Laserfiche WebLink
n <br />0 <br />N <br />H <br />= <br />a <br />it <br />a. <br />0 <br />0 <br />q <br />W <br />M <br />4 <br />£ <br />I <br />3 <br />a <br />GENERAL CONSTRUCTION NOTES (9/13/04) <br />CLEARING AND EROSION CONTROL NOTES (4/30/04) <br />SANITARY SEWER NOTES (04/02/04) <br />WATER SYSTEM NOTES (04/02/04) <br />m <br />1. SEE SURVEY FOR SITE SPECIFIC BENCH MARK AND ELEVATION DATUM. <br />1. ALL TREES TO REMAIN SHALL BE PROTECTED IN ACCORDANCE WITH LOCAL REGULATIONS PRIOR TO THE START OF <br />ANY CONSTRUCTION ACTIVITIES. <br />1. ALL SANITARY SEWER MAINS AND LATERALS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. <br />1. ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. <br />2. LOCATIONS, DIMENSIONS AND ELEVATIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE SHOWN ACCORDING <br />TO STANDARD UTILITY ATLAS SHEETS OR OTHER INFORMATION OBTAINED AT THE TIME OF PREPARATION OF THESE PLANS. PRIOR <br />2. THE CONTRACTOR SHALL PREPARE THE SITE AS DIRECTED BY THE GEOTECHNICAL ENGINEER PRIOR TO STARTING <br />2. ALL SANITARY SEWER WORK SHALL CONFORM TO LOCAL REGULATORY STANDARDS AND SPECIFICATIONS. <br />2. ALL WATER SYSTEM WORK SHALL CONFORM TO LOCAL REGULATORY STANDARDS AND SPECIFICATIONS. <br />TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, DIMENSIONS, AND ELEVATION OF ALL EXISTING UTILITIES, <br />ACTUAL CONSTRUCTION. COPIES OF THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS AND REPORT ARE AVAILABLE <br />Z <br />STRUCTURES AND OTHER FEATURES AFFECTING THE WORK AND MAKE ARRANGEMENTS FOR REQUIRED RELOCATIONS WITH THE <br />THROUGH THE OWNER OR THE GEOTECHNICAL ENGINEER. QUESTIONS REGARDING SITE PREPARATION REQUIREMENTS <br />3. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING NEW WORK TO EXISTING LINES OR APPURTENANCES, THE <br />3. CONFLICTS BETWEEN WATER AND STORM OR SANITARY SEWER SHALL BE RESOLVED BY ADJUSTING THE WATER <br />O <br />AFFECTED UTILITY. THE CONTRACTOR SHALL COOPERATE WITH THE UTILITY DURING RELOCATION OPERATIONS. <br />SHALL BE DIRECTED TO THE GEOTECHNICAL ENGINEER AND OWNER. <br />CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF EXISTING CONNECTION POINT AND NOTIFY ENGINEER OF ANY <br />LINES AS REQUIRED. <br />Q <br />CONFLICTS OR DISCREPANCIES. <br />N <br />3. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND SHALL PROVIDE AT LEAST 48 HOURS <br />3. THE CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS OF THE SITE NECESSARY FOR CONSTRUCTION. <br />4 DUCTILE IRON PI HA BE PR <br />ALL DUC LE 0 PE SHALL PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A 21,51 AWWA C151 <br />( ) <br />0� <br />NOTICE TO ALL UTILITY COMPANIES BEFORE PERFORMING ANY EXCAVATION. THE CONTRACTOR SHALL HAVE UTILITY LOCATIONS <br />ALL DISTURBED OPEN AREAS SHALL BE SEEDED, MULCHED, OR PLANTED WITH OTHER APPROVED LANDSCAPE <br />4. PVC PIPE AND FITTINGS SHALL CONFORM TO ASTM SPECIFICATION DESIGNATION D-3034, SDR 26. THE JOINTS SHALL <br />AND PIPE SHALL RECEIVE EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.51 (AWWA C151) AND <br />O <br />MARKED BY CALLING "SUNSHINE" AT 1 800 432 4770 AT LEAST 48 HOURS PRIOR TO THE START OF ANY EXCAVATION. <br />MATERIAL IMMEDIATELY FOLLOWING CONSTRUCTION. <br />CONFORM TO ASTM D-3212. INSTALLATION OF SDR 26 PIPE SHALL BE IN STRICT ACCORDANCE WITH THE REQUIREMENTS <br />SHALL BE CEMENT MORTAR LINED, STANDARD THICKNESS IN ACCORDANCE WITH ANSI A 21.4 (,AWWA C104). <br />Z <br />0 <br />H <br />CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL UTILITIES NOT INCLUDED IN THE "SUNSHINE" PROGRAM. <br />OF ASTM SPECIFICATION SECTION D2321. ALL SANITARY SEWER PIPELINES SHALL BE SOLID GREEN IN COLOR. <br />::) <br />4. THE TOP SOIL REMOVED DURING CLEARING AND GRUBBING SHALL BE STOCKPILED AT A SITE DESIGNATED BY THE <br />5. ALL FITTINGS 3" OR LARGER SHALL BE MECHANICAL JOINT, DUCTILE IRON PRESSURE CLASS 350 IN <br />IL <br />4. CHAPTER 77 153 OF THE FLORIDA STATUTES REQUIRES THAT AN EXCAVATOR NOTIFY ALL GAS UTILITIES A MINIMUM OF TWO (2) <br />OWNER AND SHALL BE USED FOR LANDSCAPING PURPOSES UNLESS OTHERWISE DIRECTED BY THE OWNER. <br />5. ALL PVC FORCE MAINS SHALL BE PRESSURE CLASS 200, SDR 21, COLOR GREEN, WITH A GREEN MAGNETIC TAPE A <br />ACCORDANCE WITH ANSI A 21.10 AND A 21.11 (AWWA C110 AND AWWA C111 RESPECTIVELY). FITTINGS SHALL <br />¢ <br />< <br />WORKING DAYS PRIOR TO EXCAVATING. THESE PLANS SHOW ONLY THE APPROXIMATE LOCATION OF GAS MAINS AND THE GAS <br />MINIMUM OF 2" WIDE PLACED 1 FOOT BELOW THE PROPOSED GRADE. THE PRINTING ON THE MAGNETIC TAPE SHALL READ <br />"FORCE <br />BE CEMENT MORTAR LINED AND BITUMINOUS COATED IN ACCORDANCE WITH AWWA C104 AND AWWA C151 <br />co <br />co <br />a <br />MAINS MUST BE FIELD VERIFIED BY ON SITE INSPECTION BY GAS COMPANY PERSONNEL. EXCAVATORS ARE INSTRUCTED TO <br />5. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH <br />MAIN" <br />RESPECTIVELY. <br />z <br />TELEPHONE THE GAS COMPANY A MINIMUM OF TWO 2 WORKING F ENTERING <br />( ) K NG DAYS BEFORE ENE G A CONSTRUCTION AREA.0 <br />ALL APPLICABLE REGULATIONS. <br />Ft <br />6. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A 21.51-91 (AWWA C151) AND <br />6. THE CONTRACTOR SHALL INSTALL TEMPORARY BLOW -OFFS AT THE END OF WATER SERVICE LATERALS TO <br />5. THE CONTRACTOR SHALL REVIEW THE PLANS FOR CONFLICTS OR OTHER DISCREPANCIES PRIOR TO CONSTRUCTION. THE <br />6. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR REMOVAL OF EXISTING STRUCTURES. <br />PIPE SHALL RECEIVE EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.51 (AWWA C151) AND SHALL BE <br />ASSURE ADEQUATE FLUSHING AND DISINFECT ION. <br />Z <br />CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER OF ANY CONFLICTS OR DISCREPANCIES BEFORE PERFORMING ANY WORK. <br />CEMENT MORTAR LINED, STANDARD THICKNESS IN ACCORDANCE WITH ANSI A 21.4 (AWWA C104). <br />7_ THE CONTRACTOR SHALL NOTIFY ALL UTILITIES TO DISCONNECT OR REMOVE THEIR FACILITIES PRIOR TO REMOVAL <br />7. ALL PVC WATER MAINS 4" THROUGH 12" SHALL BE IN ACCORDANCE WITH AWWA C900. PIPE SHALL BE <br />p <br />6. ALL PROPOSED UNDERGROUND UTILITIES MUST BE IN PLACE, TESTED AND INSPECTED PRIOR TO PAVEMENT SURFACE COURSE <br />OR DEMOLITION OF EXISTING STRUCTURES. <br />7. ALL SANITARY SEWER GRAVITY MAINS OR SANITARY SEWER FORCE MAINS THAT REQUIRE DIP ARE TO BE POLYLINED OR <br />CLASS 150 AND MEET THE REQUIREMENTS OF SDR 18 IN ACCORDANCE WITH ASTM D-2241. <br />CONSTRUCTION. <br />EPDXY LINED. <br />O <br />8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND SHALL BE <br />WATER MAIN PIPING LARGER THAN 2" AND SMALLER THAN 4" SHALL BE PRESSURE CLASS 200 AND MEET <br />11,8. <br />7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE CONDITIONS AND INSPECTION REQUIREMENTS OF ALL <br />RESPONSIBLE FOR DEMOLITION AND REMOVAL OF ALL UNDERGROUND AND ABOVE GROUND STRUCTURES THAT WILL <br />8. ALL SANITARY SEWER RIMS AND COVERS SHALL BE TRAFFIC RATED FOR H-20 LOADING. <br />THE REQUIREMENTS OF SDR 21 IN ACCORDANCE WITH ASTM D2241 UNLESS SPECIFIED OTHERWISE. <br />w <br />= <br />PERMITS ISSUED FOR THE PROJECT. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION AND <br />NOT BE INCORPORATED WITH THE NEW FACILITIES. SHOULD ANY DISCREPANCY EXIST, THE CONTRACTOR SHALL <br />w <br />F- <br />SHALL SCHEDULE ALL INSPECTIONS IN ACCORDANCE WITH AGENCY REQUIREMENTS. <br />CONTACT THE OWNER FOR CLARIFICATION PRIOR TO DEMOLITION. <br />9. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL <br />9. ALL PIPE AND FITTINGS 2" AND SMALLER SHALL BE SCHEDULE 40 PVC WITH SOLVENT WELDED SLEEVE TYPE <br />~ <br />w <br />8. ALL SPECIFICATIONS AND DOCUMENTS REFERRED TO SHALL BE OF LATEST REVISIONS AND/OR LATEST EDITION. <br />9. PRIOR TO THE COMPLETION OF CONSTRUCTION, THE RETENTION/ DETENTION AREAS SHALL BE RESHAPED, CLEARED <br />LAND SURVEYOR. THE RECORD DRAWINGS SHALL SHOW FINAL GRADES AND LOCATIONS ON ALL SANITARY SEWER MAINS, <br />STRUCTURES AND SERVICES. THE CONTRACTOR SHALL PROVIDE TEN COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE <br />JOINTS. <br />❑ <br />d <br />z <br />OF SILT, MUD AND DEBRIS, AND GRASSED IN ACCORDANCE WITH THE CONSTRUCTION DRAWINGS. <br />ENGINEER. <br />10. ALL GATE VALVES 2" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING THE <br />O <br />O <br />9. THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITH ALL APPLICABLE STATUTES, RULES, REGULATIONS AND <br />REQUIREMENTS OF AWWA C509 <br />Z <br />U <br />PERMIT CONDITIONS. <br />SANITARY SEWER TESTING AND INSPECTION REQUIREMENTS <br />TESTING04 02 04 <br />( / / ) <br />11. ALL FIRE HYDRANTS SHALL MEET THE REQUIREMENTS OF AWWA C502 AND SHALL BE APPROVED BY THE <br />� <br />10. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR ALL PRECAST AND MANUFACTURED ITEMS TO BE <br />LOCAL UTILITY AND FIRE MARSHAL. <br />z <br />USED ON THE PROJECT. ALL SHOP DRAWINGS ARE TO BE REVIEWED AND APPROVED BY THE CONTRACTOR PRIOR TO SUBMITTAL <br />00 <br />TO THE ENGINEER. <br />1. ALL GRAVITY SEWER PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE ENGINEER. CONTRACTOR SHALL <br />12. MATERIALS AND CONSTRUCTION METHODS FOR WATER DISTRIBUTION SYSTEMS SHALL BE IN ACCORDANCE <br />¢ <br />T <br />C)CID <br />NOTIFY THE ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTION. <br />WITH ALL LOCAL REGULATIONS, PLANS, AND SPECIFICATIONS FOR CONSTRUCTION, LATEST REVISION THEREOF, <br />!!!�a <br />U) <br />c7 <br />p <br />N <br />of <br />11. AT LEAST THREE (3) WORKING DAYS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER, OWNER, AND <br />PAVING, GRADING AND DRAINAGE NOTES (4/30/04) <br />AND SUPPLEMENTAL SPECIFICATIONS THERETO. APPROVAL AND CONSTRUCTION OF ALL POTABLE WATER SERVICE <br />Z <br />j <br />z = <br />0 <br />APPROPRIATE PERMITTING AGENCIES OF THE CONTRACTOR'S NAME, STARTING DATE, PROJECTED SCHEDULE, AND OTHER <br />2. THE GRAVITY SANITARY SEWER AND ALL SERVICE LATERALS SHALL BE SUBJECT TO AN INFILTRATION/EXFILTRATION <br />MAIN EXTENSIONS AND CONNECTIONS MUST BE COORDINATED THROUGH THE LOCAL REGULATORY AGENCY. <br />�, <br />00 <br />< <br />ti <br />z <br />INFORMATION AS REQUIRED. <br />1. ALL DELETERIOUS SUBSTANCES (I.E. MUCK, PEAT, BURIED DEBRIS) SHALL BE EXCAVATED IN ACCORDANCE WITH THE <br />TEST IN ACCORDANCE WITH LOCAL REGULATIONS. TESTS ARE TO BE CERTIFIED BY THE ENGINEER OF RECORD AND SHALL <br />J <br />Z <br />2 <br />N <br />w __ <br />PLANS AND SPECIFICATIONS, OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER OR OWNER. DELETERIOUS MATERIAL IS <br />BE SUBMITTED TO THE LOCAL AUTHORITIES FOR APPROVAL. COORDINATION AND NOTIFICATION OF ALL PARTIES SHALL BE <br />13. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED AND SEALED BY A <br />< <br />< <br />0 0 <br />! O <br />12. WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER WORK BEING PERFORMED ON SITE BY <br />TO BE STOCKPILED OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER. EXCAVATED AREAS SHALL BE <br />THE CONTRACTOR'S RESPONSIBILITY. <br />PROFESSIONAL LAND SURVEYOR. THE RECORD DRAWINGS SHALL SHOW THE LOCATIONS, DIMENSIONS AND <br />0 <br />to <br />Cr <br />Cr ¢ <br />a_ a_ <br />< <br />O_ <br />OTHERS. IT WILL BE NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE HIS ACTIVITIES WITH OTHERS WHERE <br />BACKFILLED WITH APPROVED MATERIALS AND COMPACTED AS SPECIFIED BY THE GEOTECHNICAL ENGINEER OR OWNER. <br />ELEVATIONS OF ALL WATER MAINS, SERVICES, MANHOLES, GRAVITY SEWER MAINS, SERVICE LATERALS, PUMP <br />w <br />O <br />NECESSARY. <br />3. ALL FORCE MAINS SHALL BE SUBJECT TO A HYDROSTATIC PRESSURE TEST IN ACCORDANCE WITH LOCAL REGULATIONS. <br />STATIONS AND FORCE MAINS. THE CONTRACTOR SHALL PROVIDE TEN COPIES OF THE CERTIFIED RECORD <br />w <br />2. IT MAY BE NECESSARY TO FIELD ADJUST PAVEMENT ELEVATIONS TO PRESERVE THE ROOT SYSTEMS OF TREES TO BE <br />TESTS SHALL BE CERTIFIED BY THE ENGINEER OF RECORD AND SUBMITTED TO THE LOCAL AUTHORITIES FOR APPROVAL. <br />DRAWINGS TO THE ENGINEER. <br />0 <br />= <br />H <br />13. SITE WORK CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF AT LEAST 3,000 PSI. AT 28 DAYS UNLESS OTHERWISE <br />SAVED. THE CONTRACTOR SHALL COORDINATE WITH OWNER'S ENGINEER PRIOR TO ANY GRADE CHANGE. <br />COORDINATION AND NOTIFICATION OF ALL PARTIES SHALL BE THE CONTRACTOR'S RESPONSIBILITY. <br />z <br />NOTED. <br />FDEP NOTES (04/02/04) <br />o< <br />14. ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER <br />3. THE CONTRACTOR IS TO SUBMIT A PROPOSED JOINTING PATTERN TO THE OWNER FOR APPROVAL PRIOR TO <br />\ <br />2p o <br />< <br />CONSTRUCTING CONCRETE PAVEMENT. <br />SANITARY SEWER NOTES (09/26/06) <br />B. ALL PIPE, PIPE FITTINGS, PIPE JOINT PACKING AND JOINTING MATERIALS, VALVES, FIRE HYDRANTS, AND <br />O <br />w <br />THAN EXISTING CONDITIONS UNLESS SPECIFICALLY EXEMPTED BY THE PLANS. <br />METERS INSTALLED UNDER THIS PROJECT WILL CONFORM TO APPLICABLE AMERICAN WATER WORKS ASSOCIATION <br />-6 W 0 <br />--I <br />UJI <br />15. ALL DISTURBED AREAS THAT ARE NOT TO BE SODDED, ARE TO BE SEEDED AND MULCHED IN ACCORDANCE WITH FDOT <br />4. THE CONTRACTOR SHALL PROVIDE AN EXPANSION JOINT AT ABUTMENT OF CONCRETE AND ANY STRUCTURE. <br />1, DEFLECTION TEST <br />(AWWA) STANDARDS. <br />t F <br />W O a <br />PRIOR TO ACCEPTANCE OF THE COMPLETED PVC SEWER LINE, A MANDREL OF NOT LESS THAN 95 PERCENT OF THE <br />€- `.. <br />z a 0 ,ri <br />M <br />STANDARDS. THE CONTRACTOR SHALL MAINTAIN ALL GRASSED AREAS UNTIL A SATISFACTORY STAND OF GRASS, ACCEPTABLE TO <br />5. ALL PAVEMENT MARKINGS IN PUBLIC RIGHTS OF WAY SHALL BE MADE WITH PERMANENT THERMOPLASTIC, AND SHALL <br />INTERNAL DIAMETER OF THE PLASTIC PIPE SHALL BE PULLED FREELY THROUGH THE PIPE, BY HAND, THROUGH EACH <br />C. ALL PUBLIC WATER SYSTEM COMPONENTS, EXCLUDING FIRE HYDRANTS, THAT WILL BE INSTALLED UNDER THIS <br />V)0 Q M <br />w <br />THE APPLICABLE REGULATORY AGENCIES, OWNER, AND ENGINEER, HAS BEEN ACHIEVED. THE CONTRACTOR SHALL BEAR THE <br />CONFORM TO FDOT STANDARD INDEX NO. 17346 UNLESS INDICATED OTHERWISE ON THE DRAWINGS. PARKING STALL <br />REACH OF SEWER. AT LEAST EIGHT (8) MONTHS AFTER INSTALLATION AND FINAL BACKFILL, BUT NO LATER THAN 30 DAYS <br />PROJECT AND THAT WILL COME INTO CONTACT WITH DRINKING WATER WILL CONFORM TO NSF INTERNATIONAL <br />C0 <br />�Q c7 r, <br />m <br />W <br />RESPONSIBILITY OF ALL REMEDIAL WORK REQUIRED UNTIL THE SYSTEM HAS BEEN ACCEPTED. <br />STRIPING SHALL BE 4" WIDE PAINTED WHITE STRIPES UNLESS INDICATED OTHERWISE ON THE DRAWINGS. <br />PRIOR TO FINAL ACCEPTANCE OF THE PROJECT, ALL PLASTIC PIPELINES SHALL BE MEASURED FOR VERTICAL RING <br />STANDARD 61. <br />'T'; <br />W w ❑ <br />= <br />16. ALL SODDED AND SEEDED AREAS BE WATERED AND FERTILIZED UNTIL THE PROJECT IS COMPLETED AND ACCEPTED BY THE <br />6. THE CONTRACTOR SHALL INSTALL EXTRA BASE MATERIAL WHEN THE DISTANCE BETWEEN THE PAVEMENT ELEVATION <br />DEFLECTION. <br />D. ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL CONTAIN NO MORE THAN 8.0% LEAD, AND <br />I .• <br />I_ <br />-(n < M <br />Z W c'o <br />O <br />a <br />OWNER. <br />AND THE TOP OF THE PIPE EXCEEDS THE MINIMUM DIMENSIONS SHOWN IN FDOT INDEX 205. <br />A VERTICAL RING DEFLECTION TEST SHALL BE REQUIRED PRIOR TO EXPIRATION OF THE CONTRACTOR'S MAINTENANCE OR <br />ANY SOLDER OR FLUX USED IN THIS PROJECT WILL CONTAIN NO MORE THAN 0.2% LEAD. <br />..f. 6- <br />O <br />17. THE CONTRACTOR SHALL LOCATE AND FLAG ALL PROPERTY CORNERS PRIOR TO FINAL ENGINEERING INSPECTION AND <br />STANDARD INDICES REFER TO THE LATEST EDITION OF FOOT "ROADWAY AND TRAFFIC DESIGN STANDARDS". <br />PERFORMANCE BOND, APPROXIMATELY 10 MONTHS AFTER FINAL ACCEPTANCE. THIS TEST SHALL BE PERFORMED BY AN <br />INDEPENDENT TESTING LABORATORY. MAXIMUM RING DEFLECTION OF THE PIPELINE UNDER LOAD SHALL BE LIMITED TO FIVE <br />E. ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL BE COLOR CODED OR MARKED IN <br />� <br />�-•t• I <br />N 0 <br />m <br />O <br />p <br />07. <br />CERTIFICATION. THE CONTRACTOR SHALL BEAR ALL COSTS INCURRED AS A CONSEQUENCE OF LOST OR DISTURBED PROPERTY <br />PERCENT (5%) OF THE VERTICAL INTERNAL PIPE DIAMETER. ALL PIPE EXCEEDING THIS DEFLECTION SHALL BE CONSIDERED <br />ACCORDANCE WITH SUBPARAGRAPH 62-555.320(21)(B)3, F.A.C., USING BLUE AS A PREDOMINANT COLOR. <br />❑ <br />CORNERS. LOST OR DISTURBED PROPERTY CORNERS SHALL BE REESTABLISHED BY A PROFESSIONAL LAND SURVEYOR. <br />8. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE CLASS III (ASTM C-76) UNLESS OTHERWISE INDICATED IN <br />TO HAVE REACHED THE LIMIT OF ITS SERVICEABILITY AND SHALL BE RELAID OR REPLACED BY THE CONTRACTOR AT NO <br />(UNDERGROUND PLASTIC PIPE WILL BE SOLID -WALL BLUE PIPE, WILL HAVE A CO -EXTRUDED BLUE EXTERNAL <br />> <br />< <br />18. THE GEOTECHNICAL ENGINEER SHALL SUPPLY THE ENGINEER AND OWNER WITH A PHOTOCOPY OF ALL COMPACTION TESTS AND <br />THE DRAWINGS AND SPECIFICATIONS. <br />ADDITIONAL COST TO THE OWNER. <br />SKIN, OR WILL BE WHITE OR BLACK PIPE WITH BLUE STRIPES INCORPORATED INTO, OR APPLIED TO, THE PIPE <br />'� <br />OTHER REQUIRED MATERIALS TESTS UNDER THIS CONTRACT. THE GEOTECHNICAL ENGINEER SHALL CERTIFY, IN WRITING, TO THE <br />WALL; AND UNDERGROUND METAL OR CONCRETE PIPE WILL HAVE BLUE STRIPES APPLIED TO THE PIPE WALL. <br />ENGINEER AND OWNER, THAT ALL TESTING REQUIREMENTS HAVE BEEN SATISFIED. <br />9. PVC STORM PIPE, 12" AND SMALLER, SHALL CONFORM TO AWWA C-900, SDR-18, CLASS 150, UNLESS OTHERWISE <br />2. FORCE MAINS <br />PIPE STRIPED DURING MANUFACTURING OF THE PIPE WILL HAVE CONTINUOUS STRIPES THAT RUN PARALLEL TO <br />C) 11 <br />\N <br />INDICATED IN THE DRAWINGS AND SPECIFICATIONS. <br />a. ORDER OF OPERATIONS: FILL THE SYSTEM WITH WATER AT A VELOCITY OF APPROXIMATELY 1 FOOT PER SECOND <br />THE AXIS OF THE PIPE, THAT ARE LOCATED AT NO GREATER THAN 90-DEGREE INTERVALS AROUND THE PIPE, <br />��! <br />r <br />19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL REQUIRED TESTING WITH THE GEOTECHNICAL ENGINEER. <br />WHILE NECESSARY MEASURES ARE TAKEN TO ELIMINATE ALL AIR. DO NOT LEAVE FILL LINE CONNECTED TO SEWER LINE <br />AND THAT WILL REMAIN INTACT DURING AND AFTER INSTALLATION OF THE PIPE. IF TAPE OR PAINT IS USED TO <br />� <br />TESTING IS REQUIRED AS DICTATED BY THE CONTRACT DOCUMENTS, CONSTRUCTION PLANS AND SPECIFICATIONS. UPON <br />10. PIPE LENGTHS SHOWN ARE APPROXIMATE. <br />UNLESS AN RPZ BACKFLOW PREVENTER IS PLACED BETWEEN THE POTABLE WATER SUPPLY AND THE LINE BEING FILLED. <br />STRIPE PIPE DURING INSTALLATION OF THE PIPE, THE TAPE OR PAINT WILL BE APPLIED IN A CONTINUOUS LINE <br />cn o <br />COMPLETION OF THE WORK, THE GEOTECHNICAL ENGINEER SHALL SUBMIT CERTIFICATIONS TO THE ENGINEER AND OWNER THAT <br />THAT RUNS PARALLEL TO THE AXIS OF THE PIPE AND THAT IS LOCATED ALONG THE TOP OF THE PIPE; FOR <br />PIPE WITH AN INTERNAL DIAMETER OF 24 OR <br />o <br />O LO <br />STATE THAT ALL REQUIREMENTS HAVE BEEN MET. <br />11. ALL DRAINAGE STRUCTURE FRAMES, GRATES AND COVERS WITHIN TRAFFIC AREAS SHALL BE TRAFFIC RATED FOR <br />b. PRESSURE TESTS & LEAKAGE: THE CONTRACTOR SHALL TEST COMPLETED SECTIONS OF LINE, INCLUDING FITTINGS, <br />INCHES GREATER, TAPE OR PAINT WILL BE APPLIED IN <br />< rn N <br />H-20 LOADINGS. <br />WITH WATER. THIS TESTING, HOWEVER, DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO REPAIR OR <br />CONTINUOUS LINES ALONG EACH SIDE OF THE PIPE AS WELL AS ALONG THE TOP OF THE PIPE. ABOVEGROUND <br />p U_ c6 w � <br />20. THE CONTRACTOR SHALL REVIEW ALL PROJECT GEOTECHNICAL REPORTS PRIOR TO BIDDING AND THE START OF CONSTRUCTION. <br />REPLACE ANY CRACKED OR DEFECTIVE PIPE. ALL WORK NECESSARY TO SECURE A TIGHT LINE SHALL BE PERFORMED BY <br />THE CONTRACTOR. TESTING SHALL BE PERFORMED IN THE PRESENCE OF THE INSPECTOR AND THE CONTRACTOR. COST FOR <br />PIPE WILL BE PAINTED BLUE OR WILL BE COLOR CODED OR MARKED LIKE UNDERGROUND PIPE.) <br />°C - m v Op <br />12. THE CONTRACTOR IS TO GRASS THE RETENTION/DETENTION POND AS INDICATED ON PLANS WITHIN ONE -WEEK <br />w p <br />21. THE CONTRACTOR SHALL MAINTAIN A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND ALL PERMITS AT THE <br />FOLLOWING CONSTRUCTION OF THE POND. <br />TESTING SHALL BE INCIDENTAL TO LINE CONSTRUCTION. <br />0. THE OPEN END OF THE AIR RELIEF PIPE FROM ALL AUTOMATIC AIR RELIEF VALVES INSTALLED UNDER THIS <br />Er N iz � <br />CONSTRUCTION SITE. <br />PROJECT WILL BE EXTENDED TO AT LEAST ONE FOOT ABOVE GRADE AND WILL BE PROVIDED WITH A SCREENED, <br />°C a r; O <br />13. MATERIALS AND CONSTRUCTION METHODS FOR STREETS AND STORM DRAINAGE CONSTRUCTION SHALL BE IN <br />PRESSURE TEST: THE NEWLY LAID PIPING OR ANY VALVED SECTION OF PIPING SHALL, UNLESS OTHERWISE SPECIFIED, <br />DOWNWARD -FACING ELBOW. <br />_ = r w C" °C <br />U , <br />22. THE CONSTRUCTION DRAWINGS DO NOT INCLUDE SPECIFICATION FOR CONSTRUC110N SAFETY. THE CONTRACTOR SHALL BE <br />ACCORDANCE WITH LOCAL REGULATIONS AND THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD <br />BE SUBJECTED FOR TWO HOURS TO A LEAKAGE TEST. RAISE THE PRESSURE BY PUMP TO 150 PSI, 150% OF DESIGN <br />.j <br />: <br />o � � z �- o <br />J O x <br />RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION SITE SAFETY. <br />SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST REVISION THEREOF AND SUPPLEMENTAL SPECIFICATIONS <br />WORKING PRESSURE, OR TEST PRESSURE AS SHOWN ON THE DRAWINGS, WHICHEVER IS GREATER. MEASURE THE PRESSURE <br />Q. NEW OR ALTERED WATER MAINS INCLUDED IN THIS PROJECT WILL BE INSTALLED IN ACCORDANCE WITH <br />o � <br />C:) < I _ < j <br />THERETO. <br />AT THE LOW POINT ON THE SYSTEM COMPENSATING FOR GAUGE ELEVATION. MAINTAIN THIS PRESSURE (+ OR - 5PSI) FOR <br />APPLICABLE AWWA STANDARDS OR IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDED PROCEDURES. <br />N a cl> a U_ <br />2 HOURS. IF PRESSURE CANNOT BE MAINTAINED USING REASONABLE PUMPING RATE, DETERMINE CAUSE, REPAIR, AND <br />14. THE CONTRACTOR SHALL PROVIDE CERTIFIED RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND <br />REPEAT THE TEST UNTIL SUCCESSFUL. THE ALLOWABLE LEAKAGE SHALL BE NO GREATER THAN ALLOWANCES SHOWN IN <br />R. A CONTINUOUS AND UNIFORM BEDDING WILL BE PROVIDED IN TRENCHES FOR UNDERGROUND PIPE INSTALLED <br />z z O W z <br />SURVEYOR. THE RECORD DRAWINGS SHALL SHOW FINAL GRADES, INVERTS, AND LOCATIONS OF ALL STORMWATER <br />TABLE 6A - HYDROSTATIC TESTING, SECTION 5.2, OF AWWA C 600-93, AWWA STANDARD FOR INSTALLATION OF DUCTILE <br />UNDER THIS PROJECT; BACKFILL MATERIAL WILL BE TAMPED IN LAYERS AROUND UNDERGROUND PIPE INSTALLED <br />.j <br />F= Z - = U - O <br />TESTING SCHEDULE GUIDE 4/30/04) <br />( <br />FACILITIES INCLUDING THE STORMWATER POND, DRAINAGE STRUCTURES, BERMS & SWALES. THE CONTRACTOR SHALL <br />IRON WATER MAINS AND THEIR APPURTENANCES. CONTACTOR SHALL BE RESPONSIBLE FOR ALL COSTS, LABOR, MATERIALS, <br />UNDER THIS PROJECT AND TO A SUFFICIENT HEIGHT ABOVE THE PIPE TO ADEQUATELY SUPPORT AND PROTECT <br />J <br />w z ¢ U w ' -' <br />PROVIDE TEN COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE ENGINEER FOR THE PURPOSE OF CERTIFYING THE <br />AND EQUIPMENT TO PERFORM THE TESTING. ALL VISIBLE LEAKS, BROKEN OR CRACKED PIPE, VALVES, ETC. SHALL BE <br />THE PIPE; AND UNSUITABLY SIZED STONES (AS DESCRIBED IN APPLICABLE AWWA STANDARDS OR <br />� <br />z _j = W U = <br />STORMWATER MANAGEMENT SYSTEM. <br />REPAIRED. <br />MANUFACTURERS' RECOMMENDED INSTALLATION PROCEDURES) FOUND IN TRENCHES WILL BE REMOVED FOR A <br />= <br />a a a = 07 N <br />ITEM TEST TYPE TEST I.D. REQUIREMENT FREQUENCY <br />DEPTH OF AT LEAST SIX INCHES BELOW THE BOTTOM OF UNDERGROUND PIPE INSTALLED UNDER THIS PROJECT. <br />i <br />z o vD p Q <br />PREREQUISITE CONDITIONS FOR TESTING SHALL BE AS FOLLOWS: <br />It <br />w z z = �_ <br />J .< <br />Embankment Max imum Density AASHTO T180 N/A Per So i I Type <br />PAVING, GRADING & DRAINAGE TESTING AND INSPECTION REQUIREMENTS (4/30/04) <br />S. ALL WATER MAIN TEES, BENDS, PLUGS, AND HYDRANTS INSTALLED UNDER THIS PROJECT WILL BE PROVIDED <br />-1 <br />w w <br />Opt imum Moisture ASTM D1557 <br />ALL PIPE HAS BEEN LAID AND THE TRENCH BACKFILLED. <br />WITH THRUST BLOCKS OR RESTRAINED JOINTS TO PREVENT MOVEMENT. <br />> F- n- M <br />U <br />Field Density AASHTO T191, T204 95% of Maximum One Per 2,500 S.F. <br />1. THE STORM DRAINAGE PIPING AND FILTRATION SYSTEM SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE <br />VALVES SHALL BE PROPERLY LOCATED, OPERABLE AND AT CORRECT ELEVATION. <br />U U 2,T238 <br />Density Hor i zonta I I y * <br />ENGINEER PRIOR TO THE PLACEMENT OF BACKFILL. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 48 HOURS IN <br />ALL REACTION ANCHORS HAVE HAD SUFFICIENT SET OF 3 DAYS. HIGH EARLY STRENGTH CONCRETE, 4500 PSI OR <br />T. NEW OR ALTERED WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL BE CONSTRUCTED OF <br />= <br />LL cn = <br />ASTM D1556, D2937 Alternating Lifts (12 Inches) <br />ADVANCE TO SCHEDULE AN INSPECTION. <br />GREATER, MAY BE USED TO REDUCE NUMBER OF DAYS. <br />ASBESTOS -CEMENT OR POLYVINYL CHLORIDE PIPE WILL BE PRESSURE AND LEAKAGE TESTED IN ACCORDANCE <br />< Cl 5; <br />2. THE CONTRACTOR SHALL MAINTAIN THE STORM DRAINAGE SYSTEMS UNTIL FINAL ACCEPTANCE OF THE PROJECT BY <br />LINES SHALL BE PROPERLY VENTED WHERE ENTRAPPED AIR IS A CONSIDERATION. <br />ALL CONSTRUCTION ACTIVITIES ON THE PROJECT, THAT REQUIRES TRENCHING OR EXCAVATION WITHIN THE LIMITS OF <br />WITH AWWA STANDARD C603 OR C605, RESPECTIVELY, AND ALL OTHER NEW OR ALTERED WATER MAINS <br />INCLUDED IN THIS PROJECT WILL BE PRESSURE AND LEAKAGE TESTED IN ACCORDANCE WITH AWWA STANDARD <br />a <br />� < z <br />J "' <br />THE OWNER. <br />THE LINE LOCATION, SHALL BE COMPLETED PRIOR TO PRESSURE TESTING OF LINE <br />C600. <br />0. <br />Utility Maximum Density AASHTO T180 N/A Per Soil Type <br />Trench Backf i f I Opt imum Moisture ASTM D1557 <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE REQUIRED TESTING WITH THE GEOTECHNICAL <br />U. NEW OR ALTERED WATER MAINS, INCLUDING FIRE HYDRANT LEADS AND INCLUDING SERVICE LINES THAT WILL <br />Under Roadways F e I d Density AASHTO T191 , T204 95% of Max imum One Per 2, 500 S.F. <br />ENGINEER. TESTING IS REQUIRED IN ACCORDANCE WITH THE TESTING SCHEDULE FOUND IN THE CONSTRUCTION <br />BE UNDER THE CONTROL OF A PUBLIC WATER SYSTEM AND THAT HAVE AN INSIDE DIAMETER OF THREE INCHES <br />and Structures T238 Density Hor i zonta I I y * <br />DRAWINGS AND SPECIFICATIONS. UPON COMPLETION OF THE WORK, THE GEOTECHNICAL ENGINEER SHALL SUBMIT <br />OR GREATER, WILL BE DISINFECTED AND BACTERIOLOGICALLY EVALUATED IN ACCORDANCE WITH RULE <br />v <br />ASTM D1556, D2937 Every 12" Vertically <br />CERTIFICATIONS TO THE ENGINEER AND OWNER STATING THAT ALL REQUIREMENTS HAVE BEEN MET. <br />F.A.C. <br />O <br />D2922D2922 <br />h4bb, <br />162-555.340, <br />. . - ..,. .., .................__. ... ....... _. ,... . <br />.A,4I-INTA ('6(It0' T TIE 6A II <br />"I'llI.I..",,.",..1.11,11ll.I . ...... _.... ._ . <br />�T,1,,(�I}�ABLFFRESS ETE�;'L`IFAK'LGF <br />At I east one for each p i pe run <br />AA.NEW OR ALTERED WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS UNDER <br />SURFACE WATER WILL HAVE A MINIMUM COVER OF TWO FEET. <br />O <br />Backf i I I of Max imum Density AASHTO T180 N/A Per So i I Type <br />(''allowable Leakage per1000 ft, ofPip€line "in MA <br />Structures Optimum Moisture ASTM D 1557 <br />(Thus table is eArerptech fi lain �"s' VA C 600 Section '^ 2 Table 6A) <br />,� <br />F i e I d Dens i t AASHTO T191, T204 95% of Max imum Ever 12 Vert i ca I I <br />Y T238 Density y Y <br />....... ......... .•....: -,.. _-....... ._._"".......... .._.. _...m._ __.m. _ w...d.: __W.,. .."m .-."._.® .__._-�:_.__.._._ -- _�.... _ ...-"..,..-„ <br />! <br />TEST Nt}11NL PIPE ICI JFTE1 II- <br />WATER SYSTEM TESTING AND INSPECT!OIJ REQUIREMENTS (04/02/04) <br />ASTM D1556, D2937t'i:. <br />D2922 <br />__ _____._..�_. __ __ <br />! ..__... ,......,.,,E. _.. .. ......,._ �........... .. _ ..._...... j ... I ..__. <br />11 <br />1'RES,Ii_TfE PSI 1 <br />I ! 3 <br />� 1 £ <br />i I -1 6 S l0 1 1 1.4 16 1S4 ' 3r 36 � _ <br />11 i,._ d -.. <br />1. ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, AND VALVES SHALL <br />REMAIN UNCOVERED UNTIL PROPERLY PRESSURE TESTED AND ACCEPTED BY THE ENGINEER AND LOCAL <br />Sub rode Bear i n Va I ues LBR -FLA. D.O.T. One Per So i I T e <br />9 9 Y P <br />..,--1--_.. a,. _ e� _ . .�_ _ _ a. <br />! -L50 ;0.32 10, 10.6=4 0.95+ ' L 1? j 1,5 l.g'1 2.?� '� 55 1 2� 8" 3 �. 3,821 4.78 j � "3 1 6 69 '.64 � fi 60 I <br />AUTHORITIES. PRESSURE TESTS SHALL BE IN ACCORDANCE WITH LOCAL WATER DEPARTMENT & FDEP <br />Check Point LBR at <br />LL ... _., ._� . <br />-, - - <br />' n ` I 17 2," <br />�00 i0,30 10 45 0,60 0lagU E L.:.ly ; 1.�tI 1 S0 - 10 � -0 � .., 0 ?,00 3.ta10 4 `0 i � -41 � +s �L Y �1 � 11 ',I <br />SPECIFICATIONS. CONTRACTOR SHALL NOTIFY OWNERS ENGINEER AND WATER DEPARTMENT INSPECTORS 48 <br />See Typ i ca I 500 L.F. Horizontal Iy <br />Pavement Sect ion <br />, <br />_..�, ._.v_. "_�,._. .... ", ....w :T _ _r w-11 ... <br />_.." -, "` �.fi6 1 5 `T�i 6 •4 j 7fi <br />:, 350 �Q S �i1 � I0 3 ICI 8"4 11,1� 1 0 1 C�9 1 g' ? � ; 2." �".S1 3' -411 <br />1 2, <br />HOURS IN ADVANCE OF PERFORMING TESTS. SEE ITEM "T" ABOVE. <br />Max imum Density AASHTO T180 One Per Soil Type <br />Opt imum Moisture ASTM D1557 <br />__ ....._ .. _.. ... ; ,I <br />.... _ ... <br />! $ .� k i e <br />31010 (0426 0 39 0 ^ 0 s L 0�4 ; 1 �4 1 t! L 0S ` � %r0 1 13 3 -4 "� -46 6,.,-4 I .! <br />- <br />2. CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED CHLORINATION/DISINFECTION AND BACTERIOLOGICAL <br />Y AASHTO T 1 91 T238 One Per 2 500 S . F . <br />Thickness ASTM D1556, D2922 Hor i zonta I I y <br />_ ._ T _ _ __ ._.., w , __ __.__ r _ ._. _ _f _ __.M _t-1_. W."-1-1-1�_........ <br />y^ [ r5 , I( , � I , I � � � �, y ; � 1. � �, t_ 5 �� I <br />0...3" il.. 4l 0 1.00 1 =4 1 4 1 1 99 , . 4 94 3 14 4 9f� 6 . <br />#. _.. ; ,._ [ .._... __._ , ,.... _I __ -- .._.-_ ....`. <br />g I I <br />�_ 0 0 0 �i5 Q 4 � d 1 j f1.9` � 1.19 11- #_ i 1 6� : L 0 [ � 1.4 �' I I � ;� � 4 _ -4 49 �+. ,°(ll �e41 <br />" „ <br />SAMPLING IN ACCORDANCE TO ITEM U ABOVE. CONTRACTOR SHALL OBTAIN CLEARANCE OF DOMESTIC WATER <br />SYSTEM. COPIES OF ALL BACTERIOLOGICAL TESTS (WHICH SHALL ALSO INDICATE THE CHLORINE RESIDUAL) <br />SHALL BE SUBMITTED TO ENGINEER. <br />Base Bearing Va I ues LBR -FLA. D.O.T. One Per Source or as Mt I . Changes <br />.,�`� <br />'�� ,0';�0,. Q.4 06S 0 Q 113 135I1 150 `"03 2215 ,.01 3a 05 4 3 _41 603' <br />...... ...... ...,, _.vt._ .e__ ,-_ F,_.._ o __._ . T _ -- ,_ w_. _. d_. <br />,'4.46 <br />Check Point LBR at 500 L.F. Horiz. <br />�W,„... <br />? 2'04 !0°�:L iO3� ,d � 06 ;t10 106 f.2S11�;1 0.1,91 � 12 755 M9 3. �09 � a3 <br />See T i ca I <br />YP <br />-_- _ ._.._... - _.. <br />' L 0 70 , 0 30 t 0 �0 0 ti9 j a S0 0 99 1 19 L , 1 'y 1 �9 1S 3S E 3 �+ 4 1 4 ?" 5A3 I <br />WATER CLEARANCE REQUIREMENTS(04/02/04) <br />V / <br />Max imum Density AASHTO T180 One Per Source <br />Opt imum Moisture ASTM D1557 Pavement Sect ion <br />Thickness AASHTO T191, T238 One Per 2,500 S.F.-! <br />a-._ n s <br />..- •. --- . -... r -• �,a 6 3 � � �._ <br />150 i0,1-9 'O 28 '0 3 #_0 55 I0 "-4 �0,92 I110 11,29 , l4 1.66 1.54 # � 11 I � � �4I � 9' <br />_._ - ', <br />.... ... w <br />E I .. <br />-` m` "' <br />' L 5 0 1 10,25 0.3�4 54 i; 6 W84 i 1 z 1 14 151 161� , pL 2 � i1 13,gi � 6 4:53 <br />( I <br />W. NEW OR RELOCATED, UNDERGROUND WATER MAINS INCLUDED IN THIS PROJECT WILL BE LAID TO PROVIDE A <br />Q <br />F i e I d Dens i t ASTM D1556, D2922 Hor i zonta I i <br />y y <br />Gradation AASHTO T27, T98 One Per Source <br />,101 r_y��___: ___ <br />?-__.M", ,..,_ i .m ._._ ....._ . s ,,, 111-1 _ "y.. _...._ .",.....__ _ <br />4 w *F `C I­11-11111- 5 1 � 5 � � �- ` 7 i ! <br />101J U_lE l0,�3 0.a0 0 4' E U,60 0.". _ _ - 105 1 0 E 1 3 1 (J 1 xil 0 3 1 3.6tt (J5 <br />_...,... _ .., ! _ , _, .,._" ... _.... _ 1... _ _. ._......... <br />HORIZONTAL DISTANCE OF AT LEAST THREE FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE <br />OF ANY EXISTING OR PROPOSED VACUUM -TYPE SANITARY SEWER, STORM SEWER, STORMWATER FORCE MAIN, OR <br />Q <br />� <br />AASHTO T90 <br />!, For pipe �wxtb IS ft.I-101, aatal lengths. To obtain the re-coixux�ended allowable- le-,ikage for pipe ath 20 fit, uourinil lengths, 1 <br />PIPELINE CONVEYING RECLAIMED WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.R.C.; HORIZONTAL <br />� <br />At t e r be r Limits ASTM C136 , D423 , D424 <br />a�nitlti0v the leakage c alcnlatecl fro�in the table by Oi 9, If the pipeWe under test contains sections of various tliimet�er, the <br />A <br />DISTANCE OF AT LEAST SIX FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY <br />M <br />Z <br />So i I Cement Base Mix Design Portland Cement One Per So i i Type0 <br />�lloable lenh�e mill 6e the sim► of the �oitipiiteKl le �k �e for each size. <br />;._ r _ . .._ w.. �_. __.. _ __ _.___ _. __n._... _... .. _.r .... .... ,.._ ...� --w- •• - <br />EXISTING OR PROPOSED GRAVITY -TYPE SANITARY SEWER (OR A HORIZONTAL DISTANCE OF AT LEAST THREE <br />FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED <br />0 <br />Assoc . Specifications <br />(To be if Maximum Density AASHTO T134 One Per Soil Type Daily <br />E_ _ __- _.�_. ._.. _.�.__.. �. _.�...�. __._...:.-._...._ __"",,- _._�.�.- _�-,-, ........-"---,---�---"-,,-----,-,-"",,-,- <br />GRAVITY -TYPE SANITARY SEWER IF THE BOTTOM OF THE WATER MAIN WILL BE LAID AT LEAST SIX INCHES <br />ABOVE THE TOP OF THE SEWER); A HORIZONTAL DISTANCE OF AT LEAST SIX FEET BETWEEN THE OUTSIDE OF <br />0 <br />co <br />used <br />separation between See Typ i ca I <br />SHWT &bottom of Optimum Moisture (Standard) Pavement Section <br />THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED PRESSURE -TYPE SANITARY SEWER, <br />WASTEWATER FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART III OF <br />U. <br />0 <br />W <br />base i s <1 .5') Compressive Port I and Cement One Set of 3 Per So i I <br />CHAPTER 62-610, F.A.C.; AND A HORIZONTAL DISTANCE OF AT LEAST TEN FEET BETWEEN THE OUTSIDE OF THE <br />. <br />Z <br />Strength Specimens Assoc. Specifications <br />Test Cores Portland Cement One Set of 3 Per Soil <br />Assoc. Specifications ** <br />WATER MAIN AND ALL PARTS OF ANY EXISTING OR PROPOSED "ON -SITE SEWAGE TREATMENT AND DISPOSAL <br />SYSTEM." <br />Z .j <br />O <br />Field Densit & AASHTO T191, T238 One Per 2,500 S.F. <br />Y <br />X. NEW OR RELOCATED, UNDERGROUND WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL <br />Thickness ASTM D1556, D2922 Horizontal <br />CROSS ANY EXISTING OR PROPOSED GRAVITY- OR VACUUM -TYPE SANITARY SEWER OR STORM SEWER WILL BE <br />LAID SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST SIX INCHES ABOVE THE OTHER PIPELINE OR AT LEAST �'(� <br />12 INCHES BELOW THE OTHER PIPELINE; AND NEW OR RELOCATED, UNDERGROUND WATER MAINS THAT ARE * <br />. <br />= <br />Asphaltic ConcretMaterials Quality AASHTO T164 <br />Bitumen Content, ASTM D2172 <br />.& <br />j- <br />INCLUDED IN THIS PROJECT AND THAT WILL CROSS ANY EXISTING OR PROPOSED PRESSURE -TYPE SANITARY Z <br />d �' <br />Gradation Per Spec i f i cat ions One Per Day <br />SEWER, WASTEWATER OR STORMWATER FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED WATER! WILL BE LAID $te• "�I�t �� <br />SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST 12 INCHES ABOVE OR BELOW THE OTHER PIPELINE. �e�- <br />- <br />Field Density ASTM 02950-81 95% of Lab Density One Per 2,500 S.F. <br />Hor i zonta I <br />�eW I <br />e!'I <br />(�jJ <br />Y. AT THE UTILITY CROSSINGS DESCRIBED IN PART II.C.1.W ABOVE, ONE FULL LENGTH OF WATER MAIN PIPE WILL <br />= <br />Los Angeles AASHTO T96-77 <br />BE CENTERED ABOVE OR BELOW THE OTHER PIPELINE SO THE WATER MAIN JOINTS WILL BE AS FAR AS <br />POSSIBLE FROM THE OTHER PIPELINE OR THE PIPES WILL BE ARRANGED SO THAT ALL WATER MAIN JOINTS ARE <br />Abrasion ASTM C131-81 Per Specifications One Per Source <br />Thickness N/A Per Specifications One Per 2,500 S.F. <br />AT LEAST THREE FEET FROM ALL JOINTS IN VACUUM -TYPE SANITARY SEWERS, STORM SEWERS, STORMWATER <br />FORCE MAINS, OR PIPELINES CONVEYING RECLAIMED WATER REGULATED UNDER PART III OF CHAPTER 62-610, <br />S'/Sr9 <br />NOTES: <br />F.A.C., AND AT LEAST SIX FEET FROM ALL JOINTS IN GRAVITY- OR PRESSURE -TYPE SANITARY SEWERS, <br />0. <br />* The Contractor sha I I not pave over so i I cement base unt i I a 30 day curing time has e I apsed <br />WASTEWATER FORCE MAINS, OR PIPELINES CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART Ili OF <br />lLn <br />** Maximum strength limits, as established by soils testing company, shall not be exceeded <br />CHAPTER 62-610, F.A.C. <br />�// <br />U) <br />*** Should any of the information provided herein conflict with either the recommendations of the <br />Geotechnical Engineer, and/or the Geotechnical Report, then the aforementioned recommendations <br />will supercede this "TESTING SCHEDULE GUIDE" <br />S <br />-� <br />H <br />- .. <br />E <br />C=2 <br />-; _ %_ , <br />- - - ­­ %. I- - -E <br />T <br />O <br />