fJ C—'Nava— 3—,RR—3"-r,lawaa prrav^.SWwlbunnbvrK®^aato SrwCWmbvualm--r:
<br />6.3.1 MarkoN aM cut tN six opening as foRaws, emusVp thx 9se eMs d tN opneig ship n W. 6_1c F—a arw eM
<br />wags and a text U wh from hip and rage intanectom ortlaralrwys.
<br />w PER Rage 9aard Wt a 2/Bim opening w each ode d tN rld&[Figm A).
<br />e ii Raga goats Cmal-5/Nuts Da , on exhsidedtlre'age(figure 9).
<br />No H(d{)e Board With Ridge; Boam,
<br />6.3.2 gxam,. Apoly. He ad d iakore t.*ft pr mot cementmiN UndHvdl d the Duns GRk.arp trot, epgesanain
<br />eaposed eMs, endurine iN "ripe edges whxe the vent meets tN shingles are sealed -a 1N ca.. a aasmry
<br />cemem.
<br />6.3.3 WaRFUNRaidaR: Sunirpx eneeM ottN sbt, phce ttmer and conform tN Cobn•rpW veal ovx lM slot wRh [ne
<br />sent urmq agaimt tN roof:urrau. emurlrp tN yen exerts pea tN sW1 "'Mina' bF at lease limn.
<br />6.3.4 Faxenars: For Cobra• Rpa Vain 3", Cobra- Rigid Vem 3—"r, (oba• Slow CawUy Ativamed" art Cuba• Srmw
<br />Caro. AManttd'•-r-I,. use IN r' NFhaM aads(imWded). Fa'Coba• Snow CpnW uuaaBsatWai%-
<br />W[h or Wrper. Nails mea always prwhate almph plywood dl cks a at kaa %J h Imo wand Banks. NOTE: GO
<br />recommeMs 3mcn rim skit Haas br imeeaud uplift resetance.
<br />6.3.5 S .4aE. AttxM1 tN vein anon though tN pe nsolded nad6p holes bcxetl x 3, IT 24, 36 art 45 imh from tN
<br />pan "(Moen 48 n mp*ce
<br />6.3.6 btab. 4pDy Me bseouem faba rigs taRtimu oyn tN krpM oftN rage udxgeN WMap/wtlxaP ohs.
<br />6.33 Ridge Shkglla>_ lamall lalp ,hag* accwdame wits shingle ma,fa tes puhihhed imolaton imtrunlon,,
<br />a,, Halls detaiW n6.34. Anal line,inscribed w top d tN Coda• rigid vein to. -asp Nlde
<br />C-0 heartsdpulp, LLG
<br />TvdAwuryauwwwtln,assal
<br />P.Nluatim Report m5af @.eLRf
<br />il6M)ip
<br />mynaroaro2/edas
<br />naesde
<br />]. Btgngre PFNS RFpw6MFM5:
<br />M reWked 4 tW& ilgO 11 or AidNldy Ha g YariSdktron m wan b WIWN cIWaM the Instahatim d tba,•duct.
<br />B. M.ad,,.niRww Punk,:
<br />Comact the mandanurnm the nanwd qA Malay for idf—atwn nn Darns 1—lode' Rvk 61G20.3-I Vein—
<br />9. Qdx Aatxawc, Eam
<br />M uL—CIUA9625; le4T) 664.3281
<br />END M EVALUATION REPOgT-
<br />,.arwR«ara.x oars', tu. twaxa Rym.mseF.wsap
<br />fera/Aesa Ya•Rwweavnaaa IT6i6)#F
<br />rasyeFda
<br />7 a, 11'
<br />u ca.•Emca tgxra•
<br />FAA Cm sotp 63.t.
<br />6,42 Tex. 1-1oot sestson to W used asp t<mpatefalam, tN vemM(I". EslaM cemx tN tempFwM/looter aces
<br />tN ridge ap sMngles at tN beginning AtN vent Alt. Note tN Wca d IN Nffie (figure N). Make sure b tlo tnls
<br />It lsoasends d tN %saaNahpn.
<br />y z /
<br />64.3 Measure the d'ntantt ham theedrIf IN roof,Wt to tN epterror haR*(D). Evaiblhh a tfs hz aWng v-Medthe
<br />loge (figure I). Unroll tN vein aM use tN a ,Wdl 1-3/4"xrh pmv— roofing nags W attach the faa ark & Its
<br />ridge vent with tN Manor d tN INN* nip Rd wah tN chalk lira ft., 1). P,, M d wit, .,t the V i a —al
<br />EasyTttr— Iva—w antom aae the vein to tN •''opiate length. It— EasyTeaf" system can as he al kiid. uu a
<br />Batty knife b site tN t. Nag Ran WD t, are embossed on tN pan as a gape br papevtY xbchhp vein b the
<br />fool. The veins dd Nl lnedw6imM1cen*%�figure g).
<br />I
<br />6.4.4 Ni When Iaaening the vent art cap d0NIes, be sure that the W 1 3/4-1, call awls comp*tely pnetrate
<br />plywood x prodde at Na. 3/4-Imh pmtrnion imn wand Dan.. In tN eau Ike/ do riaih
<br />that peovaetN mtluired peat ltN ha Psoceetlwith anxM1ingtlwodediN ventWNn begimang ta'uil dawn
<br />tN sxoM sae, do NOT be61n at mtl; NgW between tN fast. art sxoM frrot sections era then rebrn to
<br />Ixten tN Ilrst ore -foot wNton.lns will •lbw for popx fR.
<br />RmsrrA art EMM-1- Fwlw*n mNatinmslRmacw
<br />v.p
<br />f�gswregAa.vn•eeaCp fl{36TaB
<br />alaraWnp:IvRF /
<br />6de
<br />6.45 Instal ridge sM1irp*s W accpdame w%h shin,k mamdanurefs PSINNIied kaalbton instructions In tra, W"mm
<br />w top of tN ridge vent Rr prtger IappVp.
<br />66 leuSUN•Roa Vtwr:
<br />6.5.1 DO NOT uu on Mlas.
<br />6.5.2 Intail ImSau• Rage Veal before imtallmg tN fwd sates.
<br />6.5 3 Aftar de aaaang Nae dal leapt, If TULata• Ralp V t'Mowed (1 Wa veMatrpn), determine the ne[mury
<br />,lea apeairg M dr"ofl aM ca tN ,Wt "'Haig, -ng tN ends ofRw ""'Mstop at least 6 inch hom I" end
<br />v andaaI t/2' h hen hp aMhdge mtersxtun achimneys.
<br />6.53.1 Roofs a*taIat Hale baud W, a 2/8wmn opening nongtNridge m each JFigme A)
<br />65.3.2 goof, wNn a,Wp board' Cut I V men opnap alaig tN Mp an exh side tfigvre 6)
<br />6.64 ImtaN an 1&inch wide upon of ASTM D39T8 self-ad]R*Wg leak barvkr iM1oaWg FWMe Matewde prodat AppoWl or
<br />Appoud on a EOoI Baas) from iN edge d tN edge sbt erteiaup down inwards tlk rod axle on horn side of we
<br />sbt.
<br />6.55 %xe LN Tau W Rage Vent 'roar the Bile FWt, "poked- art c ,d over IN ntlF sea, art atucts usf
<br />m 3 h leap mg-shaM nails though d Epee -mottled rail Nees an tN vea, heated 3 W from tN enm IN
<br />9 h c. fasteners sNM pnetrek tMorpM1 pywood decks a embed minmum N"xch into roots D,M dales.
<br />6.5 6 Connmm mea tN kn6d' d am ridge, amine tN iv*/fema* connectors b comxt unity Eat— the T - had MMs
<br />ksckrde tN prt maaeE end caps CPver ap epposM nail NMs on iN vMnt rout, siNcme Hulk. lntag a bead d e -
<br />paCe sY'%aN uxant a[ tN downsope Wdmg edges d tM1e edge vent x the',crap^ d tN kaMp Mge M tN
<br />W. Miner beWw
<br />6.51 I IN top man of TmWW fie• dates, ti e,Mcak" IN 8 Mdslum Bamer >M 1,iAlate• file, data, 'm
<br />cadame -a WF p blN inst 1l .-nsnuttWrss. I—K TmSat t kn sea es wnh 10 h eapsaa usiip
<br />mt-5/841Rn Wry de Y screws through pe dak,d l ks thr gh tN dpv to engage the wood deck.
<br />FxeMA4sah NW dNipS LLC
<br />vanma.Ia.rwad.,sm
<br />,valaatbn ra W't m 506ALN-gf
<br />u2v n
<br />rwr*nR.o aai
<br />ropey DF
<br />REVISIONS
<br />NO DAl"E DESCRIPTION
<br />y �
<br />C •2 8 3
<br />� C
<br />L � &
<br />9 a
<br />C �a`
<br />E
<br />U .
<br />o a
<br />m LL 'yC
<br />m � m
<br />N p �
<br />m <
<br />E
<br />D'g W
<br />2 g
<br />d
<br />sLUps
<br />� 3m'
<br />J
<br />5 Z
<br />NON W
<br />LL >
<br />a RL
<br />CL C)
<br />Q
<br />U-
<br />U Q
<br />O X
<br />w 7
<br />a co
<br />ocli
<br />R It
<br />O
<br />_I
<br />LL
<br />JOB NO.
<br />DATE
<br />F13C 2014
<br />DRAWN BY
<br />MANUFACTURE
<br />SHEET NO.
<br />GAF - 2
<br />
|