Laserfiche WebLink
LAWANDA LOOP <br />10' ASPHALT PAVEMENT <br />vuvwly tiv NEZ <br />20' ASPHALT PAVEMENT <br />WOODGATE LANE <br />20' ASPHALT PAWMEN <br />WOODSIDE LANE <br />20' ASPHALT PAVEMENT <br />--- TO-P OF <br />PROP. <br />STABILIZED <br />CONSTRUCTION <br />ENTRANCE <br />COVERED BRIDGE BOULEVARD <br />23' ASPHALT PAVEMENT <br />up <br />>--'� BEES <br />1 ' RCP <br />!NV. 75.41' <br />tT0P OF�r-� SANK <br />BER <br />OP77C <br />VAULT <br />SOIL EROSION AND SEDIMENT CONTROL NOTES <br />I. ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES ARE TO BE INSTALLED PRIOR TO ANY MAJOR SOIL DISTURBANCE, <br />OR IN THEIR PROPER SEQUENCE, AND MAINTAINED UNTIL PERMANENT PROTECTION IS ESTABLISHED. <br />2. ANY DISTURBED AREAS THAT WILL BE LEFT EXPOSED, AND NOT SUBJECT TO CONSTRUCTION TRAFFIC, WILL IMMEDIATELY <br />RECEIVE A TEMPORARY SEEDING. IF THE SEASON PREVENTS THE ESTABLISHMENT OF TEMPORARY COVER, THE DISTURBED <br />AREAS WILL BE MULCHED WITH STRAW, OR EQUIVALENT MATERIAL, AT A RATE OF TWO (2) TONS PER ACRE, ACCORDING <br />TO STATE STANDARDS. <br />3. PERMANENT VEGETATION TO BE SEEDED OR SODDED ON ALL EXPOSED AREAS WITHIN SEVEN (7) DAYS AFTER FINAL <br />GRADING. MULCHING IS REQUIRED ON ALL SEEDING. WHEN HYDROSEEDING, MULCH SHALL NOT BE INCLUDED IN THE <br />TANK WITH THE SEED. <br />4. ALL WORK TO BE DONE IN ACCORDANCE WITH THE FLORIDA STORMWATER EROSION AND SEDIMENT CONTROL <br />INSPECTION MANUAL. <br />S. A SUBBASE COURSE WILL BE APPLIED IMMEDIATELY FOLLOWING ROUGH GRADING AND INSTALLATION OF IMPROVEMENTS <br />TO STABILIZE STREETS, ROADS, DRIVEWAYS, AND PARKING AREAS. IN AREAS WHERE NO UTILITIES ARE PRESENT, THE <br />SUBBASE SHALL BE INSTALLED WITHIN FIVE (5) DAYS OF THE PRELIMINARY GRADING. <br />6. IMMEDIATELY FOLLOWING INITIAL DISTURBANCE OR ROUGH GRADING, ALL CRITICAL AREAS SUBJECT TO EROSION (I.E. <br />STEEP SLOPES AND ROADWAY EMBANKMENTS) WILL RECEIVE A TEMPORARY SEEDING IN COMBINATION WITH STRAW <br />MULCH OR A SUITABLE EQUIVALENT, AT A RATE OF TWO (2) TONS PER ACRE, ACCORDING TO STATE STANDARDS. <br />7. IN ACCORDANCE WITH THE STANDARD FOR MANAGEMENT OF HIGH ACID PRODUCING SOILS, ANY SOIL HAVING A PH OF <br />4 OR LESS OR CONTAINING IRON SULFIDES SHALL BE COVERED WITH A MINIMUM OF TWELVE (12) INCHES OF SOIL HAVING <br />A PH OF 5 OR MORE PRIOR TO SEEDBED PREPARATION. AREAS WHERE TREES OR SHRUBS ARE TO BE PLANTED SHALL BE <br />COVERED WITH A MINIMUM OF TWENTY-FOUR (24) INCHES OF SOIL HAVING A PH OF 5 OR MORE. <br />8. AT THE TIME THE SITE PREPARATION FOR PERMANENT VEGETATIVE STABILIZATION IS GOING TO BE ACCOMPLISHED, ANY <br />SOIL THAT WILL NOT PROVIDE A SUITABLE ENVIRONMENT TO SUPPORT ADEQUATE VEGETATIVE GROUND COVER, SHALL <br />BE REMOVED OR TREATED IN SUCH A WAY THAT IT WILL PERMANENTLY ADJUST THE SOIL CONDITIONS AND RENDER IT <br />SUITABLE FOR VEGETATIVE GROUND COVER. IF THE REMOVAL OR TREATMENT OF THE SOIL WILL NOT PROVIDE SUITABLE <br />CONDITIONS, NON -VEGETATIVE MEANS OF PERMANENT GROUND STABILIZATION WILL HAVE TO BE EMPLOYED. <br />9. UNFILTERED DEWATERING IS NOT PERMITTED. TAKE ALL NECESSARY PRECAUTIONS DURING ALL DEWATERING <br />OPERATIONS TO MINIMIZE SEDIMENT TRANSFER. ANY DEWATERING METHODS USED MUST BE IN ACCORDANCE WITH <br />STATE STANDARDS. <br />10. SHOULD THE CONTROL OF DUST AT THE SITE BE NECESSARY, THE SITE WILL BE SPRINKLED UNTIL THE SURFACE IS WET, <br />TEMPORARY VEGETATIVE COVER SHALL BE ESTABLISHED OR MULCH SHALL BE APPLIED IN ACCORDANCE WITH STATE <br />STANDARDS FOR EROSION CONTROL. <br />11. ALL SOIL WASHED, DROPPED, SPILLED, OR TRACKED OUTSIDE THE LIMIT OF DISTURBANCE OR ONTO PUBLIC <br />RIGHT-OF-WAY WILL BE REMOVED IMMEDIATELY. <br />12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY EROSION AND SEDIMENTATION THAT MAY OCCUR BELOW <br />STORMWATER OUTFALLS OR OFFSITE AS A RESULT OF CONSTRUCTION OF THE PROJECT. <br />13. STOCKPILE AND STAGING LOCATIONS DETERMINED IN THE FIELD, SHALL BE PLACED WITHIN THE LIMITS OF DISTURBANCE <br />ACCORDING TO THE CERTIFIED PLAN. <br />14. ALL PERMANENT SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED BY THE CONTRACTOR, AND <br />SHALL BECOME THEIR RESPONSIBILITY. <br />15. PAVEMENT AREAS ARE TO BE KEPT CLEAN AT ALL TIMES. <br />16. DURING CONSTRUCTION, ANY ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY TO PREVENT EROSION OR <br />CONTROL SEDIMENT BEYOND THOSE MEASURES SHOWN ON THE APPROVED PLAN SHALL BE INSTALLED OR EMPLOYED AT <br />THE DIRECTION OF THE MUNICIPAL ENGINEER. <br />MAINTENANCE PLAN DURING CONSTRUCTION: <br />INSPECTION AND MAINTENANCE SHALL BE PERFORMED IN CONFORMANCE WITH GP-0-15-002. ALL EROSION AND SEDIMENT <br />CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL <br />BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL <br />PRACTICES AS DESIGNED AND INSTALLED FOR THE PROJECT. SEDIMENT WILL BE REMOVED FROM BEHIND THE SILT FENCE WHEN <br />IT BECOMES ABOUT 0.5 FT DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A <br />BARRIER. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN <br />THE LANDSCAPE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. <br />SEQUENCE OF CONSTRUCTION FOR EROSION CONTROL <br />I. THE ENGINEERING INSPECTOR SHALL BE NOTIFIED IN WRITING AT LEAST 48 HOURS PRIOR TO THE START OF ANY WORK. <br />2. PRIOR TO THE COMMENCEMENT OF ANY SITE WORK THE APPLICANT SHALL INSTALL THE SOIL EROSION AND SEDIMENT <br />CONTROLS AS PER THE APPROVED PLANS, WHICH INCLUDES THE SILT FENCES AND INLET FILTERS. ALL EROSION AND <br />SEDIMENT CONTROL MEASURES SHALL CONFORM TO THE LATEST VERSION OF THE FLORIDA STORMWATER EROSION AND <br />SEDIMENT CONTROL INSPECTION MANUAL. <br />3. INSTALL TREE BARRICADES AND PROTECTIVE FENCING FOR ALL TREES TO REMAIN. <br />4. PRIOR TO INITIATING DISTURBANCE, AN INSPECTION OF THE EROSION CONTROLS IS REQUIRED AND THE COUNTY SHALL <br />BE NOTIFIED. <br />S. CONSTRUCT AND MAINTAIN THE CONSTRUCTION ENTRANCES AS SHOWN ON THE PLANS AND DETAILS. STAGING AND <br />STORAGE AREA SHALL BE SET UP IN THE LOCATIONS DESIGNATED ON THE PLANS. <br />6. DEMOLISH EXISTING SITE IMPROVEMENTS (SIDEWALKS, PAVEMENT, CURBING, BUILDING, CANOPY, ETC.) AS SHOWN ON THE <br />DEMOLITION PLAN (AS APPLICABLE). <br />7. ROUGH GRADE THE SITE BASED ON THE GRADING PLAN TO THE APPROPRIATE BUILDING PAD ELEVATIONS. EXCAVATE FOR <br />AND CONSTRUCT THE DRAINAGE IMPROVEMENTS PROGRESSING UPSTREAM. PROVIDE INLET PROTECTION ON EXISTING <br />AND PROPOSED DRAINAGE STRUCTURES. <br />8. CONSTRUCT BUILDING FOUNDATIONS. INSTALL PROPOSED UTILITIES, CURBING AND THEN PAVE (BASE COURSE) PARKING <br />AREA AND DRIVE AISLES. <br />9. STABILIZATION - THE OPERATOR SHALL INITIATE STABILIZATION MEASURES AS SOON AS PRACTICABLE IN PORTIONS OF THE <br />SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. STABILIZATION MEANS COVERING <br />OR MAINTAINING AN EXISTING COVER OVER SOIL. COVER CAN BE VEGETATIVE (E.G. GRASS, TREES, SEED AND MULCH, <br />SHRUBS, OR TURF) OR NON -VEGETATIVE (E.G. GEOTEXTILES, RIP RAP, OR GABIONS). <br />10. MAINTENANCE - SEDIMENT SHALL BE REMOVED FROM SEDIMENT TRAPS WHENEVER THEIR CAPACITY HAS BEEN REDUCED BY <br />TWENTY-FIVE (25) PERCENT FROM THE DESIGN CAPACITY. A FIXED VERTICAL SEDIMENT DEPTH MARKER SHOULD BE <br />INSTALLED TO MONITOR THE CAPACITY. <br />11. FINALIZE CONSTRUCTION OF SITE IMPROVEMENTS INCLUDING THE BUILDINGS, SIDEWALKS, LANDSCAPE AREAS, SIGNAGE, <br />LIGHTING AND ANY OTHER OUTSTANDING ITEMS. <br />12. AFTER COMPLETION OF CONSTRUCTION, FINISH GRADE TO FINAL ELEVATIONS AND APPLY SEED OR SOD ON ALL LAWN <br />AREAS. <br />13. AFTER STABILIZATION HAS BEEN ESTABLISHED CLEAR DRAINAGE PIPES AND STRUCTURES OF ANY SEDIMENT WHICH MAY <br />HAVE ACCUMULATED. REMOVE ALL EROSION CONTROL DEVICES. <br />14. MAINTAIN ALL LAWN AND LANDSCAPED AREAS TO ENSURE A VIABLE STABILIZED VEGETATIVE COVER. <br />15. ADDITIONAL EROSION CONTROL MEASURES SHALL BE INSTALLED, AS MAY BE REQUIRED AND REQUESTED BY AUTHORITIES, <br />TO PREVENT THE INCIDENTAL DISCHARGE OF SILT LADEN RUNOFF FROM ENTERING A WATER COURSE OR A DRAINAGE <br />SYSTEM. <br />16. THE GENERAL PERMIT FOR STORM WATER DISCHARGES FROM CONSTRUCTION ACTIVITIES STATES THAT IT IS UNLAWFUL <br />FOR ANY PERSON TO CAUSE OR CONTRIBUTE TO A VIOLATION OF WATER QUALITY STANDARDS. <br />LEGEND <br />-X X- = SILT FENCE <br />= INLET PROTECTION <br />= CONSTRUCTION ENTRANCE <br />= STAGING AREA <br />LOD = LIMIT OF DISTURBANCE <br />-X X- = TREE BARRICADES <br />}i 5•N. I} =STOCK PILE <br />N <br />50 0 50 100 <br />SCALE: 1" = 50' <br />ER <br />Customer Loyalty through Client Satisfaction <br />www.maserconsuIting.com <br />Office Locations: <br />■ NEW JERSEY ■ NEW MEXICO <br />■ NEW YORK ■ MARYLAND <br />■ PENNSYLVANIA ■ GEORGIA <br />■ VIRGINIA ■ TEXAS <br />■ FLORIDA ■ TENNESSEE <br />■ NORTH CAROLINA ■ COLORADO <br />State of F.L. C.O.A.: 30301 / LB7388 <br />Copyright © 2021. Maser Consulting. All Rights Reserved. This <br />drawing and all the information contained herein is authorized for <br />use only by the parry for whom the services were contracted or to <br />whom it is certified. This drawing may not be copied, reused, <br />disclosed, distributed or relied upon for any other purpose without <br />the express written consent of Maser Consulting, P.A. <br />rem PROTECT YOURSELF <br />ALL STATES REQUIRE NOTIFICATION OF <br />o EXCAVATORS, DESIGNERS, OR ANY PERSON <br />PREPARING TO DISTURB THE EARTH'S <br />SURFACE ANYWHERE IN ANY STATE <br />Know what's below. <br />Call before you dig. <br />FOR STATE SPECIFIC DIRECT PHONE NUMBERS <br />VISIT: WWW.CALL81 I.COM <br />Z <br />i <br />V <br />OU <br />Z <br />E <br />� <br />O <br />O <br />U <br />� <br />a <br />o <br />a <br />Z <br />0 <br />O <br />Z <br />Z <br />EZ <br />Z <br />O <br />Z <br />O <br />F <br />r <br />Z <br />F <br />U <br />U <br />O <br />� <br />� <br />Z <br />a <br />a <br />C <br />U <br />o <br />0 <br />0 <br />N <br />N <br />N_ <br />so <br />W <br />° <br />W <br />o <br />r <br />W <br />W <br />r <br />m <br />Z <br />Q <br />° <br />W <br />0 <br />0 <br />N <br />0 <br />` <br />STUART ROGERS <br />FLORIDA PROFESSIONAL <br />ENGINEER - LICENSE NUMBER: 42718 <br />PRELIMINARY PLAT & <br />IMPROVEMENT PLAN <br />FOR <br />AUTUMN PALM <br />DRIVE, LLC <br />PARCEL ID: <br />15.26.21.0030-08100.0010 <br />CITY OF ZEPHYRHILLS <br />PASCO COUNTY <br />FLORIDA <br />TAMPA OFFICE <br />5471 West Waters Avenue <br />Suite 100 <br />Tampa, FL 33634 <br />- Phone: 813.207.1061 <br />Fax: 813.281.1050 <br />SCALE: DATE: I DRAWN BY: I CHECKED BY: <br />AS SHOWN 12/31/19 AM SMR <br />PROJECT NUMBER: DRAWING NAME: <br />19002495A C-SESC <br />SHEET TITLE: <br />SOIL EROSION & <br />SEDIMENT CONTROL PLAN <br />SHEET NUMBER: <br />I I of 21 <br />NOTE: DO NOT SCALE DRAWINGS FOR CONSTRUCTION <br />