Laserfiche WebLink
• <br />Cb <br />0) <br />0 <br />M <br />�b <br />90 <br />w/ <br />C�) C�) <br />Existing Fire Hydrant <br />C <br />coo� <br />IN) <br />eA) <br />to be Relocated <br />• <br />158' <br />--------------- t 1 11 <br />-------------- ---------- I ----- <br />------------- r <br />T <br />"'Y <br />40 <br />C) <br />(9- <br />End Phase I Trail <br />Property Line CIO <br />88 - 8 7 -8 6 - - 861 <br />90 - 8 7 <br />.. . ....... <br />Q) <br />• 135' 50' 88 - ----- <br />-240L <br />32 LF of <br />10' Trail - 4427 SY of Turning <br />Lane and <br />Driveway Future East ROW <br />asphalt pavement <br />A q <br />16 <br />0 0 . . . . ...... <br />A;f�r) CO <br />. .......... - ----- �0 <br />cv� 0 Q Q <br />j <br />9 80'swale @ 0.5% <br />0) 429 LF of 10'Trail <br />swe <br />0 @ 0.,5 -86 <br />61 Future East ROW <br />10'Shoulder- 0 7� (0 <br />60'swale 2.0% Q; <br />Q) <br />- - - - - - - - - - - - - - a..._--- - - <br />114,- - - - - - - - - - - - - - --- - - - - - - - - <br />A <br />015 <br />CO <br />• <br />C, <br />Q) <br />Ji <br />_c). <br />E <br />VL <br />Q) <br />(b <br />ew <br />- - - - - - - - - --- - --- - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br />ad <br />------------- <br />C) <br />Proposed Edge of,*vement Existing East ROW <br />C)- 1�k <br />0) <br />CO CO <br />CO 0) <br />40 <br />Q) 0-45---- <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - <br />•CO <br />LI) t7 <br />('V <br />Relocated Fire Hydrant <br />42 LF of 6" DIP <br />70 11 <br />2 - 90' Elbows 0)" 7 <br />clob' <br />Existing 12 "Water Main Existing 4" Force Main <br />Ramp & Detectable !2 Existing Right -of -Way <br />46.3 LF of 12" Steel Casing Pipe Warning per FDOT <br />Existing Pumping Station Jack & Bore per Pasco County Standards Index #304 (Typ.) 11,1119 SY of Widening Existing Edge of pavement 30 LF of Future 8"Water Main in Right -of -Way <br />(See Utility Sheets for Details) Pavement See OffsiteDownmnnf Widening Detail <br />1 1. 1 14 LF of Proposed Type "D" -1: �- "bi - See I urning Lane and <br />18 LF OT Proposed 8 Water Main in Right -of -Way Curb <br />Wet Tap Contractor to install <br />\- Provide temporary construction water 4"x4" tapping sleeve and 4" <br />service per Pasco County detail 01 Gate Valve. <br />- Wet Tap Contractor to install 8"x12" <br />tapping sleeve and 8" Gate Valve. <br />NORTH <br />Existing 12" Oak tree to be <br />removed (see landscaping <br />plans for details) <br />II <br />In <br />118 SY of pavement <br />in the Right -of -Way <br />1�89.4o , <br />Widening Detail Existing Sidewalk c- 1.50 <br />See Offsite Pavement 3ij <br />O DO \ <br />OHP - OHP - GHP 0HP 0HP QHP90--'9 41P - GHP 70hp OHP P OHP <br />C; - - - - - - - - - - - - - - - - - - --- - --1 -17 89.79 <br />... ..... ........ . ..... .......... .. ........ .......... ... . ..... .... . <br />90.69 90.52 90.09 <br />E 9 1.78 90-32 <br />0 <br />Z <br />Existing Edge of pavement <br />90.08 <br />0 <br />(b <br />69 <br />0 <br />.30 <br />0 <br />Existing Right -of -Way $9.4� <br />• C <br />.33 <br />CL Proposed Edge of pavement <br />0I 04 <br />ly C14 <br />Existing Water Valve add <br />concrete collar & raise box <br />to match pavement elevation <br />II <br />89 Existing North Right -of -Way <br />Existing Edge of pavement <br />- - -- - - - -- - -- - -- Aso--- - --- <br />HP OHP ��P Ohl QHF HP'--}- Lill UHP ------- alp GHP QHP OHP UHP OHP HP Ulf` OHP OHP <br />89.75 <br />89.70 -89059 89.18 <br />90.10 0 <br />CP 89.86 89.55 <br />T <br />--N <br />89.23 <br />Driveway Pavement Future Wet Tap <br />Detail <br />Overlay existing pavement with 1" of FC - 9.5 asphaltic concrete along this length <br />FORT KING ROAD (County Road) - Phase 1 <br />j DAUGHTERY ROAD <br />§i <br />(County Road) <br />roperty Line <br />5' Sidewalk <br />Existing South Right -of -Way <br />• 88.06 <br />Detectable Warning per FDOT Index #304Sheet 6 of 6 (Typ.) <br />Sidewalk <br />NOTES: <br />1. No track type equipment will be allowed on any asphaltic or concrete surfaces. <br />I <br />I <br />NOTES: <br />1. Turnout shall bo constructed in accordance with FDOT Index #515 <br />2. Right turn lane shall be constructed in phase 1. <br />3. No track type equipment will be allowed on any asphaltic or concrete surfaces. <br />4. Safe pedestrian will be maintained at all times. <br />5. Any sidewalk, v�hich becomes undermined, must be removed and replaced. <br />6. Sidewalk connections to roadways must meet current A.D.A. standards per F.D.O.T. index 304. <br />7. Pasco County shall have no maintenance obligation in this area. <br />8. All traffic contro devices, i.e.; Warning / Construction type signs will comply with <br />F.D.O.T. standard:3 during the construction phase. <br />9. All existing drainage to be maintained and restored to design flow lines. <br />10. No work, exce )t for emergency type, will be preformed after sundown and before sunrise. <br />11. NO OPEN CU FS without specific approval from the County Engineer. <br />Trail Pavement Section <br />101-01, Broom finish <br />4 <br />8" Su:)grade = 12" of Type B Stabilization with <br />compacted subgrade to 98% MP (LBR 40) <br />Turning Lane and Driveway Pavement <br />Structural Course = 2.5" Asphaltic concrete (Type S-3) <br />1* <br />Base = 6" of crushed concrete <br />For additional detail <br />see sidewalk details <br />on sheet 19 <br />Structural Number Required = 3.00 <br />- Subgrade = 12" of Type B Stabilization with 2.5 x 0.44 = 1.10 <br />compacted subgrade to 98% MP (LBR 40) 6 x 0.18 = 1.08 <br />12 x 0.08 = 0.96 <br />Structural Number Provided = 3.14 <br />Offs1te Pavement Widening <br />Friction Course = 1" FC 9.5 <br />Structural Course = 3" Asphaltic concrete (Type S-3) <br />Base = 6" of crushed concrete <br />Subgrade = 12" of Type B Stabilization with <br />compacted subgrade to 98% MP (LBR 40) <br />Structural Number Required = 3.70 <br />1 x 0.44 = 0.44 <br />3 x 0.44 = 1.32 <br />6 x 0.18 = 1.08 <br />12 x 0.08 = 0.96 <br />Structural Number Provided = 3.80 <br />5 <br />Revised offsite storm <br />09/30/10 <br />pipe. Added notes. <br />4 <br />Changed 5' sidewalk <br />08/31/10 <br />to 10' trail. <br />Added ditch & DBI on <br />west side of entrance <br />of Fort King Road. <br />3 <br />Updated per new Site <br />07/15/10 <br />Plan. <br />2 <br />Revised per County <br />10/30/08 <br />comments. <br />1 <br />Per City comments. <br />05108/08 <br />No. <br />Revisions <br />Date <br />co <br />0- <br />Cl) <br />co <br />-0 <br />.r <br />E <br />0 <br />(D <br />yj <br />LL <br />C: <br />C: <br />O <br />0 <br />EL <br />E <br />0 <br />C: <br />=3 <br />0 <br />-0 <br />0 <br />( <br />co <br />UL) <br />0 <br />=3 <br />C: <br />C: <br />o <br />0) <br />::3 <br />C: <br />0 <br />>1 <br />-r- <br />-0 <br />0Co <br />a) <br />N <br />Co <br />-o <br />LL <br />4- <br />CO <br />0 <br />0 <br />C) <br />0 <br />LL <br />Civil Engineer <br />Carlos A. Vasquez, <br />20684 <br />o <br />November 11, 2010 <br />Date <br />Drawn: <br />YZY <br />Checked: <br />Scale: <br />1 91=30' <br />Dwg: III 060�4*, �u <br />Job No: <br />1372-10 <br />Sheet <br />Of 27 <br />13 <br />Sheets <br />