o—
<br />e3}
<br />SCALE. 3/32€" _ 1-0"
<br />4°-4"
<br />18'-8"
<br />i
<br />69-2y4" 12'-0"
<br />175-2Y4"
<br />37'-0"
<br />13'-8"
<br />22'-8"
<br />2� 2
<br />,� —8-
<br />10,-8" 1 8'-8"
<br />WF-4J�,
<br />I? ;'
<br />f W; — 4
<br />WF
<br />r4_ vw - 4 FIZZ: Wfl 4
<br />3 }
<br />I egg 5§ i€ I
<br />F 7
<br />r I T.E. STAIR
<br />xs
<br />c - _ a
<br />g} 1 €.
<br />i® s
<br />�:OTE 3 NC,v _
<br />e 1 �Fr
<br />3''a0 NOTE 13
<br />749-0„r ;P�
<br />1 ,
<br />.3 i
<br />l --- I
<br />WF-5 WF-5 J L EVE-5
<br />ONOTE �I
<br />s
<br />r I
<br />STAIRS WF-3 NOTE 3
<br />i
<br />T.E. WE WF-5 I
<br />N0
<br />Lo
<br />1�1?_
<br />I
<br />NOTE 13 71'-0 �4" 37'-8"
<br />NOTE 1"
<br />NOTE 3�
<br />6'-10" 11'-4" � � l � � I � � 1 � � j
<br />NOTES i 9
<br />N 13
<br />%K
<br />I T.E. I E. L I
<br />1 1 5-4" 11'-0" { 25'-8" € 199 n4" 1 25 —8' m8.9
<br />. v j
<br />Nf
<br />3
<br />I
<br />I NOTE 3
<br />l/t
<br />i
<br />I
<br />NOTE 3 3 0
<br />co
<br />I I �
<br />L WF-3
<br />__j
<br />i J
<br />;
<br />o i
<br />i F
<br />w a
<br />10" 6'-2"
<br />NOTE 3
<br />E cra �
<br />€ T.E.
<br />II —3 i
<br />� T.E.
<br />I
<br />i < STAIR 1 y-. ' !
<br />,- NOTE 3
<br />i
<br />i
<br />� T.E.
<br />I
<br />, — i
<br />NOTE ,3 1 � � I I
<br />I
<br />iI I
<br />Uj
<br />L J
<br />WF-4 :_1 I
<br />r� T.E. L 1-74
<br />4'-4"
<br />11'-4" I 13'-0"
<br />6'-6" 14'-0" 1 13'-4" 5'-4"
<br />FOOTING SCHEDULE
<br />fir1:�, e8
<br />. � �t E � € ,L ��°�t 0 i�,a?E�!lJ
<br />°`I-QTI` x DcPJw a f1. N('Tl'H. `
<br />r eF-1 O-,9A� {, ; — BOTTOM
<br />- "is � @ m r.. t.ilb4 3. ':y�p" °a CONTINUOUS
<br />Y ANS.ERSE — BOTTOM
<br />_ #5 0IY I & # 0 48" O.C.,
<br />,' a.. x ,
<br />_ ..
<br />_4
<br />34 lI°
<br />„ "
<br />� TRANSVERSE ERSE BOTTOM
<br />ICI . z — 1 s .°0.1 ° a7g 6 OOP E . 6 0 10" 0.0„
<br />TRANSVERSE — BOTTOM
<br />- ( 3 5 E i� SAY, TOP AND
<br />2y
<br />a — " x 12 : x 2_—6 a'"' BOTTOM
<br />r �. �.�R— 9 3-6"
<br />6 � f �� �ALrI. B WAY, 9 , TOP AND
<br />35 1 a 6° x 12" x 3 —�6 " BOTTOM
<br />MASONRY ALASCHEDULE
<br />a
<br />MARK PATTERN THICKNESS REINFORCING
<br />mvv_1 8" CMS #5 0 40" O.C.
<br />83, CMS 5 0 32" O.C.
<br />fi
<br />MA �AIvRY _WAS 0;
<br />4.° ii" MASONRY WAI S SHAD BE TYPE 9 �I' ' 1 "° UNLESS NOTED OTHERWISE.
<br />2< AL SEf. AIEN f SHALL BE REINFORCED ' €TI I GA, GALVANIZED LATERAL
<br />REIN FORCI„ G 0,6" O,C, HORIZONTAL. EXTEND REINFORCING 6" INTO POURED
<br />ELEMENTS AND AROUND ENCASED STEEL.
<br />1 PLACE, AN ADDITIONAL #5 VERTICAL WALL REINFORCING ROD AT ENDS OF
<br />WALL, INTERSECTING WALLS AND AT EACH SIDE OF OPENINGS. GROUT CELL
<br />SOLID FULL HEGIH .
<br />4 ALL IMIASONRY REINFORCED CELLS SHALL BE IaIL LFD WITH 3000 PSI GROUT MIX.
<br />➢Q CSs:U = CONCR 1E WASONRY.UNI.3
<br />a r e .& °E- .
<br />U O4 AB AFi, N s THIS IM ,FOR REFERENCE ONLY SEE CIVIL
<br />P�� =1; ; �E= RON.
<br />2. MIF ; P F4 A LS €v- NOI I T 'SI aOTIN '. _
<br />p 0 tg DI # a PREAD FOOT.
<br />i Or �IPIP AND S AO F007NNG ELEVATION IS 1' 4" BELOW LOWEST
<br />SEE Nf� FOR L4., ..E=F r:N_ .. €'_,.r,. F E FOR .�s, AND reINA REINFORCEMENT.
<br />ISLAB-ON-GRADE_1 6x6, 'VO �,t, 4 W'af3, ON 10 MIL VAPOR
<br />BARRIER ON COMPACTED, iREAT1._D SUB —SOIL (TYPICAL).
<br />4. PRO'Y"IDE SLAB CONTROL/ CONSTRUCTION JOINTS (C.J) AS INDICATED IN
<br />ECA JOINT AT SL B ON—GRADUE' DETAIL, ON SHEET S3.01. COORDINATE
<br />LOCA_nONS W`41m ARCHITECTURAL KNISHES.
<br />5, VERIFY STEPS AND SLOPES NTH ARCH! DRAWINGS PRIOR TO
<br />CONS T RUCTION.
<br />6. MW—# INDICATES THE CONCRETE MASONRYUNIT fCMU) WALL TYPE. SEE
<br />MASONRY WALL SCHEDULE ON SHEET S3.11 FOR SIZE AND REINFORCEMENT.
<br />ALL MASONRY WALLS ARE TYPE MW-1 UNLESS NOTED OTHERWISE.
<br />7. PROVIDE 14TERTICAL MASONRY WALL CONTROL JOINTS (WCJ) AS INDICATED IN
<br />DETAIL ON SHEE a S3.01. COORDINATE LOCATIONS WITH ARCHITECTURAL
<br />FINISHES.
<br />8. SEE MECHANICAL, ELECTRICAL AND PLUMBING (MEP) DRAWINGS FOR LOCATION
<br />OF PVC SLEEVES, PLUMBING FIXTURES (SINKS, TOILETS AND TUBS), ELECTRICAL
<br />RUNS AND DUCT WORD. COORDINATE WITH HVAC CONTRACTOR.
<br />9, MC INDICATES -PHE LOCATION OF A MASONRY COLUMN. SEE SCHEDULE ON
<br />SHEET ' s v 1.
<br />1 O, SEE FlTiCAL MASONRY WALL SECTIONS, INCLUDING "TYPIPICAL EXTERIOR WALL
<br />F0.)T >x' ' , I C a t R OF STEM WALL FOGTIEG" °1D "TYPIC.AL EXTERIOR
<br />STM AL' . "O I NG A DOOF;' OIL SHEEN' S3<01.
<br />it HERE CMU WALL BUMP —OUTS OCCUR PRO VIDE ADDITIONAL FOOTING 6" PAST
<br />EXTERIOR FACE OF CMU WALL. EXTEND TRANSVERSE REINFORCEMENT INTO THE
<br />BUMP —OUT AND ADD (1) 05 CONTINUOUS.
<br />12. I I I, i, 1 1NDICA` ES LIGHT GAUGE METAL STUD `?ALL AT CLUBHOUSE. METAL
<br />i UDS SI fit' , BE SPACEDAT 1 2 O.0 AEI CENTERED UNDER ROOF TRUSS
<br />ABOV' . e ,Ob'ID f 2"' STUDS UDS CE IisTERED UNDER GIRDER TRUSSES. SEE LIGHT
<br />GAUGE t� T�:_ D A . S ONSH T S4.0 $ AND � _� RAI NOTES FOR ADDITIONAL
<br />NOsA T ONIIL. A7a PACH S _ OPEN,G.,/ <DE S . ROADE s" AIM. SON
<br />",`hD4 or SI/H F 4 ANCHOR STUD PACK TO FOUNDATION.
<br />3< rI�C 4 T6R E D F UNDA. ON W°HSRf� I��DrA`�D. SEE " I YPICAI STEPPED
<br />c.O ;IN G DETAIC ON SHEET S7.I>1.
<br />4
<br />BENEP-lus' AL
<br />COMMUNITIES
<br />3550 S. Tamiami Trail Suite 301 Sarasota, FL 34239
<br />?a
<br />John GUtherman Jr., P.E.
<br />FL. REG. #6o88o
<br />SET DISTRIBUTIONS,
<br />owriAm; IalnPPr-pm1T.qPT
<br />SHEET REVISIONS:
<br />I �
<br />i
<br />I
<br />S3.1 02""'
<br />JO
<br />
|