos. 2x4xT-8 5/81(pre-cut) wail Studs y, All dimensions should be verified. Printed dimensions shall take precedence over scaled dimensions. <br />6 pcs. 2x4xl2' WallPlates �. <br />6 pcs. 2x44' Wall Plates I Jill2 <br />2 pcs. 2x4x8' Wall Headers; r:�� - These drawings are based on the following load criteria. <br />Floor: 40 p.s.f. live load <br />ROOF FRAMING <br />12 pcs. 2x4x1r Truss Top Chords 10 p.s.f. dead load <br />1 PCs. 2x4x10' Box Rake Blocking `. '�`'• r. • �.•�s..,� __ ,, Roof: 30 p.s.f. live load <br />10 pcs. 2x4x8' Truss Bottom Chords `'-,� j �` . � a - , r� <br />2 pcs. 2x4x12' Truss King Posts & Siding Nailers �� t 1 a p.s.f. dead load t <br />6". 4x8x1IT ext. plywood Roof Sheathing <br />Allowable soil bearing pressure is assumed to be 2,500 p.s.f. or greater. <br />DOORS. WINDOW .SHUTTERS. and PLANTER BOXES LUMM <br />1 pc. 1x6x12' Door Jamb (ripped) 3' � <br />1 pc. 1x6xV Door Jamb (ripped) GA13LE All plywood should be exterior grade. Exposed lumber should be weather protected with, stain/sealer or paint. Any <br />lumber touching the ground is to be pressure treated to a degree suitable for ground contact. Ail lumber used in this <br />1 pc 1)W2x8l Door Stop <br />1 pc. 1Door Stop 5TOKAGE 5HED/FLAYHOU5E <br />project must have an allowable Fiber Stress in Bending {Fd of 875 p.s.i. or greater(Spruce -Pine - Fir No. 2 or better). <br />2pcs. 1x4x12' Door Frame <br />1 PC. 206 Door Shelf <br />1 sht 4x8x3/4' ext. plywood Door T /+�"' <br />1 ea. 2032 Double Hung window I NSTi� U CT 10 N 5 <br />1 sht 4x8x1 /2' ext. plywood Shutters <br />2 pes. 1x2x10' Shutters 1. Study the plan thoroughly and read all the instructions before starting the construe- ROOF FRAYING 24. Apply the roof shingles per manufacturer's instructions. <br />1 PC. 1%m' Planter Boxes tion of the shed. Be sure to check your local code requirements and obtain a building 12. Cut 20 chords and webs as shown in detail E3. Build (10) trusses using "S201" nail- SIDING <br />1 pc. 1XBx8' Planter Boxes permit if necessary. on plates with a minimum of (3) 7/8' roofing nails per board. Four plates should be 25. Cut the 12" tri-lap hardboard siding to size for each wall as Indicated in the wall <br />1 pc. WxTwire screen Planter Boxes SITE PREPARATION AND RUNNER PLACEMENT used on each side of the truss. The (2) gable end trusses will need (8) additional elevations on sheet 5 of 6. Start the first row 2' up from the bottom of the 44 <br />2. Select a location that Is level and slightly larger than the gable storage shed, plates each. runners, making sure the siding Is level. Fasten the siding with (2) 8d galvanized <br />WOOD VENTS and WOOD STOOP 13OX.BAKES nails at every stud. <br />2 pcs. tx24' Wood Vent Trim 3. Dig (3) trenches approximately 8' wide, 13'-0' long, and 2' deep as shown in details 13. After assembling the trusses, (4) top chords should be left for the construction of the QM <br />2 pcs. 1/2'x1/2'W Wood Vents A2 and B2. Fill each trench with gravel to the top of the grade. Packing or rolling the box rakes. 26. Check actual door opening with the dimensions in detail A6. Minor adjustments may <br />1 W. 4x8xl/2' ext. plywood Wood Vents gravel will result in a more level base. have to be made to the door dimensions. Measure and cut 1 x6 doorjamb and 1 x4 <br />2pcs. 1'-6'x6'wire screen Wood Vents 14. Cut (18) 20 blocks 6 1/2' long, (2) 2x4 spacers 10 1/2' long, and (2) triangular door trim as shown in detail A6. Nail in place with 8d galvanized nails, shimming as <br />Epos. 2x4x12'treated Wood Stoop 4. Cut (3) treated 40 runners 12'-0" long. Miter both ends of the 40's as shown in pieces of screen 6'-0' long and V-6' high. needed. install 41/2' x 36' metal drip edge at door sill. <br />detail C2. Position the runners on the gravel trenches and ensure that they are <br />FINISH and TRIM square by measuring the corners. Diagonal dimensions should equal 14'-5". See 15. Nail the screen to the top chords of the gable ends using 7/8' roofing nails as shown 27. Measure and cut 1 x4 frame and 3/4' plywood for both doors. Glue and screw 10 <br />5bundles - AWW Shingles detail A2. in detail D3. through the backside of the 3/4' plywood using 1 1/2'screws. Glue and nail 2x6 shelf <br />1 roll - IS#Roofing Felt FLOOR FRAMING to the lower door. Attach the hinges and hang the doors. <br />5. Select 2 treated 2x4's ] 2'-0° Ion to use as band boards. Cut 13 treated 2x4 floor 16. Nail the 2x4 blocks to the top chords of the gable ends using 16d cc Hafts. Nail the <br />Epos. 41/2"x10' Metal Drip Edge () g ( ) WINDOW. SHEERS, PLANTER BOX. AND WOOD STOOP <br />3501.f. 12" Td4ap Hardboard Siding joists 7'-9' long. Nail the band boards to the joists using (2)16d cc nails 16 penny remaining (4) top chords to the 2x4 blocks. Cut and fasten 1/2 plywood to the <br />g l g ( P Y underside of the box rakes using 8d cc Walla spaced 6' apart. 28. Install 2032 double hung window per manufacturer's Instructions. <br />3pcs. 1x4x8' Door Trkrrr cement coated) per joist at each end as shown in detail D2. <br />itY Comer Boards WOOD VENTS 29. Measure and cut 10 window trim, and 1x2 drip moulding as shown in detail A5. <br />8pcs. 1x4x <br />2 pcs. ix6xIV ComeFascia Board 6. Position the 2x4 floor framing on the 4x4 runners. Toenail 16d cc nails through each 17. Nail a 2x4 spacer to the 2x4 king post using 16d cc nails as shown in detail D3. Fasten the boards to the siding with 8d galvanized nails. <br />side of the 20 joists Into the 04's. <br />2 pcs. tx&12' Fascia Boards 18. Cut 1/2' plywood, 1/2' stop, and 1x2 trim for the (2) wood vents as indicated in detail 30. Construct the (2) shutters with carpenter's glue and 1 1/4" finishing nails as shown <br />2 pos. 1x2x14 Trim Boards 7. Check to ensure floor system is level and square. D5. Use carpenter's glue and 1 1/4' finishing nails to assemble the vents. Screw the in detail D6. Screw in place on each side of the windows with 21/2' screws. <br />2 pcs. 1x2x12' Trim Boards wood vent to the 20 spacer with 2 1/2' screws. <br />2shts. 4x8xl/2' exL plywood Soffits 8. Cut and fasten (4) sheets of 5/8' exterior plywood to the 20 floor using 8d cc nails ERECTING THE WALLS 31. Construct the planter box with carpenter's glue and 1 1/4' finishing nails as shown in <br />2 tubes - Carpenter's Glue spaced 6' apart as shown in detail E2. 19. Position the wall panels in place on the wood floor as shown in detail A4. Temporary detail 86. Screw in place below the windows with 2 112' screws. <br />1 tube - Caulk WALL FRAYING bracing may be necessary. Make sure the walls are plumb and square. Secure the <br />2get. - Paint or Stain 9. Use the wood floor as a work surface to construct the walls and trusses. wall panels to the floor using 16d cc nails. Nail the panels together at the corners. 32. Construct 2x4 wood stoop with 21/2' screws as shown in detail 06. <br />ERECTING THE TRUSSES FINISH AND TRIM <br />KANT-SAG HARDWARE 10. Cut 20 studs, plates, and headers for the (4) wall panels as follows: 20. Mark the top plates on the front and rear walls for the location of the trusses indicated 33. Measure and out 1 x4 corner boards as shown on sheet 5 of 6. Fasten in place with <br />96 ea. 5x31/8 S201 NaiWn Plates as"& Elm Header in detail C4. Fasten the 'RT7" truss ties with 8d cc nails to the top plates as shown 8d galvanized nails. <br />20 ea. - RT7 Truss Ties G% Una 9t14 Loa QL Lenath in detail B4. Set the trusses one at a time on the top of the wall, fastening the <br />(33) 7'-8 5/8' (2) 12'-0' (2) 3'-5' trusses to the ties. 34. Paint and/or stain as desired per manufacturer's instructions. <br />MISC. HARDWARE (1) 10118, (4) 1V-5' *(3) 2'-2' <br />(2) 8'-7 ]/2" (4) 8'-0' ROOF PLYWOOD <br />7lbs. 16d Cement Coated Nails *(1) 3'-2' (4) 7'-5' 21. Measure and cut 1/2' plywood so the joints stagger on the roof. Allow a 3/4' <br />5lbs. 8d Cement Coated Nails overhang at the edge of the top chords to cover the ix6_fascia board as shown In <br />6lbs. 8d Galvanized Nails (2) 9 5/8 detail 04 and E4. Fasten the plywood to the trusses with 8d cc nails spaced 6' apart. QUALITY PROJECT PLANS FROM: <br />6lbs. 718' Roofing Nails * Verify length with window rough opening FINISHED ROOFING TTZ&&W0 HDA, INC. ■ ST. LOUIS, MISSOURI <br />1 lb. 1 1/4' Finishing Nails 22. Apply the 15# roofing felt with 7/8' roofing nails. Start at the bottom of the roof and IlLoff oo-/r-YouirsEL/ SESIE$TM <br />1 �. 21/2' Galvanized Screws 11. Assemble the (4) wall panels as shown on sheet 3 of 6. Nall the 2x4 top and bottom overlap the felt 41, *COPYRIGHT +ems, ALL RIGHTS RESERVED <br />1 lb. 1 1/2" Galvanized Screws plates to the studs using (2)16d cc nails per stud at each end. Attach the headers This plan has been prepared to meet professional stan- <br />4 ea. 4' Hingesw/Screws in the same manner. Lay the panels aside. Note: Window rough opening dimensions 23. Measure, cut, and attach 1 x6 fascia board, 1 x2 trim, and metal drip edge as shown dards ofconstrucdon. Acarcful SHEET NO. 1 <br />Y P 9 P 9 p g study of plan instructions <br />2 ea. 4' Door Pull may vary with that of the window manufacturer. on sheet 5 of 6. Apply 1/2' plywood to the underside of overhangs as shown in detail and dimensions is advised before starting work TOTAL 6 <br />D4. <br />PROJECT PLAN NO. 12024 <br />ALL WORK SHALL COMPLY WITH ALL PREVIOUSLY NO. 9106 <br />PREVAILING CODES, FLORIDA BUILDING REVIEW DATE <br />CODE, NATIONAL ELECTRIC CODE AND CiTY ( <br />CITY OFZEPHYRHILLS ORDINANCES �Ept yk TILLS <br />PLANS EXAMINER t <br />Z� <br />
The URL can be used to link to this page
Your browser does not support the video tag.