GENERAL NOTES
<br />SYMBOLS 8 IDENTIFICATION LEGEND
<br />FLORIDA 5UILDING GODS DATA
<br />I. ALL WORK SHALL CONFORM WITH THE LATEST ADOPTED EDITIONS OF THE FLORIDA BUILDING CODE,
<br />BUILDING (FBC-5) SEVENTH EDITION (2020), FLORIDA BUILDING CODE, PLUMBING (FBC-P) SEVENTH
<br />EDITION (2020), FLORIDA BUILDING CODE, MECHANICAL (FBC-M) SEVENTH EDITION (2020), FLORIDA
<br />BUILDING CODE, FUEL GAS (FBC-FG) SEVENTH EDITION (2020), FLORIDA FIRE PREVENTION CODE (FFPC)
<br />SEVENTH EDITION (2020), NATIONAL ELECTRICAL CODE (NEC) 2011 EDITION, NATIONAL FIRE PROTECTION
<br />ASSOCIATION (NFPA) I - FIRE CODE (2018), NFPA 101 - LIFE SAFETY CODE 2010, FLORIDA ACCESSIBILITY
<br />CODE SEVENTH EDITION (2020) 4 ALL OTHER APPLICABLE LOCAL, STATE, 4 FEDERAL CODES 4
<br />ORDINANCES 4 ALL AUTHORITIES HAVING LOCAL JURISDICTION.
<br />2. THESE CONSTRUCTION DOCUMENTS HAVE BEEN PREPARED FROM THE MOST COMPLETE INFORMATION
<br />AVAILABLE TO THE ARCHITECT. ALL DATA ON EXISTING CONSTRUCTION CONDITIONS ARE APPROXIMATE
<br />4 SHALL BE VERIFIED PRIOR TO COMMENCING ANY WORK.
<br />3. IT SHALL BE THE SUBCONTRACTOR'S RESPONSIBILITY TO PERSONALLY FIELD INSPECT THE JOB SITE
<br />PRIOR TO SUBMITTING HIS BID. THE INSPECTION IS REQUIRED SO THAT THE CONTRACTOR SHALL BE
<br />TOTALLY FAMILIAR W/ THE EXISTING CONDITIONS 4 THEIR INTERFACE W/ THE NEW CONSTRUCTION AS
<br />DEFINED IN THESE CONSTRUCTION DOCUMENTS.
<br />4. THE SUBCONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE W/ THE LATEST EDITION OF THE
<br />GENERAL CONDITIONS OF THE CONTRACT, AIA DOCUMENT A201. A COPY OF THIS DOCUMENT IS
<br />AVAILABLE * THE CONTRACTORS OFFICE UPON REQUEST.
<br />5. ANY ADJUSTMENT TO THE CONSTRUCTION CONTRACT, ADDITIONS, DELETIONS OR CHANGE ORDERS,
<br />SHALL BE APPROVED BY THE OWNER, GENERAL CONTRACTOR, 4 ARCHITECT IN WRITING.
<br />6. DURING THE CONSTRUCTION PHASE, THE ADMINISTRATION OF THE CONSTRUCTION CONTRACT SHALL BE
<br />PERFORMED BY THE MCDONALDS CONSTRUCTION MANAGER
<br />-1. ALL WORK (EQUIPMENT, MATERIALS, 4 LABOR) SHALL HAVE A MINIMUM WRITTEN GUARANTEE FOR A
<br />PERIOD OF ONE (1) YEAR, UNLESS SPECIFIED OTHERWISE, FROM THE DATE OF SUBSTANTIAL COMPLETION
<br />AGAINST ANY DEFECTS IN SAID WORK, W/ APPROPRIATE REPAIR OR REPLACEMENT * NO ADDITIONAL
<br />COST TO THE OWNER
<br />S. ALL MATERIALS 4 EQUIPMENT SHALL BE INSTALLED IN A NEAT 4 FIRST CLASS WORKMANLIKE MANNER
<br />THE ARCHITECT RESERVES THE RIGHT t0 DIRECT THE REMOVAL 4 REPLACEMENT OF ANY ITEM, IN HIS
<br />OPINION, THAT DOES NOT PRESENT AN ORDERLY 4 REASONABLY NEAT OR WORKMANLIKE
<br />APPEARANCE. THE REMOVAL 4 REPLACEMENT SHALL BE DONE WHEN DIRECTED BY THE GENERAL
<br />CONTRACTOR, 4 W/OUT ADDITIONAL COST TO THE OWNER
<br />S. THE CONTRACTOR SHALL COMPLY W/ THE MANUFACTURER'S INSTRUCTIONS 4 RECOMMENDATIONS TO THE
<br />EXTENT PRINTED INFORMATION IS MORE DETAILED OR STRINGENT THAN REQUIREMENTS CONTAINED
<br />DIRECTLY IN THE PLANS.
<br />10. CONTRACTOR SHALL MAINTAIN ORDERLY HOUSEKEEPING DURING THE PROCESS OF CONSTRUCTION 4
<br />UPON COMPLETION SHALL THROUGHLY CLEAN ALL AREAS. FINAL CLEAN UP SHALL INCLUDE THE
<br />FOLLOWING:
<br />A. SWEEPING FLOORING.
<br />B. DUSTING 4 REMOVAL OF DIRT, PAINT DRIPPINGS, OIL, GREASE, 4 OTHER BLEMISHES FROM ALL
<br />SURFACES, INCLUDING PIPING 4 EQUIPMENT.
<br />C. WINDOWS, GLASS LIGHTS, 4 MIRRORS SHALL BE WASHED 4 CLEANED.
<br />D. PAINT OVERRUNS 4 PUTTY SMEARS SHALL BE REMOVED.
<br />E. HARDWARE SHALL BE CLEANED 4 POLISHED W/ FLANNEL CLOTH.
<br />II. WORK t0 BE DONE CONSISTS OF FURNISHING ALL MATERIALS, LABOR, EQUIPMENT, TOOLS, 4 ALL ITEMS 4
<br />SERVICES REQUIRED FOR CONSTRUCTION IN CONFORMITY W/ GENERAL NOTES 4 PLANS.
<br />12. THE PLANS SHOW THE LOCATION OF ALL FIXTURES 4 EQUIPMENT 4 ARE INTENDED t0 CONVEY THE
<br />GENERAL INTENT OF THE WORK IN SCOPE 4 LAYOUT. THEY ARE NOT INTENDED t0 SHOW IN MINUTE
<br />DETAIL EVERY 4 ALL OF THE ACCESSORIES INTENDED FOR THE PURPOSE OF EXECUTION OF THE WORK,
<br />BUT IT IS UNDERSTOOD THAT SUCH DETAILS ARE PART OF THIS WORW,
<br />13. THE SUBCONTRACTORS SHALL REMOVE ALL CONSTRUCTION RUBBISH, SCAFFOLDING, EQUIPMENT,
<br />TEMPORARY PROTECTION, TEMPORARY FIELD STRUCTURES, 4 OTHER COMPONENTS WHICH WERE
<br />REQUIRED IN CONNECTION W/ THE CONSTRUCTION, BUT NOT A PERMANENT PART THEREOF.
<br />14. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS 4 INSPECTIONS REQUIRED FOR THE WORK 4
<br />PAY ALL CHARGES INCIDENTAL THERETO.
<br />15. PROVIDE DOOR HARDWARE IN CONFORMANCE W/ ADA REQUIREMENTS.
<br />16. THE SUBCONTRACTOR SHALL FURNISH ALL MISCELLANEOUS FACILITIES AS NEEDED, INCLUDING
<br />TEMPORARY STAIRS, TEMPORARY RAMPS, LADDERS, RUNWAYS, STAGING, SHORING, SCAFFOLDING,
<br />BRIDGES, RAILING, BRACING, BARRIERS, CLOSURES, PLATFORMS, TEMPORARY PARTITIONS, WASTE
<br />CHUTES, 4 SIMILAR ITEMS.
<br />THE SUBCONTRACTOR SHALL PROTECT ALL CONSTRUCTION COMPONENTS DURING THE COURSE OF
<br />PAINTING 4 SHALL PROMPTLY CLEAN ALL RESIDUE, SPLATTER OR OVERSPRAY UPON COMPLETION OF
<br />HIS WORW, THE CONTRACTOR SHALL USE DROP CLOTHS, MASKING, 4 OTHER SHIELDING DEVICES t0 THE
<br />GREATEST EXTENT PRACTICAL TO PROTECT ALL ITEMS NOT TO BE PAINTED OR THOSE ITEMS WHICH
<br />HAVE ALREADY RECIEVED FINAL FINISH COATS.
<br />18. ALL PAINTING REQUIRED FOR THIS PROJECT SHALL BE PERFORMED IN ACCORDANCE W/ THE
<br />MANUFACTURER'S SPECS FOR PRODUCT HANDLING, SURFACE PREPARATION, PAINTING APPLICATION,
<br />CURING/DRYING TIME BETWEEN COATS, CLEANING 4 PROTECTION OF PAINTED SURFACES UNTIL THE
<br />SOURCE OF CONSTRUCTION IS COMPLETE. PAINT COLORS t0 BE SELECTED FOR THESE DOCUMENTS ARE
<br />AS MANUFACTURERD BY BY GLIDDEN DIVISION OF SCM CORP., ALTERNATE ACCEPTABLE MFR ARE AS
<br />FOLLOWS: BENJAMIN MOORE, D.P.I., RUSTOLEUM, PRATT LAMBERT, SHERWIN- WILL IAMS.
<br />19, ALL DRYWALL PARTITIONS ARE DIMENSIONED CENTERLINE TO CENTERLINE UNLESS OTHERWISE NOTED.
<br />ALL MASONRY PARTITIONS ARE DIMENSIONED OUT TO OUT.
<br />20. ELECTRICAL PANELS, FIRE EXTINGUISHER CABINETS, ETC., LOCATED IN RATED PARTITIONS SHALL BE
<br />BACKED W/ DRYWALL AS REQUIRED TO MAINTAIN RATING. CONTRACTOR t0 VERIFY WALL THICKNESSES
<br />REQUIRED FOR ALL ELECTRICAL PANELS, FIRE EXTINGUISHER PANELS, ETC.
<br />21. PROVIDE DOUBLE STUDS 4 BLOCKING WHERE REQUIRED TO SUPPORT MISCELLANEOUS ITEMS, I.E.
<br />TYPICAL CASEWORK, CABINETS, GRAB BARS, ETC. CONTRACTOR SHALL FURNISH 4 INSTALL ALL
<br />BACK-UP SUPPORTS
<br />22. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE IN QUESTION, THE CONTRACTOR SHALL BE RESPONSIBLE
<br />FOR OBTAINING CLARIFICATION FROM THE OWNER'S REPRESENATIVE BEFORE CONTINUING W/ CONST.
<br />23. CONTRACTOR SHALL VERIFY ALL DIMENSIONS 4 COORDINATE ALL TRADES.
<br />24. CONTRACTOR SHALL VERIFY ALL EQUIPMENT LOCATIONS 4 DIMENSIONS OF EQUIPMENT.
<br />25, REVIEW ALL ELECTRICAL LOCATIONS W/ OWNER BEFORE SIGN OFF FOR DRYWALL.
<br />26, ALL THRESHOLDS 4 FLOOR FINISH CHANGES TO BE PLACED UNDER CENTERLINE OF DOOR UNLESS
<br />OTHERWISE NOTED.
<br />21. COORDINATE TELEPHONE 4 SECURITY W/ OWNER BEFORE PROCEEDING.
<br />28. ROOF CONSTRUCTION IS NOT LIGHT FRAME TRUSS
<br />29. A SEPARATE PERMIT SHALL BE REQUIRED FOR THE FIRE SUPPRESSION SYSTEM
<br />30. ALL INSULATION MATERIALS TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A
<br />SMOKE -DEVELOPED INDEX OF NOT MORE THAN 450 PER THE FBC 7192
<br />31. CONCRETE FLOOR SLAB REPLACEMENT SHALL BE 5" CONC. SLAB W/ 6X6-W1.4XW1.4 WWF ON 6 MIL
<br />VAPOR BARRIER OVER 12" MIN. CLEAN COMPACTED FILL W/ TERMITE TREATMENT. TIE NEW SLAB INTO
<br />EXISTING SLAB/STRUCTURE W/ 03 • 2'-0". EPDXY W/ MIN. 6" EMBED.
<br />ROOM IDENTIFICATION
<br />DRAWING IDENTIFICATION
<br />INTERIOR/CASEWORK ELEVATION
<br />IDENTIFICATION
<br />SECTION CUT INDICATION
<br />PLAN OR SECTION DETAIL INDICATION
<br />ROOM NAME FLOOR / LEVEL
<br />201 ROOM NUMBER
<br />2 DRAWING NUMBER
<br />SHEET NUMBER
<br />DRAWING NUMBER
<br />2-A4 INDICATION OF DIRECTION
<br />SHEET NUMBER
<br />3 DRAWING NUMBER
<br />INDICATION OF DIRECTION
<br />,4ro SHEET NUMBER
<br />00,
<br />3 \ DRAWING NUMBER
<br />DETAILED AREA
<br />,44 \ j SHEET NUMBER
<br />SUPPLEMENTARY DRAWING INDICATION
<br />(BOUND IN PROJECT MANUAL).
<br />Ste'
<br />ELEVATION, SECTION CUT, 4 PLAN DETAIL
<br />NOTATIONS SIMILAR TO ABOVE
<br />22
<br />DOOR IDENTIFICATION
<br />22
<br />WINDOW/GLAZING IDENTIFICATION
<br />O
<br />SPECIFIC NOTES
<br />O
<br />GENERAL NOTES jam,
<br />FURNITURE 4/OR EQUIPMENT 101
<br />IDENTIFICATION
<br />ELEVATION SYMBOL
<br />REVISION SYMBOL
<br />PARTITION TAG
<br />DRAWING NUMBER
<br />PAGE NUMBER
<br />SEE SCHEDULE
<br />SEE SCHEDULE
<br />NOTES WHICH APPLY TO SPECIFIC
<br />ITEM OR ITEMS ON THE DRWG
<br />WHERE INDICATED
<br />NOTES WHICH APPLY TO ALL
<br />DRAWINGS
<br />SEE SCHEDULE
<br />FIN FLOOR ELEVATION HEIGHT
<br />ELEV 100'-0" SURFACE DESCRIPTION
<br />Ql REVISION NUMBER
<br />DATE REVISED
<br />AI DRAWING NUMBER
<br />MATERIAL DE&IGNATIONS
<br />ELEVATION /FLAN SECTION
<br />®CERAMIC
<br />® GLAZING
<br />TILE/
<br />QUARRY
<br />TILE
<br />®MASONRY
<br />RUNNING
<br />® CONCRETE
<br />BLOCK
<br />BOND
<br />CONCRETE/
<br />STUCCO/
<br />GROUT
<br />III-_ I EARTH
<br />ROCK
<br />®WONT
<br />WOOD
<br />BLOCKING
<br />an,W, • • .
<br />CLASSIFICATION BY OCCUPANCY ASSEMBLY GROUP A-2
<br />MIXED OCCUPANCY NO SEPARATION BY OCCUPANCY NONE
<br />TYPE OF CONSTRUCTION
<br />PROTECTED - HR UNPROTECTED V
<br />SPRINKLERED ❑ YES NO
<br />BUILDING VARIABLES
<br />REQUIRED 4 ALLOWED
<br />PROVIDED
<br />BUILDING HEIGHT 4
<br />HEIGHT INCREASES
<br />40'
<br />1i'-211
<br />NUMBER OF STORIES
<br />1
<br />1
<br />BUILDING AREA /
<br />3,9"19 GSFt +
<br />FLOOR AREA INCREASES
<br />(o,000 GSF
<br />3511 GSF FREEZER/COOL
<br />OCCUPANT LOAD /
<br />FLOOR AREA / PERSON
<br />" OF FIXED SEATS
<br />80 ERSONS
<br />ASSEMBLY TOTAL
<br />SEATING / PERSON
<br />N/A
<br />N/A
<br />EGRESS WIDTH / PERSON
<br />1ST FLR 2 / 16"
<br />108"
<br />LENGTH OF DEAD END
<br />20'
<br />0'
<br />MAXIMUM DISTANCE TO AN EXIT
<br />200'
<br />S0'
<br />MINIMUM NUMBER OF EXITS
<br />2
<br />2
<br />FIRE PROTECTION REQUIREMENTS
<br />STRUCTURAL FRAME - INCLUDING
<br />0
<br />0
<br />COLUMNS, GIRDERS, TRUSSES
<br />BEARING WALLS - EXTERIOR
<br />0
<br />0
<br />INTERIOR
<br />0
<br />0
<br />NONBEARING WALLS AND
<br />PARTITIONS - EXTERIOR 2t30
<br />0
<br />0
<br />NONBEARING WALLS AND
<br />PARTITIONS - INTERIOR
<br />0
<br />0
<br />FLOOR CONSTRUCTION - INCLUDING
<br />SUPPORTING BEAMS 4 JOINTS
<br />0
<br />0
<br />ROOF CONSTRUCTION - INCLUDING
<br />SUPPORTING BEAMS 4 JOINTS
<br />0
<br />0
<br />FLORIDA PLUM51NG CODE DATA
<br />OCCUPANCY RESTAURANTS
<br />REQUIRED 4 ALLOWED
<br />FIXTURES MALE/FEMALE
<br />WATER CLOSETS 4
<br />URINALS
<br />LAVATORIES 2
<br />DRINKING FOUNTAINS
<br />i!i!i!i!i!i! _ ' r IIIIIIIIIIIII
<br />El PII I Wt% d rol.
<br />CUT
<br />STONE
<br />®METAL
<br />(LARGE
<br />SCALE)
<br />ARCHITECTURAL ABBREVIATIONS
<br />EXTERIOR
<br />INSULATION
<br />J A^ v n^n� TERRAZZO
<br />PROVIDED
<br />MALE/FEMALE
<br />3
<br />I
<br />4
<br />Illilllillllllllll -
<br />r•; ''�"•� LIGHTWEIGHT '.,�.'�' •�• •�• GYPSUM BD./
<br />CONCRETE PLASTER/
<br />STUCCO
<br />a :g STRUCTURAL WOOD
<br />CONCRETE BLOCKING
<br />INDEX OF DRAWING5
<br />ARCHITECTURAL
<br />CS COVER SHEET
<br />ARI AR SHEET
<br />DI DEMOLITION PLAN AND NOTES
<br />AID FLOOR PLAN ND NOTES
<br />ALL / 1
<br />AI.2 PROPOSED SEATING PLAN
<br />A13 I T P ANS, ELEVATIONS, AND DETAILS
<br />AIA N/A
<br />A2.0 ELEVATIONS
<br />A2.1 ELEVATIONS
<br />ELECTRICAL
<br />E1.0 ELECTRICAL LIGHTING PLAN 4 SCHEDULE
<br />E2.0 ELECTRICAL POWER PLAN
<br />E3.0 ELECTRICAL SCHEDULE
<br />E4.0 ELECTRICAL DETAILS
<br />KITCHEN EaUIf=1"*lENT.
<br />KID KITCHEN COVER
<br />K2.0 EQUIPMENT PLAN
<br />K3.0 EQUIPMENT SCHEDULE
<br />ALL WORK SHALL COMPLY WITH PREVAILING
<br />CODES FLORIDA BUILDING CODE.
<br />NATIONAL ELECTRIC CODE,
<br />AND THE CITY OF ZEPHYRHILLS
<br />ORDINANCES
<br />REVIEW DATE: t- r2Z-
<br />CITY OF ZEPHYRHILLS
<br />BUILDING OFFICIAL
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />CI
<br />CAST IRON
<br />DN
<br />DOWN
<br />FT
<br />FEET
<br />HC
<br />HANDICAPPED
<br />MECH
<br />MECHANICAL
<br />OD
<br />OUTSIDE DIAMETER
<br />SCH
<br />SCHEDULE
<br />TH
<br />THRESHOLD
<br />ADJ
<br />ADJUSTABLE
<br />CB
<br />CATCH BASIN
<br />DWG
<br />DRAWING
<br />FND
<br />FEMININE NAPKIN DISPOSAL
<br />HWD
<br />HARDWARE
<br />MT
<br />METAL
<br />SNT
<br />SEALANT
<br />TKBD
<br />TACKBOARD
<br />AC
<br />AIR CONDITIONER
<br />CLG
<br />CEILING
<br />OF
<br />DRINKING FOUNTAIN
<br />FNV
<br />FEMININE NAPKIN VENDOR
<br />HT
<br />HEIGHT
<br />MF
<br />METAL FRAME
<br />PBML
<br />PAPER -BACKED METAL LATH
<br />SHT
<br />SHEET
<br />TPH
<br />TOILET PAPER HOLDER
<br />ALT
<br />ALTERNATE
<br />CEM
<br />CEMENT
<br />FIN
<br />FINISH
<br />HRIZ
<br />HORIZONTAL
<br />MRO
<br />METAL ROOF DECK
<br />PTD
<br />PAPER TOWEL DISPENSER
<br />SHO
<br />SHOWER
<br />T 4 G
<br />TONGUE 4 GROOVE
<br />ALUM
<br />ALUMINUM
<br />C,
<br />CENTERLINE
<br />EA
<br />EACH
<br />FE
<br />FIRE EXTINGUISHER
<br />MIN
<br />MINIMUM
<br />PTH
<br />PAPER TOWEL HOLDER
<br />SHOO
<br />SHOWER CONTROLS
<br />TB
<br />TOWEL BAR
<br />AB
<br />ANCHOR BOLT
<br />CHBD
<br />CHALKBOARD
<br />E
<br />EAST
<br />FECR
<br />FIRE EXTINGUISHER
<br />INCL
<br />INCLUDE
<br />M
<br />MIRROR
<br />PLAS
<br />PLASTER
<br />SHOW
<br />SHOWER HEAD
<br />TYP
<br />TYPICAL UNLESS
<br />4
<br />AND
<br />CLO
<br />CLOSET
<br />ELEC
<br />ELECTRICAL
<br />CABINET RECESSED
<br />ID
<br />INSIDE DIAMETER
<br />MISC
<br />MISCELLANEOUS
<br />PLYWD PLYWOOD
<br />SIM
<br />SIMILAR
<br />OTHERWISE NOTED
<br />L
<br />ANGLE
<br />CH
<br />COAT HOOK
<br />END
<br />ELECTRIC HAND DRYER
<br />FH
<br />FIRE HYDRANT
<br />MR
<br />MOISTURE RESISTANT
<br />PT
<br />PRESSURE TREATED
<br />SD
<br />SOAP DISPENSER
<br />U
<br />URINAL
<br />APPROX
<br />APPROXIMATELY
<br />COL
<br />COLUMN
<br />EWC
<br />ELECTRIC WATER COOLER
<br />FL
<br />FLOOR
<br />JT
<br />JOINT
<br />M514
<br />MOP 4 BROOM HOLDER
<br />SH
<br />SOAP HOLDER
<br />At
<br />CONC
<br />CONCRETE
<br />ELEV
<br />ELEVATION
<br />FD
<br />FLOOR DRAIN
<br />MTO
<br />MOUNTED
<br />R
<br />RADIUS
<br />S
<br />SOUTH
<br />VERT
<br />VERTICAL
<br />CONST
<br />CONSTRUCTION
<br />ENCL
<br />ENCLOSED / ENCLOSURE
<br />FTG
<br />FOOTING
<br />LAM
<br />LAMINATE
<br />RPtD
<br />RECESSED PAPER
<br />SPECS
<br />SPECIFICATIONS
<br />CONT
<br />CONTINUOUS
<br />EQ
<br />EQUAL
<br />FM
<br />FRAMED MIRROR
<br />LAV
<br />LAVATORY
<br />N
<br />NORTH
<br />TOWEL DISPENSER
<br />SQ
<br />SQUARE
<br />WR
<br />WASTE RECEPTICAL
<br />BD
<br />BOARD
<br />CONTR
<br />CONTRACTOR
<br />EQUIP
<br />EQUIPMENT
<br />NIC
<br />NOT IN CONTRACT
<br />RECT
<br />RECTANGULAR
<br />SS
<br />STAINLESS STEEL
<br />WC
<br />WATER CLOSET
<br />BM
<br />BEAM
<br />CJ
<br />CONTROL JOINT
<br />EXIST
<br />EXISTING
<br />GALV GALVANIZED
<br />MH
<br />MAN HOLE
<br />NITS
<br />NOT TO SALE
<br />REINF
<br />REINFORCEMENT
<br />STD
<br />STANDARD
<br />WH
<br />WATER HEATER
<br />BLK
<br />BLOCK
<br />EJ
<br />EXPANSION JOINT
<br />GA
<br />GAUGE
<br />MFR
<br />MANFACTURER
<br />NO
<br />NUMBER
<br />REQD
<br />REQUIRED
<br />STL
<br />STEEL
<br />W
<br />WEST
<br />BRK
<br />BRICK
<br />DTL
<br />DETAIL
<br />EXP
<br />EXPOSED
<br />GB
<br />GRAB BAR
<br />MO
<br />MASONRY OPENING
<br />RD
<br />ROOF DRAIN
<br />STIR
<br />STRUCTURAL
<br />W/
<br />WITH
<br />Q
<br />�ld"G
<br />u D�N�
<br />�A11 1NET
<br />/0
<br />GWB
<br />GYPSUM WALLBOARD
<br />IR
<br />RM
<br />_
<br />SMS
<br />STRUCTURAL METAL
<br />W/O
<br />WITHOUT
<br />CPT
<br />CARPET
<br />DIIM
<br />DIIMENSION
<br />EGCB
<br />EXTERIOR GYPSUM
<br />GYP
<br />GYPSUM
<br />MAX
<br />MAXIMUM
<br />OPNG
<br />OPENING
<br />RO
<br />ROUGH OPENING
<br />DR
<br />DOOR
<br />CEILING BOARD
<br />y
<br />z
<br />0
<br />a
<br />0
<br />Li
<br />0
<br />z
<br />0
<br />Ln
<br />0
<br />U
<br />w
<br />0
<br />w
<br />w
<br />N
<br />t2
<br />o
<br />0
<br />V
<br />'may
<br />o
<br />• g a
<br />L M"
<br />.. a
<br />U
<br />0 3
<br />a
<br />+ U • . „�
<br />4� •
<br />• ¢e
<br />-' 00
<br />w
<br />L -C
<br />M
<br />U. . �$
<br />• p�
<br />a •zM
<br />U coi � 'Jpa�i
<br />tz
<br />..
<br />Q 'c aa° w� U�
<br />o qx>tcu=) i-o
<br />` o
<br />aoa�v° Sao
<br />cc ° oEg�c
<br />o
<br />N w o o
<br />.� 3 ;- to
<br />Q a a
<br />o o n
<br />U
<br />cci o 4v.c1.o
<br />N n ] - ,O C 2
<br />O « y U° C° a
<br />c:
<br />O "_ °o L
<br />coa+0
<br />N p U O poC O
<br />U y°c
<br />°c�
<br />�voo'mEIn
<br />° C U C ° N O
<br />°--
<br />co° N U CQ.. N
<br />•� c U� Lin
<br />O J C O p O N
<br />O
<br />.V Q C - V 'O 8
<br />«Np•w°cio
<br />O U� arc
<br />N ° U C N U N
<br />a_rn .` w p t U C
<br />O N a) O
<br />� c � aV
<br />° o �
<br />0 C) w o U
<br />::.T -C) ao
<br />°? -a -
<br />O p 3 p p°
<br />® °�
<br />Qy a 0 > O N U U
<br />r ° `oa'Za'
<br />!- a3�c-ai_
<br />a
<br />m p m � N
<br />N
<br />3 j w tn
<br />N In
<br />T v
<br />o 0 0 C
<br />M
<br />0
<br />0
<br />N
<br />m
<br />O f2
<br />c�
<br />Qz
<br />N
<br />0
<br />o 1
<br />0c � U
<br />L U
<br />W
<br />t13 o
<br />o N Ar-
<br />c) co
<br />W � qo - o
<br />J QQC N C w C�
<br />G D U N O
<br />1802.31
<br />z
<br />w AR 1
<br />V)
<br />AA-0003276
<br />
|