Laserfiche WebLink
m <br />LY <br />0 <br />0 <br />z <br />a <br />0 <br />w <br />IL <br />0 <br />0 <br />w <br />m <br />F_ <br />0 <br />z <br />y <br />z <br />a <br />J <br />a <br />W <br />co <br />w <br />x <br />L- <br />LANDSCAPE 5PECIFICATION5 <br />I . WORK UNDER THESE SPECIFICATIONS 5HALL CON515T OF PREPARATION OF <br />PLANTING AREAS, FURNISHING AND PLANTING ALL PROPOSED NEW PLANT <br />MATERIALS SPECIFIED HEREIN AND A5 SHOWN ON THE DRAWINGS, INCLUDING BUT <br />NOT LIMITED TO FINISHED GRADING, FURNISHING TOP501L AND SPREADING, <br />STAKING, WATERING, PRUNING, FERTILIZING, MULCHING, AND LAYING SOD, AND <br />MAINTENANCE AND PROTECTION OF PLANTS UNTIL FINAL ACCEPTANCE BY THE <br />OWNER. <br />2. THE OWNER SHALL HAVE THE RIGHT TO REJECT ANY AND ALL WORK AND <br />MATERIALS WHICH, IN HIS OPINION, DO NOT MEET THE REQUIREMENTS OF <br />THE PLANTING PLAN, DETAILS, AND THESE SPECIFICATIONS. <br />3. NO SUBSTITUTIONS SHALL BE MADE TO THE PLANTING PLAN, DETAILS OR <br />THESE SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN CONSENT OF THE <br />LANDSCAPE ARCHITECT. <br />4. THE LANDSCAPE CONTRACTOR SHALL CONTACT THE OWNER AND THE <br />LANDSCAPE ARCHITECT IMMEDIATELY OF ANY CONFLICTS ARISING DURING <br />CONSTRUCTION OR INSTALLATION OF ANY IMPROVEMENTS SHOWN OR <br />IMPLIED ON THE DRAWINGS AND/OR SPECIFICATIONS. <br />5. THE LANDSCAPE CONTRACTOR SHALL FURNISH AND INSTALL ALL PLANT5 A5 <br />SHOWN ON THE DRAWINGS, A5 SPECIFIED, AND IN THE QUANTITIES LISTED ON <br />THE PLANT MATERIALS LI5T. <br />IN THE EVENT OF A VARIATION BETWEEN THE PLANT LI5T AND THE ACTUAL <br />G. NUMBER OF PLANTS SHOWN ON THE PLANTING PLAN, THE PLANTING PLAN <br />5HALL CONTROL. <br />7. ALL PLANTS SHALL BE FLOKIDA NO. I OR BETTER. ALL PLANTS SHALL BE TYPICAL OF <br />THEIR SPECIES OR VARIETY AND SHALL HAVE A NORMAL HABIT OF GROWTH. THEY <br />SHALL BE 50UND, HEALTHY AND VIGOROUS, WELL -BRANCHED AND DENSELY FOLIATED <br />WHEN IN LEAF. THEY SHALL BE FREE OF DISEASE AND INSECT PESTS, EGGS OR LARVAL. <br />THEY SHALL HAVE HEALTHY, WELL -DEVELOPED ROOT SYSTEMS. <br />8. ALL PLANTS SHALL BE NURSERY GROWN STOCK AND SHALL COMPLY WITH ALL <br />REQUIRED INSPECTIONS, GRADING STANDARDS, PLANT REGULATIONS AND <br />REQUIREMENTS FOR MEASUREMENT, BRANCHING, AND CULTURAL PRACTICES; A5 <br />SET FORTH IN THE FLORIDA DEPARTMENT OF AGRICULTURE "GRADES AND <br />STANDARDS FOR NURSERY PLANTS", PARTS I AND II, INCLUDING ANY REV1510N5 <br />A5 DETERMINED BY THE STATE PLANT BOARD OF FLORIDA. <br />9. ALL PLANTS SHALL BE HARDY UNDER CLIMATIC CONDITIONS 51MILAR TO <br />THOSE IN THE LOCALITY OF THE PROJECT. <br />10. A5 PER THESE DRAWINGS AND SPECIFICATIONS, THE "HT." (HEIGHT) OF <br />PROPOSED PLANT MATERIALS, UNLESS OTHERWISE SPECIFIED, SHALL MEAN <br />THE ACTUAL DISTANCE AS MEASURED FROM THE SOIL STRESS MARK ON THE <br />TRUNK OR BA5L OF THE PLANT TO THE TOP ELEVATION OF THE PLANT. <br />1 1. ALL PLANTS SHALL CONFORM TO THE MEASUREMENTS FOR 51ZE A5 SPECIFIED IN <br />THE PLANT LI5T. EXCEPTIONS ARE PLANTS LARGER THAN SPECIFIED IN THE PLANT <br />LI5T MAY BE U5ED IF APPROVED BY THE LANDSCAPE ARCHITECT BUT, USE OF <br />SUCH PLANTS SHALL NOT INCREASE THE CONTRACT PRICE. IF THE USE OF <br />LARGER PLANTS 15 APPROVED, THE SPREAD OF ROOTS OR BALL OF EARTH SHALL <br />BE INCREASED IN PROPORTION TO THE 51ZE OF THE PLANT. <br />12. WHEN PLANTS OF A SPECIFIED KIND OR 51ZE ARE NOT AVAILABLE, A REASONABLE <br />SUBSTITUTION MAY BE MADE UPON REQUEST IN WRITING BY THE LANDSCAPE <br />CONTRACTOR, IF APPROVED BY THE LANDSCAPE ARCHITECT . <br />13. THE LANDSCAPE CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL WORK A5 <br />SHOWN ON THE PLAN AND CONTACT THE LANDSCAPE ARCHITECT IMMEDIATELY OF ANY <br />CONFLICTS AND ADJUST A5 PER THE LANDSCAPE ARCHITECT'S DIRECTION. <br />14. THE LANDSCAPE CONTRACTOR SHALL STAKE ALL PLANT MATERIAL LOCATIONS FROM THE <br />PLANTING PLAN PRIOR TO INSTALLATION FOR APPROVAL BY THE LANDSCAPE ARCHITECT. <br />15. LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND <br />OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT <br />THE TIME OF THE PREPARATION OF THE5E PLANS, BUT DO NOT PURPORT TO BE <br />ABSOLUTELY CORRECT. THE LANDSCAPE CONTRACTOR SHALL VERIFY THE LOCATIONS, <br />ELEVATIONS AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES AND OTHER <br />FEATURES AFFECTING HIS WORK PRIOR TO CONSTRUCTION. <br />I G. IT SHALL BE THE LANDSCAPE CONTRACTOR'S SOLE RESPONSIBILITY TO NOTIFY <br />"SUNSHINE" AND ANY OTHER INTERESTED AGENCIES OR PARTIES OF H15 INTENT TO <br />EXCAVATE AND TO OBTAIN FROM ALL AGENCIES OR OTHER INTERESTED PARTIES <br />LOCATIONS OF ALL EXISTING UTILITIES OF EVERY KIND IN THE AREAS WHERE HE INTENDS <br />OR PLANS TO EXCAVATE. SUCH LOCATIONS SHALL BE OBTAINED PRIOR TO STARTING <br />CONSTRUCTION AND SHALL BE MAINTAINED DURING CONSTRUCTION. <br />17. THE LANDSCAPE CONTRACTOR SHALL PROVIDE AT LEAST 48 HOUR5 NOTICE TO <br />THE UTILITY COMPANIES IN ORDER TO PERMIT THE LOCATION OF EXISTING <br />UNDERGROUND UTILITIES IN ADVANCE OF CONSTRUCTION. <br />18. THE LANDSCAPE CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL <br />UNDERGROUND UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. <br />13. ALL PLANTING BED AREAS SHALL BE FINE GRADED BY THE LANDSCAPE <br />CONTRACTOR. <br />20. ALL PROPOSED PLANTING AREA5 FOR TREE5, PALMS, 5HRUB5, AND GROUND - <br />COVERS SHALL BE TOP DRESSED WITH A MAXIMUM OF THREE (3) INCHES OF PINE <br />BARK NUGGETS SPREAD UNIFORMLY IN DEPTH OVER THE PLANTING BED5 A5 <br />DELINEATED ON THE PLANS, UNLESS OTHERWISE SPECIFIED. <br />GENERAL NOTES <br />1. WARNING: ABOVEGROUND AND/OR UNDERGROUND UTILITIES MAY BE IN THE AREA OF <br />THI5 PROJECT. PROCEED WITH CAUTION: CALL "SUNSHINE" AND THE UTILITY OWNEK(5) <br />FORTY EIGHT (48) HOUR5 BEFORE BEGINNING WORK. TELEPHONE: 1 500-432-4770. <br />2. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE CODE5, ORDINANCES AND <br />REGULATIONS OF ZEPHYRHILLS, FL <br />3. REQUIRED TREE BARRICADES MUST REMAIN INTACT THROUGHOUT CONSTRUCTION. <br />ENCROACHMENT INTO OR FAILURE TO MAINTAIN TREE BARRICADES MAY RESULT IN <br />ENFORCEMENT ACTION. <br />4. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION. <br />2 1. THE SURFACE OF ALL AKEA5 TO BE GRASSED OR SODDED 511ALL BE PREPARED <br />FOR THE PLACEMENT OF 50D BY THE LANDSCAPE CONTRACTOR. THE LAND5CAPE <br />CONTRACTOR SHALL REMOVE ALL DEBRIS FROM THE AREAS A5 SHOWN ON THE <br />PLAN TO RECEIVE SOD AND LAY 50D EVENLY WITHOUT GAPS. ALL JOINTS SHALL <br />BE STAGGERED. <br />22. ALL OTHER AKEA5 OUTSIDE THE PROJECT WORK AREA SHALL BE PRESERVED AND <br />PROTECTED BY THE CONTRACTOR; ANY DAMAGES CAUSED BY THE CONTRACTOR <br />IN THE PERFORMANCE OF HIS/HER WORK SHALL BE RESTORED TO EXISTING OR <br />BETTER CONDITION. <br />23. THE LANDSCAPE CONTRACTOR SHALL CONTROL RUNOFF AND EROSION DURING <br />CONSTRUCTION THROUGH THE USE OF SEDIMENT BASINS, STRAW OR HAY BALES <br />A5 APPROPRIATE. <br />24. THE LAND5CAPE CONTRACTOR SHALL SPRINKLE OR OTHERWISE MANUALLY APPLY <br />WATER TO AFFECTED CONSTRUCTION AREA TO CONTROL BOTH 51GNIFICANT WIND <br />EROSION AND FUGITIVE DUST. <br />25. THE LANDSCAPE CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES FREE <br />FROM ACCUMULATION OF WA5TE MATERIALS OR DEBRIS CAUSED BY HIS CREWS <br />DURING THE PERFORMANCE OF THE WORK. UPON COMPLETION OF THE WORK, <br />THE LANDSCAPE CONTRACTOR SHALL PROMPTLY REMOVE ALL WASTE MATERIALS, <br />DEBRIS, UNUSED PLANT MATERIAL, EMPTY PLANT CONTAINERS AND ALL <br />EQUIPMENT FROM THE PROJECT 51TL. <br />2G. THE LANDSCAPE CONTRACTOR SHALL WATER, MULCH, WEED, PRUNE, AND <br />OTHERWISE MAINTAIN ALL PLANTS, INCLUDING SOD, UNTIL COMPLETION OF THE <br />CONTRACT AND FINAL ACCEPTANCE BY THE OWNER. SETTLED PLANTS SHALL BE <br />RESET TO PROPER GRADE, PLANTING 5AUCEK5 RESTORED, AND DEFECTIVE WORK <br />CORRECTED. <br />27. UPON COMPLETION OF THE WORK, THE LANDSCAPE CONTRACTOR SHALL NOTIFY <br />THE OWNER AND THE LAND5CAPE ARCHITECT IN WRITING, AND RE- QUEST A FINAL <br />INSPECTION. ANY ITEMS THAT ARE JUDGED INCOMPLETE OR UNACCEPTABLE BY <br />THE OWNER OR THE LANDSCAPE ARCHITECT SHALL BE PROMPTLY CORRECTED BY <br />THE LANDSCAPE CONTRACTOR. <br />28. THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIALS FOR A <br />PERIOD OF THREE HUNDRED 51XTY FIVE QG5) CALENDAR DAYS FROM THE DATE <br />OF FINAL ACCEPTANCE IN WRITING FROM THE OWNER. AT THE TIME OF FINAL <br />ACCEPTANCE, THE THREE HUNDRED 51XTY FIVE (3G5) DAY GUARANTEE PERIOD <br />SHALL COMMENCE. ANY MATERIALS WHICH HAVE DIED DURING THIS PERIOD <br />SHALL BE PROMPTLY REPLACED WITH SPECIMENS THAT MEET THE MINIMUM <br />REQUIREMENT5 CALLED FOR ON THE DRAWINGS. THE LANDSCAPE CONTRACTOR <br />5HALL NOT BE HELD RESPONSIBLE FOR DEATH OR DAMAGE RESULTING FROM <br />LIGHTNING, VANDALISM, AUTOMOBILES OR FROM NEGLIGENCE BY THE OWNER. <br />THE OWNER SHALL BE RESPONSIBLE FOR WATERING AND OTHERWISE MAINTAINING <br />PLANTS DURING THE GUARANTEE PERIOD IF A MAINTENANCE AGREEMENT 15 NOT <br />ACCEPTED FROM THE LANDSCAPE CONTRACTOR. <br />29. 501L IN 51DEWALK CUT OUTS, PARKING LOT ISLANDS, AND OTHER LANDSCAPE <br />SPACES ARE TO BE REPLACED WITH APPROVED IMPORTED OR EXISTING <br />STOCKPILED TOP501L THAT HAS BEEN APPROVED TO A MINIMUM DEPTH OF 18" <br />FROM TOP OF CURB OR WORK AFTER LIGHT COMPACTION TO IMPROVE <br />CONDITIONS. ALL CONSTRUCTION DEBRIS, ROCKS, 5TICK5, LIMEKOCK, SHELL, <br />ETC. ARE TO BE REMOVED FROM THE ENTIRE PLANTING AREA. BACKFILL 501L SHALL <br />BE APPROVED CLEAN TOPSOIL COMPLYING WITH THE FOLLOWING REQUIREMENTS: <br />• 501L MIXTURE PLANTING MEDIUM FOR PLANT PITS SHALL CON515T OF TWO <br />PARTS OF TOP501L AND ONE PART SAND, A5 DESCRIBED BELOW. <br />• TOPSOIL FOR USE IN PREPARING 501L MIXTURE FOR BACKFILLING PLANT PITS <br />SHALL BE FERTILE, FRIABLE, AND OF A LOAMY CHARACTER; REASONABLY FREE <br />OF SUBSOIL, CLAY LUMPS, BRUSH WEEDS AND OTHER LITTER; FREE OF <br />ROOTS, STUMPS, STONES LARGER THAN 2" IN ANY DIRECTION, AND OTHER <br />EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. IT SHALL <br />CONTAIN THREE (3) TO FIVE (5) PERCENT DECOMPOSED ORGANIC MATTER AND <br />A PH BETWEEN 5.5 AND 7.0 - SUBMIT SAMPLE AND PH TESTING RESULTS FOR <br />APPROVAL. <br />• SAND SHALL BE COARSE, CLEAN, WELL -DRAINING, NATIVE SAND. <br />CONTRACTOR SHALL SUBMIT RESULTS OF 501L TESTS FOR TOP501L AND <br />SAND PROPOSED FOR USE UNDER THIS CONTRACT FOR APPROVAL BY THE <br />OWNER. <br />• TREES SHALL BE PLANTED IN THE EXISTING NATIVE SOIL ON 51TE, UNLESS <br />DETERMINED TO BE UNSUITABLE - AT WHICH POINT THE CONTRACTOR SHALL <br />CONTACT OWNER'S REPRESENTATIVE TO DISCUSS ALTERNATE <br />RECOMMENDATION PRIOR TO PLANTING. <br />• CONTRACTOR TO SUBMIT SAMPLES OF SOIL MIXTURE FOR OWNER'S <br />REPRESENTATIVE APPROVAL PRIOR TO PLANT INSTALLATION OPERATIONS <br />COMMENCE. <br />• CITY OF ZEPHYRHILL5 TO BE NOTIFIED PRIOR TO THE DIGGING OF TRENCHES <br />FOR THE USED OF INSTALLATION OF LANDSCAPE MATERIALS. 501L SAMPLES <br />OF THE EXISTING 501L AND THE PROPOSED FILL 501L ARE TO BE PROVIDED TO <br />INSURE THE PLANTED MATERIALS SURVIVAL IN THE CA5E THAT HEAVY CLAYS <br />ARE ENCOUNTERED. <br />FURNISH SOURCE INFORMATION ON WHERE THE BACKFILL 501L 15 TO BE <br />EXCAVATED, STOCKPILED, AND PREPARED FOR USE IN INSTALLING TREE5, 5HRUB5, <br />GROUNDCOVER5, PALMS, AND LAWN5; SUBMIT SAMPLES AND CHEMICAL <br />ANALY515 FOR APPROVAL. <br />30. THE LAND5CAPE CONTRACTOR SHALL EXAMINE THE 501L5 OF ALL PLANTING AREAS <br />PRIOR TO SUBMITTING BIDS FOR THE SUITABILITY TO SUSTAIN HEALTHY PLANT <br />GROWTH A5 CALLED FOR ON THE PLANTING PLAN, DETAILS, AND THESE <br />SPECIFICATIONS. <br />3 1 . THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL TREE <br />STAKES AND GUY WIRES FROM TREES WHICH ARE ESTABLISHED AT THE END OF <br />ONE (1) COMPLETE GROWING SEASON. TREES, WHICH HAVE BEEN REPLACED <br />SHALL REMAIN STAKED FOR ONE (1) FULL GROWING SEASON, AND THE OWNER <br />SHALL BE RESPONSIBLE FOR REMOVING TREE STAKES AND GUY WIRES. <br />32. ALL LANDSCAPE BIDS SHALL BE ITEMIZED WITH THE AMOUNTS BASED ON UNIT <br />PRICES. ANY SUBSTITUTIONS, ADDITIONS, OR DELETIONS WILL CHANGE THE <br />TOTAL AMOUNT OF THE CONTRACT FEE BASED ON THE ABOVE MENTIONED UNIT <br />PRICE CRITERIA. <br />33. THE LANDSCAPE CONTRACTOR SHALL SUBMIT A SEPARATE PROPOSAL FOR A ONE <br />(1) YEAR MAINTENANCE AGREEMENT. <br />NOTE: <br />• DESIGN PLANS FOR A TREE WATERING SYSTEM MAY OR MAY NOT BE <br />INCLUDED WITH THESE PLANS. CONTRACTOR SHALL FURNISH AND <br />INSTALL AN AUTOMATIC TREE WATERING SYSTEM USING APPROVED <br />BUBBLERS INSTALLED AT THE EDGE OF THE ROOTBALL RADIUS OF ALL <br />NEW INSTALLED TREES AS PART OF THIS CONTRACT; THIS SYSTEM <br />SHALL INCLUDE PIPE, AUTOMATIC VALVES, WIRING, FITTINGS, ETC. ALL <br />AS REQUIRED TO PROVIDE A TEMPORARY OR PERMANENT WATERING <br />SYSTEM FOR THE ESTABLISHMENT OF HEALTHY TREES FOR THE <br />PROJECT. <br />3 TIMES THE <br />DIAMETER OF <br />THE ROOTBALL <br />OR FULL DKIFUNE <br />INSTALL SOIL BERM ONLY IF - <br />WATERING MANUALLY. <br />IX <br />PREVAILING <br />WIND <br />TREE STAKE <br />KOOTBALL <br />SOIL BERM FOR <br />WATERING <br />MANUALLY. <br />DRIP LINE <br />REINFORCED BLACK RUBBER HOSE <br />-WHITE FLAG ABOVE TURNBUCKLL <br />-# 10 GAUGE WIRE WITH GALVANIZED TURNBUCKLE MIN. <br />THREE PLACES <br />-MAXIMUM 3" MULCH- DO NOT ALLOW MULCH TO <br />COLLECT OVER THE THE ROOTBALL OF THE TREE. <br />TMAX. <br />2x4 X 2'-0 WOOD STAKE <br />( FLUSH WITH GROUND <br />BACKFILL WITH APPROVED IMPORTED <br />OR LX15TING TOP SOIL (THAT HAS <br />` BEEN APPROVED) FROM SITE. <br />PLACE TREE ON UNDISTURBED BOTTOM OF <br />PIT. LOCATE TREE A MININUM OF 2" (WO <br />INCHES) ABOVE FINISHED GRADE. IN THE <br />EVENT, UNDERGROUND WATER 15 PRESENT, <br />CONTACT THE LANDSCAPE ARCHITECT PRIOR <br />TO I N5TALLATI ON. <br />TREE PLANTING DETAIL <br />PREVAILIN <br />WIND <br />INSTALL SOIL BERM <br />ONLY IF WATERING <br />MANUALLY. <br />NOT TO SCALE <br />NOTE: FOR Pi <br />TOPSOIL THA <br />FROM THE LC <br />IS DUG. <br />TREE STAKE <br />PLANT SHRUB SO <br />THAT TOP OF <br />KOOTBALL KOOTBALL IS A <br />MINIMUM OF 2" (TWO <br />INCHES) ABOVE <br />FINISHED GRADE. <br />SOIL BERM FOR <br />WATERING <br />MANUALLY. <br />DRIP LINE <br />REINFORCED BLACK RUBBER H05E <br /># 10 GAUGE WIRE FROM CENTRAL TRUNK TO THREE <br />STAKES <br />THREE 2" DIA. PRESSURE TREATED LODGE <br />POLE PINE STAKES <br />MAXIMUM 3" MULCH. DO NOT ALLOW MULCH <br />TO COLLECT OVER THE THE ROOTBALL OF THE <br />TREE. <br />BACKFILL WITH I I <br />APPROVED IMPORTED PLACE TREE ON UNDISTURBED BOTTOM OF PIT. <br />OR EXISTING TOP SOIL LOCATE TREE A MININUM OF 2" (TWO INCHES) <br />(THAT HAS BEEN ABOVE FINISHED GRADE. IN THE EVENT, <br />APPROVED) FROM SITE. UNDERGROUND WATER IS PRESENT, CONTACT <br />THE LANDSCAPE ARCHITECT PRIOR TO <br />3 TIMES T1 X INSTALLATION. <br />DIAMETER OFHE <br />THE ROOTBALL <br />OR FULL DRIPLINE <br />LE� MULTI-TRU N KED TREE PLANTING DETAIL <br />NOT TO SCALE <br />Recommended Irrigation Schedule and Notes for New Tree Plantings <br />Size of Nursery Stock <br />Irrigation Schedule for Vigor <br />Irrigation Schedule for Survival <br />< 2 inch caliper <br />Daily for 2 weeks; every other <br />Twice weekly for 2 - 3 months <br />day for 2 months; weekly until <br />established <br />2 - 4 inch caliper <br />Daily for I month; every other <br />Twice weekly for 3 - 4 months <br />day for 3 months; weekly until <br />established <br />> 4 inch caliper <br />Daily for G weeks; every other <br />Twice weekly for 4 - 5 months <br />day for 5 months; weekly until <br />established <br />Notes: <br />I . Delete daily irrigation when planting in winter. Irrigation frequency can be reduced <br />slightly (e.g. 2 - 3 times each week instead of every other day) when planting <br />hardened -off, ficid-grown trees that were root -pruned during production. <br />E5tabll5hment takes 3 (hardine55 zones 10 - I I ) to 4 (hardiness zones 8 - 9) <br />months per inch trunk caliper. <br />2. Irrigation frequency can be reduced Slightly (e.g, to once or twice each week) <br />when planting hardened -off, field grown trees that were root -pruned during <br />production. <br />3. At each irrigation, apply 2 - 3 gallons per inch trunk caliper to the root ball. <br />Apply it in a manner 5o all water soaks into the root ball. Do not water if root ball <br />15 wet/saturated on the irrigation day. <br />'(from "Typical Tree Bid Specifications for Florida" by the Florida Urban Forestry Council <br />and Dr. Edward F. Gillman, University of Florida, Gainesville, Updated June 1 099) <br />Disclaimer: <br />I . The irrigation watering schedule provided on this plan 15 intended as a suggested <br />general guideline for applying water to support the e5tabll5hment of plants/trees <br />only. It shall be the Contractor's responsibility to determine, provide and warrant <br />Specific water volume, water quality and watering frequency for all Specific Species <br />of trees, 5hrub5, groundcover5 and Sod a5 identified on these plans. <br />2. Watering schedule (i.e. time, duration, frequency of application) for automatic <br />low -volume irrigation systems shall fully comply with all state and local jurisdictional <br />rules, regulations, and requirements with regard to any watering restrictions which <br />may be in place. <br />3. Avid Design Studio or Avid Engineermg shall not be held responsible for any <br />damages resulting from compliance to or non-conformance by the Owner and/or <br />Contractor of the project for the above "Recommended Irrigation Schedule and <br />Notes". <br />PALM PLANTING DETAIL <br />TENS <br />x8 BRACE <br />)TBALL <br />L BERM <br />I TWO STEEL <br />DVIDE MIN. <br />TO PREVENT <br />LM- <br />DE <br />)ALLY, <br />VOLUME <br />TED OR <br />EN <br />.NCE <br />\LL 51DE5 <br />NOT TO SCALE <br />MAXIMUM 3" MULCH <br />SOIL BERM FOR WATERING MANUALLY. <br />PREPARE PLANTING BED THROUGHOUT <br />GROUND COVER AREA. MINIMUM 1 2" <br />DEPTH OF APPROVED PLANTING 501L IN <br />GKOUNDCOVEK PLANTING BEDS <br />PLANTING SOIL MIXED PER <br />5PECIFICATION5 PROVIDE MINIMUM PIT <br />CLEARANCE AROUND ROOT BALL OF G" <br />SIDES AND BOTTOM. <br />511RUB AND GROUNDCOVER PLANTING DETAIL <br />NOT TO SCALE <br />' SEDGE IF PAVEMENT OK <br />i r <br />cuRa <br />j G KA55 <br />1 j j EDGE OF REDLINE <br />NOTE: LOCATE PLANTS IN A TRIANGULAR PATTERN AS SHOWN, <br />SPACED EQUIDISTANT FROM EACH OTHER (AT SPACING SPECIFIED <br />IN THE PLANT LIST). <br />E 5HRUB/GROUNDCOVER 5PACING PLAN <br />L I I NOT TO SCALE <br />E D <br />,,g_� W M� f%M SMX of CM700 <br />.. <br />To <br />ROTE <br />M TOP OF CLVS) FOR <br />t� .jwr "W <br />:r 54h1l. UMME=MAJ111i.K* <br />OATIS ., s . <br />48 HOURS BEFORE YOU DIG <br />CALL 5UN5hiNE <br />1-800-43 2-4770 <br />IT'S THE LAW IN FLORIDA <br />FL STATUE 553.85 I (1979) REQUIRES <br />MIN. OF 2 DAYS AND MAX. OF 5 DAYS <br />NOTICE BEFORE YOU EXCAVATE. <br />FDOT MAINTENANCE YARD TO BE <br />CONTACTED 72 HOURS PRIOR TO <br />BEGINNING CONSTRUCTION. <br />Sjw3f <br />A$YZZ�p�A <br />W W>_W_OzW <br />z <br />_ <br />0 <br />�a <br />O <br />o <br />m� <br />= <br />a <br />z <br />2 Cc <br />ui <br />JQ <br />�: <br />-i <br />-iN ui <br />Cr <br />Cr <br />o <br />U <br />o <br />a <br />E <br />E <br />T <br />N <br />0 <br />z <br />0 <br />F- <br />a <br />0 <br />U) <br />w <br />0 <br />W <br />Q <br />0 <br />0 <br />z <br />0 <br />w <br />Q <br />J) <br />oQ <br />-� N <br />CoZ cp <br />O O W <br />Qz U_J <br />Un <br />°5 LLJ <br />00®aL) <br />Z LLLJZLw <br />ZO, a 0 L <br />z U <br />0=V) <br />< <br />Wrrom <br />CnWLU -J <br />0 Q M <br />') <br />:,f <br />LLL <br />In p <br />Z <br />w W <br />0¢ <br />LV� <br />Qa o <br />>. U <br />> <br />1,_m <br />0 <br />z <br />0 <br />0 <br />w a <br />Cl) o <br />0 � <br />0 � N <br />O L L orn ED <br />Er <br />¢ v U <br />JOD <br />co N <br />J < <br />cc Q <br />= r L„ of <br />Go � U <br />O <br />n CM a V = ¢ > <br />N d C'9 2 U_ Q <br />Cl)J 0021-wU)0W <br />z z O c w z <br />U <br />J wz< LL' <br />w Q F-w > <br />U a = U) <br />Syr zUCAUa <br />li wzzcc: <br />~ <br />J J Q Q z <br />Lr w w <br />U U Q Z <br />U <br />i <br />z <br />~ J <br />IL LU <br />W <br />N °\ <br />v <br />O <br />o 94 <br />z <br />- a <br />W <br />N <br />CD <br />z <br />O <br />f '- <br />Q <br />U_ <br />LL <br />U <br />W <br />rr0- <br />v! <br />0 <br />z <br />Q <br />J <br />---- TT III 1 f I u�ili¶I11 �Z ii t 1 L14 Baal If, AI 1111 CA•Ed lil,➢ii, 911 1 11 1 1 1 1 1 i I <br />