Laserfiche WebLink
14'-0" <br />25'-4" _ <br />r — — <br />i <br />SAMPLE LINE <br />SEE SHEET C-10/C-11 <br />11 <br />t° z <br />o3 <br />r <br />1/2" HDPE SAMPLE <br />24" DIP AND- <br />1/2- HDPE <br />I N STALLED <br />BY OTHERS-f <br />12" x 1" SERVICE SADDLE <br />WITH 1" GATE VALVE <br />nurr <br />WATER LINE <br />(200 PSI) <br />WALL FAN <br />LOCATED NEAR CEILING <br />STORAGE TANK <br />(SEE NOTE 1) <br />1uIn111 <br />a�w Ii <br />�,1"�r�•N' •s•• V _'fI SEAL <br />s;t0� <br />• i <br />' S ` <br />t�i : qTF <br />(A Af <br />NA fill <br />f+++7 <br />MATTHEW S. LOVE, P.E. <br />No. 66118 <br />SEAL <br />WELL HOUSE MECHANICAL PLAN <br />12" 0 1' 2' 3' 4' 5' <br />1/2" = 1'-0" <br />st4**,&CREED <br />3802 Ehrlich Road, Suite 306 <br />Tampa, FL 33624 <br />Phone: (813)549-3740, Fax: (813)549-3744 <br />EB0006691 <br />www.mckimcreed.com <br />1/2" EXP. JOINT <br />6'-8" DOUBLE DOORS <br />10'x5' PAD <br />�p$ CITY OF ZEPHYRHILLS <br />5335 8th Street <br />Zephyrhills, FL 33542 <br />Phone: (813)780-0000 <br />4'x4' PAD <br />1/2" EXP. JOINT <br />HOSE BIBB <br />& RACK <br />LINK SEAL <br />STORAGE TANK <br />(SEE NOTE 2) <br />CONCRETE <br />WELL H EAD <br />PEDESTAL <br />PRODUCTION WELLS <br />No. 11 AND No. 12 <br />WELL SITE IMPROVEMENTS <br />WELL HOUSE PLAN <br />TYPICAL OF 2 <br />EX. WELL #11 WELL HEAD <br />N:1437703.95 <br />E: 602832.28 <br />EX. WELL #12 WELL HEAD <br />N:1437690.98 <br />E: 605850.33 <br />BACKUP <br />POWER <br />CONNECTION <br />NOTES: <br />1. 12.5% SODIUM HYPOCHLORITE TO BE STORED <br />IN A 500 GALLON DOUBLE WALLED STORAGE <br />TANK TO BE SUPPLIED AND INSTALLED BY <br />ODYSSEY MFG. <br />POLYPHOSPHATE TO BE STORED IN A 100 <br />GALLON DOUBLE WALLED STORAGE TANK TO <br />BE SUPPLIED & INSTALLED BY ODYSSEY MFG. <br />12.5% SODIUM HYPOCHLORITE CHEMICAL. <br />FEED SYSTEM TO BE SUPPLIED AND <br />INSTALLED ON SHELF BY ODYSSEY; SHELF <br />SUPPLIED AND INSTALLED BY CONTRACTOR. <br />12.5% POLYPHOSPHATE CHEMICAL. FEED <br />SYSTEM TO BE SUPPLIED AND INSTALLED ON <br />SHELF BY ODYSSEY; SHELF SUPPLIED AND <br />INSTALLED BY CONTRACTOR. <br />ALL ABOVE GROUND PIPE AND FITTINGS 4" <br />AND GREATER SHALL BE FLANGED DUCTILE <br />IRON. <br />ALL ABOVE GROUND VALVES 4" AND <br />GREATER SHALL BE FLANGED. <br />ALL BELOW GROUND PIPE, FITTINGS AND <br />VALVES 4" AND GREATER SHALL HAVE <br />RESTRAINED JOINTS ON THE WELL HOUSE <br />SITE. <br />8. CHEMICAL FEED LINES SHALL BE 1/2" <br />POLYTUBE SUPPLIED BY THE CONTRACTOR. <br />THE POLYTUBING SHALL BE INSTALLED IN 2" <br />SCH 80 PVC UNDER SLAB. THE 2" SCH 80 <br />PVC CONTAINMENT PIPE SHALL BE BROUGHT <br />3" ABOVE THE SLAB WITH A 2" CAP AND <br />1/2- TAP. (TYP) <br />DATE: <br />FEBRUARY 2012-I <br />MCE PROJ. <br /># 4584-0003 <br />DRAWN <br />QES <br />DESIGNED <br />BTN <br />CHECKED <br />JSL <br />PROJ. MGR. <br />MSL <br />SCALE <br />HORIZONTAL: <br />1/2' = 1'-0" <br />VERTICAL: <br />NA <br />M-1 <br />STATUS: REVISION <br />ISSUE FOR BID <br />e• <br />