<br />TIRE KINGDOM @ZEPHYR COMMONS
<br />STORM WATER POLLUTION PREVENTION PLAN
<br />SITE DESCRIPTION
<br />PROJECT NAME: TIRE KINGDOM � ZEPHYR COMMONS
<br />OWNER'S NAME: NOM ZEPHYRHILLS, LLC
<br />PROJECT ADDRESS: U.S. HIGHWAY 301, ZEPHYRHILLS, FL.
<br />OWNER'S ADDRESS: 3841 GREEN HILLS VILLAGE DRIVE, 400
<br />SECTION: 35, TOWNSHIP: 25 SOUTH, RANGE: 21 EAST
<br />PHONE: (615) 269-5444 FAX: (615) 383-6866
<br />DESCRIPTION OF PURPOSE AND TYPES OF SOIL DISTURBING ACTIVITIES:
<br />0.68 ACRES OF TIRE RETAIL
<br />SOIL DISTURBING ACTIVITIES WILL INCLUDE: CLEARING AND GRUBBING; INSTALLING A STABILIZED CONSTRUCTION ENTRANCE,
<br />PERIMETER AND OTHER EROSION AND SEDIMENT CONTROLS THROUGHOUT THE SITE; GRADING; EXCAVATION FOR THE
<br />RETENTION POND, STORM SEWER, UTILITIES AND BUILDING FOUNDATIONS; CONSTRUCTION OF CURB AND PARKING LOT;
<br />PREPARATION FOR FINAL PLANTING AND SEEDING.
<br />SEQUENCE OF MAJOR EVENTS:
<br />1. INSTALL STAKED SILT FENCE AS INDICATED ON THE CONSTRUCTION PLANS.
<br />2. CLEAR AND GRUB FOR PONDS TO BE USED AS SEDIMENTATION BASINS.
<br />3. EXCAVATE POND FOR SEDIMENT TRAPS FOR SITE RUNOFFS.
<br />4. BEGIN BUILDING CONSTRUCTION.
<br />5. CONSTRUCT DIVERSION SWALES AROUND PERIMETER OF SITE TO POND, AS NECESSARY.
<br />6. INSTALL STORM SEWER SYSTEM AND ITS SILTATION PROTECTION, UTILITIES AND OUT FALL STRUCTURE.
<br />7. EXCAVATE THE REMAINDER OF THE PONDS INCLUDING REMOVAL OF SILT DEPOSITS.
<br />8. STABILIZE PARKING LOT.
<br />9. CONSTRUCT CURB, BASE AND ASPHALT.
<br />10. COMPLETE FINAL SITE GRADING.
<br />11. INSTALL PERMANENT LANDSCAPING ON SITE. REPAIR ANY WASHED OUT AREAS.
<br />12. WHEN CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE EROSION PROTECTION DEVICES AND
<br />AND PLACE SOD AS NECESSARY.
<br />NAME OF RECEIVING WATERS: LOST LAKE
<br />POLLUTION REDUCTION CONTROLS
<br />EROSION AND SEDIMENT CONTROLS
<br />STABILIZATION PRACTICES
<br />WIND EROSION STABILIZATION - THE CONTRACTOR SHALL DENUDE ONLY AREAS WHERE IT IS EXPECTED TO BE GRADED OR
<br />ALTERED WITHIN A TWO (2) WEEK TIME FRAME. ALL PERVIOUS AREAS OF THE SITE INCLUDED IN GRADING THAT ARE
<br />DISTURBED DURING CONSTRUCTION SHALL BE GRADED AND PREPARED WITH A COMBINATION OF SOD AND/OR SEEDING AND
<br />MULCHING. PAD AREAS WITHIN FUTURE UNITS WHERE EARTHWORK IS COMPLETED SHALL BE COMPLETELY SEEDED AND
<br />MULCHED. AREAS WHERE CONSTRUCTION OPERATIONS WILL BE CONTINUOUS, FUGITIVE DUST SHALL BE MANAGED BY APPLYING
<br />A WATER SPRAY TO SATURATE THE SURFACE SOILS ON A DAILY BASIS (OR AS NEEDED) TO MAINTAIN MINIMAL DUST
<br />TRANSPORT. FUGITIVE DUST SHALL BE MONITORED CONTINUOUSLY AND ADDITIONAL MEASURES MAY NEED TO BE TAKEN TO
<br />CONTROL OFF SITE TRANSPORT OF UNACCEPTABLE LEVELS OF DUST.
<br />TEMPORARY STABILIZATION - TOP OF SOIL STOCK PILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION
<br />ACTIVITY TEMPORARILY CEASES FOR AT LEAST 21 DAYS SHALL BE STABILIZED WITH TEMPORARY GRASS AND MULCH NO
<br />LATER THAN 14 DAYS FROM THE LAST CONSTRUCTION ACTIVITY. GRASS SEED SHALL BE A MIXTURE OF 20 PARTS OF
<br />BERMUDA AND 80 PARTS OF PENSACOLA BAHIA. THE SEPARATE TYPES OF SEED USED SHALL BE THOROUGHLY DRY MIXED
<br />IMMEDIATELY BEFORE SOWING. SEED WHICH HAS BECOME WET SHALL NOT BE USED. THE MULCH MATERIAL USED SHALL
<br />NORMALLY BE DRY MULCH. DRY MULCH SHALL BE STRAW OR HAY CONSISTING OF OAT, RYE OR WHEAT STRAW, OR OF
<br />PANGOLA, PEANUT, COASTAL BERMUDA OR BAHIA GRASS HAY. ONLY UNDETERIORATED MULCH WHICH CAN BE READILY CUT
<br />INTO THE SOIL. SHALL BE USED. AREAS OF THE SITE WHICH ARE TO BE PAVED WILL BE TEMPORARILY STABILIZED BY
<br />APPLYING STABILIZATION AND BASE.
<br />PERMANENT STABILIZATION -DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY PERMANENTLY CEASES
<br />SHALL BE STABILIZED WITH SOD NO LATER THAN 14 DAYS AFTER LAST CONSTRUCTION ACTIVITY.
<br />STRUCTURAL PRACTICES
<br />EROSION PROTECTION - DURING THE CONSTRUCTION PHASES, APPROPRIATE PRACTICES INCLUDING, BUT NOT LIMITED TO SILT
<br />FENCE BARRIERS, HAY BALES AND WATERING OR OTHER METHODS NECESSARY WILL BE IMPLEMENTED TO CONTROL FUGITIVE
<br />DUST.
<br />SEDIMENT BASINS -THE STORM WATER MANAGEMENT AREAS (RETENTION AREAS) WILL SERVE AS SEDIMENT BASINS DURING
<br />THE CONSTRUCTION PERIOD. AT THE CONTRACTOR'S DISCRETION, THE SEDIMENT BASINS WILL BE CONSTRUCTED TO THE
<br />DESIGN CROSS-SECTION OR A MINIMUM OF 2-FEET BELOW EXISTING GROUND TO ALLOW THE SILT TO BE COLLECTED AND
<br />REMOVED PRIOR TO COMPLETION OF THE GRADING.
<br />STORM WATER MANAGEMENT
<br />STORM WATER DRAINAGE WILL BE PROVIDED BY A CURB, STORM WATER AND CATCH BASIN SYSTEM FOR THE DEVELOPED
<br />AREAS. THE AREAS NOT DEVELOPED SHALL BE GRADED TO LESS THAN 2� SLOPES AND HAVE PERMANENT SEEDING OR
<br />PLANTINGS. WHEN CONSTRUCTION IS COMPLETE THE SITE WILL DRAIN TO STORM WATER PONDS THAT WERE UTILIZED AS THE
<br />TEMPORARY SEDIMENT BASINS DURING THE CONSTRUCTION PROCESS. ANY ACCUMULATED SEDIMENT SHALL BE REMOVED FROM
<br />THE SEDIMENT BASINS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONSTRUCT ALL RETENTION/DETENTION AREAS IN
<br />ACCORDANCE WITH THE APPROVED CONSTRUCTION PLANS.
<br />SPECIFIED OTHER CONTROLS
<br />WASTE DISPOSAL
<br />WASTE MATERIALS - ALL WASTE MATERIAL SHALL BE COLLECTED AND CONTAINED IN A CONTROLLED AREA PURSUANT TO
<br />STATE AND LOCAL SOLID WASTE REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS GENERATED FROM CONSTRUCTION IS
<br />TO BE REMOVED FROM THE SITE AND DISPOSED OF APPROPRIATELY. NO CONSTRUCTION MATERIALS SHALL BE BURIED ON
<br />SITE. ALL PERSONNEL SHALL BE INSTRUCTED REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL. NOTICES STATING
<br />THESE PRACTICES SHALL BE POSTED IN THE ON SITE OFFICE TRAILER AND THE CONSTRUCTION MANAGER RESPONSIBLE FOR
<br />THE DAY TO DAY SITE OPERATIONS SHALL BE RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE FOLLOWED.
<br />HAZARDOUS WASTE - IF ENCOUNTERED, ALL WASTE MATERIALS SHALL BE DISPOSED OF IN THE MANNER SPECIFIED BY
<br />STATE AND/LOCAL REGULATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE
<br />FOLLOWED.
<br />SANITARY WASTE - ALL SANITARY WASTE SHALL BE COLLECTED FROM PORTABLE UNITS BY A LICENSED SANITARY WASTE
<br />MANAGEMENT CONTRACTOR AS REQUIRED BY STATE AND LOCAL CODES AND REGULATIONS.
<br />OFF SITE VEHICLE TRACKING
<br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE PROVIDED TO HELP REDUCE OFF SITE VEHICLE TRACKING OF SEDIMENTS.
<br />THE PAVED STREETS SHALL BE CLEANED AS NEEDED TO REMOVE ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE
<br />SITE. DUMP TRUCKS HAULING MATERIAL FROM THE SITE SHALL BE COVERED WITH A TARPAULIN AT ALL TIMES.
<br />m
<br />TIMING OF CONTROL MEASURES
<br />AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, STAKED SILT FENCE, STABILIZED CONSTRUCTION ENTRANCES AND
<br />SEDIMENT BASINS SHALL BE CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE SITE. AREAS o
<br />WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR MORE THAN 21 DAYS SHALL BE STABILIZED WITH A TEMPORARY
<br />GRASS AND MULCH WITHIN 14 DAYS OF THE LAST DISTURBANCE. ONCE CONSTRUCTION ACTIVITY CEASES PERMANENTLY THAT N
<br />AREA SHALL BE STABILIZED WITH PERMANENT SOD. AFTER THE ENTIRE SITE IS STABILIZED, THE ACCUMULATED SEDIMENT SHALL o
<br />BE REMOVED FROM THE TRAPS AND THE STAKED SILT FENCES SHALL BE REMOVED. Z =
<br />o
<br />CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS IL a
<br />THE STORM WATER POLLUTION PREVENTION PLAN REFLECTS THE PASCO COUNTY AND THE SOUTHWEST FLORIDA WATER cUn v
<br />MANAGEMENT DISTRICT (SWFWMD) REQUIREMENTS FOR STORM WATER MANAGEMENT AND EROSION AND SEDIMENT CONTROL AS o Of
<br />ESTABLISHED BY THE PASCO COUNTY STORM WATER MANAGEMENT TECHNICAL MANUAL AND THE FLORIDA ADMINISTRATIVE a
<br />CODE, CHAPTER 40D -4 AND 40D-40. TO ENSURE COMPLIANCE, THIS PLAN WAS PREPARED IN ACCORDANCE WITH SWFWMD'S z
<br />"BASIS OF REVIEW FOR SURFACE WATER MANAGEMENT PERMIT APPLICATIONS WITHIN THE SOUTHWEST FLORIDA WATER
<br />0
<br />MANAGEMENT DISTRICT".
<br />0
<br />MAINTENANCE INSPECTION PROCEDURES w
<br />w �
<br />EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES a
<br />z
<br />THESE ARE THE INSPECTION AND MAINTENANCE PRACTICES THAT SHALL BE USED TO MAINTAIN EROSION AND SEDIMENT o 0
<br />CONTROL: ¢w>—cn—ozw
<br />1. LESS THAN ONE HALF OF THE SITE SHALL BE DENUDED AT ONE TIME. z
<br />2. ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND FOLLOWING ANY STORM EVENT OF r o o0
<br />0.5-INCHES OR GREATER BY A CONTRACTOR'S REPRESENTATIVE. } Q a I a
<br />3. ALL MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT SHALL BE INITIATED } m z = co rn o
<br />WITHIN 24 HOURS OF REPORT. w z 4� N z
<br />4. BUILT UP SEDIMENT SHALL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT OF THE SILT a o o a o a
<br />FENCE. a a w
<br />5. SILT FENCE SHALL BE INSPECTED REGULARLY FOR DEPTH OF SEDIMENT AND TEARS TO SEE IF THE FABRIC IS SECURELY w
<br />ATTACHED TO THE FENCE POSTS AND TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE GROUND. o
<br />6. THE SEDIMENT BASINS SHALL BE INSPECTED. DEPTH OF SEDIMENT AND BUILD UP OF SEDIMENT SHALL BE REMOVED cq z
<br />WHEN IT REACHES 10% OF THE DESIGN CAPACITY OR AT THE END OF THE JOB. °mcn Z
<br />7 TEMPORARY AND PERMANENT GRASSING AND MULCHING AND SODDING SHALL BE INSPECTED FOR BARE SPOTS, W° o w
<br />WASHOUTS AND HEALTHY GROWTH. 06w 0
<br />8. A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION BY THE CONTRACTOR AND SHALL BE kts k Zo=_ }
<br />KEPT IN AN ACTIVE LOG READILY AVAILABLE AT THE JOB SITE. oo° , w
<br />9. EITHER THE SITE SUPERINTENDENT OR HIS DESIGNEES SHALL BE RESPONSIBLE FOR INSPECTIONS, MAINTENANCE, REPAIR _ C' t7 N¢om w
<br />ACTIVITIES AND COMPLETING THE INSPECTION AND MAINTENANCE REPORT. ° W�>J =
<br />4 to Q of U
<br />10. PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE RESPONSIBILITIES SHALL RECEIVE TRAINING FROM THE SITE 0) �°�
<br />SUPERINTENDENT. THEY SHALL BE TRAINED IN ALL THE INSPECTION AND MAINTENANCE PRACTICES NECESSARY FOR �� o¢ a
<br />KEEPING THE EROSION AND SEDIMENT CONTROLS USED ON SITE IN GOOD WORKING ORDER. $ ar ° w
<br />m c,
<br />NON —STORM WATER DISCHARGE
<br />0 0
<br />a
<br />IT IS EXPECTED THAT THE FOLLOWING NON -STORM WATER DISCHARGES WILL OCCUR FROM THE SITE DURING THE
<br />CONSTRUCTION PERIOD:
<br />1. WATER FROM WATER LINE FLUSHING. T
<br />2• PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE OCCURRED). ; o 0
<br />3• UNCONTAMINATED GROUNDWATER (FROM DEWATERING EXCAVATION). o o U,
<br />ALL NON -STORM WATER DISCHARGES SHALL BE DIRECTED TO THE SEDIMENT BASIN PRIOR TO DISCHARGE. o � o �
<br />cc coCDo
<br />NON —STORM WATER DISCHARGE C� � 4"
<br />J m N co a.
<br />J
<br />�¢=�o
<br />J LuNo�
<br />IT IS NOT EXPECTED THAT THE FOLLOWING NON -STORM WATER DISCHARGES SHALL NOT OCCUR FROM THE SITE DURING THE �' ; z �o
<br />CONSTRUCTION PERIOD:
<br />co
<br />o
<br />CONCRETE FERTILIZERS � N � � � LL
<br />DETERGENTS PETROLEUM BASED PRODUCTS J c� c� z w co c� cn
<br />zzo�wz�
<br />PAINTS (ENAMEL AND LATEX) AND FUELS U
<br />J
<br />METAL STUDS CLEANING SOLVENTS ''' Z ¢ c� w'''
<br />GLASS WOOD
<br />zOtnUJ
<br />wZz1¢
<br />TAR MASONRY BLOCK J J Q Q z
<br />SAND ROOFING SHINGLES
<br />STONE U �
<br />ww
<br />> c� ¢ z
<br />SPILL PREVENTION =
<br />Qom
<br />a z>
<br />~ Jz
<br />w
<br />MATERIAL MANAGEMENT PRACTICES W
<br />THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT SHALL BE USED TO REDUCE THE RISK OF SPILLS OR \�\
<br />OTHER ACCIDENTAL EXPOSURE OF MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF. v
<br />GOOD HOUSEKEEPING: o
<br />THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED ON SITE DURING THE CONSTRUCTION PROJECT. 9t
<br />AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED TO COMPLETE THE PROJECT. Z
<br />ALL MATERIALS STORED ON SITE SHALL BE STORED IN A NEAT ORDERLY MANNER IN THEIR APPROPRIATE CONTAINERS AND IF
<br />POSSIBLE, UNDER A ROOF OR OTHER CONTAINED ENCLOSURE.
<br />PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL MANUFACTURERS LABELED CONTAINERS.
<br />SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER.
<br />WHENEVER POSSIBLE, ALL OF THE PRODUCT SHALL BE USED BEFORE DISPOSING OF THE CONTAINER.
<br />MANUFACTURERS RECOMMENDATIONS FOR PROPER USE AND DISPOSAL SHALL BE FOLLOWED.
<br />THE SITE SUPERINTENDENT SHALL INSPECT DAILY TO ENSURE PROPER USE AND DISPOSAL OF MATERIALS ON SITE.
<br />HAZARDOUS PRODUCTS:
<br />THESE PRACTICES ARE USED TO REDUCE THE RISKS ASSOCIATED WITH HAZARDOUS MATERIALS.
<br />PRODUCTS SHALL BE KEPT IN ORIGINAL CONTAINERS UNLESS THEY ARE NOT RESEALABLE.
<br />ORIGINAL LABELS AND MATERIAL SAFETY DATA SHALL BE RETAINED; THEY CONTAIN IMPORTANT PRODUCT INFORMATION.
<br />IF SURPLUS PRODUCT MUST BE DISPOSED OF, MANUFACTURERS OR LOCAL AND STATE RECOMMENDED METHODS OF PROPER
<br />DISPOSAL SHALL BE FOLLOWED. Z
<br />PETROLEUM PRODUCTS: Q o
<br />ALL ON SITE VEHICLES SHALL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTATIVE MAINTENANCE TO REDUCE THE
<br />CHANCE OF LEAKAGE. PETROLEUM PRODUCTS SHALL BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE CLEARLY LABELED. Lu
<br />ANY ASPHALT SUBSTANCES USED ON SITE SHALL BE APPLIED ACCORDINGLY TO THE MANUFACTURERS RECOMMENDATIONS. = W
<br />FERTILIZERS: O 0
<br />o �o
<br />FERTILIZERS USED SHALL BE APPLIED ONLY IN THE MINIMUM AMOUNT RECOMMENDED BY THE MANUFACTURER. ONCE APPLIED, J
<br />FERTILIZER SHALL BE WORKED INTO THE SOIL TO LIMIT EXPOSURE TO STORM WATER. STORAGE SHALL BE IN A COVERED SHED. U. o Z
<br />THE CONTENTS OF ANY PARTIALLY USED BAGS OF FERTILIZER SHALL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID
<br />SPILLS. - m Z
<br />PAINTS: Z J Im o
<br />ALL CONTAINERS SHALL BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT SHALL NOT BE J Lu -
<br />DISCHARGED TO THE STORM SEWER SYSTEM BUT SHALL BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURERS
<br />INSTRUCTIONS OR STATE AND LOCAL REGULATIONS. _ Z
<br />CONCRETE TRUCKS: �� i W
<br />CONTRACTOR SHALL DESIGNATE AN AREA FOR DISCHARGE OF SURPLUS CONCRETE OR DRUM WASH WATER AND SHALL INSTALL
<br />A CONTAINMENT BERM AROUND THIS AREA TO PREVENT RUNOFF TO THE REMAINDER OF THE SITE. HARD DEBRIS SHALL BE W
<br />DISPOSED OF BY CONTRACTOR UPON COMPLETION OF THE PROJECT. 1 m
<br />p a.
<br />N �
<br />S
<br />H
<br />E
<br />E
<br />T
<br />N
<br />O
<br />SPILL CONTROL PRACTICES
<br />IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS
<br />OF THIS PLAN, THE FOLLOWING PRACTICES SHALL BE FOLLOWED FOR SPILL PREVENTION AND CLEANUP:
<br />MANUFACTURERS RECOMMENDED METHODS FOR SPILL CLEAN UP SHALL BE CLEARLY POSTED AND SITE PERSONNEL SHALL BE
<br />MADE AWARE OF THE PROCEDURES AND THE LOCATION OF THE INFORMATION AND CLEAN UP SUPPLIES.
<br />MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEAN UP SHALL BE KEPT IN THE MATERIAL STORAGE AREA ON SITE.
<br />EQUIPMENT AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED T0, BROOMS, DUST PANS, MOPS, RAGS, GLOVES, GOGGLES,
<br />KITTY LITTER, SAND, SAWDUST AND PLASTIC AND METAL TRASH CONTAINERS.
<br />ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY.
<br />THE SPILL SHALL BE KEPT WELL VENTILATED AND PERSONNEL SHALL WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT
<br />INJURY FROM CONTACT WITH HAZARDOUS SUBSTANCE.
<br />SPILLS OF TOXIC OR HAZARDOUS MATERIAL SHALL BE REPORTED TO THE APPROPRIATE STATE OR LOCAL GOVERNMENT
<br />AGENCY, REGARDLESS OF THE SIZE.
<br />THE SPILL PREVENTION PLAN SHALL BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM
<br />REOCCURRING AND THE CLEAN UP PROCEDURES FOR FUTURE USE. A DESCRIPTION OF THE SPILL, ITS CAUSE AND THE
<br />CLEAN UP MEASURES SHALL ALSO BE INCLUDED.
<br />THE SITE SUPERINTENDENT RESPONSIBLE FOR THE DAY TO DAY SITE OPERATIONS SHALL BE THE SPILL PREVENTION AND
<br />CLEAN UP COORDINATOR. HE OR SHE SHALL DESIGNATE OTHER SITE PERSONNEL WHO WILL RECEIVE SPILL PREVENTION AND
<br />CLEAN UP TRAINING. THESE INDIVIDUALS SHALL EACH BECOME RESPONSIBLE FOR A PARTICULAR PHASE OF PREVENTION AND
<br />CLEAN UP. THE NAMES OF THE RESPONSIBLE SPILL PERSONNEL SHALL BE POSTED IN THE MATERIAL STORAGE AREA OR IN
<br />THE OFFICE TRAILER ON SITE, IF APPLICABLE.
<br />NOTICE OF TERMINATION
<br />A NOTICE OF TERMINATION SHALL BE SUBMITTED TO THE FDEP AFTER THE CONSTRUCTION HAS BEEN COMPLETED AND THE
<br />SITE HAS UNDERGONE FINAL STABILIZATION.
<br />POLLUTION PREVENTION PLAN CERTIFICATION
<br />TO THE BEST OF MY KNOWLEDGE, I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS WERE
<br />PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED
<br />PERSONNEL PROPERLY GATHER AND EVALUATE THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR
<br />PERSONS MANAGING THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING, THE INFORMATION SUBMITTED
<br />IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
<br />SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINES AND IMPRISONMENT FOR.
<br />KNOWING VIOLATIONS.
<br />OWNER:
<br />NAME: TITLE:
<br />SIGNATURE: DATE:
<br />CONTRACTOR'S CERTIFICATION
<br />I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS AND CONDITIONS OF THE GENERAL NATIONAL
<br />POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT THAT AUTHORIZES THE STORM WATER DISCHARGES ASSOCIATED
<br />WITH CONSTRUCTION ACTIVITY FROM THE SITE IDENTIFIED AS PART OF THIS CERTIFICATION.
<br />SIGNATURE
<br />COMPANY NAME AND ADDRESS
<br />RESPONSIBLE FOR
<br />COMPANY:
<br />SIGNATURE:
<br />ADDRESS:
<br />NAME:
<br />PHONE:
<br />� GENERAL CONTRACTOR
<br />DATE:
<br />COMPANY:
<br />SIGNATURE:
<br />ADDRESS:
<br />TEMPORARY AND PERMANENT
<br />NAME:
<br />PHONE:
<br />STABILIZATION
<br />DATE:
<br />COMPANY:
<br />SIGNATURE:
<br />ADDRESS:
<br />STABILIZED CONSTRUCTION ENTRANCE,
<br />NAME:
<br />EARTH DIKES, SEDIMENT BASIN
<br />DATE:
<br />PHONE:
<br />�k'er.
<br />i— _ — -i r „ -t- — �, a —r-r --i Z--_ r--
<br />
|