SAVE -A -LOT <br />REFRIGERATION CRITERIA <br />SCOPE OF WORK <br />REFRIGERATION CONTRACTOR <br />* RECEIVE, UNLOAD, AND INSTALL ALL REFRIGERATION SYSTEMS, REMOTE E AIR- COOLED <br />CONDENSERS, UNIT COOLERS, COILS, REFRIGERATED DISPLAY FIXTURES, WALK-IN <br />COOLERS AND FREEZER PANELS. <br />* FURNISH AND INSTALL INTERCONNECTING REFRIGERATION PIPING, INCLUDING DEFROST <br />AND TEMPERATURE CONTROL VALVES AS DENOTED IN REFRIGERATION LEGEND. <br />* NOTE THAT REFRIGERANT IS TO BE SUPPLIED BY REFRIGERATION CONTRACTOR. <br />* FURNISH AND INSTALL REFRIGERATION LINE INSULATION: J" FOR MEDIUM TEMPERATURE <br />SYSTEMS AND 1" FOR LOW TEMPERATURE SYSTEMS. (NOTE: ALL EXPOSED PIPING IS <br />TO BE INSULATED & WRAPPED WITH WHITE VINYL PVC JACKETING MATERIAL.) <br />* ALL LIQUID LINES ARE TO BE INSULATED ON SUB -COOLED SYSTEMS WITH }" INSULATION. <br />* INSULATION ON EXTERIOR EXPOSED TO SUNLIGHT IS TO BE COVERED WITH VINYL PVC <br />JACKETING OR U V RATED PAINT DESIGNED FOR INSULATION. <br />* FURNISH AND INSTALL DISPLAY CASE AND UNIT COOLER CONDENSATE DRAIN PIPING. <br />* FURNISH AND INSTALL INSULATION ON ALL CONDENSATE DRAINS IN COOLERS AND <br />FREEZERS THAT ARE BELOW 32 DEGREES F. <br />* SUPPLY HEAT TAPE FOR ELECTRICAL CONTRACTOR ON FREEZER AND COOLER <br />CONDENSATE DRAINS THAT ARE BELOW 32 DEGREES F. <br />* SET SUPERHEAT TO MANUFACTURERS RECOMMENDATIONS ON ALL THERMOSTATIC <br />EXPANSION VALVES INCLUDING REFRIGERATED CASE AND WALK-IN EVAPORATORS. <br />* START UP AND ADJUST EQUIPMENT. <br />* PROVIDE A 90 DAY PARTS AND LABOR WARRANTY ON ALL SUPPLIED & INSTALLED <br />COMPONENTS. <br />* ASSIST MANAGEMENT IN OBTAINING OR PROVIDE MANUFACTURERS WARRANTIES. <br />* TEST RACK CONTROLLER FOR PROPER INSTALLATION, ALARMS & SETTINGS AND <br />PROVIDE WRITTEN DOCUMENTATION OF TESTS AND RESULTS. <br />* PROVIDE A LEGEND OF DEFROST SCHEDULES TO THE SAVE A LOT PROJECT MANAGER. <br />* USE "LONG RADIUS" TYPE ELL'S IN SUCTION AND LIQUID LINES AT ALL 90 DEGREE <br />ELL'S. <br />NOTE., DO NOT USE 45 DEGREE ELLS. <br />* EVACUATE SYSTEM WITH A VACUUM PUMP SPECIFICALLY DESIGNED FOR THIS PURPOSE <br />TO A LEVEL OF 1500 MICRONS. <br />* BREAK VACUUM ON SYSTEM BY CHARGING A SMALL AMOUNT OF REFRIGERANT INTO THE <br />SYSTEM THROUGH A DRIER UNTIL THE PRESSURE IS BROUGHT TO "0" PSIG. <br />REPEAT VACUUM (AS ABOVEO TO A LEVEL OF 500 MICRONS. <br />ELECTRICAL CONTRACTOR <br />* FURNISH AND INSTALL THE NECESSARY INTERCONNECTING WIRES AND CONDUIT <br />BETWEEN THE REFRIGERATION SYSTEM 1 AND THE AIR-COOLED CONDENSERS. <br />* FURNISH AND INSTALL THE NECESSARY INTERCONNECTING WIRES AND CONDUIT <br />BETWEEN THE REFRIGERATION SYSTEM AND THE ATTACHED REFRIGERATED LOADS. <br />* MOUNT AND INSTALL ONE TEMPERATURE SENSOR PER WALK-IN COOLER OR FREEZER. <br />NOTE: THE TEMPERATURE SENSORS WILL BE SUPPLIED FROM THE FACTORY <br />SHIPPED LOOSE) <br />) FOR FIELD INSTALLATION. <br />EXCEPTION: CASE SENSOR O S FOR NSW CASES WILL BE FACTORY D CT MOUNTED.) <br />N E <br />* FURNISH AND INSTALL THE NECESSARY INTERCONNECTING WIRES BETWEEN THE <br />REFRIGERATION SYSTEM AND TEMPERATURE SENSORS MOUNTED IN EACH <br />REFRIGERATED CASE. THE CASE SENSORS WILL BE FACTORY MOUNTED, NOTICE THAT <br />ONLY BELDEN #8762 OR EQUIVALENT CABLE SHOULD BE USED FOR COMPLETION OF <br />THIS CONNECTION. THE BARE GROUND SHIELD, OR DRAIN WIRE, SHOULD BE <br />CONNECTED AT THE CONTROL PANEL DOOR OF THE REFRIGERATION SYSTEM. <br />* FURNISH AND INSTALL THE NECESSARY CONNECTING WIRES BETWEEN THE <br />REFRIGERATION SYSTEM AND KLIXONS MOUNTED IN CASES AND UNIT <br />COOLERS/FREEZERS. THESE KLIXONS ARE TO BE WIRED IN SERIES TO THE DIGITAL <br />INPUTS ON THE CONTROLLER. KLIXONS WILL BE USED FOR TEMPERATURE CONTROLLED <br />TERMINATION OF DEFROST. <br />* FURNISH AND INSTALL THE NECESSARY INTERCONNECTING WIRES BETWEEN EACH OF <br />THE REFRIGERATION SYSTEMS AND A LOCATION TO BE DETERMINED BY SAVE -A -LOT, <br />LTD., FOR ESTABLISHING AN IN STORE ALARM. <br />* FURNISH (1) 120 VOLT, 15 AMP OUTLET IN THE MEAT COOLER AND FREEZER FOR <br />CONDENSATE LINE HEAT TRACE. COORDINATE WITH THE PROJECT MANAGER AND <br />REFRIGERATION CONTRACTOR. <br />* INSTALL HEAT TRACE MATERIAL SUPPLIED BY THE REFRIGERATION CONTRACTOR <br />ON THE MEAT COOLER AND FREEZER. <br />* VERIFY FACTORY SETTING ON WIRING ROTATION OF EACH COMPRESSOR. <br />* PROVIDE ASSISTANCE TO THE REFRIGERATION CONTRACTOR FOR START UP OF ALL <br />REFRIGERATION ELECTRICAL. <br />* IF HVAC AND LIGHTING ARE CONTROLLED BY BY THE REFRIGERATION CONTROLLER, <br />COORDINATE INSTALLATION AND FINAL TERMINATION WITH THE BUILDING ELECTRICIAN. <br />PARTS WILL BE FURNISHED BY SAVE -A -LOT WITH THE EXCEPTION OF COMMUNICATION <br />INTERFACE BOARDS IF REQUIRED. <br />--.r <br />COOLER i <br />X <br />W <br />El <br />I-so <br />33'-6 <br />Q <br />p <br />O X <br />p n <br />i <br />ROOF AC 4, <br />1 'X* <br />Iuv UPI <br />F'RMTER AI <br />W ;r <br />w X <br />� r4 <br />L N <br />15-30' <br />-6 <br />irisesA 7;",ii �/ I•- - <br />T- IN <br />Llt DE rP <br />q kEFFIC <br />BAKERY/LUNCHBOX 6'XIV <br />ID <br />76 <br />FEET <br />OF <br />WIDE <br />ISLAND <br />COFFIN <br />FROZEN <br />FOOD <br />CASE <br />WITH <br />END <br />CAPS <br />r14' <br />8o <br />N <br />i <br />1 • <br />I ,.9 <br />,� 'I <br />�I <br />1 I <br />I <br />GENERAL NOTES: <br />I. ALL FIXTURES SHOWN FADED ON PLAN ARE CONCEPTUAL AND ARE SU5JECT TO <br />CHANGE IN ORDER TO BEST MEET THE NEEDS OF PRODUCT PLACEMENT. PLEASE REFER <br />TO THE MERCHANDISING PLAN FOR PLACEMENT AND QUANTITIES. CONTACT RICK <br />50RMANN AT 314-592-c3866 WITH ANY QUESTIONS. <br />2. MICRO SEVROLLING FIXTURES INCLUDING (2) MAST, (2) TWR, AND 21X2' 5LACKHAWK <br />(PHONECARD) TO BE LOCATED IN FRONT OF THE CHECKSTANDS UNLESS OTHERWISE <br />DIRECTED SY THE DISTRICT MANAGER OR REGIONAL DIRECTOR. <br />BREAK <br />ROOM <br />15'X12' <br />} W�p ADD 24'X3 <br />WINDOW <br />a <br />5BELT 1 <br />iu, <br />BELT 2w�; <br />9 <br />a <br />j mw <br />3� <br />I o0 U <br />I � <br />W no. <br />Ln <br />U n <br />w <br />J Uj <br />�w <br />I <br />NU <br />iw <br />I <br />U <br />Zo <br />I <br />I <br />=o <br />I Y <br />w° <br />-1 <br />12� o <br />I <br />o� <br />p <br />¢� <br />UI <br />I <br />I <br />EXISTING <br />I <br />I <br />N Al <br />I <br />FeELT 4 p <br />IL I <br />QIP so BELT 5 w 9~ I 1 <br />4' AcCEssI5L9 _ I ' <br />CHECKLANE w L) U L I <br />Y � <br />X ' <br />I <br />BAKERY m v Q <br />TABLE- <br />+ HEN <br />— IL I <br />I <br />Ts a �- <br />' I <br />52 PROMOTIONAL ITEMS r p I ;.:,.., <br />:i <br />I <br />32 1-D CK WITH INSERtS &MISTERS <br />I <br />FRESH PRODUCq CASE <br />I <br />RECESSED HOSE BIBB 3&' AFF. FOR PRODUCE MI T <br />SYSTEM 4 CASE CLEAN- 4,-4. <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />0 <br />I I <br />I I <br />I <br />APPROVED <br />I <br />APPROVAL VALID FOR 90 DAYS FROM THE <br />I <br />I <br />I <br />LAST REVISION DATE ON THE TITLEBLOCK. <br />I <br />,4 Gj I <br />�J l 32, � ALL WORK SHALL CO Y WITH ALL <br />PREVAILING CODES, FLORIDA BUILDING <br />`,� n l CODE, NATIONAL ELECTRIC CODE AND <br />s,ue` f(ajCITY OF ZEPHYRHILLS ORDINANCES <br />s A c 1 <br />53 <br />P CITY <br />OF ZEPHYRHILLS <br />PLANS EXAMINER <br />lS <br />Gm <br />SF <br />LF <br />FIXTURE <br />PLAN <br />SCALE: NTS <br />REDUCED Sf ZE - N.T.S. <br />PAGE 1 OF 9 <br />DATE: 9-8-10 DRAUJN 8�1': GN <br />DRAUJN FOR: CORP <br />TOT 4L LD UI ING: <br />17,612 SF <br />SALES AREA: <br />12,336 SF <br />SACK ROOM AREA: <br />51276 SF <br />PLATFORM DISPLA`r: <br />622 LF <br />DISPLA`f' ITEMS: <br />52 LF <br />f=ROJECT LOCATION: <br />ZEPHYRHILLS, FL <br />7320 GALL BLVD <br />NOTES: <br />ALL DIMENSIONS MUST BE CONFIRMED AND <br />VERIFIED IN THE FIELD. THESE DRAWINGS ARE <br />THE PROPERTY OF sUPER\44uUi.THESE <br />DRAWINGS ARE FOR ILLUSTRAT.I ?41PURPOSES <br />ONLY AND ARE NOT TO ME 15 JIM,,ON IN LIEU <br />OF ARCHITECTURE AND ENc EF71NG DRAWINGS. <br />100 CORPORAtE OFI=ICE D%. <br />EARTH CITY, MO 63045 <br />PHONE (314) 592-9100 <br />r - - -- <br />7-1 1 —zrr- — ,T —�—�-- — I; <br />