CONSTRUCTION NOTES <br />SAFETY <br />1. DURING THE CONSTRUCTION AND MAINTENANCE OF THIS PROJECT, ALL SAFETY <br />REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR HIS REPRESENTATIVE SHALL BE <br />RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE TRAVELING PUBLIC AND THE SAFETY <br />OF HIS PERSONNEL <br />2. THE CONTRACTOR'S MAINTENANCE OF TRAFFIC PLAN MUST BE SUBMITTED AND APPROVED <br />BY THE GOVERNMENTAL AGENCIES WAVING JURISDICTION PRIOR TO BEGINNING ANY <br />CONSTRUCTION ACTIVITIES. <br />3. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA IN <br />THE FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION. <br />4. CONTRACTOR SHALL PROVIDE AND MAINTAIN ITS OWN SAFETY EQUIPMENT IN ACCORDANCE <br />WITH ITS HEALTH k SAFETY PROGRAM AND ALL OTHER APPLICABLE LEGAL AND HEALTH <br />AND SAFETY REQUIREMENTS. THE CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING ITS <br />EMPLOYEES AND SUBCONTRACTORS WITH ADEQUATE INFORMATION AND TRAINING TO ENSURE <br />THAT ALL EMPLOYEES AND SUBCONTRACTORS AND SUBCONTRACTORS' EMPLOYEES COMPLY <br />WITH ALL APPLICABLE REQUIREMENTS. CONTRACTOR SHALL REMAIN IN COMPLIANCE WITH <br />ALL OCCUPATION SAFETY AND HEALTH REGULATIONS AS WELL AS THE ENVIRONMENTAL <br />PROTECTION LAWS. THE FOLLOWING IS NOT TO BE PERCEIVED AS THE ENTIRE SAFETY <br />PROGRAM BUT JUST BASIC REQUIREMENTS. <br />5. ALL EXCAVATIONS BY THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF THE <br />DEPARTMENT OF LABOR'S OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION RULES AND <br />REGULATIONS. PARTICULAR ATTENTION MUST BE PAID TO THE CONSTRUCTION STANDARDS <br />FOR EXCAVATIONS, 29 CFR PART 1926, SUBPART P. <br />8. THE MINIMUM STANDARDS AS SET FORTH IN THE CURRENT EDITION OF 'THE STATE OF <br />FLORIDA, MANUAL ON TRAFFIC CONTROL AND SAFE PRACTICES FOR STREET AND HIGHWAY <br />CONSTRUCTION, MAINTENANCE AND UTILITY OPERATIONS' SHALL BE FOLLOWED IN THE <br />DESIGN APPLICATION, INSTALLATION, MAINTENANCE AND REMOVAL OF ALL TRAFFIC CONTROL <br />DEVICES, WARNING DEVICES AND BARRIERS NECESSARY TO PROTECT THE PUBLIC AND <br />WORKMEN FROM HAZARDS WITHIN THE PROJECT LIMITS. <br />7. ALL TRAFFIC CONTROL MARKINGS AND DEVICES SHALL CONFORM TO THE PROVISIONS SET <br />FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES PREPARED BY THE U.S. <br />DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION. <br />8. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY AND ENFORCE <br />ALL APPLICABLE SAFETY REGULATIONS. THE ABOVE INFORMATION HAS BEEN PROVIDED FOR <br />THE CONTRACTOR'S INFORMATION ONLY AND DOES NOT IMPLY THAT THE OWNER OR <br />ENGINEER WILL INSPECT AND/OR ENFORCE SAFETY REGULATIONS. <br />9. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND <br />SHALL PROVIDE AT LEAST 48 HOURS NOTICE TO THE UTILITY COMPANIES PRIOR TO <br />CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES. CALL <br />SUNSHINE ONE CALL AT 811 TO ARRANGE FOR FIELD LOCATIONS. <br />10. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, <br />ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE WORK PERFORMED <br />BY THE CONTRACTOR CALLED FOR IN THIS CONTRACT. <br />11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXCAVATIONS AGAINST <br />COLLAPSE AND WILL PROVIDE BRACING, SHEETING OR SHORING AS NECESSARY. <br />DEWATERING METHODS SHALL BE USED AS REQUIRED TO KEEP TRENCHES DRY WHILE PIPE <br />AND APPURTENANCES ARE BEING PLACED. <br />EXISTING TREE PROTECTION NOTES: <br />1. REQUIRED BARRICADES AND FLAGGING SHALL BE ERECTED BY THE CONTRACTOR AND <br />APPROVED BY THE ENGINEER AND REGULATORY AGENCIES PRIOR TO COMMENCEMENT OF <br />LAND ALTERATION ACTIVITIES. BARRICADES SHALL REMAIN IN PLACE UNTIL ALTERATION AND <br />CONSTRUCTION ACTIVITIES ARE COMPLETED. <br />2. DURING LAND ALTERATION AND CONSTRUCTION ACTIVITIES, WITHIN THE DRIPUNE OF A TREE <br />REMAINING ON SITE, UNLESS OTHERWISE APPROVED. IT SHALL BE UNLAWFUL TO REMOVE <br />VEGETATION, EXCEPT BY HAND, 13Y GRUBBING OR TO PLACE SOIL DEPOSITS, DEBRIS, <br />SOLVENTS, CONSTRUCTION MATERIAL, MACHINERY OR OTHER EQUIPMENT OF ANY KIND <br />WITHIN THE DRIPUNE OF A TREE TO REMAIN ON THE SITE <br />3. ADEQUATE PROTECTION MEASURES (I.E. HAY BALES, BAFFLES, SODDING AND SANDBAGGING) <br />SHALL BE PROVIDED, AS NECESSARY, TO MINIMIZE EROSION AND DOWNSTREAM <br />SEDIMENTATION CAUSED BY SURFACE WATER RUNOFF ON EXPOSED LAND SURFACES. <br />4. ALL TRIMMING UNDERTAKEN ON A TREE PROTECTED BY THE PROVISIONS OF THE LAND <br />DEVELOPMENT CODE SHALL BE PRUNED IN ACCORDANCE WITH THE AMERICAN NATIONAL <br />STANDARDS INSTITUTE (ANSI) A-300 PRUNING STANDARDS. THIS INFORMATION MUST BE <br />CLEARLY IDENTIFIED ON THE CONSTRUCTION PLANS. <br />CLEARINGMEMOLITION <br />1. PRIOR TO ANY SITE CLEARING, ALL TREES SHOWN TO REMAIN AS INDICATED IN THE <br />CONSTRUCTION PLANS SHALL BE PROTECTED IN ACCORDANCE WITH LOCAL TREE <br />ORDINANCES AND DETAILS CONTAINED IN THESE PLANS. IT SHALL BE THE CONTRACTOR'S <br />RESPONSIBILITY TO MAINTAIN THESE TREES IN GOOD CONDITION. NO TREE SHOWN TO <br />REMAIN SHALL BE REMOVED WITHOUT WRITTEN APPROVAL FROM THE REGULATORY AGENCY <br />OR THE OWNER. <br />2. THE CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS OF THE SITE <br />NECESSARY FOR CONSTRUCTION. DISTURBED AREAS WILL BE SEEDED, MULCHED, SODDED <br />OR PLANTED WITH OTHER APPROVED LANDSCAPE MATERIAL IMMEDIATELY FOLLOWING <br />CONSTRUCTION. <br />3. REMAINING EARTHWORK THAT RESULTS FROM CLEARING AND GRUBBING OR SITE <br />EXCAVATION IS TO BE UTIUZED ON -SITE IF REQUIRED, PROVIDED THAT THE MATERIAL IS <br />DEEMED SUITABLE FOR CONSTRUCTION BY THE OWNER'S SOILS TESTING COMPANY. EXCESS <br />MATERIAL IS TO BE EITHER STOCKPILED ON THE SITE AS DIRECTED BY THE OWNER OR <br />OWNER'S ENGINEER, OR REMOVED FROM THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR <br />ACQUIRING ANY PERMITS THAT ARE NECESSARY FOR REMOVING EXCESS EARTHWORK FROM <br />THE SITE. <br />4. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIALS SHALL BE DISPOSED OF <br />OFF -SITE IN ACCORDANCE WITH APPLICABLE REGULATORY AGENCY REQUIREMENTS. <br />5. CONTRACTOR WILL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND <br />WILL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL, PURSUANT TO ALL FEDERAL, <br />STATE, COUNTY, CRY OR OTHER GOVERNMENT AGENCY REQUIREMENTS. OF ALL <br />UNDERGROUND AND ABOVE GROUND STRUCTURES THAT WILL NOT BE INCORPORATED <br />WITHIN THE NEW FACILITIES. <br />SITE PLAN AND COORDINATE GEOMETRY <br />1. BOUNDARY SURVEY PREPARED BY LICENSED SURVEYOR. <br />2. ALL POINTS AND MONUMENTS SHALL BE SURVEYED UPON MOBILIZATION TO VERIFY THEIR <br />ACCURACY. ANY DISCREPANCIES DISCOVERED MUST BE BROUGHT TO THE ATTENTION OF <br />THE ENGINEER IN WRITING. <br />3. MONUMENTS AND OTHER SURVEY CONTROL POINTS SHALL BE PROTECTED FROM DAMAGE <br />AND DISTURBANCE IF ANY CONTROL POINTS ARE DAMAGED OR DISTURBED IT SHALL BE <br />THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER AND REPLACE THE <br />CONTROL POINTS TO THEIR ORIGINAL CONDITION AT HIS OWN EXPENSE. <br />4. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER <br />FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF <br />PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL VERIFY THE LOCATIONS, <br />ELEVATIONS AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES AND OTHER <br />FEATURES AFFECTING THIS WORK PRIOR TO CONSTRUCTION. <br />5. UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE OWNER'S <br />ENGINEER WITH COMPLETE 'AS -BUILT' INFORMATION CERTIFIED BY A REGISTERED LAND <br />SURVEYOR. THIS 'AS -BUILT' INFORMATION SHALL INCLUDE INVERT ELEVATIONS, LOCATION <br />OF FITTINGS, LOCATION OF STRUCTURES FOR ALL UTILITIES INSTALLED, AS WELL AS TOP <br />OF BANK, TOE OF SLOPE AND GRADE BREAK LOCATIONS AND ELEVATIONS FOR POND AND <br />DITCH CONSTRUCTION. NO ENGINEER'S CERTIFICATIONS FOR CERTIFICATE OF OCCUPANCY <br />PURPOSES WILL BE MADE UNTIL THIS INFORMATION IS RECEIVED AND APPROVED BY THE <br />OWNER'S ENGINEER. <br />GENERAL NOTES <br />1. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE PERMIT AND INSPECTION <br />REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AGENCIES. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR OBTAINING ALL CONSTRUCTION RELATED PERMITS, INCLUDING <br />BUT NOT LIMITED TO: RIGHT OF WAY USE PERMITS, PIPING PERMITS, MOT PERMITS, ETC, <br />PRIOR TO CONSTRUCTION, AND SCHEDULE ANY NECESSARY INSPECTIONS ACCORDING TO <br />AGENCY INSTRUCTIONS. <br />2. ALL SPECIFICATIONS AND DOCUMENTS REFERRED TO IN THESE PLANS SHALL BE OF THE <br />LATEST REVISION. <br />3. ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE <br />VARIOUS GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK. <br />4. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL PRECAST AND MANUFACTURED ITEMS <br />TO THE OWNER'S ENGINEER FOR APPROVAL FAILURE TO OBTAIN APPROVAL BEFORE <br />INSTALLATION MAY RESULT IN REMOVAL AND REPLACEMENT AT CONTRACTOR'S EXPENSE. <br />5. WORK PERFORMED UNDER THIS CONTRACT SMALL INTERFACE SMOOTHLY WITH OTHER WORK <br />BEING PERFORMED ON SITE BY OTHER CONTRACTORS AND UTILITY COMPANIES. IT WILL BE <br />NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE HIS ACTIVITIES, WHERE <br />NECESSARY, WITH OTHER CONTRACTORS AND UTILITY COMPANIES At THEIR SUBCONTRACTORS. <br />6. THE WATER, SANITARY SEWER, AND STORM DRAINAGE FACILITIES ARE SUBJECT TO THE <br />REVIEW AND APPROVAL OF THE REGULATORY AGENCY AND IT SHALL BE THE RESPONSIBILITY <br />OF THE CONTRACTOR TO OBTAIN THE REQUIRED PERMITS TO PERFORM WORK IN THE <br />PUBLIC RIGHT-OF-WAY. <br />7. CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES BEFORE ORDERING MATERIALS AND <br />CASTING STRUCTURES. <br />B. IT WILL BE NECESSARY TO EXAMINE, COORDINATE AND ADJUST ACCORDINGLY THE <br />PROPOSED LOCATIONS OF THE VARIOUS COMPONENTS OF THE SITE UTILITIES. THE LAYOUTS <br />INDICATED IN THE PUNS ARE NOT EXACT AND IT SHALL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR TO SUBMIT COORDINATION DRAWINGS SHOWING PIPE SIZES, STRUCTURES, AND <br />ELEVATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SCHEDULING AND <br />COORDINATION OF ALL THE UNDERGROUND WORK ASSOCIATED WITH THIS PROJECT. <br />9. ALL MECHANICAL EQUIPMENT SHALL BE SCREENED FROM VIEW. <br />10. ADJUSTMENTS OF INLETS, JUNCTION BOXES, MANHOLE TOPS, WATER VALVES, WATER METERS, <br />ETC. SHALL BE INCLUDED IN THE CONTRACTOR'S BID AND NO CWM SHALL BE MADE <br />AGAINST THE OWNER OR ENGINEER FOR THESE ADJUSTMENTS, IF REQUIRED. <br />11. OVERALL CLEANUP SHALL BE ACCOMPLISHED BY THE CONTRACTOR IN ACCORDANCE WITH <br />REGULATORY AGENCY STANDARDS OR AS DIRECTED BY THE ENGINEER. ANY AND ALL <br />EXPENSES INCURRED FOR THIS WORK SHALL BE INCLUDED IN THE UNIT PRICE BID FOR <br />OTHER ITEMS. <br />12. THE CONTRACTOR SHALL ENDEAVOR TO PROTECT PRIVATE PROPERTY. ANY DAMAGE CAUSED <br />BY THE CONTRACTOR IN THE PERFORMANCE OF HIS WORK SHALL BE CORRECTED TO THE <br />SATISFACTION OF THE ENGINEER AT THE CONTRACTOR'S EXPENSE. PAYMENT SHALL NOT BE <br />MADE FOR THIS WORK. <br />13. ANY DAMAGE TO STATE, COUNTY, OR LOCAL ROADS CAUSED BY THE CONTRACTOR'S <br />HAULING OR EXCAVATION EQUIPMENT SHALL BE REPAIRED BY THE CONTRACTOR TO THE <br />SATISFACTION OF THE ENGINEER. PAYMENT SHALL NOT BE LADE FOR THIS WORK. <br />14. ANY U.S.C. AI G.S. MONUMENT WITHIN LIMITS OF CONSTRUCTION IS TO BE PROTECTED. IF <br />IN DANGER OF DAMAGE, THE CONTRACTOR SHOULD NOTIFY THE OWNER'S ENGINEER. <br />PAVING AND GRADING <br />1. ALL DELETERIOUS SUBSURFACE MATERIAL (LE MUCK, PEAT, BURIED DEBRIS) IS TO BE <br />EXCAVATED IN ACCORDANCE WITH THESE PLANS OR AS DIRECTED BY THE OWNER, THE <br />OWNER'S ENGINEER, OR OWNER'S SOIL TESTING COMPANY. DELETERIOUS MATERIAL IS TO BE <br />STOCKPILED OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER. EXCAVATED AREAS <br />TO BE BACK FILLED WITH APPROVED MATERIALS AND COMPACTED AS SHOWN ON THESE <br />PUNS. CONTRACTOR IS RESPONSIBLE FOR ACQUIRING ANY PERMITS THAT ARE NECESSARY <br />FOR REMOVING DELETERIOUS MATERIAL FROM THE SITE. <br />2, ALL NECESSARY FILL AND EMBANKMENT THAT IS PLACED DURING CONSTRUCTION SHALL <br />CONSIST OF MATERIAL SPECIFIED BY THE OWNER'S SOIL TESTING COMPANY OR ENGINEER <br />AND BE PLACED AND COMPACTED ACCORDING TO THESE PLANS OR THE REFERENCED SOILS <br />REPORT. <br />3. PROPOSED SPOT ELEVATIONS REPRESENT FINISHED PAVEMENT OR GROUND SURFACE GRADE <br />UNLESS OTHERWISE NOTED ON DRAWINGS. <br />4. CONTRACTOR SHALL TRIM, TACK AND MATCH EXISTING PAVEMENT AT LOCATIONS WHERE NEW <br />PAVEMENT MEETS EXISTING PAVEMENT. <br />5. CURBING WILL BE PLACED AT THE EDGE OF ALL PAVEMENT, AS SHOWN ON THE PLANS. <br />6. REFER TO THE LATEST EDITION OF F.D.O.T. 'ROADWAY AND TRAFFIC DESIGN STANDARDS' <br />FOR DETAILS AND SPECIFICATIONS OF ALL F.D.O.T. TYPE CURBING AND GUTTERS CALLED <br />FOR IN THESE PLANS. <br />7. CONTRACTOR TO PROVIDE A 1/2' TO 1' BITUMINOUS EXPANSION JOINT MATERIAL WITH <br />SEALER AT ABUTMENT OF CONCRETE AND OTHER MATERIALS (BUILDINGS, OTHER POURED <br />CONCRETE, ETC.) <br />8. ALL PAVEMENT MARKINGS IN RIGHT-OF-WAY AND STOP BARS SHALL BE MADE WITH <br />PERMANENT THERMOPLASTIC AND SHALL CONFORM TO F.D.O.T STANDARD INDEX NO. 17346, <br />SHEETS 1-7. PARKING STALL STRIPING AND ON -SITE PRIVATE PAVEMENT MARKINGS TO BE <br />TRAFFIC GRADE PAINT. <br />9. THE CONTRACTOR WILL STABILIZE BY SEED AND MULCH, SOD OR OTHER APPROVED <br />MATERIALS ANY DISTURBED AREAS WITHIN ONE WEEK FOLLOWING CONSTRUCTION OF THE <br />UTILITY SYSTEMS AND PAVEMENT AREAS. CONTRACTOR SHALL MAINTAIN SUCH AREAS UNTIL <br />FINAL ACCEPTANCE BY OWNER. <br />10. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING APPLICABLE TESTING WITH THE SOILS <br />ENGINEER. TESTS WILL BE REQUIRED PURSUANT WITH THE TESTING SCHEDULE LOCATED ON <br />THIS SHEET. UPON COMPLETION OF THE WORK, SOILS ENGINEER WILL SUBMIT <br />CERTIFICATIONS TO THE OWNER'S ENGINEER STATING THAT ALL REQUIREMENTS HAVE BEEN <br />MET. <br />11. A QUALIFIED TESTING LABORATORY SHALL PERFORM ALL TESTING NECESSARY TO ASSURE <br />COMPLIANCE OF THE IN PLACE MATERIALS AS REQUIRED BY THESE PUNS AND THE <br />VARIOUS AGENCIES. SHOULD ANY RETESTING BE REQUIRED DUE TO THE FAILURE OF ANY <br />TESTS TO MEET THE REQUIREMENTS, THE CONTRACTOR WILL BEAR ALL COST OF SAID <br />RETESTING. <br />12. ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND TESTED OR INSPECTED PRIOR TO <br />BASE AND PAVEMENT CONSTRUCTION. <br />13. CONTRACTOR IS TO PROVIDE EROSION CONTROL AND SEDIMENTATION BARRIER (SILTATION <br />CURTAIN) TO PREVENT SILTATION OF ADJACENT PROPERTY, STREETS, STORM SEWERS AND <br />WATERWAYS. IN ADDITION, THE CONTRACTOR SHALL PLACE STRAW, MULCH OR OTHER <br />SUITABLE MATERIAL ON GROUND IN AREAS WHERE CONSTRUCTION RELATED TRAFFIC IS TO <br />ENTER AND EXIT SITE. IF. IN THE OPINION OF THE ENGINEER AND/OR LOCAL AUTHORITIES, <br />EXCESSIVE QUANTfTI ES OF EARTH ARE TRANSPORTED OFF -SITE EITHER BY NATURAL <br />DRAINAGE OR BY VEHICULAR TRAFFIC. THE CONTRACTOR IS TO REMOVE SAID EARTH TO THE <br />SATISFACTION OF THE ENGINEER AND/OR AUTHORITIES. <br />14. IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE CONTRACTOR SHALL <br />STABILIZE THE AFFECTED AREA USING SPRINKLING, IRRIGATION OR OTHER ACCEPTABLE <br />METHODS. <br />1. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE CUSS III (ASTM C-76) UNLESS <br />OTHERWISE NOTED ON PUNS. ALL DRAINAGE STRUCTURES SHALL BE IN ACCORDANCE WITH <br />FOOT ROADWAY AND TRAFFIC DESIGN STANDARDS AND LOCAL AGENCY STANDARDS UNLESS <br />OTHERWISE SHOWN ON PUNS. <br />2. PIPE LENGTHS SHOWN ARE APPROXIMATE. <br />3. ALL DRAINAGE STRUCTURE GRATES AND COVERS SHALL BE TRAFFIC RATED FOR H-20 <br />LOADINGS. <br />4. ALL STORM DRAINAGE PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE <br />OWNER'S ENGINEER PRIOR TO THE PLACEMENT OF BACKFILL CONTRACTOR TO NOTIFY THE <br />ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTION. <br />5. THE CONTRACTOR SHALL MAINTAIN AND PROTECT FROM MUD. DIRT. DEBRIS. ETC. THE <br />STORM DRAINAGE SYSTEM UNTIL FINAL ACCEPTANCE OF THE PROJECT. THE CONTRACTOR <br />MAY BE REQUIRED TO RECLEAN PIPES AND INLETS FOR THESE PURPOSES. <br />WATER DISTRIBUTION <br />1. SEE PIPE SEPARATION REQUIREMENTS, THIS SHEET. <br />2. ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. <br />3. ALL WATER SYSTEM WORK SHALL CONFORM WITH LOCAL REGULATORY AGENCY STANDARDS <br />AND SPECIFICATIONS. <br />4. CONFLICTS BETWEEN WATER AND STORM OR SANITARY SEWER TO BE RESOLVED BY <br />ADJUSTING THE WATER UNITES AS NECESSARY AND PER PIPE SEPARATION REQUIREMENTS <br />NOTED THIS SHEET. <br />5. ALL ON SITE PVC WATER MAINS 4 INCHES THROUGH 12 INCHES SHALL BE IN ACCORDANCE <br />WITH AWWA C-900 AND SHALL BE CLASS 150 SDR 18. ALL ON -SITE PVC WATER MAINS 2' <br />TO 3' SHALL BE CUSS 1120 AND MEET REQUIREMENTS OF SDR 21 IN ACCORDANCE WITH <br />ASTM 0-2241. WATER MAINS SMALLER THAN 1 1/2' SHALL BE CUSS 1120 OR 1220 <br />SCHEDULE 80 AND MEET REQUIREMENTS OF ASTM D-1795. <br />6. ALL DUCTILE IRON PIPE SHALL CONFORM TO THE REQUIREMENTS OF ANSI STANDARD A21.51 <br />MINIMUM CUSS 50. JOINTS FOR DUCTILE IRON PIPE SHALL BE MECHANICAL OR PUSH -ON <br />JOINTS. PIPE SHALL HAVE AN EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI <br />A21.51. PIPE INTERIOR SHALL HAVE A CEMENT MORTAR LINING WITH AN ASPHALTIC SEAL <br />COAT CONFORMING TO AWWA/ANSI C104/A21.4. THE WEIGHT AND CLASS DESIGNATION SHALL <br />BE PANTED IN WHITE ON THE EXTERIOR SURFACE OF ALL PIPE AND FITTINGS. <br />MANUFACTURER'S CODE OR SERIAL NUMBER SHALL BE PROVIDED ON THE BELL OF EACH <br />PIPE JOINT. <br />7. ALL DUCTILE FITTINGS SHALL BE MECHANICAL JOINT WITH A MINIMUM PRESSURE RATING OF <br />250 PSI AND SHALL CONFORM TO THE REQUIREMENTS OF ANSI/AWWA STANDARD <br />A21.10/C710. ALL FITTING SHALL BE COATED AND LINED AS SPECIFIED ABOVE FOR DUCTILE <br />IRON PIPE. <br />B. RESTRAINED JOINTS SHALL BE PROVIDED AT ALL FITTINGS AND HYDRANTS AS SHOWN ON <br />DETAILS, <br />9. ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, <br />AND VALVES SHALL REMAIN UNCOVERED UNTIL PROPERLY PRESSURE TESTED AND ACCEPTED <br />BY THE OWNER'S ENGINEER. PRESSURE TESTS TO BE IN ACCORDANCE WITH LOCAL <br />REGULATORY AGENCY SPECIFICATIONS. CONTRACTOR TO NOTIFY OWNER'S ENGINEER AND <br />LOCAL INSPECTORS 48 HOURS IN ADVANCE OF PERFORMING TESTS. <br />10. CONTRACTOR TO PERFORM CHLORINATION AND BACTERIOLOGICAL SAMPLING AND OBTAIN <br />CLEARANCE OF DOMESTIC WATER SYSTEM. COPIES OFF ALL BACTERIOLOGICAL TESTS TO BE <br />SUBMITTED TO OWNER'S ENGINEER. <br />SANITARY SEWER <br />1. SEE PIPE SEPARATION REQUIREMENTS, THIS SHEET. <br />2. ALL SANITARY SEWER MAINS AND LATERALS SHALL HAVE A MINIMUM OF 36 INCHES OF <br />COVER. <br />3. ALL ON SITE PVC GRAVITY SANITARY SEWER PIPE SHALL BE MADE OF MATERIAL HAVING A <br />CELL CLASSIFICATION OF 12454 B. 124-54 C OR 13354 B AS DEFINED IN ASTM D-1784. <br />PVC PIPE AND FITTINGS USED IN THE GRAVITY SYSTEM SHALL BEET THE REQUIREMENTS OF <br />ASTM D3034 SDR 35 TO A DEPTH OF 15' AND SDR 26 AT A DEPTH BEYOND 15'. <br />4. ALL ON SITE DUCTILE IRON PIPE SHALL BE CUSS 52 AND SHALL RECEIVE INTERIOR MID <br />EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.6, A 21.8. OR A 21.51. <br />5. ALL SANITARY SEWER WORK SHALL CONFORM WITH APPLICABLE AGENCY STANDARDS AND <br />SPECIFICATIONS, LATEST EDITION THERE OF. <br />8. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING NEW SANITARY SEWER LINES <br />TO EXISTING LINES OR APPURTENANCES, THE CONTRACTOR SHALL VERIFY LOCATION AND <br />ELEVATION OF ALL EXISTING UTILITIES NEAR THE POINT OF CONNECTION AND NOTIFY <br />OWNER'S ENGINEER OF ANY CONFLICTS OR DISCREPANCIES WITH DESIGN INFORMATION <br />SHOWN IN THESE PLANS. <br />7. ALL GRAVITY SEWER PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE OWNER'S <br />ENGINEER PRIOR TO PLACEMENT OF BASE AND PAVING AND AGAIN PRIOR TO OBTAINING <br />CERTIFICATE OF OCCUPANCY. CONTRACTOR TO NOTIFY THE ENGINEER 48 HOURS IN ADVANCE <br />TO SCHEDULE INSPECTIONS. <br />B. THE CONTRACTOR SHALL PERFORM A CLOSED CIRCUIT TELEVISION INSPECTION ON ALL <br />GRAVITY SEWERS IN ACCORDANCE WITH THE REGULATORY AGENCY HAVING JURISDICTION <br />PRIOR TO FINAL ACCEPTANCE. <br />9. ALL WASTE -WATER LATERALS WILL A MINIMUM OF 36' COVER AT THE RIGHT-OF-WAY LINE. <br />PIPE SEPARATION REQUIREMENTS: <br />FOR THE PURPOSE OF THIS SECTION, THE PHRASE 'WATER MAINS' SHALL MEAN MAINS, <br />INCLUDING TREATMENT PLANT PROCESS PIPING, CONVEYING EITHER RAW, PARTIALLY TREATED, 0 <br />FINISHED DRINKING WATER; FIRE HYDRANT LEADS; AND SERVICE LINES THAT ARE UNDER THE <br />CONTROL OF A PUBLIC WATER SYSTEM AND THAT HAVE AN INSIDE DIAMETER OF THREE INCHES <br />OR GREATER. <br />1. HOR17ONTAL SEPARATION BETWEEN UNDERGROUND WATER MAINS AND SANITARY. OR STORM <br />SEWERS WASTEWATER OR STORM WATER FORCE MAINS RECLAIMED WATER PIP INF' AND <br />ON-SFE SEWAGE TREATMENT AND DICPDCAI cYSTsu I <br />A NEW OR RELOCATED, UNDERGROUND WATER MAINS SHALL BE LAD TO PROVIDE A <br />HORIZONTAL DISTANCE OF AT LEAST THREE FEET BETWEEN THE OUTSIDE OF THE WATER <br />MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED STORM SEWER, STORM WATER <br />FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED WATER REGULATED UNDER PART III 0 <br />CHAPTER 62-610, FAC. <br />B. NEW OR RELOCATED UNDERGROUND WATER MAINS SHALL BE LAID TO PROVIDE A <br />HORIZONTAL DISTANCE AT LEAST THREE FEET, AND PREFERABLY TEN FEET,T. <br />BETWEEN <br />THE OUTSIDE OF THE WATER MAN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED <br />VACUUM -TYPE SANITARY SEWER. <br />C. NEW OR RELOCATED, UNDERGROUND WATER MAINS SHALL BE LAID TO PROVIDE A <br />HORIZONTAL DISTANCE OF AT LEAST SIX FEET, AND PREFERABLY TEN FEET, BETWEEN <br />THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED <br />GRAVITY- OR PRESSURE -TYPE SANITARY SEWER WASTEWATER FORCE MAIN OR PIPEUN <br />CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610, <br />N <br />F.A.C. THE MINIMUM HORIZONTAL SEPARATION AND <br />OR DISTANCE BETWEEN WATER MAINS D <br />GRAVITY -TYPE SANITARY SEWERS SMALL BE REDUCED TO THREE FEET WHERE THE <br />BOTTOM OF THE WATER MAN IS LAID AT LEAST SIX INCHES ABOVE THE TOP OF THE <br />SEWER. <br />D. NEW OR RELOCATED, UNDERGROUND WATER MAINS SHALL BE LAID TO PROVIDE A <br />HORIZONTAL DISTANCE OF AT LEAST TEN FEET BETWEEN THE OUTSIDE OF THE WATER <br />MAIN AND ALL PARTS OF ANY EXISTING OR PROPOSED 'ON -SITE SEWAGE TREATMENT <br />AND DISPOSAL SYSTEM' AS DEFINED IN SECTION 381.0065(2), F.S., AND RULE <br />64E-6.002, F.A.C. <br />2, VERTICAL SEPARATION BEfW N IRO R •RO IRO WATER MAINS AND SANITARY OR STORM <br />A NEW OR RELOCATED UNDERGROUND WATER MANS CROSSING ANY EXISTIN <br />G OR <br />PROPOSED GRAVITY- OR VACUUM -TYPE SANITARY SEWER OR STORM SEWER SHALL BE <br />WD 50 THE OUTSIDE OF THE WATER MAIN IS AT LEAST SIX INCHES, AND PREFERABLY <br />12 INCHES, ABOVE OR AT LEAST 12 INCHES BELOW THE OUTSIDE OF THE OTHER <br />PIPELINE. HOWEVER, IT IS PREFERABLE TO LAY THE WATER MAIN ABOVE THE OTHER <br />PIPELINE. <br />B. NEW OR RELOCATED, UNDERGROUND WATER AWNS CROSSING ANY EXISTING OR <br />PROPOSED PRESSURE -TYPE SANITARY SEWER, WASTEWATER OR STORM WATER FORCE <br />AWN, OR PIPELINE CONVEYING RECLAIMED WATER SHALL BE LAID SO THE OUTSIDE OF <br />THE WATER MAIN IS AT LEAST 12 INCHES ABOVE OR BELOW THE OUTSIDE OF THE <br />OTHER PIPELNE. HOWEVER, IT IS PREFERABLE TO LAY THE WATER MAIN ABOVE THE <br />OTHER PIPELINE <br />C. AT THE UTILITY CROSSINGS DESCRIBED IN PARAGRAPHS (A) AND (B) ABOVE, ONE FULL <br />LENGTH OF WATER MAIN PIPE SHALL BE CENTERED ABOVE OR BELOW THE OTHER <br />PIPELINE SO THE WATER MAIN JOINTS WILL BE AS FAR AS POSSIBLE FROM THE OTHER <br />PPELINE. ALTERNATIVELY, AT SUCH CROSSINGS, THE PIPES SHALL BE ARRANGED SO <br />THAT ALL WATER MAN JOINTS ARE AT LEAST THREE FEET FROM ALL JOINTS IN <br />VACUUM -TYPE SANITARY SEWERS, STORM SEWERS, STORM WATER FORCE MAINS, OR <br />PIPELINES CONVEYING RECWMED WATER REGULATED UNDER PART III OF CHAPTER <br />62-610. FAC., AND AT LEAST SIX FEET FROM ALL JOINTS IN GRAVITY- OR <br />PRESSURE -TYPE SANITARY SEWERS, WASTEWATER FORCE MAINS, OR PIPELINES <br />CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610, <br />FAC. <br />R <br />I <br />E <br />3. <br />A NO WATER MAIN SHALL PASS THROUGH, Oft COME INTO CONTACT WITH, ANY PART OF A <br />SANITARY SEWER MANHOLE. <br />B. EFFECTIVE AUGUST 28, 2003. WATER MAINS SHALL NOT BE CONSTRUCTED OR ALTERED <br />TO PASS THROUGH, OR COME INTO CONTACT WITH, ANY PART OF A STORM SEWER <br />MANHOLE OR INLET STRUCTURE. <br />4. ANITTARY OR.STORM SEWERS. WASTEWATE <br />NEW OR RELOCATED FIRE HYDRANTS WITH UNDERGROUND DRAINS SHALL BE LOCATED SO <br />THAT THE DRAINS ARE AT LEAST THREE FEET FROM ANY EXISTING OR PROPOSED STORM <br />SEWER, STORM WATER FORCE MAN, OR PIPELINE CONVEYING RECLAIMED WATER REGULATED <br />UNDER PART III OF CHAPTER 62-610. FAC.; AT LEAST THREE FEET, AND PREFERABLY TEN <br />FEET, FROM ANY EXISTING OR PROPOSED VACUUM -TYPE SANITARY SEWER; AT LEST SIX <br />FEET, AND PREFERABLY TEN FEET, FROM ANY EXISTING OR PROPOSED GRAVITY- OR <br />PRESSURE -TYPE SANITARY SEWER, WASTEWATER FORCE MAIN, OR PIPELINE CONVEYING <br />RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 52-610, FAC.; AND AT <br />LEAST TEN FEET FROM ANY EXISTING OR PROPOSED 'ON -SITE SEWAGE TREATMENT AND <br />DISPOSAL SYSTEM' AS DEFINED IN SECTION 381.0065(2), F.S., AND RULE 64E-6.002, <br />FAC. <br />GENERAL LANDSCAPE NOTES: <br />1. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES AND UNDERGROUND <br />STRUCTURES, BEFORE PERFORMING ANY WORK. ANY CONFLICTS SMALL BE IMMEDIATELY <br />BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE FOR RESOLUTION. <br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION AND PROTECTION OF ALL <br />SITE CONDITIONS TO REMAIN FROM DAMAGE DUE TO HIS WORK. IN THE EVENT OF DAMAGE, <br />ALL DAMAGE SHALL BE COMPLETELY REPAIRED TO ITS ORIGINAL CONDITION. ALL COST OF <br />SUCH WORK SHALL RESPONSIBILITY OF THE CONTRACTOR. <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNAUTHORIZED DAMAGE OR CUTTING OF <br />EXISTING TREES TO REMAIN ON SITE, DAMAGE MAY BE CAUSED BY OPERATION OF <br />EQUIPMENT, STOCKPILING OF MATERIALS, ETC. DAMAGE ALSO INCLUDES THE COMPACTION OF <br />THE ROOT ZONE BY DRIVING OR PARKING INSIDE THE DRIP-UNE OF TREES OR THE <br />SPILLAGE OF DELETERIOUS CHEMICALS, OILS, DIESEL, ETC. WITHIN THE DRIP-UNE OF TREES. <br />4. EXISTING TREES AND PALMS WITHIN AND ADJACENT TO THE UMITS OF CONSTRUCTION AND <br />SPECIFIED TO REMAIN ARE TO BE PROTECTED THROUGHOUT THE CONSTRUCTION PROCESS <br />WITH TREE BARRICADES PER LOCAL REGULATORY AGENCY REQUIREMENTS. <br />5. THE CONTRACTOR SHALL PROVIDE AN INTERNATIONAL SOCIETY OF ARBORIST (ISA) CERTIFIED <br />ARBORIST WITH A MINIMUM OF 5 YEARS EXPERIENCE WITH SIMILAR PROJECTS, TO DIRECT <br />APPROPRIATE PRUNING (ROOTS, BRANCHES) AND/OR OTHER TREATMENT NECESSARY TO <br />ENSURE THE HEALTH, VIABILITY AND ATTRACTIVENESS OF TREES TO REMAIN. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTATION OF THE CERTIFIED ARBORIST'S <br />INSTRUCTIONS. <br />S. ALL LANDSCAPE AREAS AND AROUND EXISTING TREES SHALL BE MULCHED UTILIZING <br />SHREDDED MELALEUCA OR PINE BARK NUGGETS (10OX ORGANIC). MULCH SHALL BE <br />INSTALLED TO A WETTED DEPTH OF 3'. MULCH SHALL BE FREE OF EXTRANEOUS DEBRIS. <br />7. ALL PLANT MATERIAL SHALL BE NURSERY GROWN AND SHALL COMPLY WITH ALL REQUIRED <br />INSPECTIONS, GRADING STANDARDS AND PLANT REGULATIONS, AS SET FORTH BY THE <br />FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF PLANT <br />INDUSTRY 'GRADES AND STANDARDS FOR NURSERY PUNTS', LATEST EDITION. ALL PLANT <br />MATERIAL SHALL ALSO CONFORM TO ANSI STANDARDS FOR NURSERY STOCK (ANSI <br />Z60.1-1990). THE MINIMUM GRADE FOR ALL PUNT MATERIALS SHALL BE FLORIDA 01. <br />B. THE CONTRACTOR SHALL SUPPLY SUPPLEMENTAL WATER; OVER THE AMOUNT OF WATER <br />SUPPLIED BY THE IRRIGATION SYSTEM, FOR THE ESTABLISHMENT TO ALL NEWLY INSTALLED <br />TREES AND PALMS FOR 90 DAYS, COMMENCING IMMEDIATELY AFTER INSTALLATION. IT IS THE <br />CONTRACTOR'S RESPONSIBILITY TO ADJUST WATERING AMOUNTS AND FREQUENCY TO ENSURE <br />PROPER ESTABLISHMENT OF ALL PLANT MATERIAL <br />9. PLANTING AREAS SHALL BE FREE OF EXTRANEOUS MATERIALS AND CAPABLE OF PERCOLATION <br />PRIOR TO PLANTING AND PREPARED SOIL BACKFILL <br />10. HEDGES SHALL BE A MINIMUM OF 2' IN HEIGHT AND FULL TO THE BASE, PUNTED ON 2' <br />ON CENTER WHEN SHRUBS ARE USED AS A SCREEN FOR VUA. <br />11. ALL LANDSCAPE CONSTRUCTION SHALL CONFORM TO THE MINIMUM REQUIREMENTS OF THE <br />LOCAL REGULATORY AGENCY LANDSCAPE CODE. <br />12. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER. <br />THE OWNER RESERVES THE RIGHT TO DIRECT THE REMOVAL AND REPLACEMENT OF ANY <br />ITEMS WHICH, IN HIS OPINION, DO NOT MEET INDUSTRY STANDARDS OR PRESENT AN <br />ORDERLY AND WORKMANLIKE APPEARANCE, PROVIDED THAT SUCH ITEMS CAN BE INSTALLED <br />PROPERLY USING STANDARD INDUSTRY PRACTICES. <br />13. THE LANDSCAPE CONTRACTOR SHALL MAINTAIN HIS FINISHED WORK FROM THE TIME OF <br />INSTALLATION IS COMPLETE TO THE TIME OF FINAL ACCEPTANCE BY THE OWNER. THE <br />CONTRACTOR SHALL PROVIDE THE OWNER WITH A i-YEAR WARRANTY ON THE INSTALLED <br />PLANT MATERIAL AND A 90-DAY WARRANTY ON SOD. <br />14. PLANTING SOIL SHALL BE FERTILE, NATURAL TOPSOIL, TYPICAL TO THE LOCALITY, OBTAINED <br />FROM WELL DRAINED AREAS. IT SHALL BE WITHOUT ADMIXTURE OF SUBSOIL OR CLAYS AND <br />SHALL BE FREE OF STONES, LUMPS, STICKS, PLANTS, ROOTS, TOXIC SUBSTANCES OR OTHER <br />EXTRANEOUS MATTER THAT MAY BE HARMFUL TO PLANT GROWTH OR INTERFERE WITH <br />FUTURE MAINTENANCE <br />15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TESTING OF SOILS AND MAKE THE <br />NECESSARY ADJUSTMENTS OR AMENDMENTS FOR LONG TERM PLANT HEALTH AND VITALITY. <br />16. SOD SHALL BE OF KIND AND PLACED AS SHOWN ON THE PLANS. SOD SHALL BE WELL <br />MATTED WITH GRAY ROOTS. SOD SHALL BE IN 12'X14' RECTANGLES, HAVING A MINIMUM <br />THICKNESS OF 2', AND SHALL BE FRESH, LIVE AND UNINJURED AT TIME OF PLANTING. SOD <br />SHALL BE CERTIFIED AS FREE OF WEEDS AND OTHER GRASSES, HAVING SUFFICIENT SOIL <br />MAT TO ADHERE FIRMLY TO ROOTS FOR HANDLING. SOD SHALL BE PLANTED WITHIN 72 <br />HOURS OF BEING HARVESTED AND ROLLED IMMEDIATELY AFTER INSTALLATION. <br />17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FINAL STAKING OF TREES AND PALMS <br />BASED ON SITE CONDITIONS, TO PROVIDE FOR THE STABILITY OF THE TREE AND PALM <br />MATERIALS AND TO PROTECT THE HEALTH AND SAFETY OF THE PUBLIC/PROPERTY. <br />18. TREE AERATION SYSTEM SHALL MEET THE MINIMUM REQUIREMENTS OF LOCAL GOVERNING <br />AGENCY AND UNDER THE SUPERVISION OF THE CERTIFIED ARBORIST. THE CERTIFIED <br />ARBORIST SHALL ADJUST THE REQUIREMENTS OF THE AERATION SYSTEM IN THE FIELD TO <br />ACCOUNT FOR ACTUAL FIELD CONDITIONS AND THE ROOT SYSTEM OF THE TREE <br />FDOT GENERAL NOTES: <br />ALL WORK PERFORMED WITHIN THE COUNTY/CITY R/W SHALL CONFORM TO: <br />1. FOOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (2010 EDITION) <br />(AKA STANDARD SPECS). <br />2. FOOT DESIGN STANDARDS FOR DESIGN, CONSTRUCTION, MAINTENANCE AND OPERATIONS ON <br />THE STATE HIGHWAY SYSTEM, 2010 EDITION, (AKA STANDARD INDEX). COMPLIANCE WITH ALL <br />APPLICABLE INDICES IS REQUIRED. <br />3. FLORIDA DEPARTMENT OF TRANSPORTATION ROADWAY PLANS PREPARATION MANUAL, VOLUME <br />1, CHAPTERS 2 AND 25. (REVISED 2010) 4. FLORIDA DEPARTMENT OF TRANSPORTATION FLEXIBLE PAVEMENT DESIGN MANUAL FOR NEW <br />CONSTRUCTION AND PAVEMENT REHABILITATION, MARCH 2O08. <br />5. ALL TRAFFIC STRIPES AND MARKINGS ARE TO BE LEAD-FREE, NON -SOLVENT BASED <br />THERMOPLASTIC. THE PERMn7EE SHALL FURNISH THE DEPARTMENT WITH THE <br />MANUFACTURER'S CERTIFICATION THAT THE THERMOPLASTIC IS 'LEAD FREE'. <br />6. LANE CLOSURE SHALL OCCUR BETWEEN 9:00 P.M. AND 3:30 A.M. UNLESS LANE CLOSURE <br />CALCULATIONS ARE PROVIDED AND APPROVED OR APPROVAL IS GRANTED BY THE DISTRICT <br />PERMIT ENGINEER. <br />7. THE PERMIT PLANS SHALL BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER <br />REGISTERED IN THE STATE OF FLORIDA. THE PERMITTEE'S ENGINEER OF RECORD (EOR) IS <br />RESPONSIBLE FOR THE TECHNICAL ACCURACY OF THE DESIGN PUNS. THE FOR IS <br />RESPONSIBLE FOR ANY ERRORS OR OMISSIONS IN THE PLANS SUBMITTED FOR PERMITTING. <br />B. CALL FOOT MAINTENANCE OFFICE TO SCHEDULE A PRE -CONSTRUCTION MEETING. <br />9. PER FAC RULE CHAPTER 14-96.007(5)(C)8, BEFORE CONSTRUCTION BEGINS, THE APPLICANT <br />OR THE APPLICANT'S CONTRACTOR SHALL DELIVER TO THE DEPARTMENT PROOF OF LIABILITY <br />INSURANCE. <br />10. THE DEPARTMENT REQUIRES DOCUMENTATION OF SUCCESSFUL COMPLETION OF AN APPROVED <br />WORK ZONE TRAFFIC CONTROL COURSE FOR THE AGENCY, UTILITY OR CONTRACTOR <br />EMPLOYEE(S) INSTALLING AND/OR MAINTAINING THE APPROVED MAINTENANCE OF TRAFFIC <br />PUN. DOCUMENTATION IS TO BE FURNISHED TO THE DEPARTMENT AT THE <br />PRE -CONSTRUCTION MEETING F EETI C OR BEFORE OCCUPYING THE STATE RIGHT OF WAY. ALL LANE <br />CLOSURES MUST BE APPROVED IN ADVANCE BY FOOT. <br />11. A COPY OF THE APPROVED PERMIT AND DRAWINGS MUST BE ON THE JOBSTTE FOR WORK <br />TO BEGIN IN THE FOOT RIGHT OF WAY. <br />12. ANY SIDEWALK DISTURBED WILL BE REPLACED, BY SECTION, TO FOOT SPECIFICATIONS, <br />13. ALL PORTIONS OF FDOT RIGHT OF WAY DISTURBED MUST BE SODDED. <br />14. NEW SIDEWALK PERMITTED TO CITY OR COUNTY ONLY AND SHALL INCORPORATE HANDICAP <br />RAMPS WHERE SIDEWALK INTERSECTS ROADS AND STREETS, <br />15. IN ACCORDANCE WITH FLORIDA STATUTE 335.1825 (2). THE PERMITTEE, HOWEVER, SHALL <br />BEAR REQUIRED THE COST OF ALTERATION OF ANY CONNECTION WHICH IS REQUIRED BY <br />THE DEPARTMENT DUE TO INCREASED OR ALTERED TRAFFIC FLOWS GENERATED BY CHANGES <br />IN THE FACILITIES OR NATURE OF BUSINESS CONDUCTED AT THE LOCATION SPECIFIED IN <br />THE PERMIT, IF THE DEPARTMENT ESTABLISHES THE NEED FOR SUCH ALTERATION.' <br />16. ALL CONSTRUCTION AND/OR MAINTENANCE IN THE FOOT R/W SHALL CONFORM TO THE <br />FEDERAL MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), THE DEPARTMENT'S <br />ROADWAY AND TRAFFIC DESIGN STANDARDS AND THE STANDARD SPECIFICATIONS FOR ROAD <br />AND BRIDGE CONSTRUCTION. <br />17. IF CONSTRUCTION, RECONSTRUCTION, REPAIR OR MAINTENANCE ACTIVITY NECESSITATES THE <br />CLOSING OF ONE OR MORE TRAVEL LANES OF ANY ROAD ON THE STATE PRIMARY, COUNTY <br />ROAD OR CITY STREET SYSTEM, FOR A PERIOD OF TIME EXCEEDING TWO HOURS. THE PARTY <br />PERFORMING SUCH WORK WILL BE RESPONSIBLE TO GIVE NOTICE TO THE APPROPRIATE LAW <br />ENFORCEMENT AGENCY WHICH HAS JURISDICTION WHERE SUCH ROAD IS LOCATED PRIOR TO <br />COMMENCING WORK ON THIS PROJECT. FLORIDA STATUTE 335.15 AND 336.07. <br />18. OPEN CUTTING OF ROADWAY FOR INSTALLATION OF UTILITY OR DRAINAGE FACILITIES WILL NOT <br />BE ALLOWED WITHOUT PRIOR APPROVAL FROM FOOT. ANY PROPOSED OPEN CUTS MUST BE <br />CLEARLY NOTED ON THE PLANS AND A SEPARATE LETTER MUST BE OBTAINED. <br />19. NOTE THAT SIDEWALK SHALL BE CONSTRUCTED PER FOOT INDEX 304 AND 310. DETECTABLE <br />WARNING STRIPS, AKA TRUNCATED DOMES, FOR DISTRICT SEVEN CONSTRUCTION AND <br />MAINTENANCE SHOULD BE EITHER INSET CERAMIC TILES OR THERMOPLASTIC DETECTABLE <br />WARNING STRIPS. THESE WARNING SURFACES SHALL 0 SHALL ONLY BE PROVIDED BY THE <br />FOLLOWING VENDORS/MANUFACTURERS OR AS APPROVED BY THE ENGINEER. <br />1. INUNE TRUNCATED DOME EZ TILE SUPPLED BY PROFESSIONAL PAVEMENT PRODUCTS <br />2. TOPMARK SUPPLIED BY FLINT TRADING <br />3. VANGUARD TRUNCATED DOMES SUPPLIED BY VANGUARD <br />20. NOTE THAT DRIVEWAYS ARE TO BE CONSTRUCTED PER FDOT INDEX 515. THOUGH INDEX 515 <br />ALLOWS A 2% SLOPE ACROSS SIDEWALKS, CURRENT ADA REQUIREMENTS ARE THAT 2X IS <br />MAXIMUM ALLOWABLE SLOPE AS CONSTRUCTED. PLEASE DESIGN SIDEWALK SLOPES WITHIN <br />FOOT RIGHT OF WAY AT 1.511T TO ALLOW CONSTRUCTION VARIANCES. <br />21. NOTE THAT TRAFFIC SIGNALS ARE TO REMAIN IN ACTUATION DURING CONSTRUCTION. <br />SC-1 TESTING SCHEDULE <br />NOTE: GOVERNING AGENCY REQUIREMENTS SUPERSEDE THESE REQUIREMENTS. <br />ITEM <br />TEST <br />TESTFREQUENCY <br />EMBANKMENT <br />OPTIMUM MOISTUREIMAXIMUM DENSITY <br />PER SOIL TYPE <br />100% OF MAXIMUM DENSITY AS DETERMINED BY AASHTO T99S7 <br />ONE PER SOO FEET <br />D-fi98-70 NO TOLERANCE ( ) <br />HORIZONTALLY, IN 12 INCH LIFTS <br />UTILITY TRENCH BACKFILL <br />OPTIMUM MOISTURE/MAXIMUM DENSITY <br />PER SOIL TYPE <br />OVER PIPELINES AND AROUND <br />96%OF MAXIMUM DENSITY AS DETERMINED BY AASHTO T'80-57 (ASTM <br />STRUCTURES FROM R.O. W. <br />01557.70) - MINUS 3% TOLERANCE <br />LINE TO R.O.W. LINE <br />UTILITY TRENCH BACKFILL <br />OPTIMUM MOISTURE/MAXIMUM DENSITY <br />PER SOIL TYPE <br />OVER PIPELINES AND AROUND <br />95% OF MAXIMUM DENSITY AS <br />STRUCTURES OUTSIDE <br />DETERMINED BY AASHTO Ti8O57(ASTM D1557-70)-MINUS 3%TOLERANCE <br />THE R.O.W. <br />STABILIZED SUBGRADE <br />OPTIMUM MOISTUREIMAXIMUM DENSITY <br />PER MATERIAL TYPE <br />MINIMUM a0 LBR <br />••• PER MATERIAL TYPE <br />98% OF MAXIMUM DENSITY AS DETERMINED BY AASHTO T•OG-57(ASTM <br />'•• <br />D1557-70) - NO TOLERANCE <br />BASE <br />OPTIMUM MOISTURE/MAXIMUM DENSITY <br />PER SOURCE <br />(OTHER THAN SOIL CEMENT) <br />MINIMUM 100 LBR <br />PER SOURCE <br />98% OF MAXIMUM DENSITY AS DETERMINED BY AASHTO 71 SO-57 (ASTM <br />•'• EACH LIFT <br />01557-70) - NO TOLERANCE <br />GRADATION, ATTERBURG LIMITS <br />PER SOURCE <br />CONCRETE <br />SLUMP TEST <br />ONE PER SET OF CYLINDERS <br />COMPRESSIVE STRENGTH CYLINDERS <br />ONE SET OF THREE (3) CYLINDERS FOR <br />100 CUBIC YARDS OR FRACTION THEREOF <br />AIR CONTENT <br />ONE PER SET OF CYLINDERS <br />ASPHALTIC CONCRETE <br />AGGREGATE ANALYSIS <br />ONE PER DESIGN <br />DESIGN MIX <br />ONE PER TYPE <br />BITUMEN CONTENT <br />ONE PER DAY <br />GRADATION STABILITY FLOW <br />ONE PER DAY <br />PROPERTIES OF IN PACE MATERIALS (MARSHALL) <br />ONE PER DAY <br />THICKNESS <br />••• <br />95% OF LAB DENSITY <br />••• <br />• TESTS SHALL BE LOCATED NO MORE THAN 500 FEET APART. TESTS SHALL BE •+ FOR FLEXIBLE PIPE (CORRUGATED STEEL OR ALUMINUM), 95% OF MAXIMUM <br />PERFORMED ON UCH LIFT, EXCEPT THAT TESTS SHALL NOT BE FURTHER APART DENSITY (AASHTO-T99) PER FOOT SUPPLEMENTAL SPECIFICATIONS SUB ARTICLE <br />THAN ONE (1) FOOT VERTICALLY. FIELD DENSITIES SHALL BE TAKEN OVER ALL '25-8.3.2 AS MODIFIED. <br />ROAD CROSSINGS. FIELD DENSTES FOR SANITARY .ONES SHAL_ BE STAGGERED <br />TO INCLUDE RESULTS OVER SERVICE LATERALS. THERE SHALL BE A MINIMUM OF ••• TESTS SHALL BE LOCATED NO MORE THAN 500 FEET APART. THERE SHALL <br />ONE (1) TEST SERIES FOR EACH 12 INCHES OF UFT OVER PIPELINE BETWEEN BE NO LESS THAN ONE (1) TEST PER STREET. <br />MANHOLE. TESTS AROUND STRUCTURES SHALL BE SPIRALED IN 12 INCH LIFTS. <br />U2 <br />a <br />Of` <br />7 <br />2 <br />a <br />e a <br />E <br />(v ; <br />8 <br />A <br />AiffiL C <br />I� p C <br />�so6 m'I2 <br />g S C <br />% 5 P e <br />cd EU v <br />u <br />ILLL� Iln r`0� C <br />cW <br />r <br />2 <br />1 <br />W <br />Z <br />a <br />Z <br />U ga <br />'a^^ M �5 <br />V/ <br />4z 9 <br />CC r0, <br />V <br />W <br />ZI <br />Comm. No: 12010.00 <br />Date: 01 / 16/ 14 <br />DIaWR: KLD <br />Revised: <br />70"1110111'awIR Knam <br />.HIV NQ 1PWCaIPK [GAILY e1M <br />" I/YY IAAU*M (EDIT <br />LAUREN D. CAMPO, P.E. NO. 57421 ' <br />9) 2014 HARVARD JOLLY, INC. <br />January 13, 2014 <br />DATE (SEAL) C-2 <br />