Laserfiche WebLink
a <br />3 <br />n <br />0 <br />z <br />a <br />0 <br />W <br />IL <br />O <br />U <br />W <br />m <br />H <br />O <br />z <br />a <br />2 <br />cn <br />z <br />g <br />a <br />W <br />U) <br />W <br />2 <br />H <br />TIRE KINGDOM @ZEPHYR COMMONS <br />STORM WATER POLLUTION PREVENTION PLAN <br />SITE DESCRIPTION <br />PROJECT NAME: TIRE KINGDOM � ZEPHYR COMMONS <br />OWNER'S NAME: NOM ZEPHYRHILLS, LLC <br />PROJECT ADDRESS: U.S. HIGHWAY 301, ZEPHYRHILLS, FL. <br />OWNER'S ADDRESS: 3841 GREEN HILLS VILLAGE DRIVE, 400 <br />SECTION: 35, TOWNSHIP: 25 SOUTH, RANGE: 21 EAST <br />PHONE: (615) 269-5444 FAX: (615) 383-6866 <br />DESCRIPTION OF PURPOSE AND TYPES OF SOIL DISTURBING ACTIVITIES: <br />0.68 ACRES OF TIRE RETAIL <br />SOIL DISTURBING ACTIVITIES WILL INCLUDE: CLEARING AND GRUBBING; INSTALLING A STABILIZED CONSTRUCTION ENTRANCE, <br />PERIMETER AND OTHER EROSION AND SEDIMENT CONTROLS THROUGHOUT THE SITE; GRADING; EXCAVATION FOR THE <br />RETENTION POND, STORM SEWER, UTILITIES AND BUILDING FOUNDATIONS; CONSTRUCTION OF CURB AND PARKING LOT; <br />PREPARATION FOR FINAL PLANTING AND SEEDING. <br />SEQUENCE OF MAJOR EVENTS: <br />1. INSTALL STAKED SILT FENCE AS INDICATED ON THE CONSTRUCTION PLANS. <br />2. CLEAR AND GRUB FOR PONDS TO BE USED AS SEDIMENTATION BASINS. <br />3. EXCAVATE POND FOR SEDIMENT TRAPS FOR SITE RUNOFFS. <br />4. BEGIN BUILDING CONSTRUCTION. <br />5. CONSTRUCT DIVERSION SWALES AROUND PERIMETER OF SITE TO POND, AS NECESSARY. <br />6. INSTALL STORM SEWER SYSTEM AND ITS SILTATION PROTECTION, UTILITIES AND OUT FALL STRUCTURE. <br />7. EXCAVATE THE REMAINDER OF THE PONDS INCLUDING REMOVAL OF SILT DEPOSITS. <br />8. STABILIZE PARKING LOT. <br />9. CONSTRUCT CURB, BASE AND ASPHALT. <br />10. COMPLETE FINAL SITE GRADING. <br />11. INSTALL PERMANENT LANDSCAPING ON SITE. REPAIR ANY WASHED OUT AREAS. <br />12. WHEN CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE EROSION PROTECTION DEVICES AND <br />AND PLACE SOD AS NECESSARY. <br />NAME OF RECEIVING WATERS: LOST LAKE <br />POLLUTION REDUCTION CONTROLS <br />EROSION AND SEDIMENT CONTROLS <br />STABILIZATION PRACTICES <br />WIND EROSION STABILIZATION - THE CONTRACTOR SHALL DENUDE ONLY AREAS WHERE IT IS EXPECTED TO BE GRADED OR <br />ALTERED WITHIN A TWO (2) WEEK TIME FRAME. ALL PERVIOUS AREAS OF THE SITE INCLUDED IN GRADING THAT ARE <br />DISTURBED DURING CONSTRUCTION SHALL BE GRADED AND PREPARED WITH A COMBINATION OF SOD AND/OR SEEDING AND <br />MULCHING. PAD AREAS WITHIN FUTURE UNITS WHERE EARTHWORK IS COMPLETED SHALL BE COMPLETELY SEEDED AND <br />MULCHED. AREAS WHERE CONSTRUCTION OPERATIONS WILL BE CONTINUOUS, FUGITIVE DUST SHALL BE MANAGED BY APPLYING <br />A WATER SPRAY TO SATURATE THE SURFACE SOILS ON A DAILY BASIS (OR AS NEEDED) TO MAINTAIN MINIMAL DUST <br />TRANSPORT. FUGITIVE DUST SHALL BE MONITORED CONTINUOUSLY AND ADDITIONAL MEASURES MAY NEED TO BE TAKEN TO <br />CONTROL OFF SITE TRANSPORT OF UNACCEPTABLE LEVELS OF DUST. <br />TEMPORARY STABILIZATION - TOP OF SOIL STOCK PILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION <br />ACTIVITY TEMPORARILY CEASES FOR AT LEAST 21 DAYS SHALL BE STABILIZED WITH TEMPORARY GRASS AND MULCH NO <br />LATER THAN 14 DAYS FROM THE LAST CONSTRUCTION ACTIVITY. GRASS SEED SHALL BE A MIXTURE OF 20 PARTS OF <br />BERMUDA AND 80 PARTS OF PENSACOLA BAHIA. THE SEPARATE TYPES OF SEED USED SHALL BE THOROUGHLY DRY MIXED <br />IMMEDIATELY BEFORE SOWING. SEED WHICH HAS BECOME WET SHALL NOT BE USED. THE MULCH MATERIAL USED SHALL <br />NORMALLY BE DRY MULCH. DRY MULCH SHALL BE STRAW OR HAY CONSISTING OF OAT, RYE OR WHEAT STRAW, OR OF <br />PANGOLA, PEANUT, COASTAL BERMUDA OR BAHIA GRASS HAY. ONLY UNDETERIORATED MULCH WHICH CAN BE READILY CUT <br />INTO THE SOIL. SHALL BE USED. AREAS OF THE SITE WHICH ARE TO BE PAVED WILL BE TEMPORARILY STABILIZED BY <br />APPLYING STABILIZATION AND BASE. <br />PERMANENT STABILIZATION -DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY PERMANENTLY CEASES <br />SHALL BE STABILIZED WITH SOD NO LATER THAN 14 DAYS AFTER LAST CONSTRUCTION ACTIVITY. <br />STRUCTURAL PRACTICES <br />EROSION PROTECTION - DURING THE CONSTRUCTION PHASES, APPROPRIATE PRACTICES INCLUDING, BUT NOT LIMITED TO SILT <br />FENCE BARRIERS, HAY BALES AND WATERING OR OTHER METHODS NECESSARY WILL BE IMPLEMENTED TO CONTROL FUGITIVE <br />DUST. <br />SEDIMENT BASINS -THE STORM WATER MANAGEMENT AREAS (RETENTION AREAS) WILL SERVE AS SEDIMENT BASINS DURING <br />THE CONSTRUCTION PERIOD. AT THE CONTRACTOR'S DISCRETION, THE SEDIMENT BASINS WILL BE CONSTRUCTED TO THE <br />DESIGN CROSS-SECTION OR A MINIMUM OF 2-FEET BELOW EXISTING GROUND TO ALLOW THE SILT TO BE COLLECTED AND <br />REMOVED PRIOR TO COMPLETION OF THE GRADING. <br />STORM WATER MANAGEMENT <br />STORM WATER DRAINAGE WILL BE PROVIDED BY A CURB, STORM WATER AND CATCH BASIN SYSTEM FOR THE DEVELOPED <br />AREAS. THE AREAS NOT DEVELOPED SHALL BE GRADED TO LESS THAN 2� SLOPES AND HAVE PERMANENT SEEDING OR <br />PLANTINGS. WHEN CONSTRUCTION IS COMPLETE THE SITE WILL DRAIN TO STORM WATER PONDS THAT WERE UTILIZED AS THE <br />TEMPORARY SEDIMENT BASINS DURING THE CONSTRUCTION PROCESS. ANY ACCUMULATED SEDIMENT SHALL BE REMOVED FROM <br />THE SEDIMENT BASINS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONSTRUCT ALL RETENTION/DETENTION AREAS IN <br />ACCORDANCE WITH THE APPROVED CONSTRUCTION PLANS. <br />SPECIFIED OTHER CONTROLS <br />WASTE DISPOSAL <br />WASTE MATERIALS - ALL WASTE MATERIAL SHALL BE COLLECTED AND CONTAINED IN A CONTROLLED AREA PURSUANT TO <br />STATE AND LOCAL SOLID WASTE REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS GENERATED FROM CONSTRUCTION IS <br />TO BE REMOVED FROM THE SITE AND DISPOSED OF APPROPRIATELY. NO CONSTRUCTION MATERIALS SHALL BE BURIED ON <br />SITE. ALL PERSONNEL SHALL BE INSTRUCTED REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL. NOTICES STATING <br />THESE PRACTICES SHALL BE POSTED IN THE ON SITE OFFICE TRAILER AND THE CONSTRUCTION MANAGER RESPONSIBLE FOR <br />THE DAY TO DAY SITE OPERATIONS SHALL BE RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE FOLLOWED. <br />HAZARDOUS WASTE - IF ENCOUNTERED, ALL WASTE MATERIALS SHALL BE DISPOSED OF IN THE MANNER SPECIFIED BY <br />STATE AND/LOCAL REGULATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE <br />FOLLOWED. <br />SANITARY WASTE - ALL SANITARY WASTE SHALL BE COLLECTED FROM PORTABLE UNITS BY A LICENSED SANITARY WASTE <br />MANAGEMENT CONTRACTOR AS REQUIRED BY STATE AND LOCAL CODES AND REGULATIONS. <br />OFF SITE VEHICLE TRACKING <br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE PROVIDED TO HELP REDUCE OFF SITE VEHICLE TRACKING OF SEDIMENTS. <br />THE PAVED STREETS SHALL BE CLEANED AS NEEDED TO REMOVE ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE <br />SITE. DUMP TRUCKS HAULING MATERIAL FROM THE SITE SHALL BE COVERED WITH A TARPAULIN AT ALL TIMES. <br />m <br />TIMING OF CONTROL MEASURES <br />AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, STAKED SILT FENCE, STABILIZED CONSTRUCTION ENTRANCES AND <br />SEDIMENT BASINS SHALL BE CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE SITE. AREAS o <br />WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR MORE THAN 21 DAYS SHALL BE STABILIZED WITH A TEMPORARY <br />GRASS AND MULCH WITHIN 14 DAYS OF THE LAST DISTURBANCE. ONCE CONSTRUCTION ACTIVITY CEASES PERMANENTLY THAT N <br />AREA SHALL BE STABILIZED WITH PERMANENT SOD. AFTER THE ENTIRE SITE IS STABILIZED, THE ACCUMULATED SEDIMENT SHALL o <br />BE REMOVED FROM THE TRAPS AND THE STAKED SILT FENCES SHALL BE REMOVED. Z = <br />o <br />CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS IL a <br />THE STORM WATER POLLUTION PREVENTION PLAN REFLECTS THE PASCO COUNTY AND THE SOUTHWEST FLORIDA WATER cUn v <br />MANAGEMENT DISTRICT (SWFWMD) REQUIREMENTS FOR STORM WATER MANAGEMENT AND EROSION AND SEDIMENT CONTROL AS o Of <br />ESTABLISHED BY THE PASCO COUNTY STORM WATER MANAGEMENT TECHNICAL MANUAL AND THE FLORIDA ADMINISTRATIVE a <br />CODE, CHAPTER 40D -4 AND 40D-40. TO ENSURE COMPLIANCE, THIS PLAN WAS PREPARED IN ACCORDANCE WITH SWFWMD'S z <br />"BASIS OF REVIEW FOR SURFACE WATER MANAGEMENT PERMIT APPLICATIONS WITHIN THE SOUTHWEST FLORIDA WATER <br />0 <br />MANAGEMENT DISTRICT". <br />0 <br />MAINTENANCE INSPECTION PROCEDURES w <br />w � <br />EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES a <br />z <br />THESE ARE THE INSPECTION AND MAINTENANCE PRACTICES THAT SHALL BE USED TO MAINTAIN EROSION AND SEDIMENT o 0 <br />CONTROL: ¢w>—cn—ozw <br />1. LESS THAN ONE HALF OF THE SITE SHALL BE DENUDED AT ONE TIME. z <br />2. ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND FOLLOWING ANY STORM EVENT OF r o o0 <br />0.5-INCHES OR GREATER BY A CONTRACTOR'S REPRESENTATIVE. } Q a I a <br />3. ALL MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT SHALL BE INITIATED } m z = co rn o <br />WITHIN 24 HOURS OF REPORT. w z 4� N z <br />4. BUILT UP SEDIMENT SHALL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT OF THE SILT a o o a o a <br />FENCE. a a w <br />5. SILT FENCE SHALL BE INSPECTED REGULARLY FOR DEPTH OF SEDIMENT AND TEARS TO SEE IF THE FABRIC IS SECURELY w <br />ATTACHED TO THE FENCE POSTS AND TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE GROUND. o <br />6. THE SEDIMENT BASINS SHALL BE INSPECTED. DEPTH OF SEDIMENT AND BUILD UP OF SEDIMENT SHALL BE REMOVED cq z <br />WHEN IT REACHES 10% OF THE DESIGN CAPACITY OR AT THE END OF THE JOB. °mcn Z <br />7 TEMPORARY AND PERMANENT GRASSING AND MULCHING AND SODDING SHALL BE INSPECTED FOR BARE SPOTS, W° o w <br />WASHOUTS AND HEALTHY GROWTH. 06w 0 <br />8. A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION BY THE CONTRACTOR AND SHALL BE kts k Zo=_ } <br />KEPT IN AN ACTIVE LOG READILY AVAILABLE AT THE JOB SITE. oo° , w <br />9. EITHER THE SITE SUPERINTENDENT OR HIS DESIGNEES SHALL BE RESPONSIBLE FOR INSPECTIONS, MAINTENANCE, REPAIR _ C' t7 N¢om w <br />ACTIVITIES AND COMPLETING THE INSPECTION AND MAINTENANCE REPORT. ° W�>J = <br />4 to Q of U <br />10. PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE RESPONSIBILITIES SHALL RECEIVE TRAINING FROM THE SITE 0) �°� <br />SUPERINTENDENT. THEY SHALL BE TRAINED IN ALL THE INSPECTION AND MAINTENANCE PRACTICES NECESSARY FOR �� o¢ a <br />KEEPING THE EROSION AND SEDIMENT CONTROLS USED ON SITE IN GOOD WORKING ORDER. $ ar ° w <br />m c, <br />NON —STORM WATER DISCHARGE <br />0 0 <br />a <br />IT IS EXPECTED THAT THE FOLLOWING NON -STORM WATER DISCHARGES WILL OCCUR FROM THE SITE DURING THE <br />CONSTRUCTION PERIOD: <br />1. WATER FROM WATER LINE FLUSHING. T <br />2• PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE OCCURRED). ; o 0 <br />3• UNCONTAMINATED GROUNDWATER (FROM DEWATERING EXCAVATION). o o U, <br />ALL NON -STORM WATER DISCHARGES SHALL BE DIRECTED TO THE SEDIMENT BASIN PRIOR TO DISCHARGE. o � o � <br />cc coCDo <br />NON —STORM WATER DISCHARGE C� � 4" <br />J m N co a. <br />J <br />�¢=�o <br />J LuNo� <br />IT IS NOT EXPECTED THAT THE FOLLOWING NON -STORM WATER DISCHARGES SHALL NOT OCCUR FROM THE SITE DURING THE �' ; z �o <br />CONSTRUCTION PERIOD: <br />co <br />o <br />CONCRETE FERTILIZERS � N � � � LL <br />DETERGENTS PETROLEUM BASED PRODUCTS J c� c� z w co c� cn <br />zzo�wz� <br />PAINTS (ENAMEL AND LATEX) AND FUELS U <br />J <br />METAL STUDS CLEANING SOLVENTS ''' Z ¢ c� w''' <br />GLASS WOOD <br />zOtnUJ <br />wZz1¢ <br />TAR MASONRY BLOCK J J Q Q z <br />SAND ROOFING SHINGLES <br />STONE U � <br />ww <br />> c� ¢ z <br />SPILL PREVENTION = <br />Qom <br />a z> <br />~ Jz <br />w <br />MATERIAL MANAGEMENT PRACTICES W <br />THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT SHALL BE USED TO REDUCE THE RISK OF SPILLS OR \�\ <br />OTHER ACCIDENTAL EXPOSURE OF MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF. v <br />GOOD HOUSEKEEPING: o <br />THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED ON SITE DURING THE CONSTRUCTION PROJECT. 9t <br />AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED TO COMPLETE THE PROJECT. Z <br />ALL MATERIALS STORED ON SITE SHALL BE STORED IN A NEAT ORDERLY MANNER IN THEIR APPROPRIATE CONTAINERS AND IF <br />POSSIBLE, UNDER A ROOF OR OTHER CONTAINED ENCLOSURE. <br />PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL MANUFACTURERS LABELED CONTAINERS. <br />SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER. <br />WHENEVER POSSIBLE, ALL OF THE PRODUCT SHALL BE USED BEFORE DISPOSING OF THE CONTAINER. <br />MANUFACTURERS RECOMMENDATIONS FOR PROPER USE AND DISPOSAL SHALL BE FOLLOWED. <br />THE SITE SUPERINTENDENT SHALL INSPECT DAILY TO ENSURE PROPER USE AND DISPOSAL OF MATERIALS ON SITE. <br />HAZARDOUS PRODUCTS: <br />THESE PRACTICES ARE USED TO REDUCE THE RISKS ASSOCIATED WITH HAZARDOUS MATERIALS. <br />PRODUCTS SHALL BE KEPT IN ORIGINAL CONTAINERS UNLESS THEY ARE NOT RESEALABLE. <br />ORIGINAL LABELS AND MATERIAL SAFETY DATA SHALL BE RETAINED; THEY CONTAIN IMPORTANT PRODUCT INFORMATION. <br />IF SURPLUS PRODUCT MUST BE DISPOSED OF, MANUFACTURERS OR LOCAL AND STATE RECOMMENDED METHODS OF PROPER <br />DISPOSAL SHALL BE FOLLOWED. Z <br />PETROLEUM PRODUCTS: Q o <br />ALL ON SITE VEHICLES SHALL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTATIVE MAINTENANCE TO REDUCE THE <br />CHANCE OF LEAKAGE. PETROLEUM PRODUCTS SHALL BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE CLEARLY LABELED. Lu <br />ANY ASPHALT SUBSTANCES USED ON SITE SHALL BE APPLIED ACCORDINGLY TO THE MANUFACTURERS RECOMMENDATIONS. = W <br />FERTILIZERS: O 0 <br />o �o <br />FERTILIZERS USED SHALL BE APPLIED ONLY IN THE MINIMUM AMOUNT RECOMMENDED BY THE MANUFACTURER. ONCE APPLIED, J <br />FERTILIZER SHALL BE WORKED INTO THE SOIL TO LIMIT EXPOSURE TO STORM WATER. STORAGE SHALL BE IN A COVERED SHED. U. o Z <br />THE CONTENTS OF ANY PARTIALLY USED BAGS OF FERTILIZER SHALL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID <br />SPILLS. - m Z <br />PAINTS: Z J Im o <br />ALL CONTAINERS SHALL BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT SHALL NOT BE J Lu - <br />DISCHARGED TO THE STORM SEWER SYSTEM BUT SHALL BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURERS <br />INSTRUCTIONS OR STATE AND LOCAL REGULATIONS. _ Z <br />CONCRETE TRUCKS: �� i W <br />CONTRACTOR SHALL DESIGNATE AN AREA FOR DISCHARGE OF SURPLUS CONCRETE OR DRUM WASH WATER AND SHALL INSTALL <br />A CONTAINMENT BERM AROUND THIS AREA TO PREVENT RUNOFF TO THE REMAINDER OF THE SITE. HARD DEBRIS SHALL BE W <br />DISPOSED OF BY CONTRACTOR UPON COMPLETION OF THE PROJECT. 1 m <br />p a. <br />N � <br />S <br />H <br />E <br />E <br />T <br />N <br />O <br />SPILL CONTROL PRACTICES <br />IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS <br />OF THIS PLAN, THE FOLLOWING PRACTICES SHALL BE FOLLOWED FOR SPILL PREVENTION AND CLEANUP: <br />MANUFACTURERS RECOMMENDED METHODS FOR SPILL CLEAN UP SHALL BE CLEARLY POSTED AND SITE PERSONNEL SHALL BE <br />MADE AWARE OF THE PROCEDURES AND THE LOCATION OF THE INFORMATION AND CLEAN UP SUPPLIES. <br />MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEAN UP SHALL BE KEPT IN THE MATERIAL STORAGE AREA ON SITE. <br />EQUIPMENT AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED T0, BROOMS, DUST PANS, MOPS, RAGS, GLOVES, GOGGLES, <br />KITTY LITTER, SAND, SAWDUST AND PLASTIC AND METAL TRASH CONTAINERS. <br />ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY. <br />THE SPILL SHALL BE KEPT WELL VENTILATED AND PERSONNEL SHALL WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT <br />INJURY FROM CONTACT WITH HAZARDOUS SUBSTANCE. <br />SPILLS OF TOXIC OR HAZARDOUS MATERIAL SHALL BE REPORTED TO THE APPROPRIATE STATE OR LOCAL GOVERNMENT <br />AGENCY, REGARDLESS OF THE SIZE. <br />THE SPILL PREVENTION PLAN SHALL BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM <br />REOCCURRING AND THE CLEAN UP PROCEDURES FOR FUTURE USE. A DESCRIPTION OF THE SPILL, ITS CAUSE AND THE <br />CLEAN UP MEASURES SHALL ALSO BE INCLUDED. <br />THE SITE SUPERINTENDENT RESPONSIBLE FOR THE DAY TO DAY SITE OPERATIONS SHALL BE THE SPILL PREVENTION AND <br />CLEAN UP COORDINATOR. HE OR SHE SHALL DESIGNATE OTHER SITE PERSONNEL WHO WILL RECEIVE SPILL PREVENTION AND <br />CLEAN UP TRAINING. THESE INDIVIDUALS SHALL EACH BECOME RESPONSIBLE FOR A PARTICULAR PHASE OF PREVENTION AND <br />CLEAN UP. THE NAMES OF THE RESPONSIBLE SPILL PERSONNEL SHALL BE POSTED IN THE MATERIAL STORAGE AREA OR IN <br />THE OFFICE TRAILER ON SITE, IF APPLICABLE. <br />NOTICE OF TERMINATION <br />A NOTICE OF TERMINATION SHALL BE SUBMITTED TO THE FDEP AFTER THE CONSTRUCTION HAS BEEN COMPLETED AND THE <br />SITE HAS UNDERGONE FINAL STABILIZATION. <br />POLLUTION PREVENTION PLAN CERTIFICATION <br />TO THE BEST OF MY KNOWLEDGE, I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS WERE <br />PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED <br />PERSONNEL PROPERLY GATHER AND EVALUATE THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR <br />PERSONS MANAGING THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING, THE INFORMATION SUBMITTED <br />IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE <br />SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINES AND IMPRISONMENT FOR. <br />KNOWING VIOLATIONS. <br />OWNER: <br />NAME: TITLE: <br />SIGNATURE: DATE: <br />CONTRACTOR'S CERTIFICATION <br />I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS AND CONDITIONS OF THE GENERAL NATIONAL <br />POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT THAT AUTHORIZES THE STORM WATER DISCHARGES ASSOCIATED <br />WITH CONSTRUCTION ACTIVITY FROM THE SITE IDENTIFIED AS PART OF THIS CERTIFICATION. <br />SIGNATURE <br />COMPANY NAME AND ADDRESS <br />RESPONSIBLE FOR <br />COMPANY: <br />SIGNATURE: <br />ADDRESS: <br />NAME: <br />PHONE: <br />� GENERAL CONTRACTOR <br />DATE: <br />COMPANY: <br />SIGNATURE: <br />ADDRESS: <br />TEMPORARY AND PERMANENT <br />NAME: <br />PHONE: <br />STABILIZATION <br />DATE: <br />COMPANY: <br />SIGNATURE: <br />ADDRESS: <br />STABILIZED CONSTRUCTION ENTRANCE, <br />NAME: <br />EARTH DIKES, SEDIMENT BASIN <br />DATE: <br />PHONE: <br />�k'er. <br />i— _ — -i r „ -t- — �, a —r-r --i Z--_ r-- <br />