<br />SITE DESCRIPTION: TIMING OF CONTROL MEASURES
<br />PROJECT NAME: PARCEL 4 @ZEPHYR COMMONS AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, STAKED SILT FENCE, STABILIZED CONSTRUCTION ENTRANCES AND SEDIMENT BASINS SHALL BE O
<br />PROPERTY OWNER NAME AND ADDRESS: SF ZEPHYR COMMONS OUTPARCELS LP CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE SITE. AREAS WHERE CONSTRUCTION ACTIVITY TEMPORARILY a
<br />400 CLEMATIS STREET, SUITE 201 CEASES FOR MORE THAN 21 DAYS SHALL BE STABILIZED WITH A TEMPORARY GRASS AND MULCH WITHIN 14 DAYS OF THE LAST DISTURBANCE. ONCE
<br />WEST PALM BEACH, FL 33401 CONSTRUCTION ACTIVITY CEASES PERMANENTLY THAT AREA SHALL BE STABILIZED WITH PERMANENT SOD. AFTER THE ENTIRE SITE IS STABILIZED, w
<br />TOTAL AREA OF THE SITE: 0.822 ACRES
<br />THE ACCUMULATED SEDIMENT SHALL BE REMOVED FROM THE TRAPS AND THE STAKED SILT FENCES SHALL BE REMOVED.
<br />TOTAL AREA OF THE SITE TO BE DISTURBED: 0.822 ACRES
<br />NAME OF RECEIVING WATER: EAST PASCO WATERSHED MAINTENANCE INSPECTION PROCEDURES
<br />NATURE OF THE CONSTRUCTION ACTIVITY: EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES
<br />SOIL DISTURBING ACTIVITIES WILL INCLUDE: CLEARING AND GRUBBING; INSTALLING A STABILIZED CONSTRUCTION ENTRANCE, PERIMETER AND LU
<br />OTHER EROSION AND SEDIMENT CONTROLS THROUGHOUT THE SITE; GRADING; CONSTRUCTING A STORM WATER POND, STORM SEWER, UTILITIES THESE ARE THE INSPECTION AND MAINTENANCE PRACTICES THAT SHALL BE USED TO MAINTAIN EROSION AND SEDIMENT CONTROL: o
<br />AND BUILDING FOUNDATIONS; CONSTRUCTION OF CURB AND PARKING LOT; PREPARATION FOR FINAL PLANTING AND SEEDING.
<br />1. ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND FOLLOWING ANY STORM EVENT OF 0.5-INCHES OR GREATER BY A 1C:)1a,1001r-
<br />iD `" Nr m N ,_., z
<br />CONTRACTORS REPRESENTATIVE.
<br />2. ALL MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT SHALL BE INITIATED WITHIN 24 HOURS OF REPORT. � W > - N 0 z rn
<br />INTENDED SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES: 3. BUILT UP SEDIMENT SHALL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT OF THE SILT FENCE.
<br />4. SILT FENCE SHALL BE INSPECTED REGULARLY FOR DEPTH OF SEDIMENT AND TEARS TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE z ¢ " N
<br />1. INSTALL STAKED SILT FENCE AS INDICATED ON THE CONSTRUCTION PLANS. o a ® r- �
<br />POSTS AND TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE GROUND. o u m w z a W
<br />2. EXCAVATE PONDS FOR SEDIMENT TRAPS FOR SITE RUNOFFS. n � W W 0 D m W �' o
<br />3. BEGIN BUILDING CONSTRUCTION. 5. THE SEDIMENT BASINS SHALL BE INSPECTED DEPTH OF SEDIMENT AND BUILD UP OF SEDIMENT SHALL BE REMOVED WHEN IT REACHES 10% OF THE 0 v~i � °�' z Q o 0
<br />DESIGN CAPACITY OR AT THE END OF THE JOB. a LL o a a 00 N
<br />4. CONSTRUCT DIVERSION SWALES AROUND PERIMETER OF SITE TO PONDS AS NECESSARY. °z o z w 0 • iO E rn
<br />6. TEMPORARY AND PERMANENT GRASSING AND MULCHING AND SODDING SHALL BE INSPECTED FOR BARE SPOTS WASHOUTS AND HEALTHY GROWTH. _ ce > a cv ire
<br />5. INSTALL STORM SEWER SYSTEM AND ITS SILTATION PROTECTION, UTILITIES AND OUT FALL STRUCTURES. ° ¢ ° o V o o
<br />6. STABILIZE PARKING LOT. 7. A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION BY THE CONTRACTOR AND SHALL BE KEPT IN AN ACTIVE LOG a a o
<br />7. CONSTRUCT CURB, BASE AND ASPHALT. READILY AVAILABLE AT THE JOB SITE.
<br />8. EITHER THE SITE SUPERINTENDENT OR HIS DESIGNEES SHALL BE RESPONSIBLE FOR INSPECTIONS, MAINTENANCE, REPAIR ACTIVITIES AND
<br />8. COMPLETE FINAL SITE GRADING.
<br />COMPLETING THE INSPECTION AND MAINTENANCE REPORT. P ..........
<br />9. INSTALL PERMANENT LANDSCAPING ON SITE. REPAIR ANY WASHED OUT AREAS. °� Qy .,.•••"�E•••. °%f�
<br />10. WHEN CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE EROSION PROTECTION DEVICES AND PLACE SOD AS NECESSARY 9. PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE RESPONSIBILITIES SHALL RECEIVE TRAINING FROM THE SITE SUPERINTENDENT. THEY
<br />SHALL BE TRAINED IN ALL THE INSPECTION AND MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION AND SEDIMENT CONTROLS USED ON ;
<br />SITE IN GOOD WORKING ORDER. 0.91887
<br />ig -0 STATE OF
<br />' 07/25/2022%<Cr
<br />CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL REGULATIONSOF
<br />=,�•c�,'••..,.F�oR �oP••,:'`�
<br />THE STORM WATER POLLUTION PREVENTION PLAN REFLECTS THE SOUTH WEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) REQUIREMENTS "S, BONA L•••�N"°°�
<br />unnmmnnnnuunam�n�o`a
<br />FOR STORM WATER MANAGEMENT AND EROSION AND SEDIMENT CONTROL AS ESTABLISHED BY SWFWMD STORM WATER MANAGEMENT PRACTICES NON -STORM WATER DISCHARGE
<br />MANUAL AND THE FLORIDA ADMINISTRATIVE CODE, CHAPTER 40D -4 AND 40D-40. TO ENSURE COMPLIANCE, THIS PLAN WAS PREPARED IN ACCORDANCE
<br />WITH SWFWMD'S "BASIS OF REVIEW FOR SURFACE WATER MANAGEMENT PERMIT APPLICATIONS WITHIN THE SOUTH WEST FLORIDA WATER
<br />MANAGEMENT DISTRICT". IT IS EXPECTED THAT THE FOLLOWING NON -STORM WATER DISCHARGES WILL OCCUR FROM THE SITE DURING THE CONSTRUCTION PERIOD:
<br />1. WATER FROM WATER LINE FLUSHING.
<br />2. PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE OCCURRED).
<br />3. UNCONTAMINATED GROUNDWATER (FROM DEWATERING EXCAVATION). ALL NON -STORM WATER DISCHARGES SHALL BE DIRECTED TO THE
<br />SEDIMENT BASIN PRIOR TO DISCHARGE.
<br />a
<br />POLLUTION REDUCTION CONTROLS ,J oLU
<br />EROSION AND SEDIMENT CONTROLS NON -STORM WATER DISCHARGE o o L N
<br />IT IS NOT EXPECTED THAT THE FOLLOWING NON -STORM WATER DISCHARGES SHALL OCCUR FROM THE SITE DURING THE CONSTRUCTION W Ce " C o 0
<br />STABILIZATION PRACTICES PERIOD: (� LU o
<br />J m N 120, d
<br />WIND EROSION STABILIZATION - THE CONTRACTOR SHALL DENUDE ONLY AREAS WHERE IT IS EXPECTED TO BE GRADED OR ALTERED WITHIN A CONCRETE FERTILIZERS Q = ^ 0
<br />REASONABLE TIME FRAME. ALL PERVIOUS AREAS OF THE SITE INCLUDED IN GRADING THAT ARE DISTURBED DURING CONSTRUCTION SHALL BE GRADED DETERGENTS PETROLEUM BASED PRODUCTS AND Q CD � z ^ o
<br />AND PREPARED WITH A COMBINATION OF SOD AND/OR SEEDING AND MULCHING. PAD AREAS WITHIN FUTURE UNITS WHERE EARTHWORK I5 ( ) a o J �o o x
<br />PAINTS ENAMEL AND LATEX FUELS n, ¢ � s ¢ >
<br />COMPLETED SHALL BE COMPLETELY SEEDED AND MULCHED. AREAS WHERE CONSTRUCTION OPERATIONS WILL BE CONTINUOUS, FUGITIVE DUST SHALL
<br />METAL STUDS CLEANING SOLVENTS `� rn " ¢
<br />C7C7UZCDLn
<br />BE MANAGED BY APPLYING A WATER SPRAY TO SATURATE THE SURFACE SOILS ON A DAILY BASIS (OR AS NEEDED) TO MAINTAIN MINIMAL DUST GLASS WOOD •, z z -LL_ o z
<br />TRANSPORT. FUGITIVE DUST SHALL BE MONITORED CONTINUOUSLY AND ADDITIONAL MEASURES MAY NEED TO BE TAKEN TO CONTROL OFF SITE TAR MASONRY BLOCK w z a ~¢ w
<br />TRANSPORT OF UNACCEPTABLE LEVELS OF DUST. SAND ROOFING SHINGLES O w ¢ � >
<br />STONE � 0- 0 N
<br />TEMPORARY STABILIZATION - TOP OF SOIL STOCK PILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY TEMPORARILY w ¢
<br />CEASES FOR AT LEAST 21 DAYS SHALL BE STABILIZED WITH TEMPORARY GRASS AND MULCH OR OTHER APPROVED MEANS, NO LATER THAN 14 DAYS SPILL PREVENTION Z z
<br />J
<br />FROM THE LAST CONSTRUCTION ACTIVITY. GRASS SEED SHALL BE A MIXTURE OF 20 PARTS OF BERMUDA AND 80 PARTS OF PENSACOLA BAHIA. THE O ~
<br />SEPARATE TYPES OF SEED USED SHALL BE THOROUGHLY DRY MIXED IMMEDIATELY BEFORE SOWING. SEED WHICH HAS BECOME WET SHALL NOT BE U
<br />USED. THE MULCH MATERIAL USED SHALL NORMALLY BE DRY MULCH. DRY MULCH SHALL BE STRAW OR HAY CONSISTING OF OAT, RYE OR WHEAT MATERIAL MANAGEMENT PRACTICES
<br />STRAW, OR OF PANGOLA, PEANUT, COASTAL BERMUDA OR BAHIA GRASS HAY. ONLY UNDETERIORATED MULCH WHICH CAN BE READILY CUT INTO THE
<br />SOIL. SHALL BE USED. AREAS OF THE SITE WHICH ARE TO BE PAVED WILL BE TEMPORARILY STABILIZED BY APPLYING STABILIZATION AND BASE. THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT SHALL BE USED TO REDUCE THE RISK OF SPILLS OR OTHER ACCIDENTAL O
<br />EXPOSURE OF MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF.
<br />PERMANENT STABILIZATION - DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY PERMANENTLY CEASES SHALL BE STABILIZED WITH V
<br />SOD NO LATER THAN 14 DAYS AFTER LAST CONSTRUCTION ACTIVITY. GOOD HOUSEKEEPING
<br />THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED ON SITE DURING THE CONSTRUCTION PROJECT. AN EFFORT SHALL BE MADE !w
<br />TO STORE ONLY ENOUGH PRODUCT REQUIRED TO COMPLETE THE PROJECT. ALL MATERIALS STORED ON SITE SHALL BE STORED IN A NEAT ORDERLY
<br />MANNER IN THEIR APPROPRIATE CONTAINERS AND IF POSSIBLE, UNDER A ROOF OR OTHER CONTAINED ENCLOSURE. PRODUCTS SHALL BE KEPT IN
<br />THEIR ORIGINAL MANUFACTURER'S LABELED CONTAINERS. SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE
<br />STRUCTURAL PRACTICES MANUFACTURER. WHENEVER POSSIBLE, ALL OF THE PRODUCT SHALL BE USED BEFORE DISPOSING OF THE CONTAINER. MANUFACTURER'S o.
<br />RECOMMENDATIONS FOR PROPER USE AND DISPOSAL SHALL BE FOLLOWED. THE SITE SUPERINTENDENT SHALL INSPECT DAILY TO ENSURE PROPER USE W
<br />AND DISPOSAL OF MATERIALS ON SITE. N
<br />EROSION PROTECTION - DURING THE CONSTRUCTION PHASES, APPROPRIATE PRACTICES INCLUDING, BUT NOT LIMITED TO SILT FENCE BARRIERS, HAY N BALES AND WATERING OR OTHER METHODS NECESSARY WILL BE IMPLEMENTED TO CONTROL FUGITIVE DUST. SEDIMENT BASINS - THE STORM WATER HAZARDOUS PRODUCTS
<br />MANAGEMENT AREAS (RETENTION AREAS) WILL SERVE AS SEDIMENT BASINS DURING THE CONSTRUCTION PERIOD. AT THE CONTRACTOR' DISCRETION, THESE PRACTICES ARE USED TO REDUCE THE RISKS ASSOCIATED WITH HAZARDOUS MATERIALS. PRODUCTS SHALL BE KEPT IN ORIGINAL CONTAINERS V�
<br />THE SEDIMENT BASINS WILL BE CONSTRUCTED TO THE DESIGN CROSS-SECTION OR A MINIMUM OF 2-FEET BELOW EXISTING GROUND TO ALLOW THE UNLESS THEY ARE NOT RESEALABLE. ORIGINAL LABELS AND MATERIAL SAFETY DATA SHALL BE RETAINED; THEY CONTAIN IMPORTANT PRODUCT
<br />SILT TO BE COLLECTED AND REMOVED PRIOR TO COMPLETION OF THE GRADING. INFORMATION. IF SURPLUS PRODUCT MUST BE DISPOSED OF, MANUFACTURER'S OR LOCAL AND STATE RECOMMENDED METHODS OF PROPER DISPOSAL
<br />SHALL BE FOLLOWED.
<br />STORM WATER MANAGEMENT PETROLEUM PRODUCTS
<br />ALL ON SITE VEHICLES SHALL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTATIVE MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE.
<br />PETROLEUM PRODUCTS SHALL BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE CLEARLY LABELED. ANY ASPHALT SUBSTANCES USED ON SITE O
<br />STORM WATER DRAINAGE WILL BE PROVIDED BY A CURB, STORM WATER AND CATCH BASIN SYSTEM FOR THE DEVELOPED AREAS. THE AREAS NOT SHALL BE APPLIED ACCORDINGLY TO THE MANUFACTURER'S RECOMMENDATIONS. Q
<br />DEVELOPED SHALL BE GRADED TO LESS THAN 2% SLOPES AND HAVE PERMANENT SEEDING OR PLANTINGS. WHEN CONSTRUCTION IS COMPLETE THE Q
<br />SITE WILL DRAIN TO STORM WATER PONDS THAT WERE UTILIZED AS THE TEMPORARY SEDIMENT BASINS DURING THE CONSTRUCTION PROCESS. ANY FERTILIZERS E.y
<br />ACCUMULATED SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT BASINS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONSTRUCT AL FERTILIZERS USED SHALL BE APPLIED ONLY IN THE MINIMUM AMOUNT RECOMMENDED BY THE MANUFACTURER. ONCE APPLIED, FERTILIZER SHALL BE
<br />RETENTION/DETENTION AREAS IN ACCORDANCE WITH THE APPROVED CONSTRUCTION PLANS. WORKED INTO THE SOIL TO LIMIT EXPOSURE TO STORM WATER. STORAGE SHALL BE IN A COVERED SHED. THE CONTENTS OF ANY PARTIALLY USED O
<br />BAGS OF FERTILIZER SHALL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID SPILLS. J
<br />SPECIFIED OTHER CONTROLS PAINTS O U.
<br />ALL CONTAINERS SHALL BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT SHALL NOT BE DISCHARGED TO THE STORM Uj
<br />WASTE DISPOSAL SEWER SYSTEM BUT SHALL BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURER'S INSTRUCTIONS OR STATE AND LOCAL REGULATIONS.
<br />CONCRETE TRUCKS: CONTRACTOR SHALL DESIGNATE AN AREA FOR DISCHARGE OF SURPLUS CONCRETE OR DRUM WASH WATER AND SHALL INSTALL A J O
<br />CONTAINMENT BERM AROUND THIS AREA TO PREVENT RUNOFF TO THE REMAINDER OF THE SITE. HARD DEBRIS SHALL BE DISPOSED OF BY Ce
<br />WASTE MATERIALS - ALL WASTE MATERIAL SHALL BE COLLECTED AND CONTAINED IN A CONTROLLED AREA PURSUANT TO STATE AND LOCAL SOLID CONTRACTOR UPON COMPLETION OF THE PROJECT. = Z
<br />WASTE REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS GENERATED FROM CONSTRUCTION IS TO BE REMOVED FROM THE SITE AND DISPOSED
<br />OF APPROPRIATELY. NO CONSTRUCTION MATERIALS SHALL BE BURIED ON SITE. ALL PERSONNEL SHALL BE INSTRUCTED REGARDING THE CORRECT m
<br />PROCEDURE FOR WASTE DISPOSAL. NOTICES STATING THESE PRACTICES SHALL BE POSTED IN THE ON SITE OFFICE TRAILER AND THE CONSTRUCTION W
<br />MANAGER RESPONSIBLE FOR THE DAY TO DAY SITE OPERATIONS SHALL BE RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE FOLLOWED. a a.
<br />HAZARDOUS WASTE - IF ENCOUNTERED, ALL WASTE MATERIALS SHALL BE DISPOSED OF IN THE MANNER SPECIFIED BY STATE AND/LOCAL LU LLI a
<br />REGULATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE FOLLOWED. N N
<br />SANITARY WASTE - ALL SANITARY WASTE SHALL BE COLLECTED FROM PORTABLE UNITS BY A LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR U.
<br />AS REQUIRED BY STATE AND LOCAL CODES AND REGULATIONS. O
<br />OFF SITE VEHICLE TRACKING V
<br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE PROVIDED TO HELP REDUCE OFF SITE VEHICLE TRACKING OF SEDIMENTS. THE PAVED STREETS O
<br />SHALL BE CLEANED AS NEEDED TO REMOVE ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS HAULING MATERIAL FROM THE mmi
<br />SITE SHALL BE COVERED WITH A TARPAULIN AT ALL TIMES. Always• • business` • • •
<br />S
<br />i H
<br />E
<br />E
<br />r T ■
<br />N
<br />0
<br />SPILL CONTROL PRACTICES
<br />IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS OF THIS PLAN, THE
<br />FOLLOWING PRACTICES SHALL BE FOLLOWED FOR SPILL PREVENTION AND CLEANUP:
<br />MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEAN UP SHALL BE CLEARLY POSTED AND SITE PERSONNEL SHALL BE MADE AWARE OF THE
<br />PROCEDURES AND THE LOCATION OF THE INFORMATION AND CLEAN UP SUPPLIES.
<br />MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEAN UP SHALL BE KEPT IN THE MATERIAL STORAGE AREA ON SITE. EQUIPMENT AND MATERIALS
<br />SHALL INCLUDE, BUT NOT BE LIMITED TO, BROOMS, DUST PANS, MOPS, RAGS, GLOVES, GOGGLES, KITTY LITTER, SAND, SAWDUST AND PLASTIC AND
<br />METAL TRASH CONTAINERS.
<br />ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY.
<br />THE SPILL SHALL BE KEPT WELL VENTILATED AND PERSONNEL SHALL WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT INJURY FROM CONTACT
<br />WITH HAZARDOUS SUBSTANCE.
<br />SPILLS OF TOXIC OR HAZARDOUS MATERIAL SHALL BE REPORTED TO THE APPROPRIATE STATE OR LOCAL GOVERNMENT AGENCY, REGARDLESS OF THE
<br />SIZE.
<br />THE SPILL PREVENTION PLAN SHALL BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND THE CLEAN UP
<br />PROCEDURES FOR FUTURE USE. A DESCRIPTION OF THE SPILL, ITS CAUSE AND THE CLEAN UP MEASURES SHALL ALSO BE INCLUDED.
<br />THE SITE SUPERINTENDENT RESPONSIBLE FOR THE DAY TO DAY SITE OPERATIONS SHALL BE THE SPILL PREVENTION AND CLEAN UP COORDINATOR. HE
<br />OR SHE SHALL DESIGNATE OTHER SITE PERSONNEL WHO WILL RECEIVE SPILL PREVENTION AND CLEAN UP TRAINING. THESE INDIVIDUALS SHALL EACH
<br />BECOME RESPONSIBLE FOR A PARTICULAR PHASE OF PREVENTION AND CLEAN UP. THE NAMES OF THE RESPONSIBLE SPILL PERSONNEL SHALL BE
<br />POSTED IN THE MATERIAL STORAGE AREA OR IN THE OFFICE TRAILER ON SITE, IF APPLICABLE.
<br />NOTICE OF TERMINATION
<br />A NOTICE OF TERMINATION SHALL BE SUBMITTED TO THE FDEP AFTER THE CONSTRUCTION HAS BEEN COMPLETED AND THE SITE HAS UNDERGONE
<br />FINAL STABILIZATION.
<br />POLLUTION PREVENTION PLAN CERTIFICATION
<br />TO THE BEST OF MY KNOWLEDGE, I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS WERE PREPARED UNDER MY
<br />DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATE
<br />THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY
<br />RESPONSIBLE FOR GATHERING THE INFORMATION SUBMITTED IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE AND COMPLETE. I
<br />AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINES AND
<br />IMPRISONMENT FOR KNOWING VIOLATIONS.
<br />NAME: TITLE:
<br />OPERATOR AND/OR RESPONSIBLE AUTHORITY
<br />SIGNATURE: DATE:
<br />CONTRACTOR'S CERTIFICATION
<br />"I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY WITH, THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA
<br />GENERIC PERMIT FOR STORM WATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES AND THIS STORMWATER POLLUTION
<br />PREVENTION PLAN PREPARED THEREUNDER."
<br />SIGNATURE
<br />COMPANY NAME AND ADDRESS
<br />RESPONSIBLE FOR
<br />COMPANY:
<br />SIGNATURE:
<br />ADDRESS:
<br />NAME:
<br />PHONE:
<br />GENERAL CONTRACTOR
<br />TITLE:
<br />DATE:
<br />COMPANY:
<br />SIGNATURE:
<br />ADDRESS:
<br />TEMPORARY AND PERMANENT
<br />NAME:
<br />STABILIZATION
<br />TITLE:
<br />PHONE:
<br />DATE:
<br />COMPANY:
<br />SIGNATURE:
<br />ADDRESS:
<br />STABILIZED CONSTRUCTION ENTRANCE,
<br />NAME:
<br />PHONE:
<br />EARTH DIKES, SEDIMENT BASIN
<br />TITLE:
<br />DATE:
<br />..A..,iP,�., .. u....F.F.r�..sl�,,.F.-....n.�.�'.we_5..,erns...,e�rrS+.�.,'�tw�a�.'.�-Y�.t. a..�.i.... . .a►ur:,.�f�k.��n�t.'� {� r. a r. t�Yit�4'Y?4�$a�i@.BY�N�kIA[NM 'W,�r.: �.ta�':...,�-. aa�.ve,,.s«,.,. ay .�..,.; r... ,,. a._. .s.. ,. .,� .-..�...r. wre,e. x�. .e ,.-..,, :... ..,�..�....,,.�........��....,.,..�,.�m�v,..v.�..�.,,.�...�.._,.o.�...,,�,..�...,,�....__�.....ru......_........._......._. _..___.......-.,`_.... ... _.. - - -