My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6972-6984 Ripple Pond Rd
Zephyrhills
>
Building Department
>
Building Plans
>
6972-6984 Ripple Pond Rd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 7:26:13 AM
Creation date
2/18/2025 3:46:38 PM
Metadata
Fields
Template:
Building Plans
Street #
6972-6984
Location
Ripple Pond Rd
Contractor
Lennar
Building Plans - Permit #
Unknown
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIMPSON HGAM11 <br />wl <br />(4)1/4"xl 1/2" SDS <br />SCREWS <br />TO BLOCKING & (1 <br />14X234' <br />TITEN TO CMU <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING AND <br />FASTENERS. (MIN. FIRST 4 BAYS) <br />SEE STRUCTURAL NOTES AND NAILING TOENAIL w/ <br />SCHEDULE FOR SHEATHING DETAIL-? (2)16d NAILS <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />MAX. 9" AND FASTENERS. (MIN. FIRST 4 BAYS) <br />UNSUPPORTED, <br />IF >9" SEE 1 O/S5 BACKNAIL w/ (2)16d NAILS —,_ <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. <br />MAX 9" SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />UNSUPPORTED, AND FASTENERS. (MIN. FIRST 4 BAYS) <br />IF >9" SEE 10/S5 <br />BACKNAIL w/ (2)16d NAILS <br />SEE STRUCTURAL NOTES AND NAILING <br />SCHEDULE FOR SHEATHING DETAIL <br />' <br />45°t <br />/ <br />45' t <br />SEE STRUCTURAL <br />NOTES AND NAILING <br />2x4 CRO BRACE <br />SCHEDULE FOR <br />APPROX. 8" FROM <br />SHEATHING DETAIL 2x4 KICKER <br />2x8 SYP#2 "L" BRACE TO <br />RIDGE FASTENED AT <br />@ 8'-0" 0/C. <br />EXTEND AT LEAST 90% OF <br />' <br />EACH JOINT W/ (3) 10d <br />"L" BRACE TO EXTEND <br />2x4 CROSS BRACE <br />WEB LENGTH &NOTCH AT <br />& (2)10d TOE NAILS @ <br />AT LEAST 90% OF WEB <br />APPROX. 8" FROM <br />BOTTOM CHORD (SEE TABLE) <br />EA. END @ 48" O.C. <br />LENGTH (SEE TABLE) <br />RIDGE FASTENED AT <br />SIMPSON H2.5A w/ (10) 8d <br />2x$ P.T. <br />GABLE TRUSS <br />EACH JOINT w/ (3)1Od & <br />FROM LEDGER TO <br />SILL <br />1/2" CDX PLYWOOD OR <br />d TOE NAILS @ EA.DIV <br />BLOCKING <br />• <br />7/16" OSB SHEATHING <br />ATTACHED W/ 10d <br />END <br />GYPSUM WALL BOARD <br />GABLE TRUSS <br />NAILS @ 6" O.C. EDGES <br />2"x4" PANEL BLOCKING @ 48" O.C. FOR THE FIRST <br />CDX PLYWOOD OR 7/16" <br />' <br />AND 12" O.C. FIELD <br />(4) ROWS OF TRUSSES FROM EA. END TYP. BOTTOM <br />OS SHEATHING ATTACHED <br />1OdX3" @ 3" O/C <br />CORD ATTACHED W/ (2)16d TOENAILS <br />w/ 10d NAILS @ 6 O.C. <br />w/ 1 <br />cr <br />THROUGH CHORD <br />2"x4" LEDGER (MATCH BOTTOM CHORD <br />EDGES AND 12" O.C. FIELD <br />INTO 2" 6" P T PLATE <br />SLOPE OF ADJACENT SCISSOR TRUSS) <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />MAX. 9" <br />UNSUPPORTED, BACKNAIL w/ (2)16d NAILS <br />IF >9" SEE 10/S5 SEE STRUCTURAL NOTES AND <br />NAILING SCHEDULE FOR SHEATHING <br />�- DOUBLE TOP PLATE <br />2"x4" CROSS BRACE <br />2x4 CROSS BRACE APPROX. 8" <br />APPROX. 8" FROM <br />FROM RIDGE FASTENED AT <br />RIDGE FASTENED AT <br />EACH JOINT w/ (3)10d & (2)10d <br />EACH JOINT w/ (3) <br />TOE NAILS @ EA. END <br />10d & (2)10d TOE <br />NAILS @ EA. END <br />2x FRAME WALL (SEE WALL <br />SECTION FOR SIZE & SPACING) <br />2x4 PANEL BLOCKING <br />1/2" CDX PLYWOOD OR 7/16" <br />@ 48" O/C FOR THE <br />OSB SHEATHING ATTACHED <br />FIRST (4) ROWS OF <br />W/ 10d NAILS @ 6" O.C. EDGES <br />TRUSSES FROM EA. <br />AND 12" O.C. FIELD <br />END TYP. TOP & <br />BOTTOM ATTACHED <br />• <br />( 2)16d NAILS <br />W/ (2)16d TOENAILS <br />x 2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING <br />2x4'T' ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL NOTCH " BRACE HERE <br />WEEP SCREED " -- "LTHE FIRST (4) ROWS OF TRUSSES <br />FASTEN WITH 10dx3" @ 4" O/C SPACED 2x4 "T" ON TOP OF PANEL <br />(2)16d <br />NAILS <br />@ 48" O.C. I I INSTALLED PER MANUF. 1/2 x 8 J BOLT @ 48 O.C. I I ( WEEP SCREED FROM EA. END TYP. TOP & BOTTOM BLOCKING, FASTEN WITH SIMPSON HGAIOKT w/ (4)1/4"x1 1/2" SDS SCREWS TO <br />SIMPSON META12 w/ (7)10dxl 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ 2)16d TOENAILS TRUSS & (4)1/4"x3" SDS SCREWS TO PLATES AT 24" O.C. <br />MOISTURE BARRIER 1Odx3" @ 4" O/C <br />1/2"x 8" "J" BOLT @ 32" O.C. MINIMUM 6" FROM <br />O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK - <br />MOISTURE BARRIER <br />PLATE SPLICES w/ 3/161lx2" 0 PLATE WASHER <br />SIMPSON META12 w/ (7) <br />ALTERNATE SIMPSON MSTAM24 w/ (7)10d NAILS <br />NOTE: IF EMBEDDED <br />1Odxl 1/2" NAILS AT EA. <br />& (4) 1/4"x2 1/4" TITEN @ 4'-0" O/C ALIGNED WITH <br />STRAP MISSED VERTICAL <br />SECTION <br />1 TRUSS VERTICAL WEB (24,, <br />GABLE WEB SECTION <br />2 <br />WEB, USE MSTAM36 w/ (7) <br />O.C. MAX) w/ MIN. 4' <br />1Od NAILS & (4)1l4"x21/4" <br />SCALE: N.T.S. <br />SS EMBEDMENT IN KO BLOCK <br />SCALE: N.T.S. <br />S5 <br />TITEN ON OUTSIDE <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />REFER TO DETAIL J <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />ON SHEET S5 FOR <br />X-BRACING, AND TOP <br />r <br />M <br />M <br />SEE STRUCTURAL <br />CHORD BLOCKING <br />N <br />NOTES AND NAILING <br />INFORMATION <br />tO <br />SCHEDULE FOR <br />SHEATHING DETAIL BACKNAIL w/ <br />WOOD TRUSSES <br />1 1 <br />00 <br />1/ <br />go <br />(2)16d NAILS <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />2x4 RAT RUN BRACING <br />" <br />RIDGE FASTENED AT 11 It <br />AT 24" O.C. ON TOP OF <br />EACH JOINT w/ (3) <br />BOTT. CHORD FOR 4 <br />10d & (2)10d TOE <br />TRUSS SPANS <br />NAILS @ EA. END <br />ATTACHED W/ 2 -16d <br />AT EA, TRUSS JOINT <br />(2) 2" x 4" LAMINATIONS W/ (1) ROW <br />(3) 2" x 4" LAMINATIONS W/ (1) ROW <br />(3) 2" x 6" LAMINATIONS W/ (2) ROWS OF <br />2x4 PANEL BLOCKING <br />OF STAGGERED 10d COMMON WIRE NAILS <br />OF STAGGERED 30d COMMON WIRE NAILS <br />STAGGERED 30d COMMON WIRE NAILS <br />@ 48" O/C FOR THE (2)16d NAILS <br />2x4 BLOCKING @ 24" <br />(D = 0.148", L = 3") OR EQUAL <br />(D = 0.207", L = 4112") OR EQUAL <br />(D = 0.207", L = 41/2") OR EQUAL <br />FIRST (4) ROWS OF <br />0/C w/ (2)16d <br />TRUSSES FROM EA. <br />TOENAILS @ EA. END <br />NOTES: <br />END TYP. TOP & <br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 114" DIA. x 51/2" LAG SCREWS OR EQUAL <br />BOTTOM ATTACHED <br />MASONRY WALL <br />OF THE COLUMN <br />(SPACE AS SHOWN FOR 3-PLY) <br />w/ (2)16d TOENAILS <br />ARCHITECTURAL FINISH 2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL <br />OF THE LAST LAMINATION (SPACE AS SHOWN FOR 3-PLY) <br />EXT. WALL CONN. 3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2)16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION <br />COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF <br />NON - LOAD BEARI G LOCATION D B.U.C., SAME NUMBER OF ROWS, SAME SPACING) <br />SEE TYP. WALL SECTION FOR SCALE: 3/4"=1'-0" S5 TYPICAL NAILING SCHEDULES FOR BUILT-UP COLUMNS 8 <br />ADDITIONAL INFORMATION. <br />SCALE: N.T.S. S`5 <br />1INIMUM 2x <br />:ROSS BRACING <br />5EE PLAN FOR <br />OCATIONS) TOENAIL <br />(2)16d NA <br />(2)16d PER <br />JOINT <br />2"x4" MIN SEE M/S5 <br />12" <br />SH SCHEDULE <br />,TTACHMENT <br />SYP BDCG @ 16" O.C. <br />1 x 0.131" <br />AILS EA. SIDE <br />2x4 #2 SYP w/ 1 Od <br />XO.131" @ 8" O.C. <br />ALTERNATE NON -DROP <br />CROSS BRACING DETAIL J GABLE END DETAIL('10 <br />SCALE: N.T.S. S5 SCALE: N.T.S. SS <br />GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S. <br />PRE-ENGINEERED <br />WOOD TRUSSES <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 1 O/S5 <br />"L" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />-1/2" CDX PLYWOOD OR <br />7/16" OSB SHEATHING <br />ATTACHED w/ 1 Od NAILS <br />@ 6" O.C. EDGES AND 12" <br />O.C. FIELD <br />-2x4 "T" ON TOP OF PANEL <br />BLOCKING, FASTEN WITH <br />10dx3" @ 4" O/C <br />2x4 BLOCKING 2x4 "T" BLOCKING <br />@ 48" O.C. 16d NAIL <br />"L" BRACE <br />ATTACHED W/ <br />10d NAILS @ 4" <br />O.C. TYPICAL <br />GABLE TRUSS WEB <br />DOUBLE "L" BRACING DETAIL 5 <br />SCALE: N.T.S. S5 <br />2x4 "T' BLOCKING <br />2x4 BLOCKING @ <br />48" O.C. <br />"L" BRACE ATTACHED 16d NAIL <br />W/ 10d NAILS @ 4" 0.C� <br />TYPICAL <br />GABLE TRUSS WEB <br />SINGLE "L" BRACING DETAIL 6 <br />SCALE: N.T.S. S5 <br />DIAPHRAGM <br />BLOCKING @ <br />48" 0/C GABLE TRUSS <br />TRUSS VERTICAL <br />SIMPSON SP2 w/ (12)10d <br />2x4 LEDGER (MATCH BOTTOM CHORD DBL. TOP PLATE NAILS AT EACH STUD (2) 2"x8" "L" BRACE -� <br />SLOPE OF ADJACENT TRUSS) STUD WALL (SEE TYP. SEC.) FASTENED WITH (3) <br />16d PER SIDE <br />SECTION 3 SECTION 4 <br />SCISSOR GABLE "T" BRACE <br />SCALE: N.T.S. SS SCALE: N.T.S. S5 AS PER HIB 91 SCALE: N.T.S. S5 <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S5 <br />L BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />-1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 1 Od NAILS @ 6" O.C. <br />E ES AND 12" O.C. FIELD <br />JACK TRUSS <br />,SEE PLAN FOR <br />--->> ��r CONNECTION <br />- �T -.r- <br />2x4'7" ON TOP OF PANEL) <br />BLOCKING, FASTEN WITH <br />I <br />L- 2x4 BLOCKING W/ <br />LL- <br />1 Odx3" @ 4" O/C <br />(2)12d TOENAILS <br />LL- <br />1-117 <br />rg <br />SECTION <br />SCALE: N.T.S. <br />S5 <br />OVERLAP TRUSS BRACING <br />AT LEAST TWO TRUSS SPACES <br />`MINIMUM (2)16d PER JOINT \-MINIMUM 2X4 TRUSS BRACING <br />TRUSS BRACING OVERLAP DETAIL <br />SCALE: N.T.S. <br />6" OVERLAP <br />M <br />S5 <br />"L" BRACE W/ 10d @ 4" O/C <br />(SEE SCHEDULE FOR SIZE <br />AND LOCATION) <br />8d @ 6"0/C <br />WOOD TRUSSES <br />SIMPSON HGAM1OKTA w/ (4) <br />1/4"x1 1/2" SDS SCREWS TO <br />BLOCKING & (4)1/4"X2 3/4" <br />TITEN TO CMU <br />2 x 4 BLOCKING w/ (2)1 Od <br />TOE NAILS AT EACH END @ <br />24" O/C (TYP) <br />z <br />w <br />BRACING w/ (3)1 Od x 3" AT <br />•\- <br />EACH CONN. @ 24" 0/C <br />MOISTURE BARRIER <br />BOND BEAM <br />MASONRY WALL <br />ARCHITECTURAL FINISH <br />EXT. WALL CONN. @ NON -LOAD <br />BEARING LOCATION (UNEVEN CLG.) <br />SEE TYP. WALL SECTION FOR <br />ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />"L" BRACING REQUIREMENTS <br />STUD <br />SPACING <br />NO <br />"L" BRACE <br />(1) 2"x4" (U.N.O.) <br />"L" BRACE <br />2"x6" (U.N.O.) <br />"L" BRACE <br />24" <br />0'0" - T-O" <br />T-0" - 6'-0" <br />6'-0" & GREATER <br />SCISSOR GABLE - (1) 2"x8" #2 S.P.F. @ EACH VERTICAL AND <br />(2) 2"x8" FULL HEIGHT @ DIAPHRAGM BLOCKING <br />NOTE: <br />1) "L" BRACE MUST EXTEND AT LEAST 90% OF WEB LENGTH EXCEPT, SCISSOR GABLE WHICH REQUIRES <br />BRACE TO EXTEND FULL HEIGHT OF GABLE. <br />2) "L" BRACE TO BE FASTENED TO GABLE STUD WITH 1 Odx3" NAILS @ 4" O/C. <br />3) SEE 6/S5 FOR MORE INFO. <br />SIMPSON HGA10KT w/ (4) 1/4"xi 1/2" SDS <br />SCREWS TO TRUSS & (4) 1/4"x3" SDS SCREWS <br />TO PLATES (TYP.) <br />—4UN 1. br-RKINU -- <br />GABLE END BRACING DETAIL SCALE:3/4"=1'-0" <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SIMPSON SP2 w/ (12) <br />10d NAILS AT EACH <br />STUD <br />END JACK <br />1 V-0" MAX. <br />Cr <br />Uj <br />Cr <br />O <br />a <br />r <br />�C4 <br />CORNERJACK <br />U <br />a <br />, <br />W <br />z <br />C <br />O <br />U <br />HIP FRAMING REFERENCE PLAN <br />20'-0" MAX 20'-0" MAX <br />"X" BRACE SEE DET. J/S5 -, CONTINUOUS BOTTO CHORD BRACING 2X4 MIN. <br />'qq <br />M� <br />No <br />WM <br />NOTE: STOP CHORD 2X4 #2 SYP BRACING <br />1) SEE TRUSS MANUFACTURER'S TRUSS ENGINEERING <br />ZBOTTOM <br />@ 16" O.C. MAX. FOR FIRST (4) <br />CUT SHEETS FOR ADDITIONAL PERMANENT BRACING <br />BAYS <br />THAT MY BE REQUIRED <br />CHORD GABLE END BRACING <br />2) "T" BRACING MAY BE USED IN PLACE OF PERMANENT <br />@ 4'-0" O.C. MAX. FOR FIRST (4) BAYS <br />BRACING PROVIDED IT EXTENDS OVER AT LEAST 90% OF THE WEB. <br />REQUIRED MINIMUM PERMANENT TRUSS BRACING PLAN <br />I <br />.1 <br />AS PER BCSI <br />SCISSOR TRUSS <br />SCISSOR TRUSS <br />W/ DROP CEILING BRACING DETAIL <br />SCALE: N.T.S. <br />2X4 BRACING @ 48" O.C. CONTINUOUS TO <br />FIXED LOCATION ATTACHED W/ (2)10d AT <br />EA. TRUSS (NOTE: BRACING MAY BE <br />PLACED ON EITHER TOP OR BOTTOM OF <br />THE BOTTOM CORD) <br />COSMETIC DROP CEILING FRAMING <br />MEAN ROOF HEIGHT UP TO 30'-0" SCALE: NTS <br />SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />WOOD FRAMED GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES SCALE: N.T.S. <br />FOR WIND SPEED SPECIFICATION <br />Cn <br />C_ <br />to <br />Z <br />W <br />m <br />'L GX. <br />N G <br />N Y <br />T Da <br />=- <br />m C <br />E <br />cv <br />c o <br />w a� <br />r= E <br />o <br />¢L� <br />d <br />� <br />w <br />O . <br />0ti <br />ll1�����\\� <br />To the best of the Engineer's knowledge, Information and belief, <br />the structural tural plans and specifloetlons contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />W <br />vE <br />O 8 <br />0 <br />N 0 <br />N C1 <br />9 <br />N <br />0) <br />Q <br />� <br />:r,r.-- <br />a <br />C J LL W <br />JLLW a <br />Z <br />�� o <br />-v <br />4 0 <br />IL <br />Z d J <br />aN <br />N O U U <br />W <br />o0 <br />CD r <br />z <br />z FZ <br />CL- <br />0 <br />.1 <br />L7 <br />� <br />w g <br />0 <br />w <br />f,!) <br />C d <br />U <br />c <br />� <br />o <br />CD <br />M <br />w <br />lL E <br />E <br />a0 <br />3 <br />0 <br />�5i <br />oa <br />Ic0 <br />E � <br />04 <br />� <br />Z <br />�.i <br />$ <br />N <br />G Q <br />F ° <br />O� <br />zCae <br />in <br />X3U <br />Wo <br />a� <br />rw <br />a <br />ZQ <br />°�4- <br />VS <br />N <br />>M <br />�... <br />tip. <br />�o <br />C7 <br />F— <br />^' <br />O <br />J <br />� <br />L <br />O <br />'- <br />O^ <br />co <br />C <br />a <br />:3 '- <br />a°Cr <br />cv <br />c� <br />rr^) s <br />O <br />LO <br />O <br />c0 <br />v°D <br />a <br />Q <br />CV <br />H <br />0 <br />O <br />O <br />c <br />-� <br />'d' <br />cc N <br />M <br />(V <br />LO <br />•d <br />1 <br />� <br />LO <br />ca'o <br />0 <br />c <br />E 1 <br />E <br />c <br />!� <br />U <br />JOB <br />NO: 22-12484-12481 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />S5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.